Construction Reports: Northeastern

Contract #: 2017-5122
Start of Construction : July 24, 2017
Estimated End of Construction : October 30, 2017
Highway : 7289
Length of Construction : 0.00 km
Close To : MacTier
Type of Contract : Structure Rehabilitation
Value of Contract : $10,000,000.00
Description :
Traffic Impact : Silver Lake Culvert on Highway 7289, 2.2 kilometres North of Portage Creek. There is no impact on traffic. No Traffic Staging, all work to be completed off the travelled portion of the Highway. No Speed Restriction . No anticipated Lane Restrictions at this time. No Height Restrictions
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5122
Start of Construction : July 24, 2017
Estimated End of Construction : October 30, 2017
Highway : 7290
Length of Construction : 0.00 km
Close To : MacTier
Type of Contract : Structure Rehabilitation
Value of Contract : $10,000,000.00
Description :
Traffic Impact : Blackstone River Culvert on Highway 7290, 2.1 kIlometres North of Highway 141. There is no impact on traffic. No Traffic Staging, all work to be completed off the travelled portion of the Highway. No Speed Restriction . No anticipated Lane Restrictions at this time. No Height Restrictions
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5121
Start of Construction : August 10, 2017
Estimated End of Construction : August 25, 2017
Highway : 112
Length of Construction : 0.00 km
Close To : Kirkland Lake
Type of Contract : Structural Culvert Replacement
Value of Contract : $502,248.00
Description : Highway 112 Structural Culvert Replacement - 1.6 kilometres North of Highway 650 (Township of Otto), Length 0.1 km. (Unnamed Creek Culvert).
Traffic Impact : 1.6 kilometers North of Highway 650. There is no impact on traffic. Traffic Staging for full Road Closure from August 14th to August 20, 2017 -detour take Highway 11 North to Highway 66 Easterly to Kirkland lake. From August 21st to August 25th there may be periodic occasional lane but Highway will be accessible for the travelling public
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5117
Start of Construction : July 31, 2017
Estimated End of Construction : November 30, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Emsdale
Type of Contract : Frost Heave Treatment
Value of Contract : $10,000,000.00
Description : Grading, drainage, granular base, hot mix paving
Traffic Impact : South bound, 600 meters North of Rattrays Road to Rattrays Road, Emsdale. From Township of Chaffey To Township of Perry. Expect delays up to 5 minutes. Possible mobile single lane closures, very short duration single lane closures, short duration single lane closures, long duration single lane closures and overnight lane closures. Speed reductions to 80 kilometers per hour is in affect along Highway 11 within the designated construction zone. Effective lane width 4.00 meters south bound effective August 10, 2017. No reduced height
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5114
Start of Construction : July 03, 2017
Estimated End of Construction : October 05, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Earlton
Type of Contract : ONR Overhead Bridge, Site No. 47-037, Structural Rehabilitation of Expansion Joints, followed by Grading, Hot Mix Paving
Value of Contract : $10,000,000.00
Description : ONR Overhead Bridge, Structural Rehabilitation of Expansion Joints, followed by Grading, Hot Mix Paving.
Traffic Impact : Earlton ONR Overpass, designated construction zone limits, 2.335 Kilometres Expect delays up to 5 minutes. Stage 2, Traffic through the South Bound Lane August 22nd to August 31st, 2017. Speed reduction, from 90 Kilometers to 70 Kilometers per hour is required during staged operations with single lane detour controlled by temporary traffic signals. Stop Bar, to Stop Bar, Total of 320 meters. Reduced width, temporary concrete barriers to parapet wall, is 4.1 meters. Height of temporary concrete barriers is 815 millimeters and the existing parapet wall height is 1050 millimeters. Total distance of the restricted section is 179 meters.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 21, 2017

Top of page Top of page


Contract #: 2017-5113
Start of Construction : June 26, 2017
Estimated End of Construction : October 17, 2017
Highway : 634
Length of Construction : 0.00 km
Close To : Smooth Rock Falls
Type of Contract : Culvert Rehabilitation
Value of Contract : $1,705,088.00
Description : Highway 634, from 34.0 kilometres North of Highway 11 to 37.8 kilometres North of Highway 11. Four Culvert Rehabilitations - Linings.
Traffic Impact : Highway 634, from 34.0 kilometres North of Highway 11 to 37.8 kilometres North of Highway 11. Expect delays up to 5 minutes. No Lane Restrictions in effect. No reduced speed limits in effect. A maximum of four (4) daytime single lane closures not exceeding 250 metres each will be permitted within the contract limits. Each closure shall be separated by at least 500 metres from any other single lane closure. Maintain traffic by flagging operations.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5112
Start of Construction : June 19, 2017
Estimated End of Construction : October 20, 2017
Highway : 540
Length of Construction : 0.00 km
Close To : Little Current
Type of Contract : Grading, drainage, granular base, hot mix paving and electrical.
Value of Contract : $10,000,000.00
Description : Grading, drainage, granular base, hot mix paving and electrical.
