Construction Reports: Northeastern

Contract #: 2015-5125
Start of Construction : August 17, 2015
Estimated End of Construction : October 30, 2015
Highway : 11
Length of Construction : 20.40 km
Close To :
Type of Contract : Preventive Resurfacing
Value of Contract : $6,219,056.00
Description : Work includes mix and pave repairs, granular shouldering, cable guide rail adjustments, earth ditch clean outs, edgeline and centreline rumble strips and one traffic count station with four detector loops.
Traffic Impact : On Highway 11, from 3 kilometres west of Highway 631 westerly for 20.4 kilometres. Expect delays up to 5 minutes.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5123
Start of Construction : July 13, 2015
Estimated End of Construction : October 15, 2015
Highway : 552
Length of Construction : 5.40 km
Close To : Goulais River
Type of Contract : Road Rehabilitation
Value of Contract : $2,853,836.00
Description : Work includes Grading, Drainage, Granular Base, and Hot Mix Paving,
Traffic Impact : Highway 552 from Highway 17 westerly for 5.4 kilometres. Expect delays up to 5 minutes. Single Lane Closures between sunrise and sunset, Monday to Friday.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5122
Start of Construction : July 02, 2015
Estimated End of Construction : October 09, 2015
Highway : 144
Length of Construction : 8.00 km
Close To : Chelmsford
Type of Contract : Rehabilitation and Selective Resurfacing
Value of Contract : $10,166,375.00
Description : Work includes Grading, Granular Base, Drainage, Hot Mix Paving.
Traffic Impact : Near Chelmsford, on Highway 144 from 2.1 kilometres south Regional Road 35 northerly for 23.6 kilometres, Expect delays up to 50 minutes. Single lane closures from sunrise to sunset. Delineated with plastic barrels.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5118
Start of Construction : August 10, 2015
Estimated End of Construction : September 25, 2015
Highway : 141
Length of Construction : 0.18 km
Close To : Rosseau
Type of Contract : Centre line culvert replacement
Value of Contract : $541,294.00
Description : Work includes Grading , Drainage, Granular Base, and Hot Mix Paving.
Traffic Impact : On Highway 141, in Rosseau. Expect delays up to 5 minutes. Single lane of 3.5 metres delineated with plastic barrels.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5117
Start of Construction : August 31, 2015
Estimated End of Construction : October 30, 2015
Highway : 124
Length of Construction : 0.00 km
Close To : Dunchurch
Type of Contract : Storm sewer replacement
Value of Contract : $382,297.00
Description : Work includes Grading, Drainage, Granular Base and Hot Mix Paving. Replacement of storm sewer system.
Traffic Impact : Highway 124 in Dunchurch. From 0.6 kilometres west of Highway 520 easterly for 175 metres. Expect delays up to 5 minutes. Occasional single lane closure throughout the contract limits, with traffic control persons.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 26, 2015

