Construction Reports: Southwestern

Contract #: 2015-3017
Start of Construction : July 27, 2015
Estimated End of Construction : December 31, 2015
Highway : 21
Length of Construction : 0.00 km
Close To :
Type of Contract : Grading & Drainage
Value of Contract : $1,180,592.00
Description : Non-structural culvert replacement 0.1 kilometres east of Craig Street within the territory of Saugeen First Nation.
Traffic Impact : Highway 21, 0.1 Kilometre East of Craig Street (Southampton), 0.13 Kilometre. Expect delays up to 15 minutes. Single Lane Closure with Flagging Operation and No Speed Reduction.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-3010
Start of Construction : June 03, 2015
Estimated End of Construction : October 02, 2015
Highway : 85
Length of Construction : 2.80 km
Close To : Kitchener
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical & Structural
Value of Contract : $10,569,050.00
Description : Highway 85 from Krug St. N'ly to Lancaster St., Kitchener, Guelph Street Overpass Northbound, Frederick Street Underpass, WELLINGTON ST UP (NB), WELLINGTON ST UP (SB), Spring Valley Culvert, and Highway 8 Franklin Bridge Repairs.
Traffic Impact : Highway 7 and 85 From Krug Street Northerly to 0.1 kilometers South of Lancaster Street. There is no impact on traffic. Operations to include: Full nightly northbound and southbound core or collector lane closures on Highway 7 and 85 from Krug Street to Lancaster Street for milling, paving and temporary line marking operations. Nightly closures will run from 22:00 to 06:00 hours. The following ramps are closed nightly from 22:00 to 06:00 hours Victoria / Bruce On Ramp, Wellington On Ramp, Wellington Off Ramp, Victoria / Bruce Off Ramp. Franklin Street Structure at Kingsway is closed until September 4th. There is no vehicle access across the Franklin Street structure over Highway 8. Pedestrian traffic is being maintained across the structure. Two-way traffic on Kingsway is being maintained with lane reductions. Single lane traffic in each direction at the Wellington Street structure is being maintained. The East-South and South-West Ramps at the Wellington Street Highway 85 interchange is closed until approximately mid-August 2015. Rehabilitation work at the Frederick Street structure is ongoing. Single lane traffic in each direction at the Frederick Street structure is being maintained. Guelph Street remains closed from Sereda Road to just east of Highway 7 and 85. Work in this area includes construction of the Guelph Street structure widening, watermain replacement, storm sewer replacement, road re-construction.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-3009
Start of Construction : July 15, 2015
Estimated End of Construction : November 30, 2016
Highway : 26
Length of Construction : 13.20 km
Close To : Collingwood
Type of Contract : Grading, drainage, granular base, hot mix paving, electrical and structural
Value of Contract : $9,844,789.00
Description : Thornbury to Collingwood - Resurfacing 13.2 kilometres.
Traffic Impact : Highway 26, From 0.6 kilometres west of Grey County Road 2 to 0.1 kilometres east of Grey County Road 21. Expect delays up to 5 minutes. Short duration temporary single lane/shoulder closures for entrance culvert work, crossing culverts and ditch work.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-3007
Start of Construction : June 12, 2015
Estimated End of Construction : November 27, 2016
Highway : 401
Length of Construction : 13.30 km
Close To : Chatham
Type of Contract : Highway 401 Rehabilitation of Westbound Lanes, Hot Mix Paving, Concrete Paving, Electrical and Structures
Value of Contract : $31,581,000.00
Description : Reconstruction: Essex Rd. 42 to Merlin Rd. Westbound Lanes, Chatham-Kent Including Government Drain Bridge #1(Site 13-55 W), McDougall Drain Bridge(Site 13-190 W), Baptiste Creek Bridge(Site 13-188W), Little Baptiste Creek (Site 13-187W), Queen St. overpass(Site 6-51W) Sinclair Drain Culvert (Site 13-399/C), and Electircal Improvements