Traffic Impact : From 1.0 kilometre West of Highway 6 (Little Current Southern Limits) Westerly for 17.6 kilometres Expect delays up to 10 minutes. Daily Single Lane Closures controlled by Traffic Control Persons
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5111
Start of Construction : June 19, 2017
Estimated End of Construction : September 13, 2017
Highway : 144
Length of Construction : 14.30 km
Close To : Timmins
Type of Contract : Preventative Resurfacing & Frost Heave Repair
Value of Contract : $4,029,602.00
Description : Preventive Resurfacing of Highway 144 from 14.3 kilometres south of the junction of Highway 101, northerly 14.3 kilometres (Excluding Hwy 101 and 144 intersection) and Highway 144, 45 kilometres south of Junction Highway 01/144. includes 60 metre Frost Heave Repair. Work includes Grading, Drainage, Granular Base and Hot Mix Paving.
Traffic Impact : Highway 144, from 14.3 kilometres south of the junction of Highway 101, northerly 14.3 kilometres; Highway 144, 45 kilometres south of the junction of Highway 101/144. Expect delays up to 15 minutes. Maximum of 3 Traffic control persons controlled operations daily. Effective lane width of approxuimately 4.0 metres No reduced speed limits. No height restrictions
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5110
Start of Construction : August 21, 2017
Estimated End of Construction : October 11, 2017
Highway : 400
Length of Construction : 16.70 km
Close To : Parry Sound
Type of Contract : Preventative Resurfacing including Granular work and Hot Mix Paving
Value of Contract : $4,507,586.00
Description : Preventive Resurfacing Northbound and Southbound Lane on Highway 400 from 0.1 Kilometers South of Healy Lake Road underpass to 6.7 Kilometers North of Highway 141 Interchange for 16.7 kilometres, work includes Granular and Hot Mix Paving.
Traffic Impact : 0.1 Kilometres South of Healy Lake Road underpass to 6.7 Kilometres North of Highway 141 interchange. There is no impact on traffic. Contractor will utilize a single lane closure daily. Speed Restriction to 80 Kilometers an hour. Lane Closure of 3.75 meters, Shoulder Closure of 3 Meters total. Effective closure 6.75 meters. Lane Closure will be in place from Monday to Friday at 1200 hours. No Height Restrictions.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5108
Start of Construction : June 26, 2017
Estimated End of Construction : October 12, 2017
Highway : 64
Length of Construction : 0.00 km
Close To : River Valley
Type of Contract : Grading, Drainage,Granular Base and Hot MixPaving
Value of Contract : $10,000,000.00
Description : Grading, Drainage,Granular Base and Hot Mix Paving.
Traffic Impact : Highway 64, From 0.3 kilometres South of Highway 539, Northerly 12.4 kilometres to Island Lake Road. Expect delays up to 10 minutes. Possible delays due to Treatment Area Excavation, back fill and center-line culvert removals and replacements. 24 hour flagging at deep fill culverts.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5107
Start of Construction : June 05, 2017
Estimated End of Construction : September 11, 2018
Highway : 526
Length of Construction : 14.70 km
Close To :
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Asphalt, Electrical, Structural Rehabilitation
Value of Contract : $9,936,086.00
Description : AT Highways: 69/529/526 Highway 69 - Still River Bridge. Highway 529 - Naiscoot River Bridge. Highway 529 - CPR Overhead Bridge. Highway 526 - From Highway 69 westerly to Britt post office for 14.7 kilometres.
Traffic Impact : Henvey Township to Wallbridge Township. There is no impact on traffic. No lane restrictions at this time. Reduced speed from 60 Kilometers per hour to 50 Kilometers per hour
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5107
Start of Construction : June 05, 2017
Estimated End of Construction : November 20, 2018
Highway : 529
Length of Construction : 0.00 km
Close To :
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Asphalt, Electrical, Structural Rehabilitation
Value of Contract : $10,000,000.00
Description : Grading, Drainage, Granular Base, Hot Mix Asphalt, Electrical, Structural Rehabilitation.
Traffic Impact : Naiscott River Bridge, Designated Construction Zone Limits South Junction Of Highway 69/529 Harrison Township to North Junction of Highway 69/529 Wallbridge Township. Canadian Pacific Railway Overhead Bridge, Designated Construction Zone Limits South Junction of Highway 69/529 Harrison Township to North Junction of Highway 69/529 Wallbridge Township. There is no impact on traffic. Reduced to Single Lane (Temporary traffic signal system) Reduced to 80 Kilometers per hour to 60 Kilometers per hour. no height or width restriction at this time.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 21, 2017

Top of page Top of page


Contract #: 2017-5107
Start of Construction : June 05, 2017
Estimated End of Construction : November 20, 2018
Highway : 69
Length of Construction : 0.00 km
Close To :
Type of Contract : Grading, Drainage, Granular Base,Hot Mix Asphalt Electrical and Structural Rehabilitation
Value of Contract : $10,000,000.00
Description :
Traffic Impact : Still River Bridge, Henvey Township. Expect delays up to 10 minutes. Reduced to Single Lane (temporary traffic signal system) Speed limit Reduced from 90 Kilometers per hour to 70 Kilometers per hour
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5106
Start of Construction : May 23, 2017
Estimated End of Construction : October 10, 2017
Highway : 551
Length of Construction : 0.00 km
Close To : Mindemoya
Type of Contract : Bridge replacement
Value of Contract : $10,000,000.00
Description : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structure.
