Contract #: 2014-4035
Start of Construction : April 01, 2015
Estimated End of Construction : May 11, 2016
Highway : 401
Length of Construction : 0.00 km
Close To : Trenton
Type of Contract : structural rehabilitation
Value of Contract : $2,170,376.00
Description : Structural rehabilitation.
Traffic Impact : highway 401 eastbound lane from 2.0 kilometers east of County Road 30 to 500 meters east of County Road 26 Underpass and Highway 401 westbound from 2 kilometers west of Smithfield Road Underpass to 500 meters west of County Road 26 Underpass. Expect delays up to 10 minutes. Traffic will encounter single lane closures on highway 401 both eastbound and westbound between 9:00 a.m. and 3:00 p.m. Monday to Thursday. Speeds are reduced.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4034
Start of Construction : March 15, 2015
Estimated End of Construction : September 22, 2015
Highway : 401
Length of Construction : 0.00 km
Close To :
Type of Contract : grading, granular base, hot mix paving and structural rehabilitation
Value of Contract : $0.00
Description :
Traffic Impact : Highway 401 at Hamilton Road Underpass (Hamilton-Hope Boundary Line). Expect delays up to 5 minutes. Traffic may encounter the highway with two lanes closed from Monday to Friday, 24 hours a day with reduced speeds. From 11:00 p.m. to 7:00 a.m. traffic may encounter the highway closed to one lane Monday to Friday with reduced speeds.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4032
Start of Construction : March 09, 2015
Estimated End of Construction : June 04, 2018
Highway : 401
Length of Construction : 7.50 km
Close To : Cobourg
Type of Contract : grading, drainage, granular base, hot mix paving, electrical and structures
Value of Contract : $48,678,291.00
Description : 6 Laning from Burnham Street to Highway 45 Interchange at Cobourg. Project includes widening of Highway 45 u/p. Widen Highway 401 from 4 to 6 lanes between Cobourg and Port Hope for approximately 14 kilometres to improve safety and network efficiency.
Traffic Impact : Highway 401 from 0.6 kilometers west of Burnham Street, interchange 472, easterly for 7.5 kilometers to 2.3 kilometers east of Nagle Road. Expect delays up to 5 minutes. Both westbound and eastbound traffic will encounter single lane closures on Monday 7:00 p.m. to 12:00 a.m. (midnight) from Tuesday through Thursday between 9:30 a.m. to 3:00 p.m. and 7:00 p.m. to 7:00 a.m. and Friday from 12:00 a.m.(midnight) to 7:00 a.m. Speeds are reduced. There is a width restriction of 3.75 metres.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4029
Start of Construction : February 18, 2015
Estimated End of Construction : August 29, 2017
Highway : 417
Length of Construction : 20.30 km
Close To : Ottawa
Type of Contract : grading, draining, granular base, hot mix paving, electrical and structural
Value of Contract : $55,832,640.00
Description : PAVEMENT REHAB OF Highway 417 FROM 8th Line Road to Russel Road (EB/WBL), Ottawa. PROJECT ALSO INCLUDES REHABILITATION OF BEAR BROOK BRIDGES (EBL/WBL) and 16 Str Signs.
Traffic Impact : Highway 417 eastbound 2.1 kilometers west of County Road 27, Anderson Road, interchange 104, easterly to 2.0 kilometers east of County Road 28, Rockdale Road, interchange 88; highway 417 westbound 2.1 kilometers west of County Road 27, Anderson Road, interchange 104 easterly to 2.0 kilometers east of County Road 28, Rockdale Road, interchange 88; Piperville Road Structure; Expect delays up to 5 minutes. Highway 417 single lane closures with reduced speeds. Piperville Structure will be closed both northbound and southbound. Alternate route: Piperville Road North and South follow detour D-1
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4026
Start of Construction : September 24, 2014
Estimated End of Construction : November 25, 2016
Highway : 417
Length of Construction : 0.00 km
Close To : Ottawa
Type of Contract : grading, hot mix paving, electrical and structural rehabilitation
Value of Contract : $3,324,502.00
Description : Waterproofing & paving, barrier walls, expansion joints, repair voids.