Traffic Impact : Highway 401 from 1.0 kilometre east of Essex Road 42 easterly to 0.8 kilometres east of Merlin Road. Expect delays up to 5 minutes. Highway 401 Eastbound and Westboundf traffic single lane in each direction in the Eastbound Lanes for Westbound reconstruction. Westbound traffic detoured by median crossovers. Speed limit reduced to 80 kilometres per hour. 4.1 meter Width Restriction in both directions. Access to Highway 401 Westbound via Queens Line CLOSED for Highway 401 reconstruction. Alternative Route / Detour Information: Essex Road 42.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-3006
Start of Construction : May 27, 2015
Estimated End of Construction : October 31, 2015
Highway : 24
Length of Construction : 0.00 km
Close To : Dunnville
Type of Contract : Culvert Replacement, hot mix paving and electrical
Value of Contract : $6,476,390.00
Description : Various Culverts - County of Brant & Haldimand County (Mega Culverts Contract 2B) - 7 Culverts
Traffic Impact : Highway 24, North of Oakland Road. Highway 3, west of Haldimand Road 55. Highway 3, west of Haldimand-Dunville Townline. Highway 24, South and North of Governors Road East Expect delays up to 5 minutes. Highway 24, North of Oakland Road. Highway 3, west of Haldimand Road 55. Highway 3, west of Haldimand-Dunville Townline - Temporary Portable Signals Activated reducing traffic to one lane through the work zone. Contractor performing excavation and removals. 4.5 metre lane width. Highway 24, South and North of Governors Road East - Short duration temporary single lane flagging operations for culvert rehabilitation.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-3005
Start of Construction : June 01, 2015
Estimated End of Construction : October 15, 2016
Highway : 21
Length of Construction : 0.00 km
Close To : Exeter
Type of Contract : Hot Mix Paving, Electrical and Structures
Value of Contract : $7,260,989.00
Description : Mega 2 Culverts - Various Highways 4, 8, 21, & 23 (19 Structural Culverts Rehab/Replace)
Traffic Impact : Highways 4,8,21,23. Various locations across Lambton, Middlesex and Huron Counties. Site 1 – Highway 8 at Sanctuary Line. Site 2 – Highway 4 at McGillivray Drive. Site 3 – Highway 21 at Egremont Road. Expect delays up to 5 minutes. Lanes reduced to one lane with Temporary Traffic Signals restricted to 4.8 metres.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2015-3004
Start of Construction : June 01, 2015
Estimated End of Construction : December 31, 2015
Highway : 3
Length of Construction : 19.40 km
Close To : Essex
Type of Contract : Highway 3 rehabilitation of roadway consisting of grading, drainage, granular base, asphalt paving, electrical and structural.
Value of Contract : $15,936,082.00
Description : Part A: Highway 3 Reconstruction from Essex Road 27 (Cottam Road) to Essex Road 34 (Union Avenue) Part B: Highway Resurfacing from Essex Road 8 easterly to Essex Road 27, Cottam Waterproofing - Culvert.
Traffic Impact : Part A from 0.4 kilometres west of Essex Road 27 to Essex Road 34. Part B from 0.3 kilometres east of Essex Road 8 to 0.4 kilometres west of Essex Road 27. Expect delays up to 5 minutes. From Wednesday, August 19 through to mid-September, Highway 3 closed from Division Road to Essex Road 18. Reduced speeds of 60 kilometres per hour as posted. Nightly single lane closures beginning Monday, August 17 through to Sunday, August 23 on Highway 3 between Essex Road 8 and Victoria Road. From Wednesday, August 19 through to mid-September, Highway 3 Westbound traffic detoured at Essex Road 18/ Division Road; Highway 3 Eastbound traffic detoured at Essex Road 18/Division Road.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-3023
Start of Construction : May 04, 2015
Estimated End of Construction : September 20, 2016
Highway : 4
Length of Construction : 0.00 km
Close To : Exeter
Type of Contract : Structure rehabilitation
Value of Contract : $2,949,000.00
Description : Highway 4 Structure Rehabilitations -Kippen River Bridge, Ausable River Bridge (Black Creek), Highway 6 Rehabilitation- DECK REHAB OF ROCKY SAUGEEN RIVER BRIDGE.
