Ministry of Transportation / Ministère des Transports
Home
Home > Traveller's Information > TRIP > Road Closures
Text size Enlarge Text Shrink Text
Search Search  |  

Road Closures

Please press the Refresh or Reload button at the top of your screen to see the most recent updates.

Unscheduled road closures and events for provincial highways:

Unscheduled Events

Scheduled Events

EAST MAIN ST WELLAND Eastbound [ HWY 406 - HWY 140/FARR ROAD ] - Recurring-Construction
Highway: EAST MAIN ST WELLAND
Direction: Eastbound
From/At: HWY 406
To: HWY 140/FARR ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 00:00
Event End: September 04, 2015 23:59
Last Change: Entered 2015-08-29 09:29

Top of page Top of page


EAST MAIN ST WELLAND Westbound [ HWY 140/FARR ROAD - HWY 406 ] - Recurring-Construction
Highway: EAST MAIN ST WELLAND
Direction: Westbound
From/At: HWY 140/FARR ROAD
To: HWY 406
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 00:00
Event End: September 04, 2015 23:59
Last Change: Entered 2015-08-29 09:30

Top of page Top of page


EASTPORT DRIVE Northbound [ QEW - HWY 2\NORTH SHORE BLVD ] - Recurring-Moving Maintenance Closure
Highway: EASTPORT DRIVE
Direction: Northbound
From/At: QEW
To: HWY 2\NORTH SHORE BLVD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 08, 2015 00:00
Event End: September 12, 2015 05:00
Last Change: Entered 2015-09-01 11:40

Top of page Top of page


EASTPORT DRIVE Southbound [ HWY 2\NORTH SHORE BLVD - QEW ] - Recurring-Moving Maintenance Closure
Highway: EASTPORT DRIVE
Direction: Southbound
From/At: HWY 2\NORTH SHORE BLVD
To: QEW
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 08, 2015 00:00
Event End: September 12, 2015 05:00
Last Change: Entered 2015-09-01 11:43

Top of page Top of page


EASTPORT DRIVE Southbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway: EASTPORT DRIVE
Direction: Southbound
From/At: LIFT BRIDGE
To: LIFT BRIDGE
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 09:00
Event End: September 04, 2015 16:00
Last Change: Entered 2015-08-26 13:43

Top of page Top of page


EASTPORT DRIVE Southbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Maintenance
Highway: EASTPORT DRIVE
Direction: Southbound
From/At: LIFT BRIDGE
To: LIFT BRIDGE
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 08, 2015 09:00
Event End: September 11, 2015 16:00
Last Change: Entered 2015-09-01 08:41

Top of page Top of page


HWY 10 Northbound [ County Road 17 - Southgate Road 24 / Artemesia-Melancthon Townline ] - Recurring-Construction
Highway: HWY 10
Direction: Northbound
From/At: County Road 17
To: Southgate Road 24 / Artemesia-Melancthon Townline
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 10 from Dufferin Rd. 17 to 0.6 km north of Southgate Rd. 24 will have alternating lane closures daily from 0700-1900 August 31-Sept 4.
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 19:00
Last Change: Entered 2015-08-26 13:30

Top of page Top of page


HWY 10 Northbound [ Southgate Road 24 / Artemesia-Melancthon Townline - Campbell Street ] - Recurring-Construction
Highway: HWY 10
Direction: Northbound
From/At: Southgate Road 24 / Artemesia-Melancthon Townline
To: Campbell Street
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 07:00
Event End: September 11, 2015 19:00
Last Change: Entered 2015-09-02 13:00

Top of page Top of page


HWY 10 Northbound [ Southgate Road 24 / Artemesia-Melancthon Townline - Southgate Road 24 / Artemesia-Melancthon Townline ] - Recurring-Construction
Highway: HWY 10
Direction: Northbound
From/At: Southgate Road 24 / Artemesia-Melancthon Townline
To: Southgate Road 24 / Artemesia-Melancthon Townline
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 10 from Southgate Rd. 24 to Campbell St. in Flesherton will have alternating lane closures daily Aug 31-Sept 4 from 0700-1900 hours
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 19:00
Last Change: Entered 2015-08-26 13:27

Top of page Top of page


HWY 11 Northbound [ COOPER FALLS ROAD/CANAL ROAD/COUNTY ROAD 52 - COOPER FALLS ROAD/CANAL ROAD/COUNTY ROAD 52 ] - Recurring-Maintenance
Highway: HWY 11
Direction: Northbound
From/At: COOPER FALLS ROAD/CANAL ROAD/COUNTY ROAD 52
To: COOPER FALLS ROAD/CANAL ROAD/COUNTY ROAD 52
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 02, 2015 09:00
Event End: September 03, 2015 15:00
Last Change: Entered 2015-08-27 14:17

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway: HWY 11
Direction: Northbound
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 18:00
Event End: September 03, 2015 23:59
Last Change: Entered 2015-08-25 11:23

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway: HWY 11
Direction: Northbound
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 00:00
Event End: September 04, 2015 10:00
Last Change: Entered 2015-08-25 11:23

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway: HWY 11
Direction: Northbound
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 18:00
Event End: September 13, 2015 23:59
Last Change: Entered 2015-08-31 11:47

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway: HWY 11
Direction: Northbound
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 00:00
Event End: September 13, 2015 10:00
Last Change: Entered 2015-08-31 11:47

Top of page Top of page


HWY 11 Northbound [ LINE 13/BASS LAKE ROAD - LINE 13/BASS LAKE ROAD ] - Maintenance
Highway: HWY 11
Direction: Northbound
From/At: LINE 13/BASS LAKE ROAD
To: LINE 13/BASS LAKE ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: September 09, 2015 00:00
Event End: September 09, 2015 15:00
Last Change: Entered 2015-08-27 14:21

Top of page Top of page


HWY 11 Southbound [ LACLIE STREET - LACLIE STREET ] - Maintenance
Highway: HWY 11
Direction: Southbound
From/At: LACLIE STREET
To: LACLIE STREET
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: September 09, 2015 00:00
Event End: September 09, 2015 15:00
Last Change: Entered 2015-08-27 14:19

Top of page Top of page


HWY 11 Southbound [ LINE 7/SIMCOE ROAD 27 - LINE 6 ] - Recurring-Construction
Highway: HWY 11
Direction: Southbound
From/At: LINE 7/SIMCOE ROAD 27
To: LINE 6
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 01, 2015 10:00
Event End: September 03, 2015 16:00
Last Change: Entered 2015-08-27 21:34

Top of page Top of page


HWY 11 Southbound [ SEVERN RIVER BRIDGE/WEST BRANCH - SOUTH SPARROW LAKE ROAD ] - Recurring-Construction
Highway: HWY 11
Direction: Southbound
From/At: SEVERN RIVER BRIDGE/WEST BRANCH
To: SOUTH SPARROW LAKE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 10:00
Event End: September 03, 2015 16:00
Last Change: Entered 2015-08-26 21:33

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway: HWY 11
Direction: Southbound
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 00:00
Event End: September 13, 2015 11:00
Last Change: Entered 2015-08-31 11:48

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway: HWY 11
Direction: Southbound
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 00:00
Event End: September 04, 2015 11:00
Last Change: Entered 2015-08-25 11:23

