Ministry of Transportation / Ministère des Transports
Text size Enlarge Text Shrink Text
Search   |  

Construction Reports: Northeastern

Contract #: 2016-5142
Start of Construction : June 06, 2016
Estimated End of Construction : September 07, 2016
Highway : 129
Length of Construction : 3.00 km
Close To : Thessalon
Type of Contract : Culvert Rehabilitations
Value of Contract : $3,782,848.00
Description : Work includes granular base, hot mix paving, electrical and Structural Culvert Replacements.
Traffic Impact : All work on Highway 129, Phillips Creek Culvert, 13.7 kilometres north of Highway 17. Two Sharpsand River Tributary Culverts, located 15 kilometres and 17 kilometres south of the Highway 129/556 junction. Expect delays up to 5 minutes. Highway reduced to single lane of 3.5 metres for both directions at Phillips Creek utilizing Temporary Traffic Signals; Speed Limit reduced to 60 kilometres per hour. Highway reduced to single lane of 3.65 metres for both directions at Sharpsand Tributaries utilizing Yield to oncoming Traffic; Speed Limit reduced to 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2016-5141
Start of Construction : June 06, 2016
Estimated End of Construction : August 10, 2016
Highway : 112
Length of Construction : 0.00 km
Close To : Temagami
Type of Contract : Culvert Rehabilitation
Value of Contract : $723,504.00
Description : Stoney Creek Culvert Rehabilitation, work includes Wingwall repairs east side of culvert to address safety and environmental concerns.
Traffic Impact : Near Tarzwell, Highway 112: 0.4 kilometres north of Highway 11 for 0.2 kilometres. Expect delays up to 5 minutes. Intermittent single lane closures for loading and unloading of equipment & materials/construction of site access. Traffic control barrels and Traffic Control Persons in place.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2016-5135
Start of Construction : June 06, 2016
Estimated End of Construction : September 22, 2016
Highway : 552
Length of Construction : 10.80 km
Close To : Heyden
Type of Contract : Resurfacing
Value of Contract : $6,742,602.00
Description : Work includes Grading, Drainage, Granular Base and Hot Mix Paving.
Traffic Impact : Near Hayden on Highway 552, from Highway 556 junction westerly to 0.6 kilometres west of Goulais River Bridge for 10.8 kilometres. Expect delays up to 5 minutes. Highway 552 & 556 Restricted to one lane. Controlled by Traffic Control Persons.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2016-5135
Start of Construction : June 06, 2016
Estimated End of Construction : September 22, 2016
Highway : 556
Length of Construction : 4.50 km
Close To : Heyden
Type of Contract : Resurfacing
Value of Contract : $6,742,602.00
Description : Work includes Grading, Drainage, Granular Base and Hot Mix Paving.
Traffic Impact : Near Hayden on Highway 556. From Highway 17 northerly for 4.5 kilometres to Highway 552. There is no impact on traffic. Highway 552 and 556 restricted to one lane. Controlled by Traffic Control Persons.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2016-5133
Start of Construction : May 24, 2016
Estimated End of Construction : September 05, 2017
Highway : 654
Length of Construction : 22.70 km
Close To : Callander
Type of Contract : Resurfacing
Value of Contract : $11,447,040.00
Description : Work includes grading, drainage, milling and paving, Also include repairs and rehabilitation to Wasi River Bridge, South River Bridge and Bear Creek Bridge.
Traffic Impact : On Highway 654, from Highway 534 easterly to Highway 11 for 22.7 kilometres. Expect delays up to 5 minutes. Single lane closures at various locations, Traffic controlled by traffic control personnel. South River Structure is restricted to a single lane of 3.8 metres utilizing Temporary Traffic Signals. Traffic will be maintained on the Westbound lane until August 16th, 2016.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2016-5131
Start of Construction : June 06, 2016
Estimated End of Construction : September 20, 2017
Highway : 17
Length of Construction : 21.50 km
Close To : Spanish
Type of Contract : Resurfacing and Bridge Rehabilitation
Value of Contract : $19,431,250.00
Description : Work includes Grading, Drainage,Granular Base, Hot Mix Paving, Electrical and Structural.
