Construction Reports: Southwestern

Contract #: 2014-3010
Start of Construction : July 02, 2014
Estimated End of Construction : June 24, 2015
Highway : 10
Length of Construction : 16.00 km
Close To : Shelburne
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving and Electrical.
Value of Contract : $6,395,301.00
Description : Resurfacing from Dufferin Road 17 to Dundalk - 12.1 kilometres, Dundalk to Flesherton - 16.3 kilometres Flesherton to Grey Rd. 130 - 4.2 kilometres (Total combined length = 32.6 kilometres.
Traffic Impact : From the intersection of Highway 10 and Dufferin Road 17, to 0.6 kilometres North of Highway 10 and Southgate Road 24. Expect delays up to 5 minutes. Short Duration Single lane restrictions throughout contract Monday to Friday 7:00 a.m. to 7:00 p.m.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2014-3009
Start of Construction : July 23, 2014
Estimated End of Construction : August 20, 2015
Highway : 9
Length of Construction : 8.00 km
Close To : Kincardine
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving and Electrical
Value of Contract : $8,180,702.00
Description : Highway 21 to Bruce Road 7/Side Road 20, Kincardine - Resurfacing
Traffic Impact : From the junction at highway 21, Kincardine, to 0.14 kilometres west of junction at Bruce Road 7. Expect delays up to 5 minutes. Short Duration Single lane restrictions throughout contract Monday to Friday 7:00 a.m. to 7:00 p.m. Highway 9 from Kincardine to Bruce Road 7 is closed. Detour: Highway 21 to South Line to Bruce Road 7.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2014-3007
Start of Construction : July 07, 2014
Estimated End of Construction : September 30, 2014
Highway : 6
Length of Construction : 4.80 km
Close To : Guelph
Type of Contract : Grading, Drainage, Hot Mix Paving, Granular Base, Electrical,
Value of Contract : $4,921,137.00
Description : Hanlon Expressway (Highway 6) - Highway 401 to South of Clair Road. Resurfacing 4.8 kilometres.
Traffic Impact : From Highway 401 Northerly to 0.92 kilometres South of Laird Road Interchange. Expect delays up to 10 minutes. Nightly Highway 6 Northbound Alternating single lane closures will be in effect for from 20:00 to 08:00 from Sunday August 24, 2014 to Friday August 29, 2014. Highway 6 Southbound Alternating single lane closures will be in effect for from 20:00 to 08:00 am from Sunday August 24, 2014 to Friday August 29, 2014. A single lane width and shoulder will be maintained through the closures. Highway 401 Eastbound/Highway 6 On and Off Ramp Periodic rotating ramp closures between 23:00-05:00 am from Sunday August 24, 2014 to Friday August 29, 2014. Highway 401 Westbound/Highway 6 On and Off Ramp Periodic rotating ramp closures between 23:00-05:00 am from Sunday August 24, 2014 to Friday August 29, 2014. Reduced speed limit of 60 kilometres an hour will be in effect through the construction zone.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2014-3006
Start of Construction : June 16, 2014
Estimated End of Construction : December 31, 2014
Highway : 3
Length of Construction : 1.00 km
Close To : Tillsonburg
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Concrete Paving, and Electrical – Construction of Roundabout and Isles
Value of Contract : $2,755,044.00
Description : Intersection Improvements - Roundabout at Highway 3 & Vienna Road.