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway: HWY 11
Direction: Southbound
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 19:00
Event End: September 03, 2015 23:59
Last Change: Entered 2015-08-25 11:22

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway: HWY 11
Direction: Southbound
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 18:00
Event End: September 13, 2015 23:59
Last Change: Entered 2015-08-31 11:48

Top of page Top of page


HWY 115 Southbound [ TAPLEY 1/4 LINE - TAPLEY 1/4 LINE ] - Recurring-Construction
Highway: HWY 115
Direction: Southbound
From/At: TAPLEY 1/4 LINE
To: TAPLEY 1/4 LINE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 115 SB reduced to 1 lane (left lane closed) at Tapley 1/4 Line Rd fm 7:30am 31 Aug until noon 4 Sept. (W/Peterborough)
Event Start: August 31, 2015 07:30
Event End: September 04, 2015 12:00
Last Change: Entered 2015-08-26 08:41

Top of page Top of page


HWY 12 Northbound [ ATHERLEY ROAD - ATHERLEY ROAD ] - Engineering Investigation
Highway: HWY 12
Direction: Northbound
From/At: ATHERLEY ROAD
To: ATHERLEY ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Engineering Investigation
Comment :
Event Start: September 02, 2015 22:00
Event End: September 03, 2015 07:00
Last Change: Entered 2015-08-28 11:53

Top of page Top of page


HWY 12 Northbound [ SIMCOE RD 37-TALBOT ST N - HWY 93/SIMCOE ROAD 93 ] - Recurring-Construction
Highway: HWY 12
Direction: Northbound
From/At: SIMCOE RD 37-TALBOT ST N
To: HWY 93/SIMCOE ROAD 93
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 22:00
Event End: September 28, 2015 06:00
Last Change: Entered 2015-09-01 21:25

Top of page Top of page


HWY 12 Northbound [ TALBOT ROAD/GAMEBRIDGE - RAMARA CONCESSION ROAD 11 ] - Recurring-Construction
Highway: HWY 12
Direction: Northbound
From/At: TALBOT ROAD/GAMEBRIDGE
To: RAMARA CONCESSION ROAD 11
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 21:00
Event End: September 25, 2015 07:00
Last Change: Entered 2015-09-01 22:12

Top of page Top of page


HWY 12 Southbound [ ATHERLEY ROAD - ATHERLEY ROAD ] - Engineering Investigation
Highway: HWY 12
Direction: Southbound
From/At: ATHERLEY ROAD
To: ATHERLEY ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Engineering Investigation
Comment :
Event Start: September 03, 2015 22:00
Event End: September 04, 2015 07:00
Last Change: Entered 2015-08-28 11:54

Top of page Top of page


HWY 12 Southbound [ JONES ROAD/PLAZA ENT - JONES ROAD/PLAZA ENT ] - Construction
Highway: HWY 12
Direction: Southbound
From/At: JONES ROAD/PLAZA ENT
To: JONES ROAD/PLAZA ENT
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: August 25, 2015 07:00
Event End: September 03, 2015 18:00
Last Change: Entered 2015-08-21 11:20

Top of page Top of page


HWY 12 Southbound [ JONES ROAD/PLAZA ENT - JONES ROAD/PLAZA ENT ] - Engineering Investigation
Highway: HWY 12
Direction: Southbound
From/At: JONES ROAD/PLAZA ENT
To: JONES ROAD/PLAZA ENT
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Engineering Investigation
Comment :
Event Start: September 07, 2015 07:30
Event End: September 25, 2015 16:00
Last Change: Entered 2015-09-02 07:35

Top of page Top of page


HWY 137 Northbound [ THOUSAND ISLAND PKWY - THOUSAND ISLAND PKWY ] - Recurring-Construction
Highway: HWY 137
Direction: Northbound
From/At: THOUSAND ISLAND PKWY
To: THOUSAND ISLAND PKWY
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Hwy 137 N/B & S/B @ Thousand Island Parkway Bridge (Gananoque)
Event Start: September 08, 2015 07:00
Event End: September 11, 2015 17:00
Last Change: Entered 2015-08-31 14:30

Top of page Top of page


HWY 137 Northbound [ THOUSAND ISLAND PKWY - THOUSAND ISLAND PKWY ] - Recurring-Construction
Highway: HWY 137
Direction: Northbound
From/At: THOUSAND ISLAND PKWY
To: THOUSAND ISLAND PKWY
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Hwy 137 N/B & S/B @ Thousand Island Parkway Bridge (Gananoque)
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 17:00
Last Change: Entered 2015-08-28 08:02

Top of page Top of page


HWY 138 Northbound [ MYERS RD - CAMERON RD ] - Recurring-Maintenance
Highway: HWY 138
Direction: Northbound
From/At: MYERS RD
To: CAMERON RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment : Daily single lane closures with flagging operation on Hwy 138 N/St. Andrews
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 19:00
Last Change: Entered 2015-08-26 13:25

Top of page Top of page


HWY 140 Northbound [ KLIEINSMITH ROAD - EAST MAIN STREET/FARR ROAD ] - Recurring-Construction
Highway: HWY 140
Direction: Northbound
From/At: KLIEINSMITH ROAD
To: EAST MAIN STREET/FARR ROAD
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : This is a flagging operation, one through lane will maintained.
Event Start: August 31, 2015 00:00
Event End: September 04, 2015 23:59
Last Change: Entered 2015-08-29 09:33

Top of page Top of page


HWY 140 Southbound [ EAST MAIN STREET/FARR ROAD - KLIEINSMITH ROAD ] - Recurring-Construction
Highway: HWY 140
Direction: Southbound
From/At: EAST MAIN STREET/FARR ROAD
To: KLIEINSMITH ROAD
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : This is a flagging operation and 1 through lane will be maintained.
Event Start: August 31, 2015 00:00
Event End: September 04, 2015 23:59
Last Change: Entered 2015-08-29 09:34

Top of page Top of page


HWY 17 Eastbound [ BRUCE ST - GILLIAN/LOCHWINNOCH RD ] - Recurring-Construction
Highway: HWY 17
Direction: Eastbound
From/At: BRUCE ST
To: GILLIAN/LOCHWINNOCH RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Single lane closures as required with flagging operation on Hwy 17 (Renfrew)
Event Start: August 17, 2015 07:00
Event End: September 15, 2015 19:00
Last Change: Entered 2015-08-14 14:59

Top of page Top of page


HWY 17 Westbound [ BISSETT CREEK RD - BISSETT CREEK RD ] - Recurring-Maintenance
Highway: HWY 17
Direction: Westbound
From/At: BISSETT CREEK RD
To: BISSETT CREEK RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment : Single lane closures with flagging operation on Hwy 17 @ Bissett Creek Bridge (Bissett Creek)
Event Start: September 02, 2015 06:00
Event End: September 03, 2015 18:00
Last Change: Entered 2015-09-02 07:44

Top of page Top of page


HWY 17 Westbound [ CAMPBELL DR - SCHEEL DR ] - Recurring-Construction
Highway: HWY 17
Direction: Westbound
From/At: CAMPBELL DR
To: SCHEEL DR
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily single lane closures with flagging operation on Hwy 17 in Arnprior
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 19:00
Last Change: Entered 2015-08-27 15:25