Top of page Top of page


Contract #: 2015-5113
Start of Construction : June 22, 2015
Estimated End of Construction : December 04, 2015
Highway : 144
Length of Construction : 18.10 km
Close To : Cartier
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving and Structural Culvert Rehabilitation.
Value of Contract : $11,539,512.00
Description : Work includes Grading, Drainage, Granular Base, Hot Mix Paving and Structural Culvert Rehabilitation.
Traffic Impact : On Highway 144 from 1.5 kilometres South of Municipal Road 8 to Centre Street in Cartier for 18.1 kilometres. Expect delays up to 30 minutes. Single lane closures from sunrise to sunset. Delineated with plastic barrels. Paving operations are scheduled to commence August 17. Traffic will be controlled with a convoy vehicle.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5111
Start of Construction : June 15, 2015
Estimated End of Construction : September 19, 2016
Highway : 17
Length of Construction : 10.40 km
Close To : Verner
Type of Contract : Road Rehabilitation and culvert replacements
Value of Contract : $15,244,328.00
Description : Work includes grading, granular base, hot mix paving, electrical and structural rehabilitation.
Traffic Impact : On Highway 17, between Sturgeon Falls and Verner for 10.6 kilometres. Expect delays up to 10 minutes. Single Lane Closures controlled by Traffic Control Persons throughout the Contract. Night work is anticipated for culvert replacements.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5110
Start of Construction : August 04, 2015
Estimated End of Construction : July 25, 2016
Highway : 108
Length of Construction : 23.40 km
Close To : Elliot Lake
Type of Contract : Rehabilitation, culvert replacements, shoulder work
Value of Contract : $10,365,110.00
Description : Work includes reinstating granular shoulders to design standard, replacing 50 culverts, paving and replacing guiderails.
Traffic Impact : Highway 108 from Highway 17, Northerly to Elliot Lake. Expect delays up to 10 minutes. Single lane closures throughout the contract. Advisory speed limit is 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5109
Start of Construction : May 25, 2015
Estimated End of Construction : September 20, 2016
Highway : 542
Length of Construction : 11.80 km
Close To : Mindemoya
Type of Contract : Resurfacing and structure rehabilitation.
Value of Contract : $12,946,414.00
Description : Storm Sewer, Curb & Gutter, Roadwork rehabilitation
Traffic Impact : Highway 542 from Highway 540 to Highway 542 for 11 kilometres. Expect delays up to 10 minutes. Mindemoya Creek Bridge reduced to 3.4 metres until August 31, 2015. Traffic signals installed
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5109
Start of Construction : May 25, 2015
Estimated End of Construction : September 20, 2016
Highway : 551
Length of Construction : 11.80 km
Close To : Mindemoya
Type of Contract : Resurfacing and structure rehabilitation.
Value of Contract : $12,946,414.00
Description : Rehabilitation of 5 culverts & 2 bridges, 1 Bridge replacement.
Traffic Impact : Highway 551 from Highway 540 to Highway 542 for 11 kilometres. Expect delays up to 10 minutes. Single lane closures Monday to Friday. No closures on weekends.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5108
Start of Construction : June 15, 2015
Estimated End of Construction : September 11, 2015
Highway : 17
Length of Construction : 0.00 km
Close To : Desbarats
Type of Contract : Grading, Drainage and Structure Rehabilitation
Value of Contract : $1,975,950.00
Description : Grading, Drainage and Structure Rehabilitation
Traffic Impact : Highway 17, near junction of Highway 548. Expect delays up to 5 minutes. Intermittent single lane restriction from sunrise to sunset.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 26, 2015

Top of page Top of page


Contract #: 2015-5108
Start of Construction : June 15, 2015
Estimated End of Construction : September 11, 2015
Highway : 548
Length of Construction : 0.00 km
Close To : Desbarats
Type of Contract : Grading, Drainage and Structure Rehabilitation
Value of Contract : $1,975,950.00
Description : Grading, Drainage and Structure Rehabilitation
Traffic Impact : Highway 548 from 1.8 kilometre west of Base Line to 0.2 kilometre east of Base Line. Expect delays up to 5 minutes. Two Lane or Full Closure is expected from July 16. 2015 to September 3, 2015 Alternate Route: Take Base Line then P Line.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 26, 2015

Top of page Top of page


Contract #: 2015-5107
Start of Construction : June 18, 2015
Estimated End of Construction : September 11, 2015
Highway : 638
Length of Construction : 2.20 km
Close To : Bruce Mines
Type of Contract : Culvert Rehabilitation
Value of Contract : $2,090,906.00
Description : Work includes installing a full pipe liner down the length of existing culvert and installing a by-pass pipe alongside the existing culvert by trenchless technology.
Traffic Impact : On Highway 638, 7.8 kilometres north of Highway 17 at Rydal Bank. Expect delays up to 5 minutes. Traffic may be reduced to one lane from sunrise to sunset.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 26, 2015

