Construction Reports: Central

Contract #: 2015-2006
Start of Construction : July 20, 2015
Estimated End of Construction : November 18, 2016
Highway : QEW
Length of Construction : 8.50 km
Close To : Niagara Region
Type of Contract : Bridge Rehabilitations - 4 each (Mountainview Road, Ontario Street, Tufford Road, Victoria Avenue)
Value of Contract : $9,637,008.00
Description : Four Bridge Rehabilitations: QEW - Victoria Avenue Underpass - County Road #22. QEW - Tufford Road Underpass. QEW - Ontario Street Underpass. QEW Mountain View Road Underpass.
Traffic Impact : Highway QEW, Beamsville to Vineland. There is no impact on traffic. Winter shutdown.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2015-2004
Start of Construction : June 03, 2015
Estimated End of Construction : October 26, 2018
Highway : 400
Length of Construction : 3.20 km
Close To : Newmarket
Type of Contract : Widening
Value of Contract : $79,298,438.00
Description : South Canal Bridges and highway 9 Interchange - Contract 1 of 4 Includes mainline widening from 0.2 km north of 19th Side Rd to 0.9 km north of South Canal (from 6 to 8 lanes). South Canal Road O/P replacement. Highway 400/9 Interchange reconstruction. Four (4) structural culverts also included. Realignment of Davis Rd and South Canal Bank Rd. Expansion of commuter parking lot. Construction of new drainage facilities. Installation of illumination.
Traffic Impact : Highway 400 from south of 19th Side Road to North of South Canal Bridges. Expect delays up to 15 minutes. Highway 400 Northbound will have lane closure in Lane 1, Lanes 2 and 3 alternately from 7:00 p.m. to 11:00 a.m. as well as Highway 400 Southbound will have lane closures in Lane 1, Lanes 2 and 3 alternately from 11:00 a.m. to 05:00 a.m.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2051
Start of Construction : May 11, 2015
Estimated End of Construction : November 17, 2017
Highway : 404
Length of Construction : 0.00 km
Close To : Toronto
Type of Contract : Various Structures Rehabilitation
Value of Contract : $15,241,360.00
Description : Various Bridge Rehabilitations, York: - Bethesda Road (37-346) WILCOX LAKE RD Underpass - VANDORF ROAD UNDERPASS (37-699) - 19th Ave (37-882) - Stouffville Road (37-280/1&2) Highway 404 U/P AT REG. Road 14 - Aurora Road (37-698/1&2) Reg. Road 15 U/P
Traffic Impact : 19th Avenue, Stouffville Road, Aurora Road, Bethesda Road and Vandorf Sideroad. There is no impact on traffic. Aurora Road - Stage 1 complete, during winter shutdown all lanes returned to original configuration. Stouffville Road - Stage 1 complete, during winter shutdown all lanes returned to original configuration.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2050
Start of Construction : June 09, 2015
Estimated End of Construction : November 17, 2017
Highway : 404
Length of Construction : 0.00 km
Close To : Toronto
Type of Contract : Various Structures Rehabilitation
Value of Contract : $19,589,516.00
Description : Various Bridge Rehabilitations, Toronto & York: - Steeles Avenue U/P - McNicoll Avenue - Van Horne (37-1014) - John Street Underpass - Major Mackenzie Drive Highway 404 U/P AT Regional Road 25 - Woodbine Avenue.
Traffic Impact : Van Horne Avenue, McNicoll Avenue, Woodbine Avenue Southbound Ramp, Steeles Avenue, John Street, Major Mackenzie Drive and Rouge River. There is no impact on traffic. Steeles Avenue - Stage 2 complete, original lane configuration restored for winter shutdown period. Woodbine Avenue N-S ramp to Highway 404 Southbound - Stage 2/Final complete, original lane configuration restored.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2048
Start of Construction : June 12, 2015
Estimated End of Construction : September 09, 2016
Highway : 403
Length of Construction : 0.00 km
Close To : Hamilton
Type of Contract : Resurfacing
Value of Contract : $4,894,210.00
Description : Various (2) Bridge Rehabilitations: Old Highway 6 Underpass (Plains Road North-East ramp)rehabilitation, Highway 403, West-North ramp bridge rehabilitation and Snake Road Overpass on Highway 403 waterproofing
Traffic Impact : Highway 403 and Highway 6, Plains Road Interchange There is no impact on traffic. Winter shutdown.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2044
Start of Construction : April 27, 2015
Estimated End of Construction : October 12, 2016
Highway : 401
Length of Construction : 0.00 km
Close To : Toronto
Type of Contract : Grading, Electrical, Paving and Structures
Value of Contract : $25,025,520.00
Description : Highway 401 WB Coll resurfacing from 0.5 kilometres East of Warden Avenue to 0.7 kilometres W of Leslie St. and (4) Four bridge rehabilitations on Highway 401/DVP/404 interchange: - Highway 401 - DVP Bridge No 7 (37-326/1) westbound Highway 401 Collector over ramp from westbound Highway 401 express to NB and SB DVP (Bridge #7), Superstructure Replacement (possible RBR candidate) - Highway 401 - Bridge # 10 (37-326/2) - Hwy 401 - DVP U/P (37-324/1) - Highway 401 - DON VALLEY PKWY BR 12, TWIN.