Traffic Impact : Highway 4 Ausable River Bridge 1 kilometre south of Hensall and Kippen River Bridge 0.5 kilometres south of Kippen. Highway 6 Rocky Saugeen River Bridge 5 kilometres North of Durham. There is no impact on traffic. Short Duration Single lane restrictions throughout contract. Highway 4 – North bound lane closed for stage 1 Construction at Ausable River Bridge, 3.5 lane widths with 1.5 metre shoulder (5 metres). At Kippen River Bridge, 3.5 lane widths with no shoulders. From May 21, 2015 to August 6, 2015 (Tentative). Highway 6 - North bound lane close for stage 1 construction at Rocky Saugeen River Bridge - 3.5 lane widths with no shoulders. From June 10, 2015 to August 31, 2015 (Tentative).
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-3022
Start of Construction : May 04, 2015
Estimated End of Construction : November 30, 2015
Highway : 402
Length of Construction : 0.00 km
Close To : Strathroy
Type of Contract : Grading, Hot Mix Paving, Structural
Value of Contract : $8,467,435.00
Description : Deck Rehabilitation of Sydenham River Bridge Site 19-524 E&W Deck Rehabilitation of Hickory Drive E&W Deck Rehabilitation of Adelaide Road Underpass.
Traffic Impact : Highway 402 - Part A: Hickory Drive Overpass, eastbound lane and westbound lane and Highway 402 Sydenham River Bridge, eastbound lane and westbound lane; Part B: Adelaide Road Underpass, 1.1 kilometre. Expect delays up to 5 minutes. Hickory and Sydenham structures – eastbound and westbound median lanes closed with 80 kilometres per hour speed zone. Adelaide structure – Adelaide road reduced to single lane 60 kilometres per hour speed zone controlled by temporary traffic lights.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-3021
Start of Construction : May 04, 2015
Estimated End of Construction : September 30, 2015
Highway : 401
Length of Construction : 0.70 km
Close To : Ridgetown
Type of Contract : Grading, Hot Mix Paving, Structure Rehabilitation
Value of Contract : $1,796,585.00
Description : MEGA #4, CONTRACT #7 - BRIDGE REHABS ON Highway 401 AT: FLEMING CREEK Bridge (EBL) & FLEMING CREEK Bridge (WBL).
Traffic Impact : at Fleming Creek Bridge. Expect delays up to 5 minutes. Localized single lane restrictions for duration of contract, speed limits reduced to 80 kilometres per hour. Highway 401 Emergency Detour Route
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-3017
Start of Construction : May 04, 2015
Estimated End of Construction : October 21, 2015
Highway : 3
Length of Construction : 14.20 km
Close To : Tillsonburg
Type of Contract : Cold in-place recycling, Paving, Culvert Replacement, Ditching and Sub rain Installation.
Value of Contract : $7,703,820.00
Description : Cold in-place recycling, Paving, Culvert Replacement, Ditching and Sub Drain Installation
Traffic Impact : Highway 3 - Carter Road Easterly to John Pound Road. 14.2 kilometres. Expect delays up to 20 minutes. Shoulder Work / Lane Work. Single lane closures with flagging operations. Speed limit reduction to 60 kilometres per hour will be in effect. Lane widths of approximately 3.5 metres minimum.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-3014
Start of Construction : June 08, 2015
Estimated End of Construction : July 31, 2019
Highway : 401
Length of Construction : 5.50 km
Close To : Cambridge
Type of Contract : Garding, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural Replacement and Structure Rehabilitation
Value of Contract : $121,719,000.00
Description : New Illumination both Eastbound and Westbound Bullnose Decision Points on Highway 401, Eastbound and westbound ramp Terminals at Highway 8 including a multi lane merge. 8 to 10 Lane Widening - Highway 401 Major Widening from Highway 8 to Regional Road 24 (Hespeler)-Project Length 5.5 kilometres, Retaining wall Eastbound lanes at Rogers Road.