Top of page Top of page


HWY 21 Southbound [ Lakeland Estates Road - Lakeland Estates Road ] - Recurring-Construction
Highway: HWY 21
Direction: Southbound
From/At: Lakeland Estates Road
To: Lakeland Estates Road
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 21 from North of Lakeland Estates Rd. to 50 m North of Lakeland Estates Rd. will have the Southbound right lane closed (intermittent lane closure) Sept 2-4 from 0730 to 1700 hours
Event Start: September 02, 2015 07:30
Event End: September 04, 2015 17:00
Last Change: Entered 2015-09-01 15:15

Top of page Top of page


HWY 21 Southbound [ Lakeshore Road / County Road 7 - Thomson Line / County Road 6 ] - Recurring-Construction
Highway: HWY 21
Direction: Southbound
From/At: Lakeshore Road / County Road 7
To: Thomson Line / County Road 6
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 21 Southbound from Lakeshore Road to Thomson Line will have a right lane closure, September 1-4 between 0700-1900 hours.
Event Start: September 01, 2015 07:00
Event End: September 04, 2015 19:00
Last Change: Entered 2015-08-31 07:09

Top of page Top of page


HWY 26 Eastbound [ County Road 2 - Longpoint Road / County Road 21 ] - Recurring-Construction
Highway: HWY 26
Direction: Eastbound
From/At: County Road 2
To: Longpoint Road / County Road 21
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 26 Eastbound and Westbound will have an alternating right and left lane closure from Collingwood to Thornbury, August 31-September 4 between 0700-1900 hours.
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 19:00
Last Change: Entered 2015-08-28 13:36

Top of page Top of page


HWY 26 Eastbound [ NOTTAWASAGA RIVER - ANNE STREET NORTH ] - Recurring-Construction
Highway: HWY 26
Direction: Eastbound
From/At: NOTTAWASAGA RIVER
To: ANNE STREET NORTH
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 18:00
Event End: September 04, 2015 12:00
Last Change: Entered 2015-08-27 06:30

Top of page Top of page


HWY 26 Eastbound [ WYANT DRIVE - WYANT DRIVE ] - Recurring-Construction
Highway: HWY 26
Direction: Eastbound
From/At: WYANT DRIVE
To: WYANT DRIVE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 18:00
Event End: September 11, 2015 10:00
Last Change: Entered 2015-09-01 22:07

Top of page Top of page


HWY 26 Westbound [ ANNE STREET NORTH - NOTTAWASAGA RIVER ] - Recurring-Construction
Highway: HWY 26
Direction: Westbound
From/At: ANNE STREET NORTH
To: NOTTAWASAGA RIVER
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 18:00
Event End: September 11, 2015 12:00
Last Change: Entered 2015-09-02 09:12

Top of page Top of page


HWY 26 Westbound [ NURSERY ROAD (SPRINGWATER PROV. PARK) - NOTTAWASAGA RIVER ] - Construction
Highway: HWY 26
Direction: Westbound
From/At: NURSERY ROAD (SPRINGWATER PROV. PARK)
To: NOTTAWASAGA RIVER
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 08, 2015 05:00
Event End: September 08, 2015 12:00
Last Change: Entered 2015-09-02 09:09

Top of page Top of page


HWY 3 Eastbound [ Centennial Avenue - Centennial Avenue ] - Construction
Highway: HWY 3
Direction: Eastbound
From/At: Centennial Avenue
To: Centennial Avenue
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Hwy 3 at Centennial Ave will have paving operations in both directions Sept 2 from 0700-1900 hours
Event Start: September 02, 2015 07:00
Event End: September 02, 2015 19:00
Last Change: Entered 2015-09-01 15:22

Top of page Top of page


HWY 3 Eastbound [ Centennial Avenue - Talbot Street ] - Construction
Highway: HWY 3
Direction: Eastbound
From/At: Centennial Avenue
To: Talbot Street
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 03, 2015 07:00
Event End: September 03, 2015 19:00
Last Change: Entered 2015-09-02 15:22

Top of page Top of page


HWY 3 Eastbound [ Centennial Avenue - Yarmouth Centre Road ] - Construction
Highway: HWY 3
Direction: Eastbound
From/At: Centennial Avenue
To: Yarmouth Centre Road
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 08, 2015 07:00
Event End: September 08, 2015 19:00
Last Change: Entered 2015-09-02 15:26

Top of page Top of page


HWY 3 Eastbound [ Division Road / Talbot Road (County Road 29) - Road 4 East / County Road 18 ] - Recurring-Construction
Highway: HWY 3
Direction: Eastbound
From/At: Division Road / Talbot Road (County Road 29)
To: Road 4 East / County Road 18
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Full closure eastbound and westbound for one month.
Event Start: August 20, 2015 00:00
Event End: September 19, 2015 23:59
Last Change: Entered 2015-08-19 18:30

Top of page Top of page


HWY 3 Eastbound [ E JCT CENTENNIAL RD (N)/ELGIN RD 28 (S) - JOHN POUND RD (N) ] - Recurring-Construction
Highway: HWY 3
Direction: Eastbound
From/At: E JCT CENTENNIAL RD (N)/ELGIN RD 28 (S)
To: JOHN POUND RD (N)
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 3 Eastbound and Westbound will have alternating lane closures from Carter Road to John Pound Road alternating from the left and right lanes, May 13-November 1 between 0700-1900 hours.
Event Start: May 13, 2015 07:00
Event End: November 01, 2015 19:00
Last Change: Entered 2015-05-11 14:06

Top of page Top of page


HWY 3 Eastbound [ Maidstone Avenue / Regional Road 8 - Gosfield Townline West / Arner Townline ] - Recurring-Construction
Highway: HWY 3
Direction: Eastbound
From/At: Maidstone Avenue / Regional Road 8
To: Gosfield Townline West / Arner Townline
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 3 between County Road 8 (Maidstone Avenue) and County Road 23 (Gosford Townline) at the town of Essex will have alternating lane closures nightly from 7:00 p.m. to 6:00 a.m. beginning Monday, August 17, 2015 to approximately Monday, September 14, 2015 for pavement shaving and line painting operations. Traffic will be controlled by the OPP and flagging operations.
Event Start: August 17, 2015 19:00
Event End: September 14, 2015 06:00
Last Change: Entered 2015-08-16 11:21

Top of page Top of page


HWY 3 Eastbound [ Main Street of Courtland - Main Street of Courtland ] - Recurring-Construction
Highway: HWY 3
Direction: Eastbound
From/At: Main Street of Courtland
To: Main Street of Courtland
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 3 at Courtland Fire Hall to 1 km West of Courtland Fire Hall will have the Eastbound left lane closed and the Westbound right lane closed Sept 1-15 from 0700-1900 hours
Event Start: September 01, 2015 07:00
Event End: September 15, 2015 19:00
Last Change: Entered 2015-08-31 15:37

Top of page Top of page


HWY 3 Eastbound [ TOWNLINE ROAD (WAINFLEET) - TOWNLINE ROAD ] - Recurring-Construction
Highway: HWY 3
Direction: Eastbound
From/At: TOWNLINE ROAD (WAINFLEET)
To: TOWNLINE ROAD
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 08:00
Event End: September 04, 2015 20:00
Last Change: Entered 2015-08-28 13:56