Traffic Impact : Highway 401 westbound from Warden to Bayview, Highway 401/404 and Don Valley Parkway interchange including westbound ramp from express to Don Valley Parkway and Highway 404 southbound ramp from Highway 404 to Highway 401 eastbound, northbound ramp from Don Valley Parkway to 401 westbound. There is no impact on traffic. Highway 401 westbound collectors reinstated from two lanes to three lanes from Warden to Don Mills. Express lanes reduced from five through lanes to four through lanes (original configuration).
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2042
Start of Construction : May 04, 2015
Estimated End of Construction : December 02, 2016
Highway : 401
Length of Construction : 0.00 km
Close To : Mississauga
Type of Contract : Structural Rehabilitation
Value of Contract : $20,693,396.00
Description : Bridge Rehabilitations at Highway 401/403/410 Interchange: Eastbound Collector over Highway 410, Westbound Collector over Highway 410, Eastbound Collector Over Tomken Road, Westbound Collector Over Tomken Road, Highway 401 Eastbound Collector Over Tomken Road to Dixie Road and Highway 403 South - Highway 401 Eastbound Collector. Dixie Road Bridge.
Traffic Impact : Highway 401/410/403 including Dixie Road. Expect delays up to 10 minutes. Highway 401 East Bound Off Ramp to North/South Dixie Road one lane closure. Highway 401 West Bound lane closure from East of Tomken Road to West of Highway 410.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2037
Start of Construction : May 06, 2015
Estimated End of Construction : September 13, 2016
Highway : 401
Length of Construction : 0.00 km
Close To : Pickering
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural.
Value of Contract : $9,145,000.00
Description : Highway 401, Brock Road bridge rehabilitation in Pickering - including some work for Durham Region ($2.8M)... i.e.: roadway improvements of Brock Road from Bayly Street to Pickering Parkway.
Traffic Impact : Intersection of Highway 401 and Brock Road. Expect delays up to 5 minutes. Intermittent nightly lane closures in both east bound collector and express, and west bound lanes. Intermittent nightly ramp closures.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2026
Start of Construction : August 18, 2014
Estimated End of Construction : November 16, 2018
Highway : 410
Length of Construction : 12.00 km
Close To : Brampton
Type of Contract : Expansion and Rehabilitation
Value of Contract : $169,610,063.00
Description : Widening and rehabilitation of six structures, adding a HOV and general purpose lane, carpool lots, landscaping, grading, granular base, hot mix paving, electrical and advanced traffic message signs.
Traffic Impact : Highway 410 and 403. . No Lane closures. Please refer to Contract 2014-2026 project specific website: www.my410.ca for any closure information.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2025
Start of Construction : April 15, 2015
Estimated End of Construction : October 14, 2016
Highway : QEW
Length of Construction : 0.00 km
Close To : Burlington
Type of Contract : Rehabilitation
Value of Contract : $15,539,220.00
Description : Bridge Rehabilitation QEW at Appleby Line Underpass, Trafalgar Road Underpass and Burloak Drive.
Traffic Impact : QEW: Appleby Line, Burloak Drive and Trafalgar Road. There is no impact on traffic. No lane closures.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2025
Start of Construction : April 15, 2015
Estimated End of Construction : October 14, 2016
Highway : QEW
Length of Construction : 0.00 km
Close To : Burlington
Type of Contract : Rehabilitation
Value of Contract : $15,539,220.00
Description : Bridge Rehabilitation QEW at Appleby Line Underpass, Trafalgar Road Underpass and Burloak Drive.
Traffic Impact : QEW: Appleby Line, Burloak Drive and Trafalgar Road. There is no impact on traffic. No lane closures.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2016
Start of Construction : July 16, 2014
Estimated End of Construction : October 20, 2017
Highway : 427
Length of Construction : 6.68 km
Close To : Toronto
Type of Contract : Rehabilitation
Value of Contract : $90,914,640.00
Description : Highway 427 widening and rehabilitation from Campus Road/Fasken Drive to Steeles Avenue, 7.3 kilometres (widening to 8 lanes including one HOV lane in each direction). Includes various bridge rehabilitations.