Top of page Top of page


Contract #: 2015-5106
Start of Construction : June 29, 2015
Estimated End of Construction : September 01, 2016
Highway : 69
Length of Construction : 0.00 km
Close To : French River
Type of Contract : Structural Rehabilitation
Value of Contract : $6,107,595.00
Description : Work includes new deck, structural steel and concrete repairs.
Traffic Impact : Near French River, 12.3 kilometre North of Highway 522. Expect delays up to 15 minutes. French River Structure, 12.3 kilometres north of Highway 522 down to single lane of 4 metres, controlled by traffic lights. Height restriction of 7.80 metres. Alternate route : Highway 17 to Highway 11.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5104
Start of Construction : June 01, 2015
Estimated End of Construction : October 06, 2016
Highway : 11
Length of Construction : 0.00 km
Close To : Cochrane
Type of Contract : Rehabilitation and replacements of Culverts
Value of Contract : $12,560,776.00
Description : Work includes Grading, Drainage, Granular Base, Hot Mix Paving and Structural.
Traffic Impact : On Highway 11, near Cochrane. First location is 2.9 kilometres south of Cochrane. Expect delays up to 5 minutes. Single lane of 5 metres in effect at first site located 2.9 kilometres south of Cochrane. Controlled by Temporary Traffic Signals. Speed limit reduced to 70 kilometres per hour at both locations.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5104
Start of Construction : June 01, 2015
Estimated End of Construction : November 30, 2015
Highway : 652
Length of Construction : 145.00 km
Close To : Cochrane
Type of Contract : Replacement and Rehabilitation of culverts
Value of Contract : $12,560,776.00
Description : Replacements and rehabilitation of culverts on Highway 652. Culverts are located 25.6 kilometres, 28 kilometres, 87.7 kilometres and 144 kilometres north of Cochrane.
Traffic Impact : On Highway 652, from Cochrane northerly for 145 kilometres. Expect delays up to 5 minutes. Single lane in effect at Roy Creek Culvert, 25.6 Kilometres North of Cochrane. Controlled with yield to opposing traffic signs. Speed limit reductions in effect. Watch for posted signs.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5103
Start of Construction : June 01, 2015
Estimated End of Construction : October 30, 2015
Highway : 11
Length of Construction : 0.00 km
Close To : Hearst
Type of Contract : Culvert replacement
Value of Contract : $1,980,792.00
Description : Work includes Grading Drainage, Granular Base, Hot Mix Paving and Structural Replacement.
Traffic Impact : Bradburn Creek Culvert, near Hearst on Highway 11. Located 15.8 kilometres west of Highway 583. Expect delays up to 5 minutes. Single lane of 4.5 metres at Bradburn Creek culvert. Speed limit reduced to 70 kilometres per hour. Alternate Route: Highway 17
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5101
Start of Construction : May 18, 2015
Estimated End of Construction : November 06, 2015
Highway : 17
Length of Construction : 14.90 km
Close To : Warren
Type of Contract : Rehabilitation and structural work
Value of Contract : $13,653,927.00
Description : Work inclcudes grading, drainage, paving and illumination. Work also includes rehabilitation of Bear Creek and Deer Creek Culvert and replacement of a culvert 10.6 kilometres west of Highway 575.
Traffic Impact : On Highway 17, rehabilitation from Highway 539 easterly to the junction of Highway 17 and 64 in Verner. Total length of construction is 15 kilometres. Expect delays up to 10 minutes. Highway 17 will be closed from the junction of Highway 64 in Verner to intersection of Highway 17 and Coté Street until September 4, 2015. Speed limit along detour route is 40 kilometres per hour. Highway reduced to single lane and flagging operations at various locations within the project limits. Temporary traffic signals near Warren. Lane reduced to maximum width of 4.0 metres between Temporary Concrete Barriers.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5100
Start of Construction : June 29, 2015
Estimated End of Construction : November 18, 2016
Highway : 69
Length of Construction : 0.76 km
Close To :
Type of Contract : Highway four lane expansion.
Value of Contract : $23,373,204.00
Description : Work includes grading, drainage, granular base, hot mix paving and structures. Construction of 2.7 kilometres of realigned railway tracks; and 0.6 kilometres of new Highway 69 north and southbound lanes from 1.2 kilometres south of existing Highway 522.
Traffic Impact : On Highway 69, just south of Highway 522, for 0.76 kilometres northerly Expect delays up to 15 minutes. Speed limit reduced to 60 kilometres per hour during working hours. Intermittent delays due to single lane closures.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 26, 2015