Traffic Impact : 0.9 kilometres of Highway 3 at the intersection of Highway 3 and Vienna Road. Expect delays up to 15 minutes. Alternating Lane Closure on Highway 3 and alternating Full Closure of Vienna Road North and South, while providing special access to Emergency Services Vehicles via Vienna Road at all times. Vienna Road South is closed to commuters, while maintaining special access for Emergency Services Vehicles. By decommissioning the Traffic Signals, the intersection has turned into a 3-way with Stop Sign on Vienna Road only. Highway 3 is experiencing Lane Closure on south portion on Eastbound at both East and West of Intersection. Additionally weather permitting, to complete the paving operation, Highway 3 will be reduced to one lane on August 20, 21 and 22, with Flagging Personnel on-site drirecting the traffic. Due to the Designation of Construction Zone for this contract, the Regulatory Speed Reduction Signs have been place in the Construction Zone. Considering the key scheduled paving operation, weather permitting, should it be completed by August 22, Vienna Road South will be Open to commuters by August 27, 2014, the operations will be shifted to Highway 3 westbound and Vienna Road North will be closed, while maintaining special access for Emergency Services Vehicles only. Detour 1: Highway 3 - John Pound Road - Broadway Street – Oxford Street – Simcoe Street – Highway 3 – Bell Mill Side Road – Rokeby Orchard Road – Norfolk County Road 30 – Vienna Road. Detour 2: Highway 3- Carson Line – County Road 19 (Vienna Road)
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2014-3004
Start of Construction : June 18, 2014
Estimated End of Construction : November 17, 2014
Highway : 6
Length of Construction : 0.00 km
Close To : Wiarton
Type of Contract : Structural Culvert Rehabilitations &Structural Culvert Replacement (Hot Mix Paving, Electrical & Structures)
Value of Contract : $7,309,435.00
Description : Highway 6 Mega 1 Culverts - Hepworth to Tobermory.
Traffic Impact : from Hepworth to Ferndale, Bruce County. 42 kilometres (Various locations). Expect delays up to 5 minutes. Alternating lane closures Northbound and Southbound along Highway 6 for culvert rehabilitation and replacement. Traffic will be in a single lane configuration controlled by Traffic Control Persons. Detour Routes are not anticipated
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2014-3002
Start of Construction : July 14, 2014
Estimated End of Construction : October 16, 2014
Highway : 6
Length of Construction : 8.20 km
Close To : Hagersville
Type of Contract : Grading, Drainage, granular base, Hot Mix Paving and Electrical
Value of Contract : $4,242,107.00
Description : Jarvis to Hagersville - Resurfacing 8.2 kilometres eastbound and westbound.
Traffic Impact : From north limit of Jarvis to south limit of Hagersville. Total length 8.0 kilometres. Expect delays up to 10 minutes. Northbound and southbound lanes will be flagged for placing CIREAM base, ditch clean out and for placing cross culvert works. Regulatory speed limit has been reduced to 60 kilometres per hour within the construction zone. Detour: Highway 3 and side roads.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2013-3021
Start of Construction : May 30, 2014
Estimated End of Construction : September 24, 2015
Highway : 403
Length of Construction : 1.60 km
Close To : Brantford
Type of Contract : Structural Rehabilitation
Value of Contract : $8,426,289.00
Description : Grand River Bridge Rehabilitation.
Traffic Impact : Grand River Bridge structure, 0.8 kilometres eastbound and 0.8 kilometres westbound. Expect delays up to 5 minutes. Speed reduced to 80 kilometres per hour through site. Median lane closed. Joint-Merge Lane Closure will be in effect for the eastbound Highway 403. Eastbound lane 1 and eastbound Lane 2 will be merged to a Central lane and then enter the Construction site lane closure as detailed above. OPP will be on site.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2013-3019
Start of Construction : May 26, 2014
Estimated End of Construction : October 17, 2014
Highway : 402
Length of Construction : 0.00 km
Close To : London
Type of Contract : Rehabilitations of Bridges on Highway 402
Value of Contract : $6,003,300.00
Description : Structure Rehabilitation- highway 402- Miller Road Underpass, Springer Road Underpass, Carriage Road. Underpass-Site 19-539, Sharon Road Underpass-Site 19-541, Woodhull Road. Underpass-Site 19-542, Westdel Bourne Underpass-Site 19-543, White Oak Road. Underpass-Site 19-546.