Traffic Impact : northbound and southbound lanes from Campus Road/Fasken Drive to Steeles Avenue. There is no impact on traffic. Highway 427 Northbound and Southbound lane closure between 11:00 p.m. and 6:00 a.m. from February 7 to February 12.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2015
Start of Construction : August 25, 2014
Estimated End of Construction : November 30, 2016
Highway : 401
Length of Construction : 0.00 km
Close To : Toronto
Type of Contract : Structure Rehabilitation
Value of Contract : $9,148,716.00
Description : Three Bridge Rehabilitations: Kipling Avenue, Northbound lane underpass: Kipling Avenue Southbound lane underpass: Kipling Avenue Access to Belfied.
Traffic Impact : Kipling Avenue Structure over Highway 401, Belfield Structure over Kipling Avenue Expect delays up to 30 minutes. Kipling Avenue is in 2 lane configuration north and southbound. Highway 401 eastbound and westbound, nightly lane closures between the hours of 10:00 p.m. and 6:00 a.m.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2011
Start of Construction : May 21, 2015
Estimated End of Construction : November 01, 2016
Highway : QEW
Length of Construction : 1.00 km
Close To : Niagara Region
Type of Contract : Structure replacement
Value of Contract : $9,597,462.00
Description : Design-Build: Seventh Street Underpass Bridge Replacement
Traffic Impact : QEW at Seventh Street. Expect delays up to 5 minutes. Seventh Street bridge over QEW closed. Ramp from Seventh Street south to QEW Toronto closed. Ramp from Seventh Street north to QEW Niagara closed. Possible nightly QEW lane closures between 7 p.m. and 6 a.m. Detour: From Seventh Street south to Seventh Street north follow South Service Road to Third Street to North Service Road to Seventh Street From Seventh Street north to Seventh Street south follow North Service Road. to Third Street to South Service Road to Seventh Street From Seventh Street south to QEW Toronto follow South Service Road to Jordon Road From Seventh Street south to QEW Niagara follow South Service Road to QEW Niagara on ramp. From Seventh Street north to QEW Niagara follow North Service Road to Third Street to South Service Road to QEW Niagara on ramp.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2009
Start of Construction : February 18, 2015
Estimated End of Construction : November 30, 2017
Highway : 401
Length of Construction : 20.80 km
Close To : Milton
Type of Contract : Rehabilitation
Value of Contract : $41,463,000.00
Description : 3 Bridges Rehabilited in Milton: Fifth Line Overpass / Trafalgar Bridge, Oakville Creek and Regional Road 25.
Traffic Impact : Highway 401 East Bound and West Bound lanes from 700 metres east of 5th Line to Regional Road 25 in Milton. There is no impact on traffic. Winter shutdown.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2007
Start of Construction : June 17, 2014
Estimated End of Construction : July 30, 2016
Highway : 401
Length of Construction : 0.00 km
Close To : Toronto
Type of Contract : Grading, Electrical, Paving and Structures
Value of Contract : $12,380,000.00
Description : Bridge deck rehabilitations: Victoria Park Avenue Underpass, SB & NB.
Traffic Impact : Highway 401/Victoria Park Interchange. There is no impact on traffic. Intermittent nightly lane closures in both east and westbound core and collectors.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2006
Start of Construction : May 14, 2014
Estimated End of Construction : August 31, 2016
Highway : 401
Length of Construction : 0.00 km
Close To : Mississauga
Type of Contract : Expansion
Value of Contract : $13,084,382.00
Description : Reconstruction of Mavis Road Interchange extension of Mavis/Highway 401 structure, advanced contract for Highway 401 core/collector widening.