Top of page Top of page


Contract #: 2015-5004
Start of Construction : June 22, 2015
Estimated End of Construction : July 29, 2016
Highway : 11
Length of Construction : 30.20 km
Close To : Gravenhurst
Type of Contract : Paving and rehabilitation.
Value of Contract : $7,699,192.00
Description : Grading, drainage, granular base, hot mix paving, electrical, and structural rehabilitation.
Traffic Impact : Highway 11 from 1.7 kilometres north of Severn River to 0.3 kilometres south of Taylor Road for 30.2 kilometres Expect delays up to 5 minutes. Single lane closures this week. Overpass from Highway 11 to Muskoka Road/ Highway 169 into Gravenhurst is reduced to a single lane of 3.8 metres. Delineated with temporary concrete barriers.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5003
Start of Construction : July 13, 2015
Estimated End of Construction : November 06, 2015
Highway : 11
Length of Construction : 10.00 km
Close To : Huntsville
Type of Contract : Grading, Drainage, Granular Base and Hot Mix Paving, includes 14 centreline culverts replacements
Value of Contract : $13,445,839.00
Description : Rehabilitation highway 11 northbound and southbound lanes from South Mary Lake Road (Muskoka Road 44) northerly to Stephenson Road 12 for 10.0 kilometres. South of Huntsville, includes grading, Drainage, Granular Base and Hot Mix Paving, includes 14 centreline culverts replacements, 1 centreline culvert rehab - liner and one side road culvert replacement and one entrance culvert replacement; treatmanet of two distress areas.
Traffic Impact : Highway 11, South Mary Lake Road (Muskoka Road 44) northerly to Stephenson Road 12 for 10.0 kilometers. South of Huntsville. Expect delays up to 10 minutes. Speed limit reduced to 80 kilometers per hour through constucuction zone.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5002
Start of Construction : May 19, 2015
Estimated End of Construction : October 30, 2015
Highway : 400
Length of Construction : 8.86 km
Close To :
Type of Contract : Resurfacing
Value of Contract : $9,564,982.00
Description : Work includes Grading, Drainage, Granular Base, Hot Mix Paving, and Electrical.
Traffic Impact : Near Crooked Bay on Highway 400, Crooked Bay Road to Gibson River Bridge. Expect delays up to 5 minutes. Various Lane closures throughout the Contract Limits and nightly ramp closures at following locations: Exit 168 (Crooked Bay Road/Georgian Bay Road Interchange) North Bound, and Exit #174 (South Gibson Lake Road).
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5001
Start of Construction : May 04, 2015
Estimated End of Construction : November 06, 2015
Highway : 141
Length of Construction : 0.00 km
Close To : Rosseau
Type of Contract : Structure Rehabilitation, grading, drainage and paving
Value of Contract : $1,775,040.00
Description : Work includes patch repair deck, soffit, barrier walls and wasterproofing.
Traffic Impact : On Highway 141, 5.9 kilometres east of Highway 632. Rosseau River Bridge. Expect delays up to 5 minutes. Single lane closures this week. Rosseau River Bridge restricted to a single lane of 3.7 metres. Delinetated with temporary concrete barriers.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5000
Start of Construction : May 11, 2015
Estimated End of Construction : October 15, 2015
Highway : 118
Length of Construction : 0.10 km
Close To : Huntsville
Type of Contract : Culvert Replacements
Value of Contract : $2,395,950.00
Description : 7 culvert replacements on Highway 118.
Traffic Impact : 7 culvert replacements on Highway 118 at the following locations: Between Trapper's Trail and Loon Lake Road, 100 metres soutwest of Amaleen Drive, 550 metres east of Albett Court. 1.5 kilometres northeast of One Mile Drive, 2 kilometres northeast of Thompson Road, 260 metres east of Oakley Crescent and 400 metres northeast of Mathiasville Road Expect delays up to 5 minutes.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5000
Start of Construction : May 11, 2015
Estimated End of Construction : October 15, 2015
Highway : 141
Length of Construction : 0.10 km
Close To : Huntsville
Type of Contract : Culvert Replacements
Value of Contract : $2,395,950.00
Description : 6 culvert replacements on Highway 141.
Traffic Impact : 6 culvert replacements on Highway 141 at the following locations: 130 metres northeast Penny's line, 250 metres southwest of Penny's line, 1.2 kilometres west of Walkers's road, 160 metres northwest of Three Mile Lake, 800 metres and 1.2 kilometres northwest of Fish Hatchery Road. Expect delays up to 5 minutes. There will be a single lane of 3.5 metres on Highway 141 at the following sites. 130 metres northeast Penny's line, 250 metres southwest of Penny's line, 1.2 kilometres west of Walkers's road, 160 metres northwest of Three Mile Lake, 800 metres and 1.2 kilometres northwest of Fish Hatchery Road. Speed limit reduced to 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5000
Start of Construction : May 11, 2015
Estimated End of Construction : October 15, 2015
Highway : 35
Length of Construction : 0.10 km
Close To : Huntsville
Type of Contract : Culvert Replacements
Value of Contract : $2,395,950.00
Description :
Traffic Impact : 5 culvert replacements on Highway 35 at the following locations: 35 metres south of Timber Trail Lane, 60 metres north of Kandalore Road, 1 and 2.2 kilometres south of Sherbourne Road and 75 metres northeast of Ten Mile Bay Road. Expect delays up to 5 minutes.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-5000
Start of Construction : May 11, 2015
Estimated End of Construction : October 15, 2015
Highway : 60
Length of Construction : 0.10 km
Close To : Huntsville
Type of Contract : Culvert Replacements
Value of Contract : $2,395,950.00
Description : 2 culvert replacements on Highway 60 at the following locations: 260 metres west of Harp Lake Road and 260 metres west of Allison's Point Road.
Traffic Impact : 2 culvert replacements on Highway 60. Expect delays up to 5 minutes.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5139
Start of Construction : May 18, 2015
Estimated End of Construction : November 27, 2015
Highway : 17
Length of Construction : 3.30 km
Close To : Massey
Type of Contract : Bridge Rehabilitation
Value of Contract : $3,471,300.00
Description : On Highway 17, at Massey. Work includes deck repairs and new overlay, new railings, new sidewalk and curbs.
Traffic Impact : Aux Sables River Bridge on Highway 17 at Massey. Expect delays up to 15 minutes. Adjacent Bell Street will be reduced to one lane. Traffic controlled by Flag Persons. The eastbound lane of the Aux Sables River Bridge in Massey will be reduced to one lane traffic. Available lane width is 5.5 metres.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5137
Start of Construction : May 01, 2015
Estimated End of Construction : August 16, 2017
Highway : 60
Length of Construction : 19.20 km
Close To :
Type of Contract : Grading, Drainage, Granular Base Hot Mix Paving, Structure Replacement, Structure Rehabilitation, and Electrical
Value of Contract : $24,686,070.00
Description : Resurfacing of Highway 60 from junction of Highway 127 easterly for 19.2 kilometres. Rehabilitation of the Amable Creek Culvert, 8 kilometres east of Highway 127. Replacement of 3 culverts situated at 11, 11.3 and 26.5 kilometres west of Highway 127. Rehabilitation of the Madawaska River Bridge located 3.1 kilometres west of Highway 127 in Whitney.
Traffic Impact : Expect delays up to 5 minutes. Single lane closures in effect on Highway 60 within the limits of the project weekdays from sunrise to sunset. Speed limit reduced to 60 kilometres per hour when work is taking place. Culvert replacement on Highway 60, near Whitney has a 4.5 metre lane width controlled by traffic signals.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5136
Start of Construction : May 04, 2015
Estimated End of Construction : November 30, 2015
Highway : 101
Length of Construction : 47.90 km
Close To : Foleyet
Type of Contract : Grading, paving and structural rehabilitation
Value of Contract : $14,772,373.00
Description : Work includes replacement of asphalt pavement/waterproofing, minor recoating of bridge
Traffic Impact : On Highway 101, from Foleyet to Shawmere River Bridge westerly for 47.9 kilometres. Expect delays up to 10 minutes. Speed limit reduced to 60 kilometres per hour with a single lane closure at Shawmere River Bridge. Single lane traffic controlled by flagpersons thoughout the contract. Alternative Routes are Highway 144 and Highway 129.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 27, 2015