Traffic Impact : Underpasses at White Oak Road, Woodhull Road, Springer Road Expect delays up to 10 minutes. Highway 402 at White Oak Road, Eastbound and Westbound lanes may be reduced to one lane in vicinity of White Oak Road. Highway 402 at Woodhull Road, Eastbound and Westbound lanes may be reduced to one lane in vicinity of Woodhull Road. Highway 402 at Springer Road, Eastbound and Westbound lanes may be reduced to one lane in vicinity of Springer Road. White Oak Road at Highway 402, Full Closure of White Oak Road at Highway 402. Woodhull Road at Highway 402, Full Closure of Woodhull Road at Highway 402. Springer Road at Highway 402, Full Closure of Springer Road at Highway 402. Local Detour Provided
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2013-3018
Start of Construction : May 05, 2014
Estimated End of Construction : November 29, 2014
Highway : 23
Length of Construction : 25.70 km
Close To : Mitchell
Type of Contract : Grading, Drainage, Hot Mix Paving and Electrical
Value of Contract : $10,911,129.00
Description : Resurfacing From Elginfield (Highway 7) northerly 36 km to the south limit of Mitchell (Frank Street). Repair or replacement of culverts, curb and gutter and steel beam guide rail- Length 36.0 kilomètres.
Traffic Impact : From Highway 7 Northerly 36.0 kilometres to Mitchell South Limit Expect delays up to 5 minutes. One lane closed at various locations for Culvert installations.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2013-3016
Start of Construction : May 05, 2014
Estimated End of Construction : December 12, 2014
Highway : 21
Length of Construction : 20.50 km
Close To : Port Elgin
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural Rehabilitation
Value of Contract : $10,279,050.00
Description : Port Elgin to Southampton to Alvanley - 20.5 kilometres, Deck Rehabilitation of Sauble River Bridge.
Traffic Impact : Port Elgin North Limits to Southampton South Limits, Southampton North Limits to Alvanley 20.5 kilometres. Expect delays up to 5 minutes. August 24-30, 2014 Sauble River Bridge structural rehabilitation. One lane closure (Southbound) at all times twenty four hours a day, seven days a week. Lane reduced to 3.5 meters with .25 meter offset from traffic to Temporary Concrete Barrier. Speed reduced to 60 kilometers per hour. Traffic Signals in place on both ends of the structure. August 24-30, 2014 Southampton to Alvanley Intermittent closures for entrance culverts and centreline culvert remove and replace. Traffic control barrels in place. August 24-30, 2014 Southampton to Alvanley Intermittent closures for ditching and seeding operations. Traffic control barriers and Traffic Control Persons in place to direct traffic.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2013-3015
Start of Construction : May 05, 2014
Estimated End of Construction : August 15, 2014
Highway : 4
Length of Construction : 5.90 km
Close To : London
Type of Contract : Drainage, hot mix paving and electrical
Value of Contract : $3,265,890.00
Description : Talbotville to Highway 401 - Resurfacing.
Traffic Impact : from 0.3 kilometres north of Highway 3 northerly to 0.2 kilometres north of Highway 401. Total length 5.9 kilometres. Expect delays up to 10 minutes. A lane on each direction will remain open all time except single lane section south of Longhurst Line to the south limit of contract will be flagged for placing granular material and other remaining works on single lane section northbound and southbound lanes from August 4 -8, 2014. Alternate route: Highway 3 and side roads.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2013-3014
Start of Construction : April 28, 2014
Estimated End of Construction : November 06, 2015
Highway : 401
Length of Construction : 0.00 km
Close To : Cambridge
Type of Contract : Grading, Drainage, Hot Mix Paving, Granular Base, Electrical, Structure Rehabilitation (1) and Structure Replacement (2)
Value of Contract : $18,946,042.00
Description : Replacement of Fountain Street Underpass and Speedsville Road Underpass, Rehabilitation of Ramp Underpass from Highway 8.