Traffic Impact : Highway 17, from 3.5 kilometres west of Highway 6 easterly for 18.8 kilometres to Nairn Centre, includes Spanish River Bridge Rehabilitation 8.2 kilometres east of Highway 6. Expect delays up to 5 minutes. Traffic reduced to 80 kilometres per hour throughout construction zone. Spanish River Bridge reduced to one lane with temporary traffic signals. Traffic lane width with is 4.5 metres.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2016-5131
Start of Construction : June 06, 2016
Estimated End of Construction : September 20, 2017
Highway : 6
Length of Construction : 21.50 km
Close To : Spanish
Type of Contract : Resurfacing and Bridge Rehabilitation
Value of Contract : $19,431,250.00
Description : Work includes Grading, Drainage,Granular Base, Hot Mix Paving, Electrical and Structural.
Traffic Impact : Expect delays up to 5 minutes. Traffic reduced to 60 kilometres per hour throughout construction zone. Spanish River Bridge reduced to one lane with temporary traffic signals. Traffic lane width is 3.6 metres.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2016-5130
Start of Construction : May 23, 2016
Estimated End of Construction : October 21, 2016
Highway : 17
Length of Construction : 22.20 km
Close To : Sudbury
Type of Contract : Road Rehabilitation
Value of Contract : $12,508,400.00
Description : Work includes Grading, Drainage, Granular Base, Hot Mix Paving, Structural and Electrical.
Traffic Impact : Highway 17, from 1.2 kilometres east of Sudbury at Highway 17 & Municipal Road 55 intersection westerly on 17 for 21 kilometres. Expect delays up to 5 minutes. Possibility of shoulder and single lane closures on Highway 17 for both east and west bound lanes at various locations throughout the contract. Highway 17/55 interchange ramp heading east on Highway 17 East will be closed from 6:00 on Monday June 27 for approximately 48 hours.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2016-5128
Start of Construction : May 23, 2016
Estimated End of Construction : September 16, 2016
Highway : 101
Length of Construction : 0.00 km
Close To : Foleyet
Type of Contract : Road Rehabilitation
Value of Contract : $6,774,778.00
Description : Work includes Grading, Drainage Improvements, Granular Base, and Hot Mix Paving.
Traffic Impact : On Highway 101, from 0.4 kilometres west of Young St in Foleyet, Easterly for 21.1 kilometres. Expect delays up to 5 minutes. Traffic Control Personnel in place at a maximum of 5 locations. Speed limit reduced to 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2016-5010
Start of Construction : June 13, 2016
Estimated End of Construction : October 31, 2016
Highway : 400
Length of Construction : 9.50 km
Close To : MacTier
Type of Contract : Resurfacing
Value of Contract : $9,718,985.00
Description : Work includes Grading and Hot Mix Paving.
Traffic Impact : 400 northbound and southbound lanes, preventive resurfacing from 2.9 kilometres north of Muskoka Road 12 northerly to Healy Lake Road Underpass for 9.5 kilometres, work includes Grading and Hot Mix Paving. Expect delays up to 5 minutes. Traffic may encounter daily single lane closures. Speeds reduced to 80 kilometres per hour during lane closures.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2016-5008
Start of Construction : June 24, 2016
Estimated End of Construction : May 31, 2017
Highway : 141
Length of Construction : 0.20 km
Close To : Rosseau
Type of Contract : Structure replacement
Value of Contract : $3,229,063.95
Description : Replacement of Rosseau River structure.
Traffic Impact : On Highway 141, 5.9 kilometres east of Highway 632. Rosseau River Bridge. Expect delays up to 5 minutes. Temporary modular bridge open to traffic. Single lane of 3.5 metres. Maximum bridge width set at 4.2 metres.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2016-5007
Start of Construction : May 24, 2016
Estimated End of Construction : October 11, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Bracebridge
Type of Contract : Road Rehabilitation.
Value of Contract : $4,005,043.00
Description : Work includes grading, granular base, hot mix paving, drainage, electrical and structural.
