Public Involvement Centre #2 - Evaluation Criteria

Factor: Traffic and Transportation

Sub-Factors Measure Unit
Person Throughput Person throughput on Hwy 417 during peak period in 2021 person-km
Person Throughput Person throughput on the network during peak in 2021 person-km
Vehicle Throughput Vehicle throughput on Hwy 417 during peak period in 2021 vehicle-km
Vehicle Throughput Vehicle throughput on a network basis during the peak period for 2021 horizon vehicle-km
Average Vehicle Travel Speed Average vehicle speed on Highway 417 during the period for 2021 horizon year km/h
Average Vehicle Travel Speed Average vehicle speed over the network during the period for 2021 horizon year km/h
Total Delay Total network delay during the peak hour in 2021 vehicle-hours
Duration and extent of congested conditions During the peak period for 2021, the time when level of service is below "E" and length of corridor affected lane-km-hours
Effect on existing public transit operations Change in transit level of service (travel time and route) improvement / no change / reduction
Intersection operations in the vicinity of interchanges Average delay at directly affected intersection(s) during worst case peak hour, 2021 horizon year sec / vehicle
Network Connectivity Change in mobility. Availability of connections within the freeway and arterial road network improvement/ no change / reduction
Out of Way Travel Increase in travel distance due to a ramp closure or turn prohibitions, etc. km
Mean travel time to all destinations Mean travel time needed to complete a trip on the network minutes
Ability to accommodate cyclists and compatibility with infrastructure at crossing road ramp intersection Number of free-flow ramp/cyclist conflict locations each
Ability to accommodate pedestrians at crossing road ramp intersection Number of conflicts between pedestrian crossings and free-flow ramp or lanes each
Collision Risk on ramps and/or at ramp terminals Change in collision risk as determined qualitatively less risk / no change / more risk
Collision Risk on the mainline Change in collision risk as measured with collision modification factors number of collisions
Compatibility with future transit infrastructure Physical impact on planned/proposed transit infrastructure none / minor / major
Compatibility with municipal planning goals and objectives Degree of conformance with 2003 Ottawa Official Plan and Master planning documents good / fair / poor

Factor: Natural Environment

Sub-Factors Measure Unit
Loss of wildlife habitat Area of upland habitat removed ha
Stormwater Management Increase in area of impervious surfaces m2
Impact on cold water fish habitat In-water construction required for cold water fisheries crossing yes / no
Impact on warm water fish habitat In-water construction required for warm water fisheries crossing yes / no

Factor: Social and Cultural Environment

Sub-Factors Measure Unit
Effect on noise sensitive receivers Number of NSR with a noise increase of 0-5 dBAs each
Effect on noise sensitive receivers. Number of NSR with a noise increase of 5-10 dBAs each
Effect on noise sensitive receivers. Number of NSRs with a noise increase greater than 10 dBAs each
Air Quality: Net impact on receptors of interest Change in air quality impacts at receptors of interest relative to the base case for the 2021 horizon year good / fair / poor
Displacement/ disruption of built heritage Number of built heritage features displaced or disrupted each
Displacement/ disruption of archaeological sites Number of archaeological sites displaced or disrupted each
Displacement/ disruption of landscaping Area of landscaping removed m2
Traffic Infiltration Impact on safety due to the presence of through traffic on local streets improved / neutral / worse
Emergency response level of service Impact on emergency response level of service improved / neutral / worse

Factor: Land Use and Property

Sub-Factors Measure Unit
Removal of Class 1-3 agricultural land Area of Class 1, 2 or 3 agricultural land removed ha
Businesses displaced Number of businesses displaced each
Access / egress related to commercial / industrial land use or district Number of businesses with changed entrance each
Commercial / industrial property required Area of commercial / industrial property required m2
Institutional uses displaced Number of institutional uses displaced each
Access to institutional land uses Number of institutions with changed entrance each
Institutional property required Area of institutional property required m2
Recreational uses displaced Number of recreational uses displaced each
Access to recreational land uses Number of recreational land uses with changed entrance each
Recreational property lost Area of recreational property required m2
Removal of greenspace / open space Area of green space and/or open space removed. m2
Residences displaced Number of homes removed each
Access to residences Number of homes with changed entrance each
Residential property required Area of residential property required m2
Impact on potentially contaminated property Number of potentially contaminated properties required each

Factor: Land Use and Property

Sub-Factors Measure Unit
Removal of Class 1-3 agricultural land Area of Class 1, 2 or 3 agricultural land removed ha
Businesses displaced Number of businesses displaced each
Access / egress related to commercial / industrial land use or district Number of businesses with changed entrance each
Commercial / industrial property required Area of commercial / industrial property required m2
Institutional uses displaced Number of institutional uses displaced each
Access to institutional land uses Number of institutions with changed entrance each
Institutional property required Area of institutional property required m2
Recreational uses displaced Number of recreational uses displaced each
Access to recreational land uses Number of recreational land uses with changed entrance each
Recreational property lost Area of recreational property required m2
Removal of greenspace / open space Area of green space and/or open space removed. m2
Residences displaced Number of homes removed each
Access to residences Number of homes with changed entrance each
Residential property required Area of residential property required m2
Impact on potentially contaminated property Number of potentially contaminated properties required each

Factor: Cost

Sub-Factors Measure Unit
Capital construction cost Relative road construction cost, excluding property and engineering costs dollars