Top of page Top of page


Contract #: 2014-5135
Start of Construction : April 20, 2015
Estimated End of Construction : November 13, 2015
Highway : 520
Length of Construction : 2.10 km
Close To : Burks Falls
Type of Contract : Major Structure Rehabilitation
Value of Contract : $2,693,373.00
Description : Work includes deck repairs, waterproofing, paving and new barrier walls.
Traffic Impact : Highway 520, Distress River Bridge, 23.2 kilometres west of Highway 11. Expect delays up to 5 minutes. Distress River Bridge reduced to a single lane of 3.67 metres. Traffic signals in place. Delineated with temporary concrete barriers. Speed limit reduced to 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5131
Start of Construction : May 12, 2015
Estimated End of Construction : October 09, 2015
Highway : 631
Length of Construction : 0.00 km
Close To : White River
Type of Contract : Culvert Replacements
Value of Contract : $5,584,369.00
Description : 3 culvert replacements. On Highway 631 and Highway 17. Cedar Creek Culvert, 20.5 kilometres north of Hornepayne, West Beaton Culvert, 70.4 kilometres north of Highway 17 near White River and Picnic Lake Culvert, 1.5 kilometres west of White River on Highway 17.
Traffic Impact : On Highway 631 and Highway 17. Cedar Creek Culvert, 20.5 kilometres north of Hornepayne, West Beaton Culvert, 70.4 kilometre north of Highway 17 near White River and Picnic Lake Culvert, 1.5 kilometres west of White River on Highway 17. Expect delays up to 5 minutes. Cedar Creek Culvert reduced to a single lane of 3.75 metres. Delineated with temporary concret barriers on both sides. Picnic Lake culvert on Highway 17 reduced to 4 metres. Delineated with tempoary concrete barriers, plastic barrels and guiderails. Traffic controlled by temporary traffic signal lights. Possible flagging operations at both locations.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5129
Start of Construction : September 02, 2014
Estimated End of Construction : October 06, 2015
Highway : 144
Length of Construction : 19.00 km
Close To : Cartier
Type of Contract : Culvert replacments, grading, paving
Value of Contract : $13,975,000.00
Description : Work includes Grading, Drainage, Granular Base, Warm Mix Paving, and Structural Culvert Installation.
Traffic Impact : Highway 144. Just south of Half Way Lake Provincial Park Main Entrance northerly for 36 kilometres. Expect delays up to 15 minutes. Multiple single lane closures throughout the length of the Contract. Speed limit reduced to 60 kilometres per hour through Elboga Lake. Single Lane of 5 metres with traffic signals over Elboga Culvert. Delineated with Steel beam guide rail and concrete barriers.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5128
Start of Construction : August 05, 2014
Estimated End of Construction : November 06, 2015
Highway : 101
Length of Construction : 31.00 km
Close To : Timmins
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, and Structural Culvert Replacement.
Value of Contract : $14,914,283.00
Description : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, and Structural Culvert Replacement.
Traffic Impact : Between Foleyet and Timmins on Highway 101. 48 0.1 kilomertres East of Highway 144, westerly for 48 kilometres. Expect delays up to 10 minutes. Single lane traffic closures controlled by traffic personnel throughout contract. Speed limit reduced to 60 kilometres per hour. Opishing Bridge reduced to 4 metres. Controlled with traffic signals.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 27, 2015