Traffic Impact : structural rehabilitation of County road 5 (Limoges Road ) Underpass. Highway 417 eastbound and westbound 2.0 kilometers west of Country Road 5, Limoges Road, Underpass to 2.0 kilometers eastbound and westbound east of County Road 5, Limoges Road Underpass for 4.0 kilometers Expect delays up to 5 minutes. Highway 417 traffic will encounter single lane closures both eastbound and westbound with reduced speeds. PLEASE NOTE: County Road 5 (Limoges Road) underpass at highway 417 will have a single lane width restriction of 3.4 meters controlled by concrete barriers and temporary traffic signals.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4022
Start of Construction : October 01, 2014
Estimated End of Construction : September 10, 2015
Highway : 401
Length of Construction : 16.00 km
Close To : Gananoque
Type of Contract : Pavement resurfacing
Value of Contract : $8,844,859.00
Description : Binder Paving from Ganonoque to Highway 137 East and westbound lanes.
Traffic Impact : highway 401 eastbound and westbound from 2.0 kilometers west of County Road 32, Gananoque, interchange 645 to 3.0 kilometers east of Highway 137, interchange 661 Expect delays up to 10 minutes. Traffic will encounter lane reductions on highway 401 both eastbound and westbound from Monday to Friday at 12:00 p.m. (noon). Speeds are reduced. There is a width restriction of 4.0 meters.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4019
Start of Construction : September 22, 2014
Estimated End of Construction : September 03, 2015
Highway : 417
Length of Construction : 24.50 km
Close To : Casselman
Type of Contract : center line culvert replacements, hot mix paving, sign installation
Value of Contract : $4,736,470.00
Description : Replace selected centre line culverts in very poor condition located from Dunvegan Road westerly.
Traffic Impact : 1 kilometer east of Regional Road 7, interchange 58, easterly to 1.3 kilometers west of County Road 30. There is no impact on traffic. Winter shutdown.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4014
Start of Construction : July 14, 2014
Estimated End of Construction : September 17, 2015
Highway : 62
Length of Construction : 5.82 km
Close To : Belleville
Type of Contract : grading, drainage, granular base, hot mix paving, structure widening and rehabilitation, traffic signals and illumination
Value of Contract : $6,739,384.00
Description : Rehabilitation of Highway 62, from 0. 5 kilometres North of Ashley St., Northerly to County Road 14. Includes rehabilitation of Palliser Creek Bridge and intersection improvements at Hastings CR 5.
Traffic Impact : Foxboro from 0.8 kilometers north of Ashley Street to 0.3 kilometers north of Foxboro-Stirling Road for 3.0 kilometers. Expect delays up to 5 minutes. Traffic will encounter reduced speeds and a width restriction of 3.5 meters. Please note there are temporary traffic lights at Frankford Road. The on ramp at highway 62 and Stirling Road will be closed starting April 20 to May 1, 2015.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4012
Start of Construction : September 02, 2014
Estimated End of Construction : May 10, 2016
Highway : 401
Length of Construction : 0.00 km
Close To : Trenton
Type of Contract : hot mix paving, grading, granular base, and structural steel coating rehabilitation
Value of Contract : $7,024,963.00
Description : Structural Steel Coating.
Traffic Impact : Trent River Bridge and Canadian National Railway Overhead Bridge, for 3.5 kilometers. There is no impact on traffic. Traffic should be aware of possible construction vehicles ingressing and egressing on paved shoulders at Trent River, and on the east side of highway 33, behind the temporary concrete barriers Friday to Saturday both east and westbound.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4009
Start of Construction : August 05, 2014
Estimated End of Construction : May 31, 2015
Highway : 401
Length of Construction : 0.00 km
Close To : Belleville
Type of Contract : Structural Rehabilitation
Value of Contract : $1,239,072.00
Description : Structural rehabilitation of the Highway 62 overpass at Belleville.
Traffic Impact : westbound lane at Highway 62 from a point 3.0 kilometres east of Highway 62 to 0.3 kilometres west of Highway 62 Interchange. There is no impact on traffic. Winter maintenance. Contract is shut down.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4005
Start of Construction : May 23, 2014
Estimated End of Construction : March 27, 2015
Highway : 401
Length of Construction : 3.00 km
Close To : Belleville
Type of Contract : Paving and Structural Rehabilitation
Value of Contract : $6,616,000.00
Description : Structural rehabilitation.