Traffic Impact : Hespeler Road, Regional Road 24 to Highway 8. Expect delays up to 10 minutes. Regulatory 80 kilometre speed zones are in affect in construction zone. Reduced lane widths 3.5 metres with 0.5 metres shoulders. 401 Westbound from Hespeler Road to Speedsville Road. None anticipated. 401 Eastbound from Speedsville Road to Hespeler Road no closure anticipated. North West Ramp (Hespeler to 401) North East Ramp (Hespeler to 401) None anticipated. South West Ramp (Hespeler to 401) None anticipated. West North South Ramp (401 to Hespeler) None anticipated. Emergency Detour Route as signed.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-3012
Start of Construction : May 01, 2014
Estimated End of Construction : December 31, 2015
Highway : 10
Length of Construction : 12.00 km
Close To : Forest
Type of Contract : Grading, Drainage, Hot Mix Paving and Electrical
Value of Contract : $6,245,480.00
Description : Grading, Drainage, Hot Mix Paving and Electrical
Traffic Impact : Highway 10 1.5 kilometres south of Dufferin Road 17 northerly to Flesherton (Campbell Street) 12 kilometres Expect delays up to 10 minutes. August 23rd, 2015 - Sunday (No Construction Activities). August 24 –August 29, 2015 1.5 Kilometres South of Dufferin Road 17 Northerly to Flesherton South Limits (by Knights Inn). Potential Intermittent lane closures in 2 places for CIREAM and Centre Line Culvert Operations. Traffic control barrels and Traffic Control Persons in place. August 23rd, 2015 - Sunday (No Construction Activities). August 24 – August 29, 2015 From Southern Limits of Flesherton (By Knights Inn) to Campbell Street (Flesherton). Potential Intermittent lane closures for Top Soil, Seeding, grading and drainage work with Traffic control barrels and Traffic Control Persons in place.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-3010
Start of Construction : July 14, 2014
Estimated End of Construction : August 31, 2015
Highway : 10
Length of Construction : 16.00 km
Close To : Shelburne
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving and Electrical.
Value of Contract : $6,395,301.00
Description : Resurfacing from Dufferin Road 17 to Dundalk - 12.1 kilometres, Dundalk to Flesherton - 16.3 kilometres Flesherton to Grey Rd. 130 - 4.2 kilometres (Total combined length = 32.6 kilometres.
Traffic Impact : Highway 10 from the intersection of Highway 10 and Dufferin Road 17, to 0.6 kilometres North of Highway 10 and Southgate Road 24. Length of Contract 16.0 kilometres. Expect delays up to 5 minutes. Monday to Friday 7:00 a m to 7:00 p m Short Duration Single lane restrictions throughout contract. Site clean up, electrical, signs, entrance removal, granular sealing.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2014-3004
Start of Construction : August 03, 2014
Estimated End of Construction : October 30, 2015
Highway : 6
Length of Construction : 42.00 km
Close To : Wiarton
Type of Contract : Structural Culvert Rehabilitations &Structural Culvert Replacement (Hot Mix Paving, Electrical & Structures)
Value of Contract : $7,309,435.00
Description : Structural Culvert Rehabilitations & Structural Culvert Replacementand Hot Mix Paving, Electrical & Structures.
Traffic Impact : From Hepworth to Tobermory, (Various locations) For the year of 2015. Expect delays up to 5 minutes. Alternating lane closures Northbound and Southbound along Highway 6 for culvert rehabilitation and replacement. Traffic will be in a single lane configuration controlled by Traffic Control Persons. Judges Creek Culvert: Northbound and Southbound traffic and will be controlled with portable temporary traffic signals. Anticipated Lane Width Restriction of 3.5 metres may be in place.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2013-3021
Start of Construction : May 30, 2014
Estimated End of Construction : November 27, 2015
Highway : 403
Length of Construction : 1.60 km
Close To : Brantford
Type of Contract : Structural Rehabilitation
Value of Contract : $8,426,289.00
Description : Grand River Bridge Rehabilitation.
Traffic Impact : Grand River Bridge structure 0.8 Kilometres Eastbound and 0.8 Kilometres Westbound. Expect delays up to 5 minutes. Shoulder Lane is closed with Quick Movable Barriers. Closure times are as follows: Monday to Thursday from 0:00 to 15:00 and from 19:00 to 24:00. Friday from 0:00 to 14:00 and 19:00 to 24:00 hours, Saturday and Sunday from 0:00 to 24:00 Reduced speed of 80 kilometres per hour. Shoulder widths during one and two lane configuration are reduced to 0.25 metres.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2013-3019
Start of Construction : May 11, 2014
Estimated End of Construction : October 16, 2015
Highway : 402
Length of Construction : 0.00 km
Close To : London
Type of Contract : Rehabilitation of Bridges on Highway 402
Value of Contract : $6,003,300.00
Description : Structrure Rehabilitation, highway 402- Miller Road Underpass, Springer Rd UP Site 19-538, Carriage Road Underpass, Sharon Road Underpass, Woodhull Road Underpass, Westdel Bourne Underpass, White Oak Road Underpass.