Traffic Impact : Near Bracebridge, On Highway 118, Vankoughnet Road Underpass structure over Highway 11. Taylor Road Underpass Rehabilitation over Highway 11, 3.9 kilometres south of Muskoka Road 117 for 0.8 kilometres. Expect delays up to 10 minutes. Vankoughnet Road Underpass has traffic signals in place with a lane width reduced to 3.86 metres and a height restriction of 5.86 metres. Taylor Road Underpass has traffic signals in place with a lane width reduced to 4.60 metres and a height restriction of 5.82 metres. Intermittent single lane closures throughout contract.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5137
Start of Construction : May 09, 2016
Estimated End of Construction : November 18, 2016
Highway : 539
Length of Construction : 0.00 km
Close To : Field
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structure Rehabilitation
Value of Contract : $3,687,140.00
Description : Four Structures between River Valley to Field, Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structure Rehabilitation
Traffic Impact : On Highway 17, McCarty Creek Bridge Rehabilitation, 11.7 kilometres west of Highway 64 and Sturgeon River Bridge Rehabilitation, 0.5 kilometres south of Highway 539A. There is no impact on traffic. Single lane restriction of 3.5 metres at both McCarty and Sturgeon River Bridges. Delineated with temporary concrete barriers. Controlled by Temporary Traffic Signals. Speed limit reduced to 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5134
Start of Construction : May 13, 2016
Estimated End of Construction : November 11, 2016
Highway : 655
Length of Construction : 0.00 km
Close To :
Type of Contract : Grading, Hot Mix Paving & Structural Replacement
Value of Contract : $5,586,628.00
Description : Replacement of Jocko Creek Culvert, 30.3 kilometres north of Highway 101 for 0.53. kilometres.
Traffic Impact : On Highway 655, 30.3 kilometres North of Highway 101. Expect delays up to 5 minutes. Highway reduced to single lane during contractor operations. Delineated with plastic barrels. Speed limit will be reduced to 70 kilometres and 50 kilometres per hour. Stage 1 will have two single lanes of 4 metres with west height will be 0.76 metres and east height will be 0.81 metres.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5131
Start of Construction : May 30, 2016
Estimated End of Construction : September 26, 2016
Highway : 65
Length of Construction : 15.40 km
Close To :
Type of Contract : Resurfacing and structure rehabilitation
Value of Contract : $6,360,245.00
Description : Work includes Grading, Drainage, Granular Base, Hot Mix Paving and Electrical. Structural Culvert Replacement, 7 kilometres south of Highway 65/66 junction.
Traffic Impact : On Highway 65, From 50 metres south of Highway 66 Southerly 15.4 kilometres Expect delays up to 5 minutes. Single lane of 4.5 metres on Highway 65 located approximately 8 kilometres south of Highway 66 for culvert replacement. Speed limit reduced to 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5131
Start of Construction : May 30, 2016
Estimated End of Construction : September 26, 2016
Highway : 66
Length of Construction : 15.40 km
Close To : MacTier
Type of Contract : Structure replacement
Value of Contract : $6,360,245.00
Description : Replacement of Whiskey Jack Creek Culvert on Highway 66, 200 metres east of Highway 65, Work includes, Grading, Drainage, Granular Base, Hot Mix Paving.
Traffic Impact : On Highway 66, 200 metres east of Highway 65 There is no impact on traffic.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5129
Start of Construction : May 30, 2016
Estimated End of Construction : December 05, 2016
Highway : 560
Length of Construction : 0.00 km
Close To : Elk Lake
Type of Contract : Structural replacements and rehabilitation
Value of Contract : $6,500,527.00
Description : Work includes Structural Culvert Replacement, Structural Culvert Rehabilitation and Structural Rehabilitation. 12.0 kilometres.
Traffic Impact : On Highway 560. 4 structures all located west of Highway 65 at following distances. 9.1 kilometres, 10.7 kilometres, 23 kilometres and 32 kilometres west of Highway 65 and one structures located 14.9 kilometres East of Highway 65. Expect delays up to 5 minutes. Short duration single lane closure at this time. Speed limit reduced to 60 kilometres per hour at the discretion of the Contractor. Single lane widths of 3.4 metres at Lost Lake Bridge only. Height restriction of 5.8 metres will be in place.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5128
Start of Construction : February 29, 2016
Estimated End of Construction : November 30, 2016
Highway : 540
Length of Construction : 17.50 km
Close To :
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, Structural Culvert Rehabilitation, Structural Culvert Replacement and Bridge Replacement
Value of Contract : $13,127,126.00
Description : Grading, Drainage, Granular Base, Hot Mix Paving and Structural Replacement & Rehabilitation. Includes 2 structural culverts rehabilitations, 3 structural culvert replacements and one bridge replacement.
Traffic Impact : Close to Kagawong on Highway 540 westerly for 16.5 kilometres and Highway 540 B from Highway 540/542 junction northerly for 1.0 kilometre. Expect delays up to 5 minutes. Witty's Creek Culvert, Burnt Creek Culvert, Ice Lake Culvert and Bond Creek Culvert down single lanes of 4 metres. Speed limit reduced to 60 kilometres per hour at these locations.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5127
Start of Construction : June 06, 2016
Estimated End of Construction : November 07, 2016
Highway : 583
Length of Construction : 0.00 km
Close To : Hearst
Type of Contract : Culvert Replacement
Value of Contract : $2,531,216.00
Description : Obijou River Culvert Replacement, 30 kilometres south of Hearst for 0.2 kilometres. Work includes Grading, Drainage, Granular Base, Hot Mix Paving and Structure Replacement.