Traffic Impact : eastbound from highway 37 to Wyman’s Road and highway 401 westbound from Wyman’s Road to 1.0 kilometer west of Mitchell Road. Expect delays up to 30 minutes. From April 20 to May 8 both eastbound and westbound traffic will encounter single lane closures 24 hours a day, 7 days a week. There is a width restriction of 4.1 metres.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4004
Start of Construction : July 18, 2014
Estimated End of Construction : July 02, 2015
Highway : 401
Length of Construction : 0.00 km
Close To :
Type of Contract : structural rehabilitation
Value of Contract : $1,042,740.00
Description : correct LHRS is 47210 offset 0.45 Proc. Const 130742
Traffic Impact : Highway 401 eastbound lane at Sutherland Creek Bridge and South Service Road. There is no impact on traffic. Winter shutdown.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4002
Start of Construction : May 25, 2014
Estimated End of Construction : September 02, 2015
Highway : 401
Length of Construction : 0.00 km
Close To : Prescott
Type of Contract : structure rehabilitation
Value of Contract : $7,019,745.00
Description : Rehabilitation of the Blue Church Rd underpass (Site #16-165) and Merwin Lane underpass (Site #16-166), both located just west of Prescott.
Traffic Impact : highway 401 Lemons Creek Culvert; Blue Church Road Underpass, and Merwin Lane Underpass for 9.4 kilometres. Expect delays up to 5 minutes. Traffic will encounter lane reductions Monday to Thursday and until 3:00 p.m. on Friday. There is a width restriction of 4.5 meters in both directions. Speeds will be reduced.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2014-4001
Start of Construction : July 14, 2014
Estimated End of Construction : November 02, 2015
Highway : 41
Length of Construction : 29.70 km
Close To : Pembroke
Type of Contract : culvert replacement and hot mix paving
Value of Contract : $6,475,480.00
Description : Pavement Rehabilitation from the north Junction of Hwy 60 at Eganville, northerly to Highway 17.
Traffic Impact : from highway 60 to highway 17. There is no impact on traffic. Winter shutdown.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2013-4079
Start of Construction : May 17, 2014
Estimated End of Construction : August 11, 2015
Highway : 417
Length of Construction : 0.00 km
Close To : Vanier
Type of Contract : Structural rehabilitation
Value of Contract : $3,056,360.00
Description :
Traffic Impact : westbound and eastbound at County Road 14/4 Saint Eugene Road. Expect delays up to 5 minutes. Highway 417 traffic will encounter westbound and eastbound lane closures with reduced speeds. Please note: Single lane closures on St. Eugene Road with reduced speeds.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2013-4078
Start of Construction : March 28, 2014
Estimated End of Construction : May 30, 2015
Highway : 41
Length of Construction : 3.00 km
Close To : Renfrew
Type of Contract : grading, drainage, granular, base, hot mix paving, electrical and structure rehabilitation
Value of Contract : $1,393,288.00
Description :
Traffic Impact : Hydes Creek Bridge, 1.9 kilometers South of Lennox and Addington Renfrew Boundary for 3 kilometres. There is no impact on traffic. Winter shutdown.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2013-4074
Start of Construction : April 04, 2014
Estimated End of Construction : November 27, 2015
Highway : 7
Length of Construction : 0.00 km
Close To : Marmora
Type of Contract : grading, granular base, temporary electrical and structural rehabilitation
Value of Contract : $1,607,634.00
Description : Replacement of the Crowe River Bridge at Marmora.
Traffic Impact : village of Marmora, Crowe River Bridge, 1.6 kilometers There is no impact on traffic. winter shutdown
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2013-4069
Start of Construction : February 19, 2014
Estimated End of Construction : June 17, 2016
Highway : 17
Length of Construction : 16.00 km
Close To : Pembroke
Type of Contract : hot mix paving and three structural rehabilitations
Value of Contract : $8,773,960.00
Description : Pavement Rehabilitation from Renfrew Rd 24 (Whitewater Rd.), westerly to the start of the passing lane east of Forest Lea Road (Renfrew Road 42), 12.5 kilometres. Work includes the replacement of 6 poor and very poor culverts within the project limits and 3 Structures
Traffic Impact : from 1.6 kilometres west of Round Lake Road easterly to 0.1 kilometres west of Whitewater Road for 12.5 kilometres Expect delays up to 15 minutes. As of April 27, 2015 traffic will encounter lane closures Monday to Thursday and Friday until 2:00 p.m. Speeds are reduced. There is a width restriction of 3.2 metres.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2013-4067
Start of Construction : February 03, 2014
Estimated End of Construction : October 02, 2015
Highway : 15
Length of Construction : 23.95 km
Close To : Smith Falls
Type of Contract : grading hot mix paving, drainage, granular base, intersection improvements and electrical
Value of Contract : $22,877,526.00
Description : Work includes grading, drainage, granular base, paving, 4 passing lanes. Pavement rehabilitation of Highway 15, from 735 metres south of Leeds and Grenville Road 42, northerly to Young's Hill Road (formerly Forfar Rd). Work also includes replacement of the Crosby.