Traffic Impact : Mindemoya Creek Bridge (site 49-026) Replacement, from 5.2 kilometres south of the junction of Highway 551 and Highway 542, southerly 1.1 kilometre. Expect delays up to 5 minutes. Single lane temporary modular bridge in use which is controlled by temporary traffic signals. Speeds are reduced to 30 kilometers per hour. Effective land width is 4.2 meters. 5.0 metre height restriction at centre line of traffic lane
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5105
Start of Construction : June 05, 2017
Estimated End of Construction : October 24, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Iroquois Falls
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving and Electrical
Value of Contract : $10,000,000.00
Description : Grading, Drainage, Granular Base, Hot Mix Paving and Electrical.
Traffic Impact : Highway 11 from 25.4 kilometres North of Highway 67, northerly 19.2 kilometres. Expect delays up to 5 minutes. No Lane Restrictions in effect. A Maximum of five (5) daytime single lane closures not exceeding five hundred (500) metres each will be permitted within the Contract limits. Each closure shall be separated by at least one thousand (1000) metres from any other single lane closure. Maintain traffic by flagging operations. No reduced speed limits
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5104
Start of Construction : May 18, 2017
Estimated End of Construction : August 22, 2017
Highway : 144
Length of Construction : 0.00 km
Close To : Gogama
Type of Contract : Structural Culvert Replacement
Value of Contract : $10,000,000.00
Description : Structural Culvert Replacement.
Traffic Impact : Highway 144 Kenetogami Creek Culvert. Expect delays up to 15 minutes. Final Stage: Traffic controlled by temporary flagging operations when required.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5103
Start of Construction : June 05, 2017
Estimated End of Construction : October 10, 2017
Highway : 637
Length of Construction : 0.00 km
Close To : Killarney
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving & Structural
Value of Contract : $10,000,000.00
Description : Grading, Drainage, Granular Base, Hot Mix Paving & Structural - Treatment of various distress areas (12 Frost Heaves) and Replacement of Massey Creek Culvert.
Traffic Impact : On highway 637, 7 kilometres from highway 69 westerly 42 kilometres. Expect delays up to 15 minutes. Reduced to single lane at three locations. Reduced speed limit of 60 kilometers per hour through work area. Lane width restricted to 4.0 meters. No reduced heights in place
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5102
Start of Construction : June 26, 2017
Estimated End of Construction : October 13, 2017
Highway : 17
Length of Construction : 45.00 km
Close To : Algoma Mills
Type of Contract : Grading Drainage, Granular Base, Hot Mix Paving
Value of Contract : $9,815,152.00
Description : Highway 17 - Site 1 From the East Junction of Highway 538 and Highway 17 Easterly 12.7 kilometres to the West Junction of Highway 17 and Martin Road Site 2 From 0.4 kilometres West of Highway 108 Easterly10.5 kilometres to 0.5 kilometres East of Village Road. Site 3 From Declerk/Menard Crescent (Spanish) Easterly 9.18 kilometres to 100 metres West of Germain Road. Site 4: Pathway from Birchwood Circle easterly to Air Services Road for 45.0 kilometres.
Traffic Impact : Expect delays up to 10 minutes. Multiple temporary single lane closures throughout the contract vicinity. No reduced speed limits. Effective lane width remains unchanged. No reduced height restrictions.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5101
Start of Construction : June 05, 2017
Estimated End of Construction : July 27, 2018
Highway : 144
Length of Construction : 0.00 km
Close To : Cartier
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, Structural Culvert Replacements, Bridge Rehabilitation and Bridge Replacement.
Value of Contract : $8,717,208.00
Description : Highway 144: Whitson River Bridge Replacement, 20.6 Kilometers North of Highway 17, Vermillion River Tributary Culvert Replacement, 4.5 Kilometers North of Whitson River, CPR OVERHEAD BRIDGE Rehabilitation, 26.1 Kilometers north of Highway 17 at Dowling and Highway 7044 Pump-House Culvert Replacement, 6.7 Kilometers South of North Entrance at Cartier for 7.1 Kilometers
Traffic Impact : Whitson River Bridge Replacement, 20.6 kilometres North of Highway 17, VERMILION RIVER TRIBUTARY CULVERT Replacement, 4.5 Kilometres North of Whitson River, Canadian Pacific Railroad Bridge Rehabilitation, 26.1 Kilometres north of Highway 17 at Dowling and Highway 7044 Pump-House Creek Culvert Replacement, 6.7 kilometres South of North Entrance at Cartier. Expect delays up to 10 minutes. Traffic is staged to a single lane controlled by portable temporary signals at the Vermilion Culvert. A speed reduction to 60 Kilometers Per Hour is in place. Lane width 4.3 minimum. Height 5.2 minimum.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5100
Start of Construction : May 23, 2017
Estimated End of Construction : September 15, 2017
Highway : 129
Length of Construction : 26.20 km
Close To : Chapleau
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural Replacement
Value of Contract : $10,000,000.00
Description : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural Replacement.
