| Sub-Factors |
Measure |
Unit |
| Person Throughput |
Person throughput on Hwy 417 during peak period in 2021 |
person-km |
| Person Throughput |
Person throughput on the network during peak in 2021 |
person-km |
| Vehicle Throughput |
Vehicle throughput on Hwy 417 during peak period in 2021 |
vehicle-km |
| Vehicle Throughput |
Vehicle throughput on a network basis during the peak period for 2021 horizon |
vehicle-km |
| Average Vehicle Travel Speed |
Average vehicle speed on Highway 417 during the period for 2021 horizon year |
km/h |
| Average Vehicle Travel Speed |
Average vehicle speed over the network during the period for 2021 horizon year |
km/h |
| Total Delay |
Total network delay during the peak hour in 2021 |
vehicle-hours |
| Duration and extent of congested conditions |
During the peak period for 2021, the time when level of service is below "E" and length of corridor affected |
lane-km-hours |
| Effect on existing public transit operations |
Change in transit level of service (travel time and route) |
improvement / no change / reduction |
| Intersection operations in the vicinity of interchanges |
Average delay at directly affected intersection(s) during worst case peak hour, 2021 horizon year |
sec / vehicle |
| Network Connectivity |
Change in mobility. Availability of connections within the freeway and arterial road network |
improvement/ no change / reduction |
| Out of Way Travel |
Increase in travel distance due to a ramp closure or turn prohibitions, etc. |
km |
| Mean travel time to all destinations |
Mean travel time needed to complete a trip on the network |
minutes |
| Ability to accommodate cyclists and compatibility with infrastructure at crossing road ramp intersection |
Number of free-flow ramp/cyclist conflict locations |
each |
| Ability to accommodate pedestrians at crossing road ramp intersection |
Number of conflicts between pedestrian crossings and free-flow ramp or lanes |
each |
| Collision Risk on ramps and/or at ramp terminals |
Change in collision risk as determined qualitatively |
less risk / no change / more risk |
| Collision Risk on the mainline |
Change in collision risk as measured with collision modification factors |
number of collisions |
| Compatibility with future transit infrastructure |
Physical impact on planned/proposed transit infrastructure |
none / minor / major |
| Compatibility with municipal planning goals and objectives |
Degree of conformance with 2003 Ottawa Official Plan and Master planning documents |
good / fair / poor |
| Sub-Factors |
Measure |
Unit |
| Effect on noise sensitive receivers |
Number of NSR with a noise increase of 0-5 dBAs |
each |
| Effect on noise sensitive receivers. |
Number of NSR with a noise increase of 5-10 dBAs |
each |
| Effect on noise sensitive receivers. |
Number of NSRs with a noise increase greater than 10 dBAs |
each |
| Air Quality: Net impact on receptors of interest |
Change in air quality impacts at receptors of interest relative to the base case for the 2021 horizon year |
good / fair / poor |
| Displacement/ disruption of built heritage |
Number of built heritage features displaced or disrupted |
each |
| Displacement/ disruption of archaeological sites |
Number of archaeological sites displaced or disrupted |
each |
| Displacement/ disruption of landscaping |
Area of landscaping removed |
m2 |
| Traffic Infiltration |
Impact on safety due to the presence of through traffic on local streets |
improved / neutral / worse |
| Emergency response level of service |
Impact on emergency response level of service |
improved / neutral / worse |
| Sub-Factors |
Measure |
Unit |
| Removal of Class 1-3 agricultural land |
Area of Class 1, 2 or 3 agricultural land removed |
ha |
| Businesses displaced |
Number of businesses displaced |
each |
| Access / egress related to commercial / industrial land use or district |
Number of businesses with changed entrance |
each |
| Commercial / industrial property required |
Area of commercial / industrial property required |
m2 |
| Institutional uses displaced |
Number of institutional uses displaced |
each |
| Access to institutional land uses |
Number of institutions with changed entrance |
each |
| Institutional property required |
Area of institutional property required |
m2 |
| Recreational uses displaced |
Number of recreational uses displaced |
each |
| Access to recreational land uses |
Number of recreational land uses with changed entrance |
each |
| Recreational property lost |
Area of recreational property required |
m2 |
| Removal of greenspace / open space |
Area of green space and/or open space removed. |
m2 |
| Residences displaced |
Number of homes removed |
each |
| Access to residences |
Number of homes with changed entrance |
each |
| Residential property required |
Area of residential property required |
m2 |
| Impact on potentially contaminated property |
Number of potentially contaminated properties required |
each |
| Sub-Factors |
Measure |
Unit |
| Removal of Class 1-3 agricultural land |
Area of Class 1, 2 or 3 agricultural land removed |
ha |
| Businesses displaced |
Number of businesses displaced |
each |
| Access / egress related to commercial / industrial land use or district |
Number of businesses with changed entrance |
each |
| Commercial / industrial property required |
Area of commercial / industrial property required |
m2 |
| Institutional uses displaced |
Number of institutional uses displaced |
each |
| Access to institutional land uses |
Number of institutions with changed entrance |
each |
| Institutional property required |
Area of institutional property required |
m2 |
| Recreational uses displaced |
Number of recreational uses displaced |
each |
| Access to recreational land uses |
Number of recreational land uses with changed entrance |
each |
| Recreational property lost |
Area of recreational property required |
m2 |
| Removal of greenspace / open space |
Area of green space and/or open space removed. |
m2 |
| Residences displaced |
Number of homes removed |
each |
| Access to residences |
Number of homes with changed entrance |
each |
| Residential property required |
Area of residential property required |
m2 |
| Impact on potentially contaminated property |
Number of potentially contaminated properties required |
each |