Traffic Impact : at Westdel Bourne, Sharon Drive and Miller Road. Expect delays up to 10 minutes. Eastbound and Westbound lanes may be reduced to one lane in the vicinity of Westel Bourne, Sharon Drive and Miller Road. Minimum Eastbound and Westbound total width: 4.25 metres. Miller Road reduced to single lane, portable temporary traffic signals in place. Minimum Northbound and Southbound total width: 3.3 metres. Full Closure of Sharon Drive and Westdel Bourne at Highway 402. Local Detour Provided.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2013-3014
Start of Construction : April 28, 2014
Estimated End of Construction : November 06, 2015
Highway : 401
Length of Construction : 4.00 km
Close To : Cambridge
Type of Contract : Grading, Drainage, Hot Mix Paving, Granular Base, Electrical, Structure Rehabilitation (1) and Structure Replacement (2)
Value of Contract : $18,946,042.00
Description : Replacement of Fountain Street Underpass and Speedsville Road Underpass, Rehabilitation of Ramp Underpass from Highway 8.
Traffic Impact : Between Regional Road 8 / King Street and Regional Road 24 / Hespeler Road. Expect delays up to 15 minutes. Long Term Lane Closure: Fountain Street at the Highway 401 Underpass will be closed. April 22, 2015 to October 18, 2015. Highway 401 will be closed eastbound and westbound from Saturday August 29 at 10:00 pm until Sunday August 30, 2015 at 9:00 am. 401 Eastbound and Westbound Lane Closures at: Monday to Thursday - 00:00 to 06:00 and 20:00 to 24:00 Friday - 00:00 to 06:00 and 21:00 to 24:00 Saturday - 19:00 to 22:00 1 lane closure Sunday - 09:00 to 10:00. Highway 8 East – West Ramp Lane Closures will be in effect as follows: Monday to Thursday - 00:00 to 07:00 and 20:00 to 24:00 Friday - 00:00 to 07:00 and 20:00 to 24:00 Saturday - 19:00 to 22:00 Sunday - 09:00 to 10:00 1 lane closure. Highway 8 West – East Ramp Monday to Thursday - 00:00 to 06:00 and 19:00 to 24:00 Friday - 00:00 to 06:00 and 19:00 to 24:00 Saturday -19:00 to 22:00 1 lane closure Sunday 09:00 to 10:00 A Reduced speed limit of 80 kilometres per hour will be in effect through the single and two lane closures. Detour routes remain in effect from April 22, 2015 to October 18, 2015. Eagle Street to Speedsville Road or Hespeler Road to Maple Grove Road and Shantz Hill Road to King Street to Sportsworld Drive to Maple Grove Road. Detour routes will be in effect starting at 10:00 pm Saturday August 29. Continuing until Sunday August 30, 2015 at 9:00 am. West bound Highway 401 traffic will be detoured at Hespeler Road northerly to Maple Grove Road west to Sportsworld Drive, then southerly to King Street and then back to Highway 401 west bound. East bound Highway 401 traffic will be detoured at King Street northerly to Sportsworld Drive north to Maple Grove Road, then east to Hespeler Road and then southerly back to Highway 401 east bound.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2013-3003
Start of Construction : July 02, 2013
Estimated End of Construction : July 10, 2015
Highway : 89
Length of Construction : 0.00 km
Close To : Shelburne
Type of Contract : Grading, drainage, granular base, hot mix paving, electrical and structural replacement/rehabilitation
Value of Contract : $6,213,810.00
Description : Replacement of South Saugeen River Bridge, South Saugeen River Bridge Rehabilitation, Mud Creek Bridge Rehabilation and Grand River (Keldon) Bridge Replacement.