Traffic Impact : Between Regional Road 8 / King Street and Regional Road 24 / Hespeler Road. Expect delays up to 10 minutes. LONG TERM CLOSURE Speedsville Road at the Highway 401 Underpass will be closed. Starting Monday May 5, 2014 continuing to October 31, 2014. LONG TERM LANE CLOSURE Highway 8 at Highway 401 West-East Ramp Starting Monday June 9, 2014 continuing to October 5, 2014 Highway 8 at Highway 401 West-East Ramp will be reduced to one lane. 401 Eastbound Lane Closure: Monday August 25 to Thursday August 28, 2014 00:00 to 05:00: Two Lane Closure 05:00 to 06:00. Single Lane Closure 20:00 to 24:00: Single Lane Closure Friday August 29, 2014 00:00 to 05:00: Two Lane Closure 05:00 to 06:00. Single Lane Closure 21:00 to 24:00: Single Lane Closure Saturday August 30 2014 00:00 to 09:00: and 19:00 to 24:00 Single Lane Closure 401 Westbound Lane Closure: Monday August 25 to Thursday August 28, 2014 00:00 to 06:00: Two Lane Closure 06:00 to 07:00. Single Lane Closure 20:00 to 24:00: Single Lane Closure Friday August 29, 2014 00:00 to 06:00: Two Lane Closure 06:00 to 07:00. Single Lane Closure 21:00 to 24:00: Single Lane Closure Saturday August 30, 2014 00:00 to 07:00: Two Lane Closure 07:00 to 08:00: Single Lane Closure Sunday August 30, 2014 22:00 to 24:00: Single Lane Closure A Reduced speed limit of 80 kilometres per hour will be in effect through the single and two lane closures. Detour routes remain in effect from May 5, 2014 to October 31, 2014. Detour Route to the East of Speedsville Road is Eagle Street to Hespeler Road to Maple Grove Road. Detour Route to the West of Speedsville Road is Eagle Street to Fountain Street to Maple Grove Road. Detour routes remain in effect from June 9, 2014 to October 5, 2014. An alternate route for eastbound Highway 401 will take traffic south on King Street to the on ramp at Shantz Hill.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2013-3013
Start of Construction : May 26, 2014
Estimated End of Construction : August 31, 2014
Highway : 401
Length of Construction : 0.00 km
Close To : London
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving and Structures
Value of Contract : $4,083,660.00
Description : Westminster Structure Replacement.
Traffic Impact : Underpass at Westminster Drive in London Ontario, 0.4 kilometres. Expect delays up to 5 minutes. Highway 401 Eastbound/Westbound speed reduced to 80 kilometre per hour. Westminster Drive Single Lane Closure (as needed). Highway 401 Westbound/Eastbound Single Lane Closure (as needed).
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2013-3009
Start of Construction : September 06, 2013
Estimated End of Construction : July 25, 2014
Highway : 401
Length of Construction : 21.20 km
Close To : Morriston
Type of Contract : Resurfacing
Value of Contract : $6,322,000.00
Description : Waterloo Regional Road 33 Townline Road to Halton Regional Boundary - Resurfacing - 21.4 kilometres.
Traffic Impact : From Guelph Line (Interchange 312) to Highway 6 (Interchange 299). Expect delays up to 30 minutes. Sporadic eastbound lane closures. 2 of 3 lanes closed per direction on a given night. Nightly lane closures start at 9:00 p.m. normally. Speed is reduced to 80 kilometres per hour through the contract limits.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2013-3008
Start of Construction : April 01, 2014
Estimated End of Construction : December 23, 2014
Highway : 6
Length of Construction : 11.40 km
Close To : Chatsworth
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving and Electrical.
Value of Contract : $7,061,365.00
Description : Resurfacing from Chatsworth to Owen Sound - 11 kilometres, Addition of Left Turn Lanes and Partial Illumination at the intersection of Grey Road 16, Various upgrades to existing Truck Inspection Site South of Owen Sound.
Traffic Impact : Highway 6 & 10 From North Limit of Chatsworth to South Limit of Owen Sound. Length of Contract 11.4 kilometres. Expect delays up to 20 minutes. Single lane closures for operations ongoing from Chatsworth to Owen Sound controlled by Traffic Control Persons thoughout the day. As per detour signage.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2013-3005
Start of Construction : June 10, 2013
Estimated End of Construction : July 15, 2014
Highway : 3
Length of Construction : 14.10 km
Close To : Delhi
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, and Structural
Value of Contract : $9,090,557.00
Description : Resurfacing from Delhi to Simcoe - 14.1 kilometres. Rehabilitation of Big Creek Culvert & Kent Creek Culvert Sites.
