Contract #: 2017-6001
Start of Construction : May 17, 2017
Estimated End of Construction : September 29, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Longlac
Type of Contract : Grading, Granular Base, Hot Mix Paving and Culvert Replacement.
Value of Contract : $4,076,947.00
Description : Flynne Creek East Culvert replacement and Chowder Creek Culvert East replacement.
Traffic Impact : Flynne Creek East Culvert replacement 43.6 kilometres east Highway 625 or 28.8 kilometres west Cochrane / Thunder Bay District Boundary or 60 kilometres east Longlac. Chowder Creek Culvert East replacement 40.4 kilometres east Highway 625 or 32.0 kilometres west Cochrane / Thunder Bay District Boundary or 57 kilometres east Longlac Expect delays up to 5 minutes. Reduced to single lane, with reduced speed limit of 70 kilometres per hour.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2017-6000
Start of Construction : May 03, 2017
Estimated End of Construction : October 31, 2017
Highway : 658
Length of Construction : 24.60 km
Close To : Kenora
Type of Contract : Grading, Granular Base, Drainage and Hot Mix Paving.
Value of Contract : $10,056,650.00
Description : Highway 658, also known as Redditt Road near Peterson road northerly or south of the Black River Bridge full depth rehabilitation. Highway 658, centreline culvert replacements from the Highway 17A junction northerly.
Traffic Impact : on Highway 658, from Highway 17A northerly for 24.6 kilometres. Expect delays up to 15 minutes. Effective lane width of 3.5 metres and variable shoulder.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6274
Start of Construction : April 18, 2017
Estimated End of Construction : June 03, 2018
Highway : 17
Length of Construction : 18.90 km
Close To : Rossport
Type of Contract : Gradng. Drainage, Granular Base and Hot Mix Paving
Value of Contract : $18,481,718.00
Description : 1.9 kilometres east Schreiber west limits westerly 18.9 kilometres to Rossport Canadian Pacific Railway overhead or 0.4 kilometres west Walker Lake Road (Schreiber) westerly, rehabilitation with rock hazard treatments.
Traffic Impact : Rossport easterly from 225 metres west of Main Street to 345 metres west of Simon Street in Schreiber. Expect delays up to 15 minutes. Reduced to a single lane controlled by Traffic Control Person.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6271
Start of Construction : May 29, 2017
Estimated End of Construction : September 15, 2017
Highway : 614
Length of Construction : 0.00 km
Close To : Manitouwadge
Type of Contract : Grading, Granular Base, Hot Mix Paving and Culvert Replacement
Value of Contract : $1,946,090.00
Description : Chicken Farm Creek Culvert replacement.
Traffic Impact : Highway 614 - 70 metres south of Manitou Side Road, southerly for 2.6 kilometres. Expect delays up to 5 minutes. Reduced to single lane controlled by traffic signals. Reduced speed limit of 60 kilometres per hour. Effective lane width of 4.2 metres. Height reduced to 5.0 metres at traffic signals.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6270
Start of Construction : April 10, 2017
Estimated End of Construction : September 30, 2017
Highway : 17
Length of Construction : 19.30 km
Close To : Dryden
Type of Contract : Grading, Drainage, Granular Base and Hot Mix Paving
Value of Contract : $12,819,395.00
Description : 0.5 kilometres West Highway 665 near Dryden, Westerly 19.3 kilometres to 8.5 kilometres West Highway 605 full depth reclamation.
Traffic Impact : From 0.5 kilometres West of Highway 655 near Dryden, Westerly for 19.3 kilometres. Expect delays up to 10 minutes. Single lane closures, effective lane width of 5.0 metres.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6249
Start of Construction : March 01, 2017
Estimated End of Construction : September 29, 2017
Highway : 61
Length of Construction : 0.00 km
Close To :
Type of Contract : Structural Rehabilitation - Grading, Granular Base, and Hot Mix Paving.
Value of Contract : $4,915,160.00
Description : Jarvis River Culvert site 48W-183C rehabilitation 25.8 kilometres north of the United States border or 9.5 kilometres south Highway 608 or 0.4 kilometres south of Cloud Lake Road; Slate River Tributary Culvert site 48W-195C replacement 38.3 kilometres north of the United States border or 1.8 kilometres north Highway 608.
