Highway 416 Photographs
Construction of the Highway Photographs
- Overview of construction on the new Hwy 416/401 Interchange and of the existing 16/401 Interchange, with the existing bridge to the USA in the background (view from north to south)
- Installation of 'Hi-Load' falsework of the N-16 ramp and SBL connection structure
- Completed N-16 ramp and SBL connection structure with removal of 'Hi-Load' falsework in progress
- Installation of reinforced earth concrete wall panels at the east abutment of the N-16 ramp structure
- Installation of 4300 mm diameter corrugated steel pipe (CSP) culvert to provide access for snowmobiles on the Provincial Top Trail E105 under future 416 south bound lanes
- Placing of concrete in the deck of the N-W structure
- Construction of formwork for 'fixed pier' of the W-N ramp structure
- Completed fixed pier of the W-N ramp structure
- Johnstown Creek twin 3.0 m box culvert under proposed W-N ramp fill
- Completed Country Rd. 44/Hwy 416 Interchange (viewed from the west towards the east)
- Subdrain installation to remove moisture under the roadway which will eliminate the freezing and expansion forces that have cracked the roadway in the past.
- Concrete removal on the old deck of the northbound lanes of 416 (previously HWY 16).
- Landscaping work - Snow hedges are constructed to reduce drifting.