Traffic Impact : On Highway 583, 30 kilometres south of Hearst Expect delays up to 5 minutes. Temporary Modular Bridge in place. Effective lane width of 4.21 metres. Posted Speed Reduction from to 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5126
Start of Construction : November 09, 2015
Estimated End of Construction : October 20, 2017
Highway : 11
Length of Construction : 4.80 km
Close To : Powassan
Type of Contract : Rehabilition and resurfacing
Value of Contract : $22,796,025.00
Description : Rehabilitation of Highway 11 Northbound lanes. Work includes grading, drainage, paving and structures. Two New Snowmobile Culverts.
Traffic Impact : Highway 11 near Powassan. Northbound lanes from 5.7 kilometres south of Highway 534 Interchange northerly for 4.8 kilometres. Expect delays up to 5 minutes. Northbound lane closed. Northbound traffic diverted to Southbound lanes. 2 way traffic on Southbound lanes. Delineated by 1.02 metres high flexible posts. Lanes are 4.5 metres wide. Speed limit reduced to 80 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5122
Start of Construction : July 02, 2015
Estimated End of Construction : July 31, 2016
Highway : 144
Length of Construction : 8.00 km
Close To : Chelmsford
Type of Contract : Rehabilitation and Selective Resurfacing
Value of Contract : $10,166,375.00
Description : Work includes Grading, Granular Base, Drainage, Hot Mix Paving.
Traffic Impact : Near Chelmsford, on Highway 144 from 2.1 kilometres south Regional Road 35 northerly for 23.6 kilometres, Expect delays up to 15 minutes. Single Lane Closures with plastic barrels from sunrise to sunset. Monday to Friday, no speed reductions at the moment.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5121
Start of Construction : September 07, 2015
Estimated End of Construction : October 10, 2017
Highway : 66
Length of Construction : 3.40 km
Close To :
Type of Contract : Realignment of Highway and Surface Rehabilitation
Value of Contract : $22,087,577.00
Description : Work includes Grading, Granular Base, Hot Mix Paving and Electrical (Illumination).
Traffic Impact : Near Virginiatown, from 10.6 kilometres east of Highway 624 easterly for 3.4 kilometres. Expect delays up to 5 minutes. Speed limit reduced to 70 kilometres per hour at the west projects limits and 60 kilometres per hour through the remainder of the construction zone on Highway 66.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5119
Start of Construction : January 04, 2016
Estimated End of Construction : September 18, 2020
Highway : 69
Length of Construction : 14.90 km
Close To : French River
Type of Contract : 4 lane expansion
Value of Contract : $197,303,069.00
Description : Work includes 14.8 kilometres of mainline construction, 2 full interchanges, 10 new bridges, mulltiple structural culverts, Electrical - illumination and counting stations, relocation of Variable Message Signs.
Traffic Impact : Near French River, from 2.9 kilometres north of Highway 522 to 4.6 kilometres north of Highway 607 for 14.8 kilometres. Expect delays up to 10 minutes. Minor delays possible due to construction and blasting operations. Speed limit reduced to 70 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5115
Start of Construction : May 09, 2016
Estimated End of Construction : October 17, 2017
Highway : 101
Length of Construction : 32.60 km
Close To : Wawa
Type of Contract : Grading, Drainage, Granular, Hot Mix Paving, Electrical
Value of Contract : $28,451,187.00
Description : Rehabilitation of Highway 101, from Junction of Highway 17 easterly for 2.2 kilometres, includes Speckled Trout Creek Culvert and Agawa River Overflow Culverts on Highway 17, 85 kilometres south of Highway 101.
Traffic Impact : Near Wawa, Highway 101, from Junction of Highway 17 easterly for 2.2 kilometres Expect delays up to 5 minutes. Speed limit reduced to 70 kilometres per hour. Single lane width of 3.75 metres.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5115
Start of Construction : May 09, 2016
Estimated End of Construction : October 17, 2017
Highway : 17
Length of Construction : 32.60 km
Close To : Wawa
Type of Contract : Grading, Drainage, Granular, Hot Mix Paving, Electrical, and Structure Rehabilitation
Value of Contract : $28,451,187.00
Description : Rehabilitation of Highway 17 from 14.8 km north of Highway 101 southerly for 30.4 km and rehabilitation of Speckled Trout Creek Culvert and Agawa River Overflow Culverts on Highway 17, 85 kilometres south of Highway 101.