Top of page Top of page


Contract #: 2014-5126
Start of Construction : October 06, 2014
Estimated End of Construction : November 27, 2015
Highway : 17
Length of Construction : 0.20 km
Close To : Webbwood
Type of Contract : Overhead structure rehabilitation
Value of Contract : $5,632,500.00
Description : Canadian Pacific Railway replacement at Webbwood, 10.5 kilometres west of Highway 6.
Traffic Impact : Highway 17 Railway Overhead structure at Webbwood, 10.5 kilometres west of Highway 6. Expect delays up to 15 minutes. Temporary Traffic Signals are in place for various stages of construction to direct traffic through the construction site. Railway Overhead reduced to one lane traffic of 4.0 metres wide. Speed limit reduced to 70 kilometres per hour on south side of structure and 60 kilometres per hour on north side.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5118
Start of Construction : September 02, 2014
Estimated End of Construction : October 31, 2015
Highway : 583
Length of Construction : 0.00 km
Close To : Hearst
Type of Contract : Structure Replacements
Value of Contract : $9,138,507.00
Description : Replacement of Prune Creek and Jessie Bridges on Highway 583 south of Highway 11 near Hearst.
Traffic Impact : 16 and 23 kilometres south of Highway 11 Prune and Jessie River Replacements. There is no impact on traffic. Single lane width of 4.5 metres at Jesse River Bridge and Prune Creek Bridge. Delineated with temporary concrete barriers. Single lane closures delineated with plastic barrels at other locations throughout the contract.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5116
Start of Construction : April 20, 2015
Estimated End of Construction : September 30, 2015
Highway : 11
Length of Construction : 0.20 km
Close To : Cochrane
Type of Contract : Major Culvert Rehabilitation
Value of Contract : $3,223,495.00
Description : Mondor Creek Culvert Rehabilition on Highway 11 near Cochrane, 200 metres in length.
Traffic Impact : Highway 11, 4.2 kilometres soutth of Highways 579 and 652 in the Township of Lamarche. Expect delays up to 10 minutes. Single lane of 5 metres at Mondor Creek. Speed limit reduced in construction zone. Traffic signals in place. Alternate Route: Highway 101 West to Highway 655.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5108
Start of Construction : June 25, 2014
Estimated End of Construction : October 30, 2015
Highway : 11
Length of Construction : 0.00 km
Close To : Hearst
Type of Contract : Structure replacement
Value of Contract : $8,964,990.00
Description : Grading, drainage, granular base, hot mix paving, and structure replacement.
Traffic Impact : Valentine River Bridge Replacement, 22 kilometres west of Highway 583. Expect delays up to 5 minutes. Single lane closure may be required for earth excavation, embankment construction or for shoulder widening
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5106
Start of Construction : May 21, 2014
Estimated End of Construction : November 15, 2015
Highway : 17
Length of Construction : 12.30 km
Close To : Corbeil
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural
Value of Contract : $15,278,000.00
Description : Rehabilitation from 0.3 kilometres east of Highway 94 easterly to 0.2 kilometres west of Highway 531 for 12.2 kilometres, included is two structural culverts replacements and one bridge rehabilitation - expansion joints and new construction of a Eastbound Passing Lane extension from 2.8.
Traffic Impact : from Junction of Highway 94 to Junction of Highway 531, Easterly for 12.3 kilometres. Expect delays up to 10 minutes. Speed limit reduced to 70 kilometres per hour. Single lane traffic throughout the contract 24 hours a day.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5102
Start of Construction : June 02, 2014
Estimated End of Construction : October 31, 2015
Highway : 65
Length of Construction : 21.90 km
Close To : New Liskeard
Type of Contract : Structural Rehabilitation
Value of Contract : $9,829,000.00
Description : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, Structural Culvert Replacement, Structural Rehabilitation and Illumination.
Traffic Impact : From 0.1 kilometres East of Armstrong Street to Quebec Border, 21.9 kilometres in total. Highway 11 from 0.3 kilometres South of Radley Hill Road, Northerly for 3.0 kilometres Expect delays up to 5 minutes. Moose Creek Bridge reduced to single lane of 4 metres. Traffic controlled by temporary traffic signals. Speed limit reduced to 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5101
Start of Construction : May 19, 2015
Estimated End of Construction : August 15, 2016
Highway : 11
Length of Construction : 30.60 km
Close To : Mattice
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical.