Traffic Impact : from Delhi South Limits to Simcoe West Limits 14.1 kilometres. Expect delays up to 5 minutes. Alternating lane closures possible for eastbound and westbound along Highway 3 for road reconstruction. Traffic will be in a single lane configuration controlled by flagman.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2013-3003
Start of Construction : July 02, 2013
Estimated End of Construction : October 31, 2014
Highway : 89
Length of Construction : 0.00 km
Close To : Shelburne
Type of Contract : Grading, drainage, granular base, hot mix paving, electrical and structural replacement / rehabilitation
Value of Contract : $6,213,810.00
Description : Replacement of South Saugeen River Bridge, South Saugeen River Bridge Rehabilitation, Mud Creek Bridge Rehabilation and Grand River (Keldon) Bridge Replacement.
Traffic Impact : West of Mount Forest (Conn) to east of Shelburne (Keldon). Expect delays up to 25 minutes. Short duration temporary single shoulder/lane closures. Regulatory Speed reduction to 60 kilometres per hour. Reduced to one lane with temporary traffic signals at Mud Creek Structure. Reduced to one lane with temporary traffic signals at South Saugeen River East bridge. Wellington Road 16 at Highway 89 South Saugeen East Bridge closed to Traffic at Highway 89. Reduce to one lane with temporary traffic signals at Culvert 35-512C. There is a lane restriction of 4.35 metre width. Detour Route # 1 (travelling Wellington Road 16 South) Highway 89 west to Wellington Road 14 south to Line 8 east to Wellington 16 South. Approximately 20 kilometres. Detour Route # 2 (travelling Wellington Road 16 North) Line 8 east to Wellington Road 14 north to Highway 89. Approximately 20 kilometres.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2013-3002
Start of Construction : April 01, 2013
Estimated End of Construction : December 23, 2014
Highway : 6
Length of Construction : 14.70 km
Close To : Owen Sound
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Structural and Electrical.
Value of Contract : $10,343,755.00
Description : Resurfacing from Springmount to Hepworth 14.7 kilometres, Structure Replacement-Shallow Lake, Rehabilitation of Stokes River Bridge.
Traffic Impact : From 0.1 kilometres north of Highway 21 (Springmount) to 0.1 kilometres North of Bruce County Road 10 (Hepworth) and 8.6 kilometres north of Bruce County Road 9 (Stokes Bay Bridge). Length of Contract 14.7 kilometres Expect delays up to 10 minutes. Possible single lane closures using flagmen during surface course asphalt paving operations. Single lane Closures using Flag persons for work at Stokes River Bridge for deficiencies will be required. As per detour signage and/or OPP Instructions.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2012-3034
Start of Construction : May 01, 2014
Estimated End of Construction : November 29, 2014
Highway : 403
Length of Construction : 0.00 km
Close To : Brantford
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural Rehabilitation
Value of Contract : $11,769,200.00
Description : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural Rehabilitation.
Traffic Impact : King George Road, Ewing Drive and West Street Underpasses. There is no impact on traffic. 1) Ramp to East bound Highway 403 at King George Road closed for South bound traffic on King George Road.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2012-3032
Start of Construction : April 11, 2013
Estimated End of Construction : October 24, 2014
Highway : 3
Length of Construction : 0.00 km
Close To : St. Thomas
Type of Contract : Structural Rehabilitations
Value of Contract : $6,522,825.00
Description : Rehabilitations of Kettle Creek Branch Bridge, First Avenue Underpass, Balaclava Street Underpass, Burwell Road Underpass, St. Thomas Bypass, Highway 4-Replacement of Dodds Creek Culvert.