Traffic Impact : On Highway 129 South of Chapleau, From 0.1 Kilometers North of Five Mile Creek North to 0.3 Kilometers South of Junction Highway 101. Total length is 26.6 Kilometers Expect delays up to 15 minutes. Stage 2 is scheduled to be complete at Poulin Creek on August 18, 2017 and will move to normal lane widths, temporary traffic signals will be removed. No reduced speed limit Lane widths - 3.25 meters with 1.5 meters paved shoulder in both North and South Bound lanes.height - No height. Stage 2 scheduled to start at Toe Creek on August 16, 2017 with single lane controlled by traffic signals. No reduced speed limit. Lane widths - 3.65 meters between temporary guide-rail at Toe Creek starting July 18, 2017 4. Reduced height - 5 meters at Toe Creek effective July 18, 2017. Stage 1 scheduled to start at Burying Creek on July 20, 2017 with single lane controlled by traffic signals. No reduced speed limit. Lane widths - 3.65 meters between temporary guide-rail at Burying Creek starting July 20, 2017 4. Reduced height - 5 meters at Burying Creek effective July 20,2017.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5004
Start of Construction : June 01, 2017
Estimated End of Construction : August 01, 2018
Highway : 7289
Length of Construction : 0.00 km
Close To : MacTier
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural Rehabilitation
Value of Contract : $4,013,322.00
Description : On Highway 7289 CPR Overhead (Site No. 42-115), 1.3 kilometres south of Muskoka Road 169 CNR Subway (Site No. 42-116), 0.1 kilometres south of Muskoka Road 169 for 3.37 kilometres, work includes Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, and Structural Rehabilitation.
Traffic Impact : 3.37 Kilometres of Highway 7289 CPR Overhead (Site Number: 42-115). 1.3 Kilometres South of Muskoka Road 169 CNR Subway (Site number: 42-116), 0.1 Kilometres South of Muskoka Road 169 Expect delays up to 10 minutes. CPR Overhead Bridge 1.3 kilometres south of Muskoka Road 169 reduced to single lane bi-directional traffic controlled by Portable temporary lights. Wide load lane width restriction for the CPR overhead was field measured at 6.13 metres.CNR Subway Bridge 0.1 kilometres south of Muskoka Road 169, reduced to single lane bi-directional traffic controlled by temporary traffic signals. Wide load lane width restriction for the CNR subway was field measured at 5.36 metres
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2017-5000
Start of Construction : May 15, 2017
Estimated End of Construction : September 27, 2017
Highway : 60
Length of Construction : 0.00 km
Close To : Huntsville
Type of Contract : Asphalt Recycling, Granular Shouldering, Electrical Rehabilitation, Asphalt Paving, Culvert Replacement, Structural Rehabilitation
Value of Contract : $10,000,000.00
Description : Asphalt Recycling, Granular Shouldering, Electrical Rehabilitation, Asphalt Paving, Culvert Replacement, Structural Rehabilitation.
Traffic Impact : From Highway 11, easterly to 0.3 kilometres east of Hidden Valley Road. DCZ From: Sta. 10+310 in the Geographic Township of Chaffery to Sta. 18+085 in the Geographic Township of Chaffery on Highway 11 and to Sta. 19+650 in the Geograhpic Township of Chaffery on Highway 60 Expect delays up to 5 minutes. Single Lane Closure - as of June 5, 2017, the southbound ramp (exit 223), Highway 60/11 interchange will be closed for 70 working days. Temporary Single Lane Closures are in effect along Highway 60 Monday to Thursday. Speed Reductions (by 20 kilometers per hour) are in affect along Highway 60 Monday to Thursday. The regulatory speed reductions are only permitted when, while and where lane closures are in place and workers are present. No width restrictions. No reduced height. restrictions
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5138
Start of Construction : April 04, 2017
Estimated End of Construction : October 31, 2017
Highway : 639
Length of Construction : 0.00 km
Close To : Elliot Lake
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural
Value of Contract : $10,000,000.00
Description :
Traffic Impact : Christman Creek Culvert, 12.5 kilometers North of Highway 108 (0.3 kilometer). Boland River Bridge, 16.7 kilometers North of Highway 109 (0.1 kilometer). Expect delays up to 5 minutes. Single lane closure at Boland River Bridge. Temporary detour at the Christman Creek Culvert. Reduced speed through job site 60 kilometers per hour at Christman Creek and Boland River Bridge. Temporary detour 4.0 meters at Christman Creek and North Bound - Closed. South Bound -3.03 meters at Boland Bridge. No height restrictions.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5132
Start of Construction : May 31, 2017
Estimated End of Construction : August 27, 2018
Highway : 17
Length of Construction : 0.00 km
Close To : Goulais River
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Structural Rehabilitation, and Electrical
Value of Contract : $10,000,000.00
Description : Grading, Drainage, Granular Base, Hot Mix Paving, Structural Rehabilitation, and Electrical
Traffic Impact : From 1.3 kilometres South of highway 552 JCT from the South Limit of Goulais River Bridge Northerly to the Chippewa River Bridge, 27.9 kilometres. Construction Zone Limits: 2.3 kilometres South of Highway 552 Northerly for 29.9 kilometres to the Chippewa River Bridge. Expect delays up to 15 minutes. A maximum of six (6) daytime single lane closures, delineated by traffic barrels.- Goulais River Bridge: long term temporary single lane restriction, delineated by temporary concrete barrier, and controlled by temporary traffic lights. Hardwood's Creek Bridge: long term temporary single lane restriction, delineated by temporary concrete barrier, and controlled by portable temporary traffic signals. Reduced Speed Limits:- Goulais River Bridge and Hardwood's Creek Bridge: 60 kilometres per hour. Effective Width (Lane and Shoulder):- Goulais River Bridge: 4.0 metres. Hardwood's Creek Bridge: 5.024 metres.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5131
Start of Construction : May 01, 2017
Estimated End of Construction : October 17, 2017
Highway : 17
Length of Construction : 21.50 km
Close To : Spanish
Type of Contract : Resurfacing and Bridge Rehabilitation
Value of Contract : $19,431,250.00
Description : Work includes Grading, Drainage,Granular Base, Hot Mix Paving, Electrical and Structural.