Traffic Impact : Culverts 0.4 kilometres south of Highway 61 and Cloud Lake Road intersection and 1.8 kilometres North of Highway 61 and Highway 608. There is no impact on traffic. Slate River Tributary Culvert - temporary single lane closure with effective lane width of 4.5 metres between 7 a.m. and 7 p.m. Reduced speed limit of 70 kilometres per hour.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6031
Start of Construction : September 19, 2016
Estimated End of Construction : August 31, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Kakabeka Falls
Type of Contract : Grading, Drainage, Hot Mix Paving, Structural Rehabilitation
Value of Contract : $3,543,810.00
Description : Kakabeka Falls Bridge (Kaministiquia River) rehabilitation 0.2 kilometres east Highway 590.
Traffic Impact : Highway 11/17 Kaministiquia River Bridge at Kakabeka Falls, 0.20 kilometres east of Highway 590. Expect delays up to 10 minutes. Occasional single lane reductions. Effective lane width west-bound lane is 3.5 metres. Effective lane width east-bound lane is 3.5 metres.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6027
Start of Construction : May 15, 2017
Estimated End of Construction : July 15, 2017
Highway : 614
Length of Construction : 0.00 km
Close To : Manitouwadge
Type of Contract : Grading, Drainage, Granular Base, Warm Mix Paving and Structural Rehabilitation.
Value of Contract : $3,047,240.00
Description : Black River Bridge rehabilitation. 30.0 kilometres south Manitouwadge or 20.6 kilometres north Highway 17
Traffic Impact : 20.6 kilometres north of Highway 17, or 30.0 kilometres south of Manitouwadge. Expect delays up to 5 minutes. Reduced to single lane controlled by traffic signals. Reduced speed limit to 60 kilometres per hour. Effective lane width of 3.70 metres. Height reduced at traffic signals.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6023
Start of Construction : June 19, 2016
Estimated End of Construction : August 31, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Shabaqua
Type of Contract : Grading, Granular Base, Hot Mix Asphalt, Embankment Rehabilitation, Culvert Replacement and Culvert Rehabilitation
Value of Contract : $3,935,080.00
Description : Brule Creek culvert replacement, Oskondaga River Tributary Culvert replacement.
Traffic Impact : On Highway 17, 5.0 kilometres west of Highway 11. Expect delays up to 5 minutes. There will be temporary single lane closures.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6016
Start of Construction : May 15, 2017
Estimated End of Construction : June 25, 2017
Highway : 61
Length of Construction : 0.00 km
Close To : Thunder Bay
Type of Contract : Structure Rehabilitation, Grading, Granular Base, Hot Mix Paving and Electrical
Value of Contract : $3,053,810.00
Description : Neebing River Bridge rehabilitation.
Traffic Impact : 0.3 kilometres east of Arthur Street in Thunder Bay or 2.8 kilometres southwest of Harbour Expressway. Expect delays up to 10 minutes. Reduced speed limit to 70 kilometres per hour.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6015
Start of Construction : June 05, 2017
Estimated End of Construction : September 03, 2017
Highway : 7288
Length of Construction : 0.00 km
Close To : Red Lake
Type of Contract : Drainage, Granular Base, Structure and Electrical
Value of Contract : $2,834,331.00
Description : Pindar Creek Culvert site replacement and South Berens Creek Culvert replacement.
Traffic Impact : On Nungesser Road, 12.4 kilometres north Highway 125 and 88.2 kilometres north Highway 125. Expect delays up to 5 minutes. Traffic staging, with a reduced speed limit to 60 kilometres per hour. Effective lane width of 3.8 metres.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6014
Start of Construction : May 08, 2017
Estimated End of Construction : July 14, 2017
Highway : 11
Length of Construction : 27.50 km
Close To : Barwick
Type of Contract : Grading, Drainage, Granular Base, Paving, Electrical and Structure.
Value of Contract : $12,068,623.00
Description : 5.6 kilometres west Highway 71 (at CNR crossing 0.5 kilometres west Barwick Road) westerly 25.6 kilometres; Bunting Creek Culvert rehabilitation 6.6 kilometres west Highway 619 & Rainy River Tributary Culvert replacement 4.2 kilometres west Highway 621.
Traffic Impact : Highway 11 - 0.5 kilometres west of Barwick Road to 0.41 kilometres east of Lauzon Road. Expect delays up to 15 minutes. Effective lane width of 4.5 metres.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6013
Start of Construction : May 29, 2017
Estimated End of Construction : July 02, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Atikokan
Type of Contract : Structural Timber Culvert Replacement
Value of Contract : $5,327,805.00
Description : Highway 11, Flood Creek East Culvert site 48W-245C; Highway 11, Flood Creek West Culvert site 48W-261C; Highway 11, Caribus Lake Tributary Culvert site 45-269C; Highway 11, Mills Creek Timber Culvert site 45-261C; Highway 11, Gagne Lake Culvert site 45-275C.