Traffic Impact : (Kettle Creek Overpass, Balaclava Street Underpass, First Avenue Interchange and Burwell Street Underpass 3.1 kilometres Highway 4 (Dodds Creek Culvert at North Side of Talbotville) 1.0 kilometre. Expect delays up to 5 minutes. March 24-28, 2014 Ongoing work will include occasional single lane closures with flagging. Minimal delays during flagging operations. No reduced speed limits. No detour routes on Highway 3; Detour route in place for Northbound Traffic on Balaclava Street in Saint Thomas
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2012-3028
Start of Construction : May 13, 2013
Estimated End of Construction : August 30, 2014
Highway : 21
Length of Construction : 20.00 km
Close To : Goderich
Type of Contract : Grading, Drainage, Hot Mix Paving, Structural and Electrical.
Value of Contract : $16,591,615.00
Description : Highway 21 Resurfacing from Bayfield to Goderich-Cold in Place- 20.0 kilometres. Culvert Rehabilitation, Culvert Replacement 0.18 kilometres South of Jowett's Grove Road S/Old River Road Int. Northerly to 0.49 km North of Jowett's Grove Rd N/Bayfield River Rd Intersection Distance 1.4 kilometres, Intersection Improvements including realignment and turning lanes at the Jowett's Grove Rd South/Old River Road Intersection
Traffic Impact : From the South limits of Bayfield, Northerly to the South Limits of Goderich. Length of Contract 20.0 kilometres. There is no impact on traffic. Contract finished. Road turned back over to MTO Friday, August 15th, 2014.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2012-3022
Start of Construction : April 28, 2014
Estimated End of Construction : October 03, 2015
Highway : 401
Length of Construction : 4.00 km
Close To : London
Type of Contract : New interchange
Value of Contract : $18,283,415.00
Description : Highway 401-New Interchange at Wonderland Road, London-Design Build.
Traffic Impact : from 0.5 kilometres West of the Glanworth Drive underpass easterly to 1.0 East of the Scotland Drive underpass. There is no impact on traffic. Highway 401 Eastbound and Westbound lanes - ongoing single lane closures and speed reduction.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2012-3015
Start of Construction : October 01, 2012
Estimated End of Construction : October 31, 2014
Highway : 401
Length of Construction : 0.00 km
Close To : Windsor
Type of Contract : Grading, Granular Hot Mix Paving, Concrete Paving, Drainage, Electrical, ATMS, Structural and Building Sciences.
Value of Contract : $20,358,000.00
Description : EXPANSION AND RECONFIGURATION OF THE CANADIAN PLAZA OF THE WINDSOR-DETROIT TUNNEL INCLUDING ROADWAY IMPROVEMENTS.
Traffic Impact : Windsor-Detroit Tunnel Plaza Improvements, Windsor Ontario. Expect delays up to 15 minutes. Various lane closures, lane shifts and intersection closures on Wyandotte, Goyeau and Park Streets will occur. Goyeau Street, between Park and Wyandotte Streets is now permanently closed as of February 11, 2013. Access to the Tunnel to USA is only from Wyandotte Street. There is no through street from Wyandotte to Park. Temporary traffic control signage and detour signs will be erected for various stages of construction to direct traffic in and around the construction site. The Windsor-Detroit Tunnel will remain open and accessible at all times during construction.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2012-3011
Start of Construction : October 22, 2012
Estimated End of Construction : November 30, 2014
Highway : 85
Length of Construction : 10.80 km
Close To : Waterloo
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural
Value of Contract : $32,305,105.00
Description : Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural.