Top of page Top of page


HWY 3 Westbound [ TOWNLINE ROAD - TOWNLINE ROAD (WAINFLEET) ] - Recurring-Construction
Highway: HWY 3
Direction: Westbound
From/At: TOWNLINE ROAD
To: TOWNLINE ROAD (WAINFLEET)
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 08:00
Event End: September 04, 2015 20:00
Last Change: Entered 2015-08-28 13:58

Top of page Top of page


HWY 35/115 Northbound [ HWY 401 - MAIN ST. ] - Recurring-Construction
Highway: HWY 35/115
Direction: Northbound
From/At: HWY 401
To: MAIN ST.
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 18:00
Event End: September 04, 2015 15:00
Last Change: Entered 2015-08-27 00:06

Top of page Top of page


HWY 35/115 Southbound [ 6TH ROAD/TAUNTON ROAD - HWY 401 ] - Recurring-Construction
Highway: HWY 35/115
Direction: Southbound
From/At: 6TH ROAD/TAUNTON ROAD
To: HWY 401
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 28, 2015 00:00
Event End: September 03, 2015 23:59
Last Change: Entered 2015-08-25 08:39

Top of page Top of page


HWY 4 Northbound [ Clandeboye Drive - Clandeboye Drive ] - Recurring-Construction
Highway: HWY 4
Direction: Northbound
From/At: Clandeboye Drive
To: Clandeboye Drive
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 4 Northbound and Southbound 500 meters North of Clandeboye Drive will have a right lane closure, August 10 - September 30 between 0700-1700 hours.
Event Start: August 11, 2015 07:00
Event End: September 30, 2015 17:00
Last Change: Entered 2015-08-10 10:53

Top of page Top of page


HWY 4 Northbound [ King Street(Hensall Road) / County Road 84 - King Street(Hensall Road) / County Road 84 ] - Construction
Highway: HWY 4
Direction: Northbound
From/At: King Street(Hensall Road) / County Road 84
To: King Street(Hensall Road) / County Road 84
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 4 south of Hensall at the Black Creek River Bridge, will be reduced to one lane until Saturday, October 31st, 2015, for bridge work.
Event Start: August 09, 2015 02:00
Event End: October 31, 2015 00:00
Last Change: Entered 2015-08-09 14:10

Top of page Top of page


HWY 4 Northbound [ Kippen Road / County Road 12 - Kippen Road / County Road 12 ] - Construction
Highway: HWY 4
Direction: Northbound
From/At: Kippen Road / County Road 12
To: Kippen Road / County Road 12
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 4 south of Kippen at the Kippen Creek Bridge, will be reduced to one lane until Saturday, October 31st, 2015, for bridge work.
Event Start: August 09, 2015 14:00
Event End: October 31, 2015 00:00
Last Change: Entered 2015-08-09 14:15

Top of page Top of page


HWY 4 Northbound [ Richmond Street N - Mill Street ] - Maintenance
Highway: HWY 4
Direction: Northbound
From/At: Richmond Street N
To: Mill Street
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: September 08, 2015 08:00
Event End: September 08, 2015 18:00
Last Change: Entered 2015-09-02 13:26

Top of page Top of page


HWY 400 Northbound [ 401 - FINCH AVENUE ] - Moving Maintenance Closure
Highway: HWY 400
Direction: Northbound
From/At: 401
To: FINCH AVENUE
Lanes Affected: 3 Left Lane(s)
Traffic Impact :
Reason Moving Maintenance Closure
Comment : Short duration lane closures will occur periodically.
Event Start: September 03, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-09-01 14:02

Top of page Top of page


HWY 400 Northbound [ ANNE ST. - ANNE ST. ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: ANNE ST.
To: ANNE ST.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 26/ BAYFIELD STREET NB
Reason Recurring-Construction
Comment :
Event Start: September 05, 2015 21:00
Event End: September 12, 2015 07:00
Last Change: Entered 2015-08-27 09:51

Top of page Top of page


HWY 400 Northbound [ ANNE ST. - ANNE ST. ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: ANNE ST.
To: ANNE ST.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DUNLOP STREET / SIMCOE ROAD 90 NB
Reason Recurring-Construction
Comment :
Event Start: August 29, 2015 22:00
Event End: September 05, 2015 07:00
Last Change: Entered 2015-08-25 14:00

Top of page Top of page


HWY 400 Northbound [ CANAL ROAD. - HWY 11 JCT ] - Recurring-Maintenance
Highway: HWY 400
Direction: Northbound
From/At: CANAL ROAD.
To: HWY 11 JCT
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: August 31, 2015 21:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-28 11:31

Top of page Top of page


HWY 400 Northbound [ CANAL ROAD. - SIMCOE ROAD 88 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: CANAL ROAD.
To: SIMCOE ROAD 88
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from SIMCOE ROAD 88 EB/WB, Off-ramp to SIMCOE ROAD 88 EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. On Monday, 2 lanes will close at Midnight while from Tuesday to Thursday, 1 lane will close at 8:00PM and a 2nd lane will close at 10:00PM. On Friday, 1 lane will close at Midnight and a 2nd lane will close at Midnight while on Saturday, 1 lane will close at 7:00PM and a 2nd lane will close at 10:00PM.
Event Start: September 07, 2015 22:00
Event End: September 13, 2015 11:00
Last Change: Entered 2015-09-02 12:12

Top of page Top of page


HWY 400 Northbound [ CANAL ROAD. - SIMCOE ROAD 88 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: CANAL ROAD.
To: SIMCOE ROAD 88
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from SIMCOE ROAD 88 EB/WB, Off-ramp to SIMCOE ROAD 88 EB/WB
Reason Recurring-Construction
Comment : Alternating two lane closure.
Event Start: August 30, 2015 22:00
Event End: September 04, 2015 11:00
Last Change: Entered 2015-08-26 14:09

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - PARTRIDGE SKI TRAIL ROAD ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: DUCKWORTH STREET
To: PARTRIDGE SKI TRAIL ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 08, 2015 18:00
Event End: September 11, 2015 11:00
Last Change: Entered 2015-08-31 11:47

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - PARTRIDGE SKI TRAIL ROAD ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: DUCKWORTH STREET
To: PARTRIDGE SKI TRAIL ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: August 30, 2015 18:00
Event End: September 04, 2015 11:00
Last Change: Entered 2015-08-25 11:22

Top of page Top of page


HWY 400 Northbound [ ESSA ROAD / SIMCOE ROAD 27 - ESSA ROAD / SIMCOE ROAD 27 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: ESSA ROAD / SIMCOE ROAD 27
To: ESSA ROAD / SIMCOE ROAD 27
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from ESSA ROAD / SIMCOE ROAD 27 NB
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:00
Event End: September 06, 2015 06:00
Last Change: Entered 2015-08-26 13:59

Top of page Top of page


HWY 400 Northbound [ ESSA ROAD / SIMCOE ROAD 27 - HWY 26/ BAYFIELD STREET ] - Recurring-Maintenance
Highway: HWY 400
Direction: Northbound
From/At: ESSA ROAD / SIMCOE ROAD 27
To: HWY 26/ BAYFIELD STREET
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: August 31, 2015 20:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-27 07:55