Traffic Impact : Highway 17, from 3.5 kilometres west of highway 6 easterly 18.8 kilometres to Nairn Centre. Expect delays up to 20 minutes. Traffic reduced to 70 kilometres per hour throughout construction zone. Lane Closures will occur on Highway 17 west of Highway 6 . Utilization of long duration single lane closure for paving with traffic control persons.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5131
Start of Construction : May 01, 2017
Estimated End of Construction : October 17, 2017
Highway : 6
Length of Construction : 21.50 km
Close To : Spanish
Type of Contract : Resurfacing and Bridge Rehabilitation
Value of Contract : $19,431,250.00
Description : Work includes Grading, Drainage,Granular Base, Hot Mix Paving, Electrical and Structural.
Traffic Impact : Highway 6 from highway 17 Southerly 2.7 kilometres. Expect delays up to 20 minutes. Traffic reduced to 70 kilometres per hour throughout construction zone. Lane closures will occur on Highway 6. Utilization of long duration single lane closure for paving with traffic control persons.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5129
Start of Construction : July 04, 2016
Estimated End of Construction : October 27, 2017
Highway : 11
Length of Construction : 34.70 km
Close To : Val Rita
Type of Contract : Road surface reconstruction including drainage,grading, hot mix paving. includes one bridge rehabilitation and 2 structural culverts
Value of Contract : $29,174,493.00
Description : Work includes Grading Drainage, Granular Base, Hot Mix Paving, Electrical, Structural Culvert Replacement and Structural Rehabilitation: Solomon Creek Bridge Rehab, 45.7 kilometres west of Highway 581, Holledge Creek Culvert Rehab, 51.5 kilometres west of Highway 581, (8.3 kilometres east of Opasatika River Bridge) East of Opasatika, and Creek Culvert Replacement, 3.3 kilometres east of Opasatika River Bridge.
Traffic Impact : Resurfacing Highway 11, from: intersection of Hyundai Road and Highway 11 westerly for 689 meters in McCrea Township. intersection of Hyundia Road and Highway 11 easterly for 3390 meters. To: Intersection of Hyundia Road and Highway 11 easterly for 2065 meters Township of Idington. Intersection of Bonneview Road and Highway 11 easterly for 528 Meters Township of O'brien. Expect delays up to 10 minutes. Some impacts to public traffic. Work on site includes Solomon Creek Bridge Rehabilitation. Full lane or part lane and shoulder used for travel during single lane closures. Solomon Creek Bridge lane restriction of 4.5 meters on eastbound lane - westbound lane closed. Height restriction of 5.0 meters on eastbound lane , eastbound lane of bridge deck being removed. Speed is reduced to 60 kilometers per hour through bridge working zone
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5127
Start of Construction : June 29, 2016
Estimated End of Construction : October 05, 2018
Highway : 11
Length of Construction : 0.00 km
Close To : Nagagami
Type of Contract : Grading, Drainage, granular Base, Hot Mix Paving, Electrical and Structure replacement.
Value of Contract : $27,883,565.00
Description : Highway 11 : Nagagami River Bridge Replacement, 2.1 kilometres west of highway 631 and Shekak River Bridge Replacement, 9.4 kilometres east of Highway 631 for 3.3 kilometres.
Traffic Impact : Highway 11 Nagagami and Shekak River Bridges. Expect delays up to 5 minutes. No restrictions, Traffic could be reduced to 70 kilometres per hour at the Nagagami when workers are on site but speed signs are covered at the end of the day and on the weekends.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5108
Start of Construction : May 15, 2017
Estimated End of Construction : November 03, 2017
Highway : 560
Length of Construction : 0.00 km
Close To : Elk Lake
Type of Contract : Structural bridge replacement
Value of Contract : $10,000,000.00
Description : Structural bridge replacement.
