Develop a realistic integrate Freeway and arterial network model for testing ITS application. Analyse and evaluate ITS based transportation methods. Identify most suitable traffic responsive ramp metering system.
MTO Contact: Steve Erwin
Define safe, efficient, reliable and cost effective means for managing traffic through highway work zones. Develop guidelines for use of ITS technologies for managing delay, defining variable speed limits, guiding the lane merging process and automated enforcement
MTO Contact: Steve Erwin
Conduct resilient modulus testing on unbound material and subgrade soils according to SHRP AASHTO T307-99. Database of the material and subgrade soils will be established
MTO Contact: Tom Kazmierowski
Asses the state of research on the effect of climate change on design standards. Propose appropriate methodologies on applying current information on climate change to the design of drainage infrastructure.
MTO Contact: Joe Bucik
Update and expand on MTO operational performance functions for interchanges and ramps. In addition to Central Region, data from across the province will be utilized.
MTO Contact: Janice Munro
Examine the geometric potential of stereo methods for DEM generation. Assess the accuracy, cost effectiveness and time savings.
MTO Contact: Ron Berg
Examine the use of a multi-sensor mobile data collection system for acquiring highway pavement data. Semi-automated methods of for the acquisition of pavement distress and geometric data will be examined in comparison to existing field methods.
MTO Contact: Ron Berg
Development of a new limit state design working stress method applicable to both metallic and geosyntheic reinforced soil walls and consistent with the Canadian Highway Bridge Design Code.
MTO Contact: Tom Kasmierowski
Evaluation of Highway 655 binders for low-temperature performance properties.
MTO Contact: Kia Tam
Establish the feasibility of integrating renewable energy generating technologies into the existing highway infrastructure. Identify the potential benefits and barriers of such an integration scheme. Provide MTO with a methodology for evaluating such projects.
MTO Contact: Mark Ayton
Asses the fatigue reliability of steel girder bridges using collected live load data. Calibrate reliability-consistent design factor for fatigue design.
MTO Contact: Bala Tharmabala
Evaluate work zone strategies to improve worker and user safety. Determine how user delay costs could be incorporated into decision making. Evaluate the feasibility of implementing new technologies to improve highway work zone safety.
MTO Contact: Gerry Chaput
Develop an integrated GPS-GIS system for linking travel time estimation analyses, including static estimation for planning purposes and dynamic prediction for ITS applications.
MTO Contact: Steve Erwin
Determine applicability of high speed pavement distress data collection in Ontario as a replacement for the existing manually based method of visual condition surveys.
MTO Contact: Li Ningyuan
Provide a basis for a more confident evaluation of reinforcement corrosion activities using half cell potential measurements. The results of the research may/will allow MTO to better assess the state of concrete structures and take remedial actions.
MTO Contact: Hannah Schell
Evaluation of several test methods for determining the bond strength between layers. Two different types of tests for the characterization of asphalt mixes will be evaluated.
MTO Contact: Pam Marks
Developing statistical models that can be used to quantify the effects of winter storms on the safety and mobility of Ontario highways related to factors such as storm, road and traffic characteristics and maintenance methods.
MTO Contact: Shael Gwartz