Top of page Top of page


HWY 400 Northbound [ FINCH AVENUE - MAJOR MACKENZIE DRIVE ] - Recurring-Moving Maintenance Closure
Highway: HWY 400
Direction: Northbound
From/At: FINCH AVENUE
To: MAJOR MACKENZIE DRIVE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 07, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-01 13:05

Top of page Top of page


HWY 400 Northbound [ HWY 26/ BAYFIELD STREET - HWY 26/ BAYFIELD STREET ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: HWY 26/ BAYFIELD STREET
To: HWY 26/ BAYFIELD STREET
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 03, 2015 22:00
Event End: September 10, 2015 06:00
Last Change: Entered 2015-08-27 08:33

Top of page Top of page


HWY 400 Northbound [ HWY 26/ BAYFIELD STREET - HWY 26/ BAYFIELD STREET ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: HWY 26/ BAYFIELD STREET
To: HWY 26/ BAYFIELD STREET
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 27, 2015 22:00
Event End: September 03, 2015 06:00
Last Change: Entered 2015-07-09 18:13

Top of page Top of page


HWY 400 Northbound [ HWY 89/SIMCOE ROAD 89 - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: HWY 89/SIMCOE ROAD 89
To: INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB, On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 WB, Off-ramp to INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure.
Event Start: August 30, 2015 20:00
Event End: September 04, 2015 11:00
Last Change: Entered 2015-08-26 14:14

Top of page Top of page


HWY 400 Northbound [ HWY 89/SIMCOE ROAD 89 - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: HWY 89/SIMCOE ROAD 89
To: INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB, On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 WB, Off-ramp to INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. On Monday, 2 lanes will close at Midnight while from Tuesday to Thursday, 1 lane will close at 8:00PM and a 2nd lane will close at 11:00PM. On Friday, 1 lane will close at Midnight and a 2nd lane will close at Midnight while on Saturday, 1 lane will close at 7:00PM and a 2nd lane will close at Midnight.
Event Start: September 07, 2015 20:00
Event End: September 13, 2015 11:00
Last Change: Entered 2015-09-02 12:20

Top of page Top of page


HWY 400 Northbound [ JANE STREET - 401 ] - Moving Maintenance Closure
Highway: HWY 400
Direction: Northbound
From/At: JANE STREET
To: 401
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Moving Maintenance Closure
Comment : Short duration lane closures will occur periodically.
Event Start: September 03, 2015 23:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-09-01 13:52

Top of page Top of page


HWY 400 Northbound [ KING ROAD - AURORA ROAD. ] - Moving Maintenance Closure
Highway: HWY 400
Direction: Northbound
From/At: KING ROAD
To: AURORA ROAD.
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Moving Maintenance Closure
Comment : Short duration lane closures will occur periodically.
Event Start: September 03, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-09-01 14:17

Top of page Top of page


HWY 400 Northbound [ LOWER BIG CHUTE ROAD - VASEY ROAD/SIMCOE ROAD 23 ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: LOWER BIG CHUTE ROAD
To: VASEY ROAD/SIMCOE ROAD 23
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 08, 2015 00:00
Event End: September 11, 2015 12:00
Last Change: Entered 2015-09-02 13:18

Top of page Top of page


HWY 400 Northbound [ LOWER BIG CHUTE ROAD - VASEY ROAD/SIMCOE ROAD 23 ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: LOWER BIG CHUTE ROAD
To: VASEY ROAD/SIMCOE ROAD 23
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: August 31, 2015 00:00
Event End: September 04, 2015 12:00
Last Change: Entered 2015-08-26 09:52

Top of page Top of page


HWY 400 Northbound [ MAJOR MACKENZIE DRIVE - AURORA ROAD. ] - Recurring-Moving Maintenance Closure
Highway: HWY 400
Direction: Northbound
From/At: MAJOR MACKENZIE DRIVE
To: AURORA ROAD.
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 07, 2015 22:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-01 13:00

Top of page Top of page


HWY 400 Northbound [ MAPLE LEAF DRIVE - 401 ] - Recurring-Moving Maintenance Closure
Highway: HWY 400
Direction: Northbound
From/At: MAPLE LEAF DRIVE
To: 401
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 07, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-01 13:09

Top of page Top of page


HWY 400 Northbound [ PORT SEVERN ROAD - SEVERN RIVER BRIDGE ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: PORT SEVERN ROAD
To: SEVERN RIVER BRIDGE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 08, 2015 06:00
Event End: September 11, 2015 11:00
Last Change: Entered 2015-09-02 16:26

Top of page Top of page


HWY 400 Northbound [ PORT SEVERN ROAD - SEVERN RIVER BRIDGE ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: PORT SEVERN ROAD
To: SEVERN RIVER BRIDGE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: August 31, 2015 06:00
Event End: September 04, 2015 11:00
Last Change: Entered 2015-08-26 07:23

Top of page Top of page


HWY 400 Northbound [ SIMCOE ROAD 88 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: SIMCOE ROAD 88
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure.
Event Start: August 30, 2015 20:00
Event End: September 04, 2015 11:00
Last Change: Entered 2015-08-26 14:12

Top of page Top of page


HWY 400 Northbound [ SIMCOE ROAD 88 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: SIMCOE ROAD 88
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. On Monday, 2 lanes will close at Midnight while from Tuesday to Thursday, 1 lane will close at 8:00PM and a 2nd lane will close at 10:00PM. On Friday, 1 lane will close at Midnight and a 2nd lane will close at Midnight while on Saturday, 1 lane will close at 7:00PM and a 2nd lane will close at 10:00PM.
Event Start: September 07, 2015 20:00
Event End: September 13, 2015 11:00
Last Change: Entered 2015-09-02 12:15

Top of page Top of page


HWY 400 Northbound [ VASEY ROAD/SIMCOE ROAD 23 - VASEY ROAD/SIMCOE ROAD 23 ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: VASEY ROAD/SIMCOE ROAD 23
To: VASEY ROAD/SIMCOE ROAD 23
Lanes Affected: 1 Left Lane(s)
Traffic Impact : On-ramp from VASEY ROAD/SIMCOE ROAD 23 EB/WB
Reason Construction
Comment :
Event Start: May 19, 2015 09:00
Event End: November 30, 2015 23:59
Last Change: Entered 2015-04-28 08:40

Top of page Top of page


HWY 400 Southbound [ 401 - JANE STREET ] - Moving Maintenance Closure
Highway: HWY 400
Direction: Southbound
From/At: 401
To: JANE STREET
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Moving Maintenance Closure
Comment : Short duration lane closures will occur periodically.
Event Start: September 03, 2015 23:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-09-01 13:47

Top of page Top of page


HWY 400 Southbound [ 401 - MAPLE LEAF DRIVE ] - Recurring-Moving Maintenance Closure
Highway: HWY 400
Direction: Southbound
From/At: 401
To: MAPLE LEAF DRIVE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 07, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-01 13:07

Top of page Top of page


HWY 400 Southbound [ ANNE ST. - ANNE ST. ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: ANNE ST.
To: ANNE ST.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 03, 2015 21:00
Event End: September 10, 2015 06:00
Last Change: Entered 2015-08-27 09:14