Traffic Impact : Highway 560 Lower Opikinimika River Bridge. Expect delays up to 15 minutes. Lanes will be reduced to single lane controlled by temporary traffic signals. Speed reduction to 60 kilometres per hour. Traffic controlled by temporary flagging operations when required. 3.6 metre lane width between temporary concrete barriers 0.82 metres high 5 metre clearance under Temporary traffic signal lights
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5107
Start of Construction : June 05, 2017
Estimated End of Construction : November 20, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : North Bay
Type of Contract : Grading, Granular Base, Hot Mix Paving, Drainage
Value of Contract : $10,000,000.00
Description : Grading, Granular Base, Hot Mix Paving, Drainage
Traffic Impact : Highway 11 from 1.0 kilometres south of Lakeshore Drive Underpass, northerly 6.9 kilometres to 0.2 kilometres north of Highway 17 interchange, North Bay. Expect delays up to 10 minutes. Traffic staging Stage A Cross-overs - Diversion of Southbound traffic to Northbound lane for 2 way traffic. Continued 2 way travel in Southbound lane with (optional) exit of Southbound traffic to North-East/west Ramp (Lakeshore Drive) Diversion and reinstatement of Southbound traffic to Southbound lane. Reduced speed southbound lane from 80 kilometres per hour to 60 kilometres per hour. Northbound and Southbound traffic in stage A reduced from 100 kilometres per hour reduced to 80 kilometres per hour. Effective width (lane and shoulder) 3.75 metre lane with shoulder ranging 2.5 to 3.0 metres. No reduced height.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5106
Start of Construction : May 01, 2017
Estimated End of Construction : September 15, 2017
Highway : 519
Length of Construction : 30.60 km
Close To : Wawa
Type of Contract : Grading, Drainage, Hot Mix Paving, Structural and Electrical
Value of Contract : $10,000,000.00
Description : Grading, Drainage, Hot Mix Paving, Structural and Electrical
Traffic Impact : Highway 519 from Highway 17 to Dubreuilville. Expect delays up to 15 minutes. Temporary Single Lane Detour Information Continuous July 26 – September 15, 2017 (24 hours /days a week) at Twin Lakes Culvert Replacement. Single Lane Detour Maximum Vehicle Width 4.4 meters, Temporary Traffic Signal, Dumas Township (Roughly 10 kilometers West of the Town of Dubreuilville on Highway 519. August 21st to August 26th Monday Through Saturday Intermittent single lane closures for Guardrail Replacements, Ground Mounted Sign Replacements, and Pavement Markings
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5104
Start of Construction : May 15, 2017
Estimated End of Construction : October 31, 2017
Highway : 60
Length of Construction : 0.00 km
Close To : Algonquin Park
Type of Contract : Grading, Drainage, Granular Base and Hot Mix Paving
Value of Contract : $10,000,000.00
Description : Grading, Drainage, Granular Base and Hot Mix Paving.
Traffic Impact : Highway 60 – From 0.16 kilometres East of Station Road, Easterly 13.6 kilometres to Kearney Creek Bridge, Sta 12+241 Canisbay Twp to Sta11+670 Sproule Twp.,13.6 kilometres Expect delays up to 15 minutes. Single Lane closures will be in effect on Highway 60 within the limits of the project, controlled by traffic control persons when operations are taking place. Granular Surface for approximately 5 kilometers starting Monday, July 3, 2017. Advisory 60 kilometers per hour signs will be in place. Monday to Thursday 6 a.m. to 7 p.m. and Friday from 6 a.m. until noon, single lane closure operations controlled by traffic control persons
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5103
Start of Construction : April 24, 2017
Estimated End of Construction : August 02, 2019
Highway : 17
Length of Construction : 0.00 km
Close To : Lively
Type of Contract : Grading, Drainage, Gran. Base, Hot Mix Paving, Electrical, 6 Structure Rehabilitations and 1 Structural Culvert Replacement.
Value of Contract : $10,000,000.00
Description : Grading, Drainage, Gran. Base, Hot Mix Paving, Electrical, 6 Structure Rehabilitations and 1 Structural Culvert Replacement.
Traffic Impact : Highway 17 from 1.2 kilometers east of the Highway 17 and Municipal Road 55 Interchange at Sudbury, Westerly 22.2 kilometers. Vermilion River Bridge east and west bound lanes. Municipal Road 3 Underpass, Santala Road Underpass, Meatbird Creek Culvert, Municipal Road 24 east and west bound overpasses. Expect delays up to 15 minutes. On highway 17 four lanes eastbound highway 17 is closed from Municipal Road 55 Interchange at Sudbury to Fairbank Lake Road resulting in the westbound lanes becoming one lane travelling east and one lane traveling west. The complete lane closure results in a reduced speed limit of 80 kilometres per hour. Highway 17 effective lane width 3.75 metres due to flex posts installed along the centreline and each lane having a turning lane at various points along the 22 kilometre section where there is no shoulder. Municipal Road 3 Underpass is reduced to one 3.5 metre lane width. No traffic signals are used and yield to oncoming traffic in effect.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5012
Start of Construction : May 01, 2017
Estimated End of Construction : November 30, 2017
Highway : 11
Length of Construction : 29.80 km
Close To : Chapleau
Type of Contract : Highway Rehabilitation including: grading, Drainage, Granular Base, Hot Mix Paving and 2 structural culvert replacements
Value of Contract : $26,818,780.00
Description :
Traffic Impact : Highway 11 Rehabilitation, from the West Limit of Missinaibi River Bridge, easterly to 0.2 kilometres West of Hyundai Road for 29.8 kilometres, includes Five Mile Creek Culvert Replacement, 1.2 kilometres east of Missinaibi River Bridge at Mattice, and Hamilton Creek Culvert (Unknown Creek Culvert) Replacement, 36.1 kilometres east of East Junction of Highway 583. Expect delays up to 5 minutes. Single Lane traffic with temporary traffic signals at Five Mile Creek and Hamilton Creek. Effective lane width and height at both culverts is 5 metres. Daily lane closures with Traffic Control Persons
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5007
Start of Construction : May 24, 2016
Estimated End of Construction : September 30, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Bracebridge
Type of Contract : Structure Rehabilitation
Value of Contract : $4,342,899.00
Description : Highway 11 Vankoughnet Road Underpass Rehabilitation at Highway 118, and Taylor Road Underpass Rehabilitation, 3.9 kilometres south of Muskoka Road 117 at Bracebridge, for 0.8 kilometres. Work includes grading, granular base, hot mix paving, drainage, electrical and structural.