Traffic Impact : from 0.3 kilometres south of Big Hill Road, northerly to 0.25 kilometres south of Young’s Hill Road. Expect delays up to 15 minutes. Traffic will encounter lane closures Monday to Friday.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2013-4066
Start of Construction : March 12, 2014
Estimated End of Construction : April 30, 2015
Highway : 35
Length of Construction : 2.00 km
Close To : Lindsay
Type of Contract : grading, drainage, hot mix paving, and intersection improvements
Value of Contract : $4,301,422.00
Description : 4 to 5 Laning of Highway 35 from highway 7 southerly for 2 kilometres.
Traffic Impact : City of Kawartha Lakes Lindsay widening of highway 35 from 0.15 kilometres south of highway 7 southerly for 2.2 kilometres There is no impact on traffic. Winter shutdown.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2013-4065
Start of Construction : May 03, 2014
Estimated End of Construction : October 28, 2016
Highway : 17
Length of Construction : 8.00 km
Close To : Arnprior
Type of Contract : grading, drainage, hot mix paving, electrical and three new structures
Value of Contract : $33,057,140.00
Description : Project includes new interchange and structure at Campbell Drive and new flyover structure at Scheel Drive. Extend Highway 417 (Arnprior Bypass to Renfrew. Phase 1 - 5 kilometres is currently under construction. Phase 2 comprises 7 kilometres of expansion. The total length of the expansion is 34.0 kilometres of twinning, including Phases 3 and 4.
Traffic Impact : from Highway 417 from 2.3 kilometres east of County Road 508 (Calalbogie Road) easterly for 8.0 kilometres. Expect delays up to 15 minutes. Starting April 6, traffic will encounter single lane closures on highway 17, 417 at Campbell Drive. Alternate route: White Lake Road to River Road, River Road to Usborne Street, Usborne Street to McLean Drive, McLean Drive to highway 17. Closure of Scheel Drive North: Highway 17 eastbound take County Road 54, McLean Drive, to Scheel Drive. Highway 17 westbound take Campbell Drive to Usborne Street, Usborne Street to McLean Drive, McLean Drive to Scheel Drive. Closure of Scheel Drive South: highway 17 eastbound take Calabogie Road to Russett Drive , Russett Drive to Scheel Drive. Highway 17 westbound take White Lake Road to Vanjumar Road continue to Russett Drive, Russett Drive to Scheel Drive.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2013-4030
Start of Construction : June 25, 2013
Estimated End of Construction : March 31, 2015
Highway : 417
Length of Construction : 0.00 km
Close To : Ottawa
Type of Contract : Structural rehabilitation
Value of Contract : $5,369,330.00
Description : Structural rehabilitation and highway 417 concrete repairs.
Traffic Impact : westbound and eastbound at Highway 138; Highway 417 westbound from 6.0 kilometers west of Highway 34 and eastbound from 6.0 kilometers west of highway 34; highway 138 and highway 34 underpasses There is no impact on traffic. Under winter maintenance.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2012-4056
Start of Construction : June 03, 2013
Estimated End of Construction : July 06, 2017
Highway : 401
Length of Construction : 2.20 km
Close To : Kingston
Type of Contract : grading, drainage, granular base, hot mix paving, electrical and structural
Value of Contract : $39,443,220.00
Description : Phase 3 of 6 Laning expansion between County Road 38 and Highway 15 in Kingston. Project includes the replacement of the Montreal Street Underpass Structure at Interchange 619 and the rehabilitation and widening of the CNR Overhead structure located just east of Montreal Street Work also includes the construction of new interchange ramp at Interchange 619.
Traffic Impact : 0.6 kilometres west of Montreal Street to 2.25 kilometres east of Montreal Street. Expect delays up to 10 minutes. Speeds will be reduced on highway 401. Starting April 20 there will be a long duration ramp closure on the north south east ramp.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2012-4054
Start of Construction : May 17, 2013
Estimated End of Construction : July 31, 2015
Highway : 401
Length of Construction : 0.00 km
Close To : Cornwall
Type of Contract : rapid bridge replacement of two Cornwall Center Road Overpasses
Value of Contract : $14,231,069.00
Description : Replacement of the Cornwall Centre Road Eastbound and westbound lane Overpasses. Proposed work involves replacing the bridge decks by means of rapid replacement techniques.