Top of page Top of page


HWY 400 Southbound [ ANNE ST. - ANNE ST. ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: ANNE ST.
To: ANNE ST.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 27, 2015 21:00
Event End: September 03, 2015 06:00
Last Change: Entered 2015-08-21 00:08

Top of page Top of page


HWY 400 Southbound [ ANNE ST. - ANNE ST. ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: ANNE ST.
To: ANNE ST.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure. From Monday to Friday, 1 lane will close at 9:00PM and a 2nd lane will close at 10:00PM. On Saturday, 1 lane will close at 10:00PM and a 2nd lane will close at Midnight. On Sunday, 1 lane will close at 10:00PM and s 2nd lane will close at 11:00PM.
Event Start: September 10, 2015 21:00
Event End: September 17, 2015 06:00
Last Change: Entered 2015-08-27 09:36

Top of page Top of page


HWY 400 Southbound [ AURORA ROAD. - KING ROAD ] - Moving Maintenance Closure
Highway: HWY 400
Direction: Southbound
From/At: AURORA ROAD.
To: KING ROAD
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Moving Maintenance Closure
Comment : Short duration lane closures will occur periodically.
Event Start: September 03, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-09-01 14:11

Top of page Top of page


HWY 400 Southbound [ AURORA ROAD. - MAJOR MACKENZIE DRIVE ] - Recurring-Moving Maintenance Closure
Highway: HWY 400
Direction: Southbound
From/At: AURORA ROAD.
To: MAJOR MACKENZIE DRIVE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 07, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-01 12:58

Top of page Top of page


HWY 400 Southbound [ DUCKWORTH STREET - DUCKWORTH STREET ] - Construction
Highway: HWY 400
Direction: Southbound
From/At: DUCKWORTH STREET
To: DUCKWORTH STREET
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: August 31, 2015 19:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-27 09:55

Top of page Top of page


HWY 400 Southbound [ ESSA ROAD / SIMCOE ROAD 27 - ESSA ROAD / SIMCOE ROAD 27 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: ESSA ROAD / SIMCOE ROAD 27
To: ESSA ROAD / SIMCOE ROAD 27
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from ESSA ROAD / SIMCOE ROAD 27 SB
Reason Recurring-Construction
Comment :
Event Start: September 06, 2015 22:00
Event End: September 14, 2015 06:00
Last Change: Entered 2015-08-27 14:54

Top of page Top of page


HWY 400 Southbound [ ESSA ROAD / SIMCOE ROAD 27 - ESSA ROAD / SIMCOE ROAD 27 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: ESSA ROAD / SIMCOE ROAD 27
To: ESSA ROAD / SIMCOE ROAD 27
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from ESSA ROAD / SIMCOE ROAD 27 SB
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:00
Event End: September 06, 2015 06:00
Last Change: Entered 2015-08-26 14:02

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - CANAL ROAD. ] - Recurring-Maintenance
Highway: HWY 400
Direction: Southbound
From/At: HWY 11 JCT
To: CANAL ROAD.
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: August 31, 2015 21:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-28 11:33

Top of page Top of page


HWY 400 Southbound [ HWY 26/ BAYFIELD STREET - ESSA ROAD / SIMCOE ROAD 27 ] - Recurring-Maintenance
Highway: HWY 400
Direction: Southbound
From/At: HWY 26/ BAYFIELD STREET
To: ESSA ROAD / SIMCOE ROAD 27
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: August 31, 2015 20:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-27 07:56

Top of page Top of page


HWY 400 Southbound [ HWY 26/ BAYFIELD STREET - HWY 26/ BAYFIELD STREET ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: HWY 26/ BAYFIELD STREET
To: HWY 26/ BAYFIELD STREET
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 26/ BAYFIELD STREET SB
Reason Recurring-Construction
Comment :
Event Start: August 27, 2015 22:00
Event End: September 03, 2015 06:00
Last Change: Entered 2015-07-09 18:15

Top of page Top of page


HWY 400 Southbound [ HWY 26/ BAYFIELD STREET - HWY 26/ BAYFIELD STREET ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: HWY 26/ BAYFIELD STREET
To: HWY 26/ BAYFIELD STREET
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 26/ BAYFIELD STREET SB
Reason Recurring-Construction
Comment :
Event Start: September 03, 2015 22:00
Event End: September 10, 2015 06:00
Last Change: Entered 2015-08-27 08:59

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - SIMCOE ROAD 88 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: HWY 89/SIMCOE ROAD 89
To: SIMCOE ROAD 88
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from SIMCOE ROAD 88 EB/WB, On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to SIMCOE ROAD 88 EB/WB
Reason Recurring-Construction
Comment : Alternating two lane closure.
Event Start: August 30, 2015 11:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 14:20

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - SIMCOE ROAD 88 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: HWY 89/SIMCOE ROAD 89
To: SIMCOE ROAD 88
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from SIMCOE ROAD 88 EB/WB, On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to SIMCOE ROAD 88 EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. On Monday, 2 lanes will close at Midnight while from Tuesday to Thursday, 1 lane will close at 11:00AM and a 2nd lane will close at 9:00PM. On Friday, 1 lane will close at 7:00PM and a 2nd lane will close at 9:00PM while on Saturday, 1 lane will close at 9:00PM and a 2nd lane will close at Midnight.
Event Start: September 07, 2015 11:00
Event End: September 13, 2015 05:00
Last Change: Entered 2015-09-02 12:26

Top of page Top of page


HWY 400 Southbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: INNISFIL BEACH ROAD - SIMCOE ROAD 21
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB, On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. On Monday, 2 lanes will close at Midnight while from Tuesday to Thursday, 1 lane will close at 11:00AM and a 2nd lane will close at 10:00PM. On Friday, 1 lane will close at 7:00PM and a 2nd lane will close at 11:00PM while on Saturday, 1 lane will close at 9:00PM and a 2nd lane will close at Midnight.
Event Start: September 07, 2015 11:00
Event End: September 13, 2015 05:00
Last Change: Entered 2015-09-02 12:23

Top of page Top of page


HWY 400 Southbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: INNISFIL BEACH ROAD - SIMCOE ROAD 21
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB, On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 11:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 14:17

Top of page Top of page


HWY 400 Southbound [ MAJOR MACKENZIE DRIVE - FINCH AVENUE ] - Recurring-Moving Maintenance Closure
Highway: HWY 400
Direction: Southbound
From/At: MAJOR MACKENZIE DRIVE
To: FINCH AVENUE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 07, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-01 13:03

Top of page Top of page


HWY 400 Southbound [ MAJOR MACKENZIE DRIVE - LANGSTAFF ROAD ] - Moving Maintenance Closure
Highway: HWY 400
Direction: Southbound
From/At: MAJOR MACKENZIE DRIVE
To: LANGSTAFF ROAD
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Moving Maintenance Closure
Comment : Short duration lane closures will occur periodically.
Event Start: September 03, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-09-01 13:38

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Construction
Highway: HWY 400
Direction: Southbound
From/At: PARTRIDGE SKI TRAIL ROAD
To: HWY 11 JCT
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Alternating 1 lane closure. For all days, one lane will close at Midnight (12:00AM).
Event Start: September 08, 2015 00:00
Event End: September 11, 2015 12:00
Last Change: Entered 2015-08-31 11:47