Traffic Impact : Highway 89 West of Mount Forest (Conn) to east of Shelburne (Keldon). Expect delays up to 10 minutes. Short duration temporary single shoulder/lane closures. No restrictions at Mud Creek Structure. Regulatory speed reduction from 80 to 60 kilometres per hour.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2012-3034
Start of Construction : March 30, 2013
Estimated End of Construction : November 13, 2015
Highway : 403
Length of Construction : 0.00 km
Close To : Brantford
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural Rehabilitation
Value of Contract : $11,769,200.00
Description : ALL Highway 403- 6 Structures-West Street, North Park, Highway 24 Interchange UP (King George Road, Site 1-32, Tollgate Rd UP-Site 1-143, Ewing Drive UP - Site 1-142, Park Road UP-Wayne Gretsky Parkway, City of Brantford
Traffic Impact : Highway 403, King George Road, Wayne Gretzky Parkway Underpass. There is no impact on traffic. Wayne Gretzky Parkway (City of Brantford) reduced to one lane each direction.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2012-3022
Start of Construction : April 28, 2014
Estimated End of Construction : October 03, 2015
Highway : 401
Length of Construction : 4.00 km
Close To : London
Type of Contract : New Interchange
Value of Contract : $18,283,415.00
Description : Highway 401-New Interchange at Wonderland Road, London-Design Build.
Traffic Impact : Highway 401 from 0.5 kilometres West of the Glanworth Drive underpass easterly to 1.0 kilometres East of the Scotland Drive underpass. There is no impact on traffic. Highway 401 Eastbound and Westbound Lanes - Median cross-over, with reduction to single lane traffic in each direction in effect, traffic on Westbound lanes. - Speed reduction to 80 kilometres per hour. - Eastbound lanes closed for construction. - Minimum Eastbound total width: 5.8 metres - 0.6 metres Shoulder, 3.8 metres Lane, 1.4 metres Shoulder. - Minimum Westbound total width: 6.25 metres - 0.5 metres Shoulder, 3.75 metres Lane, 2.0 metres Shoulder. Morrison Road Closed from Scotland Drive to Wonderland Road. Manning Drive Closed from White Oak Road to Morrison Road. Wonderland Road Closed from Morrison Road to Glanworth Drive.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2012-3007
Start of Construction : July 25, 2012
Estimated End of Construction : October 05, 2015
Highway : 3
Length of Construction : 0.00 km
Close To : Dunnville
Type of Contract : Structural Replacement
Value of Contract : $27,953,735.00
Description : Replacement/Rehabilitation of Grand River Bridge Cayuga), Culvert Replacement in Cansfield, near Cayuga (CMGC Process Delivery Model).
Traffic Impact : Cayuga/Grand River – Structure 500 metres West of Grand River Bridge to 500 metres East of Grand River Bridge. Expect delays up to 5 minutes. Narrow Lanes – 3.25 metres at East and West Approaches. Recommended Speed of 30 kilometres per hour. Traffic shifted onto detour bridge. Contractor has traffic management in-place.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page


Contract #: 2011-3003
Start of Construction : October 01, 2011
Estimated End of Construction : October 31, 2016
Highway : 7
Length of Construction : 5.50 km
Close To : Kitchener
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Structural, High Mast Illumination, Noise Barriers and ATMS
Value of Contract : $96,115,878.00
Description : Reconstruction from Fischer Hallman Road to Courtland Avenue, Kitchener 5.5 kilometres - Includes 12 Bridge Rehabilitation.
Traffic Impact : Highway 7/8: From 1.9 kilometres West of Fischer-Hallman Road Easterly to 0.8 kilometres East of Courtland Avenue. Expect delays up to 10 minutes. Homer Watson Boulevard: Southbound and Northbound: Reduced to a single lane in each direction at the interchange. Homer Watson Eastbound On Ramp (North-East Ramp): Closed for approximately 8 months. Homer Watson Eastbound Off Ramp (West-North/South Ramp): Closed for approximately 4 months. Lane widths - Eastbound: (2) 3.5 metres lanes with 0.4 metres inside shoulder and 0.6 metres outside shoulder. Westbound (2) 3.5 metre lanes with 0 metre shoulder. Highway 7/8 Westbound and Eastbound: Nightly single lane closures throughout the project limits Sunday – Friday. Nightly Closure: Homer Watson Boulevard to be closed between Ottawa Street and Hoffman Street. Monday August 24th, Tuesday August 25th and Wednesday August 26th, 2015 8 p. m. – 6 a.m
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 21, 2015 - August 28, 2015
Last Updated: August 21, 2015

Top of page Top of page