Traffic Impact : Highway 401 and Mavis Road Interchange. There is no impact on traffic. No lane closures.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2004
Start of Construction : June 23, 2014
Estimated End of Construction : June 30, 2016
Highway : 401
Length of Construction : 0.00 km
Close To : Clarington
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, Watermain and Structures
Value of Contract : $32,482,468.00
Description : Improve operations at the interchange in support of the expansion at Darlington Nuclear Generating Station. Holt Road structure to be replaced with new structure that can accommodate 10-lanes underneath and future East Durham Link; widening from 2 to 4 lane cross section for Holt Road; 3 roundabouts; realignment and reconstruction of Service Roads; illumination; realignment and reconstruction of Waterfront Trail where it crosses Holt Rd and South Service Road
Traffic Impact : Eastbound and Westbound Lanes at Holt Road Interchange. Expect delays up to 5 minutes. Single Lane Closures from 7:00 p.m. to 9:00 p.m., Two lane closures from 9:00 p.m. to 5:00 a.m.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2014-2002
Start of Construction : March 18, 2015
Estimated End of Construction : November 30, 2018
Highway : 401
Length of Construction : 0.00 km
Close To : Milton
Type of Contract : Bridge replacement
Value of Contract : $48,892,000.00
Description : DB: 8 Bridge Rehabilitations in Milton - WP 2150-11-01: Campbellville Rd Bridge - WP 2299-13-01: CPR Overpass - WP 2320-13-01: CPR Overpass - WP 2321-13-01: Sixteen Mile Creek - WP 2232-13-01: Sixteen Mile Creek - WP 2191-08-01: Appleby Line (Halton RR#8)
Traffic Impact : Highway 401 East Bound and West Bound lanes from 600 metres east of Appleby Line to 500 metres West of the Guelph Junction Railway Overpass. There is no impact on traffic. Winter shutdown.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2013-2047
Start of Construction : April 30, 2014
Estimated End of Construction : December 23, 2016
Highway : QEW
Length of Construction : 0.00 km
Close To : Hamilton
Type of Contract : Rehabililitation
Value of Contract : $48,021,448.00
Description : Burlington Bay Skyway Toronto Bound - Structural Steel Coating for corrosion protection.
Traffic Impact : Burlington Bay Skyway Toronto Bound lanes. There is no impact on traffic. No lane closures.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2013-2014
Start of Construction : August 01, 2013
Estimated End of Construction : November 18, 2016
Highway : 401
Length of Construction : 3.30 km
Close To : North York
Type of Contract : Structural rehabilitation, grading, drainage, earth excavation, electrical upgrade, sewers, guiderail, concrete roadbase, deck removal, miscellaneous paving.
Value of Contract : $60,964,820.00
Description : Highway 401 Eastbound Collector Lanes from Dufferin Street to East of Avenue Road construction and Bridge Rehabilitation.
Traffic Impact : Highway 401 eastbound and westbound express and collectors, Allen Road northbound at 401. Expect delays up to 30 minutes. Periodic on and off ramp closures northbound Allen Road to eastbound 401 and southbound Allen Road to 401 eastbound. Periodic closures of the Bathurst ramp to 401 eastbound and the off ramp to Avenue Road from 401 eastbound. These closures will generally take place from 22:00 to 05:00 hours nightly. These closures will be in effect from July 2015 to December 2015, weather permitting. Please use Keele Street or Avenue Road to utilize Dufferin Street. Removal of asphalt on Avenue WNS ramp. Alternate route: Highway 400, Keele Street, Dufferin Street, Allen Road, Bathurst Street.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2013-2001
Start of Construction : June 11, 2013
Estimated End of Construction : July 14, 2017
Highway : 400
Length of Construction : 0.00 km
Close To : Toronto
Type of Contract : Rehabilitation
Value of Contract : $33,360,560.00
Description : Rehabilitation of six structures.
Traffic Impact : Highway 400/401 Interchange. Expect delays up to 10 minutes. Nightly lane closures and/or full closures of Highway 401 Westbound Express and Collector will take place intermittently. During the full closures of Highway 401 Westbound Express or Collector, motorists will be diverted to the express or collector lanes depending on which full closure takes place. The work is scheduled to be completed by the end of December 2016 weather permitting. Highway 400 Southbound Ramp to Highway 401 Westbound Collector will be reduced to one lane to accomodate construction. Intermittent Full Closure of this ramp will also take place nightly in which Detour via Black Creek Southbound to Jane St. will be provided to access Highway 401 West. Please refer to the URL to the MTO Contract 2013-2001 project-specific website: www.400-401interchange.ca
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page


Contract #: 2012-2034
Start of Construction : April 12, 2013
Estimated End of Construction : April 30, 2016
Highway : 400
Length of Construction : 0.00 km
Close To : Barrie
Type of Contract : Widening, drainage improvements and new structure
Value of Contract : $10,142,410.00
Description : Crown Hill Overpass (30-138) Bridge Replacement and rehabilitation of Highway 400 northbound lanes.
Traffic Impact : from 2.5 kilometres South of Highway 400 and Highway 11 Split to 300 metres North of Crown Hill Overpass on Highway 11. There is no impact on traffic. During daylight hours intermittent single lane closure on Highway 400 Northbound from Duckworth Interchange to Crown Hill Overpass for construction of new bridge and approaches.
Region of Ontario : Central
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: February 05, 2016 - February 12, 2016
Last Updated: February 05, 2016

Top of page Top of page