Value of Contract : $25,287,852.00
Description : Work includes grading, culvert replacements, granular base, hot mix paving and electrical work. Missinaibi River Bridge westerly to railroad crossing for 30.6 kilometres.
Traffic Impact : Highway 11 near Mattice, from Missinaibi River Bridge westerly to railroad crossing. Expect delays up to 20 minutes. Milling and paving operations ongoing. Single lane of 4.9 metres at Six Mile Creek structure, single lane of 5.2 metres at Armstrong Creek Structure and 5.0 metres at Evelyn Creek structure. Temporary signals in place. Speed limit reduced to 70 kilometres per hour at all locations.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5100
Start of Construction : May 20, 2014
Estimated End of Construction : October 31, 2015
Highway : 60
Length of Construction : 7.70 km
Close To : Walford
Type of Contract : Grading, drainage, granular base, hot mix paving, structure replacement, and electrical work
Value of Contract : $5,062,856.00
Description : Near Whitney. Replacement Norway and Opeongo Creek Culverts on Highway 60. Total length of construction zone is 7.7 kilometres.
Traffic Impact : 17.9 kilometres and 21.5 kilometres west of Highway 127 Junction. Expect delays up to 10 minutes. Norway and Opeongo Creek culverts reduced to single lane of 4.5 lane metres. Traffic signals in place. Speed reduced to 60 kilometres per hour at both locations.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5009
Start of Construction : May 01, 2015
Estimated End of Construction : October 30, 2015
Highway : 531
Length of Construction : 3.50 km
Close To : Bonfield
Type of Contract : Resurfacing.
Value of Contract : $2,934,470.00
Description : Resurfacing, work inlcudes milling and paving.
Traffic Impact : Highway 531, from Highway 17 for 3.5 kilometres to Bonfield. Expect delays up to 10 minutes. Speed limit reduced to 60 kilometres per hour when workers present.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5009
Start of Construction : May 01, 2015
Estimated End of Construction : October 30, 2015
Highway : 533
Length of Construction : 3.50 km
Close To : Mattawa
Type of Contract : Resurfacing.
Value of Contract : $2,934,470.00
Description : Resurfacing, work inlcudes milling and paving and ditching
Traffic Impact : Highway 533, from 1.0 kilometres north of Highway 17, northerly to Highway 656 for 3.8 kilometres Expect delays up to 10 minutes. Advisory speed limit of 60 kilometres per hour when workers present or where there is granular driving surfaces.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5004
Start of Construction : November 10, 2014
Estimated End of Construction : November 27, 2015
Highway : 112
Length of Construction : 19.80 km
Close To :
Type of Contract : Resurfacing and grading
Value of Contract : $9,586,403.00
Description : Design Build Minor, Highway 112 -from Highway 11 northerly to Highway 66 for 19.8 kilometres (South of Kirkland Lake), inculudes Highway 650 from Highway 112 easterly 1.6 kilometres Resurfacing and Grading.
Traffic Impact : Close to Tarzwell. Highway 112, from Highway 11 to Highway 66 for 20 kilometres. Expect delays up to 10 minutes. Singe Lane restrictions controlled by flagging.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5002
Start of Construction : October 20, 2014
Estimated End of Construction : November 30, 2015
Highway : 35
Length of Construction : 0.27 km
Close To : Dwight
Type of Contract : Structure Replacement
Value of Contract : $4,514,030.00
Description : Work includes replacement of superstructure (deck), sidewalks. Bearings, crack injection at pier footings, new deck drains and upgrades to guiderails waterproofing and asphalt overlay.
Traffic Impact : On Highway 35, near Dorset. Muskoka River Bridge replacement, 1 kilometre north of Muskoka Road 117. Expect delays up to 10 minutes. Single lane of 4.30 metres at Muskoka River Bridge. Delineated with Temporary Concrete Barriers. Traffic Signals in place. Reduced speed limit in place.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-5000
Start of Construction : June 02, 2014
Estimated End of Construction : September 18, 2015
Highway : 118
Length of Construction : 0.02 km
Close To : Huntsville
Type of Contract : 4 Structural Rehabilitations.
Value of Contract : $4,486,418.00
Description : Grading, Drainage, granular Base, Hot Mix Paving, Structure Rehabilitation, and Electrical.
Traffic Impact : Boyne River Bridge on Highway 60, 3.4 kilometres west of Highway 35. Anson and Black Creek Bridges on Highway 118. Halls Lake Culvert on Highway 35 Expect delays up to 5 minutes. Daily single lane closures using traffic control persons and plastic barrels at 2 locations.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 25, 2015