Traffic Impact : Highway 11, Flood Creek East Culvert - 0.4 kilometres west Highway 623; Highway 11, Flood Creek West Culvert replacement - 0.6 kilometres west Highway 623; Highway 11, Caribus Lake Tributary Culvert replacement - 3.2 kilometres west Highway 11B; Highway 11, Mills Creek Timber Culvert replacement - 40.5 kilometres west Highway 11B or 2.3 kilometres west Flanders; Highway 11, Gagne Lake Culvert replacement - 95.0k kilometres west Highway 11B or 20.6 kilometres east Highway 502. Expect delays up to 5 minutes. At Gagne Lake Culvert site, traffic reduced to single lane with reduced speed limit of 70 kilometres per hour. Effective lane width of 4.0 metres. Height reduced to 5.0 metres.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6012
Start of Construction : February 01, 2017
Estimated End of Construction : October 14, 2017
Highway : 627
Length of Construction : 5.90 km
Close To : Marathon
Type of Contract : Culvert Replacement
Value of Contract : $3,992,280.00
Description : 1.8 metre diameter centreline culvert replacement with relocation in 18 metre high fill with bank stabilization (and sink hole remediation) 0.6 kilometres south highway 17 (previously a 100K culvert liner project)
Traffic Impact : On Highway 627, Camp Creek (Pic River Tributary), 615 metres South of Highway 17. Expect delays up to 10 minutes.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6011
Start of Construction : June 05, 2017
Estimated End of Construction : September 29, 2017
Highway : 11
Length of Construction : 0.00 km
Close To :
Type of Contract : Grading, Granular Base, Hot Mix Asphalt and Culvert Replacement.
Value of Contract : $4,676,453.00
Description : Part 1) Norami Lake Culvert site 48E-063C replacement 7.7km west Auden-Tertiary-Road (former Hwy 801) and west Jellicoe or 15.1km east Hwy 580 Part 2) Watson Creek culvert 48E-064C replacement 9.2km west Auden-Tertiary-Road (former Hwy 801) and west Jellicoe or 13.6km east Hwy 580 Part 3) Postagoni River Culvert site 48C-002C rehabilitation 26.1km south Hwy 580 Beardmore Junction
Traffic Impact : Norami Creek Culvert - approximately 7.5 kilometres west of Road 807, Watson Creek Culvert - approximately 9 kilometres West of Road 801 and Postagoni River culvert - approximately 26.4 kilometres West of Highway 580. Expect delays up to 5 minutes. Reduced to single lane controlled by temporary traffic signals. Reduced speed limit to 70 kilometres per hour. Effective lane width of 4.5 metres. Height reduced at traffic signals.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6008
Start of Construction : May 02, 2017
Estimated End of Construction : October 06, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Atikokan
Type of Contract : Grading, Granular Base, Hot Mix Paving and Structural
Value of Contract : $6,211,415.00
Description : Kemuel Lake Culvert - site 45-270C replacement, Lerome Lake culvert - site 45-273C replacement and Jackfish Lake Culvert - site 45-274C replacement.
Traffic Impact : Kemuel Lake Culvert, 0.5 kilometres west of Highway 11B; Jackfish Creek Culvert, from 12.3 kilometres west of Highway 11B to 14.7 kilometres west of Highway 11B; Lerome Lake Culvert, from 8.5 kilometres west of Highway 11B to 10.8 kilometres west of Highway 11B. Expect delays up to 15 minutes. Traffic reduced to one lane controlled by traffic signals. Temporarily reduced to one lane during daylight hours at Lerome Lake. Speed limit reduced to 70 kilometres per hour. Effective lane width of 4.0 metres at Kemuel Lake and Jackfish Creek. Height reduced at traffic signals.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6005
Start of Construction : March 13, 2017
Estimated End of Construction : September 27, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Longlac
Type of Contract : Structural Culvert Replacement
Value of Contract : $3,618,750.00
Description : Fish (or Chowder) Creek Culvert site 48E-070C replacement; Sandlink Creek Culvert site 48E-128C replacement
Traffic Impact : On Highway 11, Chowder Creek Culvert 36.2 kilometres east Highway 625; On Highway 625, Sandlink Creek Culvert 8.8 kilometres south of Highway 11. Expect delays up to 15 minutes. Temporary concrete barriers in place, traffic controlled by temporary traffic signals in both locations. Height reduced to 5.0 metres at traffic signals. Reduced speed to 70 kilometres per hour at Chowder Creek and 60 kilometres per hour at Sandlink Creek. Effective lane width of 4.2 metres at Chowder Creek and 3.8 metres at Sandlink Creek.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6004
Start of Construction : March 27, 2017
Estimated End of Construction : September 03, 2018
Highway : 72
Length of Construction : 0.00 km
Close To : Sioux Lookout
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving and Structural Replacement
Value of Contract : $12,607,750.00
Description : Moose Creek Bridge replacement with 0.7 metre grade raise with retaining walls 52.3 kilometres North Highway 17 - 17.1 kilometres South of Sioux Lookout.