Traffic Impact : Highway 17, 14.8 kilometres north of Highway 101 for 30.4 kilometres. Expect delays up to 5 minutes. Speed limit reduced to 70 kilometres per hour. Single lane width of 3.75 metres.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5113
Start of Construction : June 22, 2015
Estimated End of Construction : July 30, 2016
Highway : 144
Length of Construction : 18.10 km
Close To : Cartier
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving and Structural Culvert Rehabilitation.
Value of Contract : $11,539,512.00
Description : Work includes Grading, Drainage, Granular Base, Hot Mix Paving and Structural Culvert Rehabilitation.
Traffic Impact : On Highway 144 from 1.5 kilometres South of Municipal Road 8 to Centre Street in Cartier for 18.1 kilometres. There is no impact on traffic. Single Lane Closures delineated with plastic barrels weekdays. Sunrise to Sunset. No speed reduction at this time.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5111
Start of Construction : June 15, 2015
Estimated End of Construction : September 19, 2016
Highway : 17
Length of Construction : 10.40 km
Close To : Verner
Type of Contract : Road Rehabilitation and culvert replacements
Value of Contract : $15,244,328.00
Description : Work includes grading, granular base, hot mix paving, electrical and structural rehabilitation.
Traffic Impact : On Highway 17, between Sturgeon Falls and Verner for 10.6 kilometres. There is no impact on traffic. Occasional single lane closures controlled by Traffic Control Persons.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5110
Start of Construction : August 04, 2015
Estimated End of Construction : July 25, 2016
Highway : 108
Length of Construction : 23.40 km
Close To : Elliot Lake
Type of Contract : Rehabilitation, culvert replacements, shoulder work
Value of Contract : $10,365,110.00
Description : Work includes reinstating granular shoulders to design standard, replacing 50 culverts, paving and replacing guiderails.
Traffic Impact : Highway 108 from Highway 17, Northerly to Elliot Lake. Expect delays up to 10 minutes. Lane closures controlled by flag personnel due to grading activities, speed limit reduced to 60 kilometres per hour on Highway 108 at the treatment area and milling locations.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5109
Start of Construction : May 25, 2015
Estimated End of Construction : September 20, 2016
Highway : 540
Length of Construction : 0.50 km
Close To : Mindemoya
Type of Contract : Resurfacing and structure rehabilitation.
Value of Contract : $12,946,414.00
Description : Rehabilitation of 5 culverts & 2 bridges, 1 Bridge replacement.
Traffic Impact : Highway 540 from Highway 540 to Highway 542 for 11 kilometres. Expect delays up to 10 minutes. Speed limit reduced to 60 kilometres per hour. Graham Creek Culvert structure down to 3.91 metres, controlled by temporary traffic signals.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5109
Start of Construction : May 25, 2015
Estimated End of Construction : September 20, 2016
Highway : 542
Length of Construction : 11.80 km
Close To : Mindemoya
Type of Contract : Resurfacing and structure rehabilitation.
Value of Contract : $12,946,414.00
Description : Storm Sewer, Curb & Gutter, Roadwork rehabilitation
Traffic Impact : Highway 542 from Highway 540 to Highway 542 for 11 kilometres. Expect delays up to 10 minutes. Traffic signals installed. Single lane closures.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5109
Start of Construction : May 25, 2015
Estimated End of Construction : September 20, 2016
Highway : 551
Length of Construction : 11.80 km
Close To : Mindemoya
Type of Contract : Resurfacing and structure rehabilitation.
Value of Contract : $12,946,414.00
Description : Rehabilitation of 5 culverts & 2 bridges, 1 Bridge replacement.
Traffic Impact : Highway 551 from Highway 540 to Highway 542 for 11 kilometres. Expect delays up to 5 minutes. Possible shoulder/lane closures, Traffic Control Persons present.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5106
Start of Construction : June 29, 2015
Estimated End of Construction : September 01, 2016
Highway : 69
Length of Construction : 0.00 km
Close To : French River
Type of Contract : Structural Rehabilitation
Value of Contract : $6,107,595.00
Description : Work includes new deck, structural steel and concrete repairs.