Top of page Top of page


Contract #: 2013-5115
Start of Construction : July 15, 2013
Estimated End of Construction : December 31, 2015
Highway : 518
Length of Construction : 0.00 km
Close To : Magnetawan
Type of Contract : Grading, Drainage, Granular base, Hot Mix Paving, Electrical & Structure Replacement
Value of Contract : $2,869,100.00
Description : Haines Creek Culvert Replacement, 2.5 kilometres east of Highway 518 and 400 Interchange and Jenkins Creek Culvert Replacement, 0.9 kilometres west of Highway 510 at Magnetawan.
Traffic Impact : 2.5 kilometres east of Highway 400. Expect delays up to 5 minutes. Traffic lane reduced to 4 metres. Delineated with temporary concrete barriers. Controlled by Temporary Traffic Signals. Speed limit reduced to 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2012-5101
Start of Construction : July 25, 2012
Estimated End of Construction : October 30, 2015
Highway : 69
Length of Construction : 11.20 km
Close To : Wanup
Type of Contract : 4 Lane Expansion
Value of Contract : $64,604,700.00
Description : Includes one temporary tie-in located near the south project limit. New diamond interchange at Crooked Lake Road. Includes thirteen new structures.
Traffic Impact : Highway 69, 3.1 kilometres north of Highway 64 northerly for 11.2 kilometres. Expect delays up to 10 minutes. Speed Limit of 90 kilometres per hour at newly opened lanes. Speed limit reduced to 60 kilometres per hour during construction crossing in the vicinity of Murdock River Bridge. Northbound lanes reduced to 8.3 metres for 2 kilometres with Temporary Concrete Barriers approximately 13 kilometres north of Highway 64.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2012-5100
Start of Construction : June 27, 2012
Estimated End of Construction : August 26, 2016
Highway : 69
Length of Construction : 13.70 km
Close To : Estaire
Type of Contract : New 4-Lane Construction, including Highway 64 interchange and side-roads with grading, drainage, granular base, hot mix, structure and illumination
Value of Contract : $80,777,500.00
Description : Between Bigwood and Estaire. Highway 69 Expansion. 2.7 kilometres North of Highway 607 to 7.2 kilometres North of Highway 64. Work includes 1 new structure and 8 new structural culverts,
Traffic Impact : Highway 69 Between Bigwood and Estaire, 2.7 kilometres North of Highway 607 to 7.2 kilometres North of Highway 64. Expect delays up to 5 minutes. Speed limit reduced to 70 kilometres per hour during the work week inside the project limits or 60 kilometres per hour at construction access #2. Returned to 90 kilometres per hour on weekends.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015