Recently Completed Projects |
||
|
Location
|
Length
|
Completed |
|
|
8 km |
Summer 2008 |
|
Estaire Bypass |
6.5 km |
November 2008 (to be
opened with Estaire to Highway 537 paving contract) |
|
Estaire to Highway 537 |
4.1 km |
April 2009 (to be
opened with Estaire to Highway 537 paving contract) |
|
Interchange at |
2.4 km |
June 2006 (to be
opened with Highway 537 to |
|
Old |
0.6 km |
July 2006 (to be
opened with Highway 537 to |
|
Projects Currently Under Construction |
||
|
Location
|
Length
|
Planned
Completion |
|
Parry Sound to Nobel. Construction started June 2005 |
7 km |
2011 |
|
Nobel Bypass. Construction started October 2006 |
5 km |
2011 |
|
Nobel to Highway 559.
Construction started January 2008 |
5 km |
2011 |
|
Highway 537 to |
8.6 km |
Fall 2009 |
|
|
4 km |
2010 (two lanes) |
|
Estaire to Highway 537 Paving |
11 km |
Fall 2009 |
|
Projects Currently In Planning / Engineering / Property Acquisition |
|
|
Location
|
Length
|
|
From Highway 559 to Highway 7182 ( |
16 km |
|
From Highway 7182 ( |
11 km |
|
From the |
14 km |
|
From |
27 km |
|
Highway 522 to Highway 64 |
25 km |
|
Highway 64 to Estaire |
22 km |