Traffic Impact : Highway 7 and 85 from Krug Street to 0.4 kilometres North of Regional Road 15 10.8 kilometres Expect delays up to 10 minutes. Operations to include Structure work at Lancaster Street, University Avenue and Regional Road 15 (underneath the structures and on Lancaster, University and Regional Road 15) for structure rehabilitation. Lane restrictions are in place on Lancaster Street, University Avenue and Regional Road 15 in vicinity of structures. Daytime shoulder closures on Highway 85 for culvert clean out, pipe lining work and electrical removals. Nighttime single lane and/or ramp closures on Highway 85 in the vicinity of Lancaster Street, Bridgeport Road, University Avenue, King Street, Northfield Drive and Lexington Avenue for milling and paving operations, shouldering, concrete sealer application, guide rail and structure rehabilitation. Single lane closures intended for on Northfield Drive structure through the weekend of August 23rd and 24th. Please note the Ministry is intending to use Twitter to deliver the upcoming road closure info to the public in addition to the MTO website and 511. *Notes: All work is dependent on weather conditions. Detour Routes for surface asphalt echelon paving to be implemented as per Contract requirements, is scheduled to continue through August 29th, 2014. Detour routes to be implemented nightly as per Contract requirements. Contractor to coordinate with police services and confirm specific lane closure dates / times to MTO Traffic Operations and obtain RMOW Work Permits as required. University Avenue South-West Ramp remains closed and is to be closed until approximately October 17th, 2014.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2012-3007
Start of Construction : July 25, 2012
Estimated End of Construction : October 05, 2015
Highway : 3
Length of Construction : 0.00 km
Close To : Dunnville
Type of Contract : Structural Replacement
Value of Contract : $27,953,735.00
Description : Replacement/Rehabilitation of Grand River Bridge Cayuga), Culvert Replacement in Cansfield, near Cayuga (CMGC Process Delivery Model).
Traffic Impact : Cayuga/Grand River – Structure 500 metres West of Grand River Bridge to 500 metres East of Grand River Bridge. Expect delays up to 5 minutes. Narrow Lanes – 3.25 metres at East and West Approaches. Recommended Speed of 30 kilometres per hour. Possible temporary short bridge closures during girder erection. Traffic shifted onto detour bridge. Contractor has traffic management in-place.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2012-3000
Start of Construction : May 22, 2012
Estimated End of Construction : August 15, 2014
Highway : 401
Length of Construction : 3.00 km
Close To : Guelph
Type of Contract : Structural Rehabilitation
Value of Contract : $4,458,709.00
Description : Structural rehabilitation.
Traffic Impact : Wellington Road 32 Underpass About 3 kilometres Highway 401 Wellington Road 35 Underpass About 3 kilometres Highway 401 Highway 6 North Underpass About 3 kilometres Expect delays up to 5 minutes. Highway 401 Wellington Road 32 Underpass Nightly Temporary Single and Double lane closures Eastbound and Westbound at the underpass, with a reduction of speed to 80 kilometres per hour. Highway 401 Wellington Road 35 Underpass Nightly Temporary Single and Double lane closures Eastbound and Westbound at the underpass, with a reduction of speed to 80 kilometres per hours. Highway 401 Highway 6 North Underpass Nightly Closures of North-East Ramp and West-North Ramp. North-West Ramp Deceleration lane closed. Highway 6 Southbound right lane reduction to become North-West Ramp exit. On Highway 401 Nightly Temporary Single and Double lane closures Eastbound and Westbound at the underpass, with a reduction of speed to 80 kilometres per hour. Detour: During North-East ramp nightly closures use Wellington Road 34 to reach Highway 6 South to go Eastbound on Highway 401.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014

Top of page Top of page


Contract #: 2011-3003
Start of Construction : October 01, 2011
Estimated End of Construction : October 31, 2015
Highway : 7
Length of Construction : 5.50 km
Close To : Kitchener
Type of Contract : Grading, Drainage, Granular Base, Hot Mix Paving, Structural, High Mast Illumination, Noise Barriers and ATMS
Value of Contract : $96,115,878.00
Description : Reconstruction from Fischer Hallman Road to Courtland Avenue, Kitchener 5.5 kilometres - Includes 12 Bridge Rehabilitation.
Traffic Impact : Highway 7/8: From 1.9 kilometres West of Fischer-Hallman Road Easterly to 0.8 kilometres East of Courtland Avenue. There is no impact on traffic. Courtland Westbound On Ramp: Closed for approximately 7 months.
Region of Ontario : Southwestern
Contact Name : Road Info
Contact Number : 1-800-268-4686 / 416 235-4686 TTY:905 704/2426/1-866-471-8929
Valid for the week of: August 22, 2014 - August 29, 2014
Last Updated: August 22, 2014