Traffic Impact : 0.5 Kilometers South of Highway 118, 2 kilometers North of Road Underpass. Taylor road at Highway 11. Expect delays up to 10 minutes. Intermittent single lane closures using traffic control barrels. Traffic signals activated. Temporary concrete barrier in-place. Lane width reduction to 4.20 metres, height reduction is 5.82 metres.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2016-5007
Start of Construction : May 24, 2016
Estimated End of Construction : September 30, 2017
Highway : 118
Length of Construction : 0.00 km
Close To : Muskoka Falls
Type of Contract : Structure Rehabilitation
Value of Contract : $4,342,899.00
Description : Highway 11 Vankoughnet Road Underpass Rehabilitation at Highway 118, and Taylor Road Underpass Rehabilitation, 3.9 kilometres south of Muskoka Road 117 at Bracebridge, for 0.8 kilometres. Work includes grading, granular base, hot mix paving, drainage, electrical and structural.
Traffic Impact : Vankoughnet Road Underpass. Expect delays up to 10 minutes. Traffic signals activated. Temporary concrete barrier in place. Lane width reductions 3.96 meters, height reduction 5.86 meters. The east/west - north ramp traffic may be put onto the right granular shoulder during weekday daylight hours. The east-south and the east/west-north ramp will not have lane closures at the same time.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2015-5128
Start of Construction : February 29, 2016
Estimated End of Construction : September 28, 2017
Highway : 540
Length of Construction : 17.50 km
Close To : Gore Bay
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, Structural Culvert Rehabilitation, Structural Culvert Replacement and Bridge Replacement
Value of Contract : $13,127,126.00
Description : Grading, Drainage, Granular Base, Hot Mix Paving and Structural Replacement & Rehabilitation. Includes 2 structural culverts rehabilitations, 3 structural culvert replacements and one bridge replacement.
Traffic Impact : Highway 540 from Kagawong Westerly for 16.0 km, Highway 540 B from the East junction of Highway 540/542 Northerly 1.0 km and Bond Creek Culvert on Highway 540, 12.0 km West of Highway 6/540 Intersection Expect delays up to 5 minutes. One lane closure restriction for scheduled operations at Kagawong Bridge. For one lane restriction temporary traffic light installed at Kagawong Bridge.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2015-5126
Start of Construction : November 09, 2015
Estimated End of Construction : November 30, 2017
Highway : 11
Length of Construction : 4.80 km
Close To : Powassan
Type of Contract : GRADING, DRAINAGE, GRANULAR BASE, HOT MIX PAVING, PARTIAL ILLUMINATION AND STRUCTURES
Value of Contract : $22,796,025.00
Description : Rehabilitation of Highway 11 Northbound lanes from 5.7 kilometres south of Highway 534 Interchange northerly 4.8 km, Grading, Drainage, Granular Base, Hot Mix Paving and Structures - New North McGillvray Creek Bridge (NBL), 3.8 kilometres south of highway 534/Clarke Street Interchange, Culvert Replacement with New Br and McGillvray Creek Tributary Culvert (NBL) Replacement and SBL Rehabilitation Ext, 1.9 kilometres south of highway 534/Clarke Street Interchange, 1&2 two New Snowmobile Culverts northbound and southbound lanes.
Traffic Impact : 5.7 kilometres south of Highway 534, northerly for 4.8 kilometres, municipality of Powassan. There is no impact on traffic. Collector lane closed. No reduced speed limits. Open lane is 6.4 meters. No reduced height.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2015-5121
Start of Construction : September 08, 2015
Estimated End of Construction : October 27, 2017
Highway : 66
Length of Construction : 3.40 km
Close To : Kirkland Lake
Type of Contract : Realignment of Highway and Surface Rehabilitation. Grading, Drainage, Granular Base, Hot mix Paving and Electrical
Value of Contract : $22,087,577.00
Description : Work includes Grading, Granular Base, Hot Mix Paving and Electrical (Illumination).
Traffic Impact : Near Virginiatown, from 10.6 kilometres east of Highway 624 easterly for 3.4 kilometres. Expect delays up to 15 minutes. West project limits speed zone reduced from 90 kilometers per hour to 70 kilometers per hour on Highway 66. Regulatory speed zone of 60 kilometers per hour through the remainder of the constructions zone on Highway 66.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2015-5119
Start of Construction : March 01, 2016
Estimated End of Construction : September 30, 2020
Highway : 69
Length of Construction : 14.90 km
Close To : French River
Type of Contract : 4 lane expansion,.Grading, Drainage, Granular Base, Hot Mix Paving, ATMS, Electrical, and Structural
Value of Contract : $197,303,069.00
Description : Work includes 14.9 kilometres of mainline construction, 2 full interchanges, 10 new bridges, mulltiple structural culverts, Electrical - illumination and counting stations, relocation of Variable Message Signs.