Traffic Impact : Near French River, 12.3 kilometre North of Highway 522. Expect delays up to 15 minutes. French River Structure, 12.3 kilometres north of Highway 522 down to single lane of 4 metres, controlled by traffic lights. Height restriction of 7.80 metres. Alternate route : Highway 17 to Highway 11.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5104
Start of Construction : June 01, 2015
Estimated End of Construction : October 06, 2016
Highway : 11
Length of Construction : 0.00 km
Close To : Cochrane
Type of Contract : Culvert rehabilitations
Value of Contract : $12,560,776.00
Description : Culvert rehabilitation.
Traffic Impact : Highway 11, 15.5 Kilometres west of Cochrane. Expect delays up to 5 minutes. Passing lane closed during daytime hours. Two-way traffic maintained. Total width of 8 metres between Temporary Concrete Barriers. Speed limit reduced to 70 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5104
Start of Construction : June 01, 2015
Estimated End of Construction : October 06, 2016
Highway : 652
Length of Construction : 0.00 km
Close To : Cochrane
Type of Contract : Culvert rehabilitations
Value of Contract : $12,560,776.00
Description : Culvert rehabilitation, Highway 652, Wally Creek Culvert, 28 kilometres North of Cochrane and Kesagami River Culvert, 144 kilometres North of Cochrane.
Traffic Impact : Highway 652, Wally Creek Culvert, 28 kilometres North of Cochrane and Kesagami River Culvert, 144 kilometres North of Cochrane. Expect delays up to 5 minutes. Wally Creek Culvert, 28 kilometres North of Cochrane has a single lane restriction of 5 metres, delineated with Temporary concrete barriers. Controlled with yield signs. Speed limit reduced to 60 kilometres per hour. Kesagami River Culvert, 144 kilometres North of Cochrane has a single lane of 5 metres, delineated with Temporary concrete barriers, traffic signals in place. Speed limit reduced to 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5101
Start of Construction : May 18, 2015
Estimated End of Construction : September 01, 2016
Highway : 17
Length of Construction : 14.90 km
Close To : Warren
Type of Contract : Rehabilitation and structural work
Value of Contract : $13,653,927.00
Description : Work inclcudes grading, drainage, paving and illumination. Work also includes rehabilitation of Bear Creek and Deer Creek Culvert and replacement of a culvert 10.6 kilometres west of Highway 575.
Traffic Impact : On Highway 17, rehabilitation from Highway 539 easterly to the junction of Highway 17 and 64 in Verner. Total length of construction is 15 kilometres. Expect delays up to 5 minutes. Daily Single Lane Closures controlled by Traffic Control Persons
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5100
Start of Construction : June 29, 2015
Estimated End of Construction : November 18, 2016
Highway : 69
Length of Construction : 0.76 km
Close To :
Type of Contract : Highway four lane expansion.
Value of Contract : $23,373,204.00
Description : Work includes grading, drainage, granular base, hot mix paving and structures. Construction of 2.7 kilometres of realigned railway tracks; and 0.6 kilometres of new Highway 69 north and southbound lanes from 1.2 kilometres south of existing Highway 522.
Traffic Impact : On Highway 69, just south of Highway 522, for 0.76 kilometres northerly. Expect delays up to 5 minutes. Detour on existing Highway 69 now in place. Speed limit reduced to 70 kilometres per hour
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5007
Start of Construction : May 15, 2016
Estimated End of Construction : October 28, 2016
Highway : 11
Length of Construction : 11.10 km
Close To : Temagami
Type of Contract : Rehabilitation and resurfacing
Value of Contract : $9,522,148.00
Description : Work includes two Structural Culverts Minor Rehabilitation, Jessie Creek Culvert located 2.8 kilometres south of Temagami South Limits and Herridge Creek Culvert, 10.4 kilometres south of Temagami.
Traffic Impact : South of Temagami, From 0.2 kilometres south of Wilson Lake Road to 0.2 kilometres south of Lakeshore Drive in Temagami for 11.1 kilometres Expect delays up to 10 minutes. Single Lane Closures controlled by Traffic Control Persons throughout the Contract. There will be a full closure late in the week for blasting. A single lane of traffic must be reopened within 15 minutes. All access roads to the blast area will be monitored to ensure no vehicles enter the site.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5005
Start of Construction : May 02, 2016
Estimated End of Construction : October 28, 2016
Highway : 11
Length of Construction : 7.00 km
Close To : North Bay
Type of Contract : Rehabilitation and Structure Replacement
Value of Contract : $8,397,598.00
Description : Work includes improvement of one vertical curve at bridge, guide rail adjustments and drainage improvements; Include Duchesnay Creek Bridge replacement.