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Construction
Highway: HWY 400
Direction: Southbound
From/At: PARTRIDGE SKI TRAIL ROAD
To: HWY 11 JCT
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Alternating 1 lane closure. For all days, one lane will close at Midnight (12:00AM).
Event Start: August 31, 2015 00:00
Event End: September 04, 2015 12:00
Last Change: Entered 2015-08-25 11:23

Top of page Top of page


HWY 400 Southbound [ PORT SEVERN ROAD - HWY 12 N JCT ] - Construction
Highway: HWY 400
Direction: Southbound
From/At: PORT SEVERN ROAD
To: HWY 12 N JCT
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: August 30, 2015 23:59
Event End: September 04, 2015 12:00
Last Change: Entered 2015-08-26 21:36

Top of page Top of page


HWY 400 Southbound [ SEVERN RIVER BRIDGE - PORT SEVERN ROAD ] - Construction
Highway: HWY 400
Direction: Southbound
From/At: SEVERN RIVER BRIDGE
To: PORT SEVERN ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 08, 2015 18:00
Event End: September 11, 2015 11:00
Last Change: Entered 2015-09-02 16:29

Top of page Top of page


HWY 400 Southbound [ SEVERN RIVER BRIDGE - PORT SEVERN ROAD ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: SEVERN RIVER BRIDGE
To: PORT SEVERN ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 18:00
Event End: September 04, 2015 12:00
Last Change: Entered 2015-08-26 07:26

Top of page Top of page


HWY 400 Southbound [ SHEPPARD AVENUE - 401 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: SHEPPARD AVENUE
To: 401
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 23:59
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-27 07:11

Top of page Top of page


HWY 400 Southbound [ SIMCOE ROAD 88 - CANAL ROAD. ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: SIMCOE ROAD 88
To: CANAL ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from SIMCOE ROAD 88 EB/WB, Off-ramp to SIMCOE ROAD 88 EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. On Monday, 2 lanes will close at Midnight, and from Tuesday to Thursday, 1 lane will close at 11:00AM and a 2nd lane will close at 10:00PM. On Friday, 1 lane will close at 7:00PM and a 2nd lane will close at 10:00PM while on Saturday, 1 lane will close at 9:00PM and a 2nd lane will close at 11:00PM.
Event Start: September 07, 2015 11:00
Event End: September 13, 2015 05:00
Last Change: Entered 2015-09-02 12:31

Top of page Top of page


HWY 400 Southbound [ SIMCOE ROAD 88 - CANAL ROAD. ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: SIMCOE ROAD 88
To: CANAL ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from SIMCOE ROAD 88 EB/WB, Off-ramp to SIMCOE ROAD 88 EB/WB
Reason Recurring-Construction
Comment : Alternating two lane closure.
Event Start: August 30, 2015 11:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 14:21

Top of page Top of page


HWY 400 Southbound [ VASEY ROAD/SIMCOE ROAD 23 - VASEY ROAD/SIMCOE ROAD 23 ] - Construction
Highway: HWY 400
Direction: Southbound
From/At: VASEY ROAD/SIMCOE ROAD 23
To: VASEY ROAD/SIMCOE ROAD 23
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 08, 2015 09:00
Event End: September 11, 2015 23:59
Last Change: Entered 2015-09-02 13:20

Top of page Top of page


HWY 400 Southbound [ VASEY ROAD/SIMCOE ROAD 23 - VASEY ROAD/SIMCOE ROAD 23 ] - Construction
Highway: HWY 400
Direction: Southbound
From/At: VASEY ROAD/SIMCOE ROAD 23
To: VASEY ROAD/SIMCOE ROAD 23
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: August 31, 2015 09:00
Event End: September 04, 2015 12:00
Last Change: Entered 2015-08-26 09:55

Top of page Top of page


HWY 400 Southbound Off-ramp [ - 401 Eastbound Collector ] - Construction
Highway: HWY 400
Direction: Southbound
From/At:
To: 401 Eastbound Collector
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Long term left lane closure from 6:00 a.m. on July 29, 2015 until 5:00 a.m. on December 1st, 2015.
Event Start: July 29, 2015 06:00
Event End: December 01, 2015 05:00
Last Change: Entered 2015-07-21 19:03

Top of page Top of page


HWY 400 Southbound Off-ramp [ - 401 Eastbound Collector ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At:
To: 401 Eastbound Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 23:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-27 06:54

Top of page Top of page


HWY 400 Southbound On-ramp [ VASEY ROAD/SIMCOE ROAD 23 Eastbound/Westbound - ] - Construction
Highway: HWY 400
Direction: Southbound
From/At: VASEY ROAD/SIMCOE ROAD 23 Eastbound/Westbound
To:
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 27, 2015 09:00
Event End: November 30, 2015 23:59
Last Change: Entered 2015-07-21 20:30

Top of page Top of page


HWY 401 Eastbound [ BENNETT ROAD - BOUNDARY ROAD ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: BENNETT ROAD
To: BOUNDARY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 20:00
Event End: September 04, 2015 08:00
Last Change: Entered 2015-08-27 00:02

Top of page Top of page


HWY 401 Eastbound [ Burnham St (IC 472) - Nagle Rd ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At: Burnham St (IC 472)
To: Nagle Rd
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Rolling closures EB and WB from 0.5km West of Burham St to 2.3KM east of Nagle Rd. Rolling closures will be successive
Event Start: September 02, 2015 23:00
Event End: September 03, 2015 03:00
Last Change: Entered 2015-08-27 20:20

Top of page Top of page


HWY 401 Eastbound [ Burnham St (IC 472) - Nagle Rd ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: Burnham St (IC 472)
To: Nagle Rd
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Right lane closure in both directions nightly.
Event Start: September 08, 2015 19:00
Event End: September 11, 2015 07:00
Last Change: Entered 2015-09-02 06:32

Top of page Top of page


HWY 401 Eastbound [ CORNWALL CENTRE RD - CORNWALL CENTRE RD ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At: CORNWALL CENTRE RD
To: CORNWALL CENTRE RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Weekly lane closures 401 E/B & W/B @ Cornwall Centre Rd from Monday 7am to Friday 3pm (Cornwall)
Event Start: August 31, 2015 07:00
Event End: September 30, 2015 15:00
Last Change: Entered 2015-08-28 15:05

Top of page Top of page


HWY 401 Eastbound [ Currie Rd (149KM) - Highway 4 / Colonel Talbot Rd (177KM) ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: Currie Rd (149KM)
To: Highway 4 / Colonel Talbot Rd (177KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 401 Eastbound and Westbound will have an alternating right and left lane closure from Currie Road to Highway 4, September 2-4 between 0700-1900 hours.
Event Start: September 02, 2015 07:00
Event End: September 04, 2015 20:00
Last Change: Entered 2015-08-28 15:52