Traffic Impact : Moose Creek Bridge - 52.4 kilometres Northeast of Highway 17 - 17.1 kilometres Southwest of Sioux Lookout. Expect delays up to 5 minutes. Reduced to single lane controlled by traffic signals. Speed limit reduced to 60 kilometres per hour. Effective lane width of 4.0 metres. Height reduced to 5.0 metres at traffic signals.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6003
Start of Construction : May 29, 2017
Estimated End of Construction : August 20, 2017
Highway : 618
Length of Construction : 12.00 km
Close To : Red Lake
Type of Contract : Grading, Drainage Improvement, Granular Base and Hot Mix Paving
Value of Contract : $9,110,243.00
Description : Part 1) - Highway 105 Red Lake junction southerly 11.7 kilometres, rehabilitation with 10/36 culverts replaced.
Traffic Impact : On Highway 618 - from the Junction of Highway 618 and Highway 105 southerly for 11.7 kilometres. Expect delays up to 15 minutes. Traffic reduced to single lane, with an effective lane width of 3.25 metres.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2016-6002
Start of Construction : April 03, 2017
Estimated End of Construction : October 10, 2017
Highway : 502
Length of Construction : 38.40 km
Close To : Dryden
Type of Contract : Grading, Drainage, In-Place Processing, Granular Base and Hot Mix Paving
Value of Contract : $13,116,344.00
Description : On Highway 502, 66.0 kilometres north Hwy 11 northerly 38.5 kilometres or 37 kilometres south Highway 584 southerly 38.5 kilometres
Traffic Impact : On Highway 502, 66.0 kilometres north of Highway 11 and Highway 102 northerly for 38.5 kilometres. Expect delays up to 10 minutes. Single lane closures at 3-4 locations within the construction zone. Effective lane width of 4.0 metres.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2015-6041
Start of Construction : April 03, 2017
Estimated End of Construction : June 30, 2017
Highway : 17
Length of Construction : 0.00 km
Close To : Nipigon
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving and Structural Replacement.
Value of Contract : $15,438,161.00
Description : Pays Plat River bridge #3 rehabilitation 24.5 kilometres west Schreiber or 62.2 kilometres east highway11 (Nipigon Junction) Pays Plat Creek bridge #1 site 48C-019 rehabilitation 24.7 kilometres west Schreiber or 62.4 kilometres east highway11.
Traffic Impact : 62 Kilometres East of Nipigon. Expect delays up to 5 minutes. Structure reduced to single lane. Speed limit reduced to 70 kilometres per hour. Effective lane width of 3.8 metres, Height reduced to 5.8 metres.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2015-6034
Start of Construction : April 03, 2016
Estimated End of Construction : September 14, 2017
Highway : 595
Length of Construction : 0.00 km
Close To : Nolalu
Type of Contract : Structural Culvert Replacement
Value of Contract : $5,414,260.00
Description : Sitch #2, Sitch #3, and Cedar Creek Culverts.
Traffic Impact : Highway 595, Sitch Creek Culvert #2 replacement 0.8 kilometres north Highway 588 (Hymers). Highway 595, Sitch Creek Culvert #3 replacement 1.1 kilometres north Highway 588 (Hymers) Highway 595, Cedar Creek Culvert replacement 1.4 kilometres south Highway 590. Expect delays up to 5 minutes. Sitch Creek Culvert #2 & #3 are reduced to a single lane controlled by traffic signals. Reduced speed limit of 60 kilometres per hour. Effective lane width of 3.70 metres in place. Height reduced to 5.0 metres at traffic signals.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2015-6002
Start of Construction : December 01, 2015
Estimated End of Construction : October 27, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Fort Frances
Type of Contract : Structural Rehabilitation
Value of Contract : $7,790,598.00
Description : Noden Causeway over Rainy Lake final rehabilitation phase 19.7 kilometres east Highway 502 - substructure repairs for all structure sites: east low level 6.2 kilometres east Fort Frances, west low level 5.5 kilometres east Fort Frances and high level 4.7 kilometres east Fort Frances.