Traffic Impact : From 6.4 kilometres North of North Bay, northerly for 7 kilometres. Expect delays up to 5 minutes. Single lane constructed just east of Highway 11 at Duchesnay Creek. Detour lane width is 4 metres with two paved shoulders of 0.5 metres wide each. Delineated with temporary concrete barriers. Traffic controlled with traffic lights. Speed limit reduced to 70 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5004
Start of Construction : June 22, 2015
Estimated End of Construction : October 28, 2016
Highway : 11
Length of Construction : 30.20 km
Close To : Gravenhurst
Type of Contract : Paving and rehabilitation.
Value of Contract : $7,699,192.00
Description : Grading, drainage, granular base, hot mix paving, electrical, and structural rehabilitation.
Traffic Impact : Highway 11 from 1.7 kilometres north of Severn River to 0.3 kilometres south of Taylor Road for 30.2 kilometres Expect delays up to 5 minutes. Possible single lane closures in northbound and southbound lanes on Highway 11. Reduced overhead clearance on southbound underneath Muskoka 169 Ramp. Overhead structure into Gravenhurst down to 3.8 metres. Delineated with Temporary concrete barriers
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5003
Start of Construction : July 13, 2015
Estimated End of Construction : June 30, 2016
Highway : 11
Length of Construction : 10.00 km
Close To : Huntsville
Type of Contract : Rehabilitation and Resurfacing
Value of Contract : $13,445,839.00
Description : Work includes grading, Drainage, Granular Base and Hot Mix Paving, includes 14 centreline culverts replacements, 1 centreline culvert rehab - liner and one side road culvert replacement and one entrance culvert replacement; treatmanet of two distress areas.
Traffic Impact : Highway 11, from South Mary Lake Road (Muskoka Road 44) northerly to Stephenson Road 12 for 10.0 kilometres Expect delays up to 5 minutes. Single lane closures on both northbound and southbound lanes.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2015-5001
Start of Construction : May 04, 2015
Estimated End of Construction : June 24, 2016
Highway : 141
Length of Construction : 0.00 km
Close To : Rosseau
Type of Contract : Structure Rehabilitation, grading, drainage and paving
Value of Contract : $1,775,040.00
Description : Work includes patch repair deck, soffit, barrier walls and waterproofing.
Traffic Impact : On Highway 141, 5.9 kilometres east of Highway 632. Rosseau River Bridge. Expect delays up to 5 minutes. Temporary modular bridge open to traffic. Single lane of 3.5 metres. Maximum bridge width set at 4.2 metres.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2014-5137
Start of Construction : May 01, 2015
Estimated End of Construction : August 16, 2017
Highway : 60
Length of Construction : 19.20 km
Close To :
Type of Contract : Grading, Drainage, Granular Base Hot Mix Paving, Structure Replacement, Structure Rehabilitation, and Electrical
Value of Contract : $24,686,070.00
Description : Resurfacing of Highway 60 from junction of Highway 127 easterly for 19.2 kilometres. Rehabilitation of the Amable Creek Culvert, 8 kilometres east of Highway 127. Replacement of 3 culverts situated at 11, 11.3 and 26.5 kilometres west of Highway 127. Rehabilitation of the Madawaska River Bridge located 3.1 kilometres west of Highway 127 in Whitney.
Traffic Impact : Expect delays up to 5 minutes. Madawaska River Bridge on Highway 60 reduced to 3.6 metres. Controlled by traffic control persons.Speed limit reduced to 60 kilometres per hour when workers present. Single lane closures in effect within the limits of the project. Culvert located 26.5 kilometres west of Highway 127 is restricted to 4.5 metres and delineated with temporary concrete barriers.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2014-5136
Start of Construction : May 04, 2015
Estimated End of Construction : July 15, 2016
Highway : 101
Length of Construction : 47.90 km
Close To : Foleyet
Type of Contract : Grading, paving and structural rehabilitation
Value of Contract : $14,772,373.00
Description : Work includes replacement of asphalt pavement/waterproofing, minor recoating of bridge
Traffic Impact : On Highway 101, from Foleyet to Shawmere River Bridge westerly for 47.9 kilometres. Expect delays up to 5 minutes. Maximum of 3 Single Lane Operations per day within the contract limits, Controlled by flagging personnel. Alternative Routes are Highway 144 and Highway 129.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2014-5128
Start of Construction : August 05, 2014
Estimated End of Construction : June 30, 2016
Highway : 101
Length of Construction : 48.00 km
Close To : Timmins
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, and Structural Culvert Replacement.