Traffic Impact : Near French River, from 2.9 kilometres north of Highway 522 to 4.6 kilometres north of Highway 607 for 14.9 kilometres. Expect delays up to 15 minutes. Traffic currently on existing Highway 69 with no lane restrictions in place during Stage 1. Speed reduction zone applies to Contract Limits, however zoned only as required. Speed limit reduced from 90 kilometres per hour to 70 kilometers per hour when workers are present.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2015-5115
Start of Construction : May 09, 2016
Estimated End of Construction : October 17, 2017
Highway : 101
Length of Construction : 32.60 km
Close To : Wawa
Type of Contract : Grading, Drainage, Granular, Hot Mix Paving, Electrical
Value of Contract : $28,451,187.00
Description : Grading, Drainage, Granular, Hot Mix Paving, Electrical
Traffic Impact : Near Wawa, Highway 101, from Junction of Highway 17 easterly for 2.2 kilometres Expect delays up to 15 minutes. No traffic staging. Advisory speed of 70 kilometers per hour. No reduced height. Periodic single lane closures with flagging operations. Lane width of 3.75 meters with varying shoulder width.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2015-5115
Start of Construction : May 09, 2016
Estimated End of Construction : October 17, 2017
Highway : 17
Length of Construction : 32.60 km
Close To : Wawa
Type of Contract : Grading, Drainage, Granular, Hot Mix Paving, Electrical, and Structure Rehabilitation
Value of Contract : $28,451,187.00
Description : The contract consists of Grading, Drainage, Granular, Hot Mix Paving, Electrical, and Structure Rehabilitation.
Traffic Impact : 14.8 kilometres north of Highway 101 southerly for 30.4 kilometres & Highway 101 from Highway 17 easterly for 2.2 kilometres. Speckled Trout Creek Culvert & Agawa River Overflow Culverts on Highway 17, approximately 85 kilometres south of Highway 101 Expect delays up to 15 minutes. No traffic staging . Advisory speed of 70 kilometres per hour. Lane width of 3.75 metres with varying shoulder width. No reduced height. Periodic single lane closures with flagging operations.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2015-5006
Start of Construction : December 14, 2015
Estimated End of Construction : November 30, 2017
Highway : 11
Length of Construction : 12.00 km
Close To : Huntsville
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving and Culvert Replacement
Value of Contract : $17,205,350.00
Description : Design Build Minor, Rehabilitation of Highway 11 (NBL's & SBL's) from north of North Muskoka Road Bridge to South Mary Lake Road for 12.0 kilometres, including Unknown Culvert Rehabilittion, 0.9 kilometres north of Stephenson Road 1.
Traffic Impact : Highway 11 North of North Muskoka River Bridge to South Mary Lake Road for 12.0 kilometres. Expect delays up to 10 minutes. Possible mobile single lane closures, Very Short Duration single lane closures, Short Duration single lane closures, Long Duration single lane closures and Overnight Lane Closures Speed reduction in some locations to 80 kilometres per hour. No lane width restriction. No reduced height
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017
Last Updated: August 18, 2017

Top of page Top of page


Contract #: 2014-5137
Start of Construction : May 01, 2015
Estimated End of Construction : November 30, 2017
Highway : 60
Length of Construction : 0.00 km
Close To : Algonquin Park
Type of Contract : Grading, Drainage, Granular Base Hot Mix Paving, Structure Replacement, Structure Rehabilitation, and Electrical
Value of Contract : $24,686,070.00
Description : Resurfacing of Highway 60 from junction of Highway 127 easterly for 19.2 kilometres. Rehabilitation of the Amable Creek Culvert, 8 kilometres east of Highway 127. Replacement of 3 culverts situated at 11, 11.3 and 26.5 kilometres west of Highway 127. Rehabilitation of the Madawaska River Bridge located 3.1 kilometres west of Highway 127 in Whitney.
Traffic Impact : Hwy 60 Resurfacing of Highway 60; #2 – Amable Creek Culvert; #3 – Madawaska River Bridge; #4 – Unknown Creek Culvert ; #5– Unknown Creek Culvert; #6 – Unknown Creek Culvert. Expect delays up to 5 minutes. Lane closures will be in effect on Highway 60 within the limits of the project, controlled by traffic control persons. Advisory 60 kilometer per hour signs will be in place. Monday to Friday sunrise to sunset lane closure operations controlled by traffic control persons. Speed will be reduced to 50 kilometres per hour at Madawaska River bridge. This area will be down to a single lane controlled by traffic control persons when operations are taking place. Staged Construction at Culvert #43-236/C, Highway 60, 26.5 kilometres west of Highway127 down to one 4.5 metre lane, controlled by temporary traffic signals. This configuration will be in place until the culvert replacement is completed in the summer of 2017. Speed reduced to 60 kilometers per hour. Culvert #43-234 will be down to a 8.65 metre total platform width in stage 2 , with temporary concrete barriers on both sides. This configuration will be in place until the culvert replacement is completed in the summer of 2017.The culvert is located 11.3 kilometres west of Highway 127. Speed reduced to 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 18, 2017 - August 25, 2017