Traffic Impact : Highway 11, 0.63 kilometres east of Noden Causeway East Low Level Bridge to 0.63 kilometres west of High Level Bridge. Expect delays up to 5 minutes. Effective lane width of 5.0 metres.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2014-6031
Start of Construction : April 08, 2015
Estimated End of Construction : September 30, 2017
Highway : 17
Length of Construction : 0.00 km
Close To :
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving and Structural Replacement
Value of Contract : $6,597,000.00
Description : Gravel River bridge site replacement 44.7 kilometres east Highway 11 Nipigon.
Traffic Impact : Highway 17 – Gravel River Bridge 44.5 kilometres West of South junction Highway 11/17. Expect delays up to 5 minutes. Reduced to single lane controlled by traffic signals. Speed limit reduced to 50 kilometres per hour. Effective lane width 4.5 metres. Height reduced at traffic signals.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2014-6026
Start of Construction : June 03, 2015
Estimated End of Construction : June 25, 2021
Highway : 11
Length of Construction : 11.50 km
Close To : Red Rock
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structures
Value of Contract : $108,768,349.00
Description : Stillwater Creek bridge westerly 11.8 kilometres to Red Rock Road #9 (or 1.5 kilometres west Highway 585 westerly 11.8 kilometres to 4.8 kilometres west Highway 628) predominantly new (four lane) alignment including: North Trout Creek bridges; new west bound South Trout Creek bridge; new east bound South Trout Creek Bridge. removal of the old highway bridge is under this project; Still Water Creek bridges; Itzcaulde Creek Culvert; and partial intersection illumination for Highway 628, Golf Course Road, Red Rock Road #8.
Traffic Impact : Highway 11/17, 4.8 kilometres west of Highway 628 easterly for 11.8 Kilometres to 1.5 kilometres west of Highway 585. Expect delays up to 10 minutes. Effective lane width is 4.25 metres.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2014-6018
Start of Construction : May 26, 2015
Estimated End of Construction : September 20, 2017
Highway : 11
Length of Construction : 16.80 km
Close To : Nipigon
Type of Contract : Grading earth and rock, Granular Base, Granular Sub-base, Hot Mix Paving, Drainage, Culverts and Lighting.
Value of Contract : $33,710,870.00
Description : The new four lane section goes from 1.5 kilometres east Highway 587 westerly 6.5 kilometres to 5.0 kilometres west Highway 587 or starting 1.3 kilometres west of West Loon Road and ending between Eldorado Road and Birch Beach Road.
Traffic Impact : From 5.0 kilometres west of Highway 587, easterly for 6.6 kilometres. Expect delays up to 15 minutes.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2014-6000
Start of Construction : September 04, 2014
Estimated End of Construction : August 31, 2017
Highway : 17
Length of Construction : 0.00 km
Close To : Marathon
Type of Contract : Structure Rehabilitation, Grading, Drainage, and Hot Mix Paving
Value of Contract : $11,517,000.00
Description : Pic River bridge Rehabilitation.
Traffic Impact : 7.2 kilometres East of Marathon There is no impact on traffic.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017

Top of page Top of page


Contract #: 2013-6000
Start of Construction : August 26, 2013
Estimated End of Construction : July 28, 2017
Highway : 11
Length of Construction : 0.00 km
Close To : Nipigon
Type of Contract : Construction of a new four-lane cable stayed bridge over the Nipigon River and widening of the approaches to the bridge to four lanes.
Value of Contract : $118,227,470.00
Description : Construction of a new four-lane cable stayed bridge over the Nipigon River and widening of the approaches to the bridge to four lanes.
Traffic Impact : Highway 11/17, from 1.7 kilometres east of the junction Highway 11/17 (Nipigon) westerly to First Street. Expect delays up to 10 minutes. Reduced speed limit of 70 kilometres per hour. Effective lane width of 5.0 metres, no height restriction. May have brief one lane closures during the construction process. The contractor is providing a pedestrian transport service across the bridge at 10-15 minute intervals.
Region of Ontario : Northwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: June 28, 2017 - July 05, 2017
Last Updated: June 23, 2017