Value of Contract : $14,914,283.00
Description : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, and Structural Culvert Replacement.
Traffic Impact : Between Foleyet and Timmins on Highway 101. From 01. kilometres East of Highway 144, westerly for 48 kilometres. Expect delays up to 5 minutes. Possible Traffic Control Personnel at 2 locations.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2014-5118
Start of Construction : September 02, 2014
Estimated End of Construction : September 30, 2016
Highway : 583
Length of Construction : 0.00 km
Close To : Hearst
Type of Contract : Structure Replacements
Value of Contract : $9,138,507.00
Description : Replacement of Prune Creek and Jessie Bridges on Highway 583 south of Highway 11 near Hearst.
Traffic Impact : 16 and 23 kilometres south of Highway 11 Prune and Jessie River Replacements. Expect delays up to 5 minutes. Single lane width of 4.67 metres at Prune Creek Bridge. Delineated with temporary concrete barriers. Speed limit reduced to 50 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2014-5108
Start of Construction : June 25, 2014
Estimated End of Construction : June 30, 2016
Highway : 11
Length of Construction : 0.00 km
Close To : Hearst
Type of Contract : Structure replacement
Value of Contract : $8,964,990.00
Description : Grading, drainage, granular base, hot mix paving, and structure replacement.
Traffic Impact : Valentine River Bridge Replacement, 22 kilometres west of Highway 583. There is no impact on traffic. Work to resume shortly
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2014-5002
Start of Construction : October 20, 2014
Estimated End of Construction : July 15, 2016
Highway : 35
Length of Construction : 0.27 km
Close To : Dwight
Type of Contract : Structure Replacement
Value of Contract : $4,514,030.00
Description : Work includes replacement of superstructure (deck), sidewalks. Bearings, crack injection at pier footings, new deck drains and upgrades to guiderails waterproofing and asphalt overlay.
Traffic Impact : On Highway 35, near Dorset. Muskoka River Bridge replacement, 1 kilometre north of Muskoka Road 117. Expect delays up to 10 minutes. Single lane closures throughout contract during the daytime, open to two lanes at night time. Single lane closures delineated with plastic barrels
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2013-5115
Start of Construction : July 15, 2013
Estimated End of Construction : October 21, 2016
Highway : 518
Length of Construction : 0.00 km
Close To : Magnetawan
Type of Contract : Grading, Drainage, Granular base, Hot Mix Paving, Electrical & Structure Replacement
Value of Contract : $2,869,100.00
Description : Haines Creek Culvert Replacement, 2.5 kilometres east of Highway 518 and 400 Interchange and Jenkins Creek Culvert Replacement, 0.9 kilometres west of Highway 510 at Magnetawan.
Traffic Impact : 2.5 kilometres east of Highway 400. Expect delays up to 5 minutes. Single lane restriction of 4 metres, controlled by traffic signals. Speed limit reduced to 60 kilometres per hour.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page


Contract #: 2012-5100
Start of Construction : June 27, 2012
Estimated End of Construction : August 26, 2016
Highway : 69
Length of Construction : 13.70 km
Close To : Estaire
Type of Contract : New 4-Lane Construction, including Highway 64 interchange and side-roads with grading, drainage, granular base, hot mix, structure and illumination
Value of Contract : $80,777,500.00
Description : Between Bigwood and Estaire. Highway 69 Expansion. 2.7 kilometres North of Highway 607 to 7.2 kilometres North of Highway 64. Work includes 1 new structure and 8 new structural culverts,
Traffic Impact : Highway 69 Between Bigwood and Estaire, 2.7 kilometres North of Highway 607 to 7.2 kilometres North of Highway 64. There is no impact on traffic. Stage 3 configuration will consist of 1 lane of Highway 69 traffic in each of the new north bound and south bound lanes. The single lanes will be delineated by plastic barrels on the centreline of each new lane. The new Highway 64 interchange will be fully utilized to exit off and enter onto Highway 69. Speed limit reduced to 70 kilometres per hour during work week inside and returned to 90 kilometres per hour on weekends.
Region of Ontario : Northeastern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 30, 2016 - July 07, 2016
Last Updated: June 30, 2016

Top of page Top of page