The checklists presented below provide a comprehensive list of documentation requirements to be included in a Hydrology Report submitted to MTO. It is the responsibility of the designer to determine the applicability of the documentation requirements listed to the design being considered. The selection should be based on the suitability of the tasks to each particular design proposal, and the scale and nature of the proposed project.
Download for printing: MTO Hydrology Requirement Checklists (PDF - 241 KB)
To view PDF files, you will require Adobe Acrobat Reader
These checklists should be used to:
| Issue | Applicability to This Project | Is it Documented | Comments | |
|---|---|---|---|---|
|
Determine the
Requirement for Hydrology Report |
The level of planning and design being addressed in the report. | |||
| The rationale for preparing the report and who initiated the study. | ||||
| The number and locations of the watercourse crossings being considered. | ||||
| Reference to other Reports associated with this watercourse crossing. | ||||
|
Approval
Requirements |
Acquire MTO Approvals for:
|
| Issue | Applicability to This Project | Is it Documented | Comments | |
|---|---|---|---|---|
|
Review
Previous Drainage Studies |
Review and reference watershed, subwatershed or master drainage plans. | |||
| Review and reference MTO Environmental Study Reports. | ||||
Review and reference other drainage studies such as:
|
||||
| Conformance to previous highway studies (e.g. preliminary design reports). | ||||
| Identify Data Needs and Availability | Identify data needs and and how much of the data is available. | |||
|
Identify
Characteristics of the Watercourse |
Identify the physical characteristics of the watercourse. | |||
| Identify the history of flooding. | ||||
|
Identify
On -Site Conditions |
Complete a site inspection at the proposed water crossing sites and collect required data and information. | |||
|
Identify site constraints.
|
||||
|
Identify
Requirements of Other Agencies |
Identify regulatory fish habitat requirements from: | |||
Identifying regulatory flood line requirements from:
|
||||
| Identify approval requirements of other agencies. |
| Issue | Applicability to This Project | Is it Documented | Comments | |
|---|---|---|---|---|
|
Identify
Existing Drainage Problems |
Identify existing drainage problems on upstream and downstream riparian property. | |||
|
Identify
Issues with Other Structures Upstream and Downstream |
Identify if there are bridge or culvert structures upstream or downstream including their configuration and distance from the proposed structure. | |||
| Identify existing drainage problems of other bridge structures upstream or downstream. | ||||
| Identify impact of the other structures on the design criteria for the crossing being considered. | ||||
|
Investigate
Stability of the Watercourse |
Identify the geomorphic stability of the stream at the proposed crossing location. | |||
Establish the design criteria that would address for the conditions of the watercourse at the proposed crossing location.
|
||||
|
Criteria
that Regulate the Watercourse |
Identify upstream and downstream water level controls. | |||
| Identify flow controls upstream and downstream. | ||||
|
Identify
Design Alternatives |
Identify the different possible alternatives for crossing such as different locations, different configurations, spans or height of structure and different types of structure (bridge or culvert). |
| Issue | Applicability to This Project | Is it Documented | Comments | |
|---|---|---|---|---|
|
Develop
the Design Criteria |
Develop the design criteria for the proposed structure based on collected data, MTO standards, policies, guidelines and manuals and the CHBDC. | |||
| Acquire approvals for the proposed design criteria and modify design criteria if necessary. | ||||
|
Conduct the
Hydrologic Analysis |
Perform the hydrologic analysis, or verify existing analysis, to determine the design, check and regulatory flow rates using appropriate stream gauge station. Perform frequency analysis on stream flow data for 2, 10, 25, 50, 100-year return periods. | |||
| Perform the hydrologic analysis, or verify available analysis, to determine the design, check and regulatory flow rates applying alternative runoff simulation methods based on precipitation and watershed characteristic data for (2, 10, 25, 50, 100-year return periods). Document results of the analysis (as per the MTO online web page "Evaluation of Drainage Management Software"). | ||||
|
Design
the Bridge or Culvert Opening |
Perform the hydraulic analysis to size the bridge or culvert opening(s). | |||
Conduct water surface profile calculations, or verify existing analysis, to determine backwater and assess the impacts upstream and downstream. (An appropriate number of stream cross sections must be selected and defined for an accurate assessment of the water surface profile.)
|
||||
| Determine flow velocities for all storm events modelled. | ||||
|
Analyse
Scour and Determining the Depth of Footings |
Perform the analysis to ensure the level of scour will not jeopardise the structural integrity of the bridge or culvert crossing. | |||
| Determine the appropriate depth of footing for the piers and abutments. | ||||
|
Design for
Ice and Debris |
Determine the requirement for conveying ice and debris flow and avoiding ice jams. | |||
|
Design to
Convey the Regulatory Storm |
Identify the High Water Level, flood plane and flow path for the Regulatory flow event. | |||
| Identify if the post development extreme event will flow over the approach, over the structure or through the structure. | ||||
Determine the depth of flow:
|
||||
| Identify design features that will allow the structure to withstand additional forces due to overtopping, if applicable. |
| Issue | Applicability to This Project | Is it Documented | Comments | |
|---|---|---|---|---|
|
Designing
Erosion Protection Measures |
Provide scour and erosion control measures at the location of the crossing as well as, upstream and downstream if necessary. | |||
|
Design
Fish Habitat Protection Measures |
Design fish habitat protection measures.
|
|||
|
Address
Impacts on Lands and Structures |
Determine the impact on surrounding lands and structures and develop solution to address these impacts, if feasible. | |||
| Determine the impact on the highway and develop solution to address impact, if feasible. | ||||
| Determine the requirements for compensation to affected structures or lands, if applicable. |
| Issue | Applicability to This Project | Is it Documented | Comments |
|---|---|---|---|
|
Design Bridge Deck Drainage.
|
|||
| Complete the Requirements for Erosion and Sediment Control During Construction. | |||
|
Recommending the Best Alternative.
|
| Welcome | Document Map | About this Document | Quick Reference Guide | Checklists |
| MTO Approvals | Background Information | Drainage Issues | Hydraulic Design |
| Mitigating Impacts | Construction and Operation | Computational Methods |
| MTO Drainage Policy | Glossary | Disclaimer | Authors & Contacts |
This site is maintained by the Government of Ontario
Privacy | Important Notices | External Links Disclaimer
© Queen's Printer for Ontario, 2009
Last modified: January 22, 2009