Traffic Impact : highway 401 from 2.0 kilometers west of Cornwall Centre Road to 1.3 kilometres east of Cornwall Centre Road. (Cornwall Centre Road is 1.1 kilometres west of Brookdale Avenue in Cornwall) Expect delays up to 5 minutes. Traffic will encounter lane closures on highway 401 both eastbound and westbound. Highway 401 will be closed to one lane detour from the Brookdale Structure to approximate 2 kilometres west of Cornwall Center Road eastbound lane traffic will be diverted via median crossover to the original location of the westbound lane for the temporary two way traffic configuration controlled by concrete barriers. There is a width restriction of 5.5 metres. PLEASE NOTE: Cornwall Center Road is closed between Brookdale Avenue and Power Dam Road. Detour signs are in place. North West ramp at Brookdale interchange is closed. Alternate route for north west ramp will be south west ramp.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2012-4014
Start of Construction : November 30, 2012
Estimated End of Construction : August 28, 2015
Highway : 17
Length of Construction : 0.00 km
Close To : Petawawa
Type of Contract : structural rehabilitation
Value of Contract : $6,060,000.00
Description : Petawawa River Bridge rehabilitation - Replace deck.The work includes a concrete deck replacement with waterproofing, paving and semi-integral conversion. A Temporary Modular Bridge will be installed to detour traffic during the bridge deck replacement.
Traffic Impact : from 1080 metres west of the Paquette Road to 1125 metres east of Murphy Road. There is no impact on traffic. Winter maintenance. Traffic may encounter periodic lane closures.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2012-4007
Start of Construction : May 01, 2013
Estimated End of Construction : November 30, 2015
Highway : 417
Length of Construction : 0.00 km
Close To : Ottawa
Type of Contract : refer to city of Ottawa website http://ottawa.ca/en/major-projects or call 3-1-1
Value of Contract : $0.00
Description : highway 417 eastbound and westbound Nicholas Street to Regional Road 174.
Traffic Impact : eastbound and westbound Nicholas Street to Regional Road 174. Expect delays up to 5 minutes. Traffic may enounter lane closures. Please refer to city of Ottawa website http://ottawa.ca/en/major-projects or call 3-1-1
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2011-4020
Start of Construction : December 07, 2011
Estimated End of Construction : May 25, 2015
Highway : 62
Length of Construction : 4.53 km
Close To : Belleville
Type of Contract : Grading, Widening, Municipal Watermain, Drainage, Granular Base, Hot Mix Paving and Electrical.
Value of Contract : $20,305,808.00
Description : 2 5-laning from Highway 401 Northerly to Vermilyeas Road. 4-Laning from Vermilyea Road northerly to Ashley Street (Foxborough).
Traffic Impact : Highway 62 north from 401 to 0.8 kilometres north of Ashley Street Foxboro for 4.9 kilometres. There is no impact on traffic. Winter shutdown.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015

Top of page Top of page


Contract #: 2010-4015
Start of Construction : August 18, 2010
Estimated End of Construction : October 05, 2015
Highway : 417
Length of Construction : 0.00 km
Close To : Ottawa
Type of Contract : southeast ramp realignment
Value of Contract : $4,307,047.00
Description : From 2.0 kilometres west of Pinecrest Road interchange 129 in the City of Ottawa to 1.2 kilometres east of Pinecrest Road interchange 129; southeast ramp realignment. Please note that this is a City of Ottawa project and is referred to as ISD12-6012, NOT 2010-4015. Public can also access the following website link to get updated information: http://ottawa.ca/en/city-hall/planning-and-development/hwy-417-pinecrest-road-interchange-eastbound-transit-operational
Traffic Impact : highway 417 eastbound lanes Richmond Road interchange to Woodroffe Avenue interchange. Expect delays up to 10 minutes. Traffic will encounter periodic single lane closures between the hours of 10:00 a.m. to 2:30 p.m. and 9:00 p.m. to 6:00 a.m. Traffic will also encounter periodic ramp closures to the south east on ramp at the Pinecrest Road interchange.
Region of Ontario : Eastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: April 17, 2015 - April 24, 2015
Last Updated: April 17, 2015