Top of page Top of page


HWY 401 Eastbound [ HWY 402 IC-183 (SCOTLAND RD/GLANWORTH) - HWY 402 IC-183 (SCOTLAND RD/GLANWORTH) ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: HWY 402 IC-183 (SCOTLAND RD/GLANWORTH)
To: HWY 402 IC-183 (SCOTLAND RD/GLANWORTH)
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 401 Eastbound and Westbound will have lane closures in effect from 1.5 kilometer West of Glanworth Drive underpass to approximately 1 kilometre East of Scotland Drive underpass. There will be a FULL Eastbound lane closure with traffic being detoured at the median crossover, and a left lane Westbound closure from April 14, 2015 1200 hours to September 30, 2014 1800 hours due to construction operations (new bridge).
Event Start: April 14, 2015 12:00
Event End: September 30, 2015 18:00
Last Change: Entered 2015-04-13 14:09

Top of page Top of page


HWY 401 Eastbound [ Hamilton Rd - Hamilton Rd ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: Hamilton Rd
To: Hamilton Rd
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily and nightly lane reductions Hwy 401 EB and WB at Hamilton Rd (Port Hope)
Event Start: September 08, 2015 00:00
Event End: September 11, 2015 23:59
Last Change: Entered 2015-09-02 09:49

Top of page Top of page


HWY 401 Eastbound [ Hamilton Rd - Hamilton Rd ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: Hamilton Rd
To: Hamilton Rd
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 401 EB and WB lane reductions at Hamilton Rd for bridge work (Port Hope)
Event Start: August 31, 2015 00:00
Event End: September 04, 2015 23:59
Last Change: Entered 2015-08-28 10:11

Top of page Top of page


HWY 401 Eastbound [ Highway 40 / Communication Road (90KM) - Highway 40 / Communication Road (90KM) ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: Highway 40 / Communication Road (90KM)
To: Highway 40 / Communication Road (90KM)
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 401 from Harwich Rd. to Hwy 40 will have single lane closure in both directions Sept 15-Sept 17 from sunrise to sunset.
Event Start: September 15, 2015 07:00
Event End: September 17, 2015 19:00
Last Change: Entered 2015-08-25 14:57

Top of page Top of page


HWY 401 Eastbound [ Highway 8 / King Street E/Shantz Hill Rd (278KM) - Franklin Blvd (284KM) ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: Highway 8 / King Street E/Shantz Hill Rd (278KM)
To: Franklin Blvd (284KM)
Lanes Affected: 2 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 401 Eastbound and Westbound will have a right lane closure from King Street to Franklin Boulevard, August 30-September 4 between 2000-0600 hours. There will also be a centre lane closure during this time between 0000-0500 hours each day.
Event Start: August 30, 2015 20:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-28 14:42

Top of page Top of page


HWY 401 Eastbound [ LARUE MILLS RD - LARUE MILLS RD ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: LARUE MILLS RD
To: LARUE MILLS RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Lane reductions Hwy 401 E/B & W/B @ La Rue Mills Rd (W/Mallorytown)
Event Start: September 01, 2015 07:00
Event End: September 02, 2015 18:00
Last Change: Entered 2015-08-28 13:44

Top of page Top of page


HWY 401 Eastbound [ LYN RD - LYN RD ] - Recurring-Engineering Investigation
Highway: HWY 401
Direction: Eastbound
From/At: LYN RD
To: LYN RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Lane reductions Hwy 401 E/B & W/B @ Lyn Rd (Brockville)
Event Start: September 02, 2015 08:00
Event End: September 03, 2015 19:00
Last Change: Entered 2015-09-01 09:42

Top of page Top of page


HWY 401 Eastbound [ MONTREAL ST (IC 619) - CATARAQUI RIVER BRIDGE ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: MONTREAL ST (IC 619)
To: CATARAQUI RIVER BRIDGE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Lane reductions Hwy 401 E/B & W/B @ Montreal St (Kingston). Nightly 6pm-7am, daily 10am-2pm
Event Start: August 31, 2015 18:00
Event End: September 03, 2015 14:00
Last Change: Entered 2015-08-27 12:52

Top of page Top of page


HWY 401 Eastbound [ NASSAGWAEGA ROAD - TRAFALGAR TRUCK INSPECTION STATION ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: NASSAGWAEGA ROAD
To: TRAFALGAR TRUCK INSPECTION STATION
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from JAMES SNOW PKWY NB, On-ramp from HWY 25 NB, On-ramp from JAMES SNOW PKWY SB, On-ramp from HWY 25 SB, Off-ramp to JAMES SNOW PKWY NB/SB, Off-ramp to HWY 25 NB/SB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. 1 Lane will close at 10:00PM and a 2nd lane will close at 11:00PM.
Event Start: August 31, 2015 22:00
Event End: September 05, 2015 05:00
Last Change: Entered 2015-08-28 12:50

Top of page Top of page


HWY 401 Eastbound [ SALEM ROAD - BROCK ST ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: SALEM ROAD
To: BROCK ST
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 22:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-27 21:49

Top of page Top of page


HWY 401 Eastbound [ THOUSAND ISLAND PKWY E/B (IC 647) - THOUSAND ISLAND PKWY E/B (IC 647) ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: THOUSAND ISLAND PKWY E/B (IC 647)
To: THOUSAND ISLAND PKWY E/B (IC 647)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Hwy 401E/B @ Thousand Island Parkway (Gananoque)
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 17:00
Last Change: Entered 2015-08-28 08:09

Top of page Top of page


HWY 401 Eastbound [ THOUSAND ISLAND PKWY E/B (IC 647) - THOUSAND ISLAND PKWY E/B (IC 647) ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: THOUSAND ISLAND PKWY E/B (IC 647)
To: THOUSAND ISLAND PKWY E/B (IC 647)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Hwy 401E/B @ Thousand Island Parkway (Gananoque)
Event Start: September 08, 2015 07:00
Event End: September 11, 2015 17:00
Last Change: Entered 2015-08-31 14:26

Top of page Top of page


HWY 401 Eastbound [ Townline Road (286KM) - Townline Road (286KM) ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: Townline Road (286KM)
To: Townline Road (286KM)
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 401 from 0.6 km West of Flemming Creek to 0.6 km East of Fleming Creek will have the Eastbound and Westbound right lane closed July 18 at 0700 to Octorber 2 at 2000 hours.
Event Start: July 18, 2015 07:00
Event End: October 02, 2015 20:00
Last Change: Entered 2015-07-16 11:39

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - BROCK ROAD Northbound ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: BROCK ROAD Northbound
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: August 06, 2015 22:00
Event End: November 06, 2015 05:00
Last Change: Entered 2015-08-04 14:33

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - EGLINTON AVE Eastbound ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: EGLINTON AVE Eastbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 02, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-09-01 15:29

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - WESTNEY ROAD Eastbound ] - Recurring-Maintenance
Highway: HWY 401
Direction: Eastbound
From/At:
To: WESTNEY ROAD Eastbound
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 02, 2015 10:00
Event End: September 03, 2015 12:00
Last Change: Entered 2015-08-28 09:37

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - YONGE ST Northbound ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: YONGE ST Northbound
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 11, 2015 10:00
Event End: September 11, 2015 14:00
Last Change: Entered 2015-09-01 08:38

Top of page Top of page


HWY 401 Eastbound Collector [ ALLEN ROAD Collector - AVENUE ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: ALLEN ROAD Collector
To: AVENUE ROAD Collector
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure. From Sunday to Thursday, 2 lanes will close at 10:30PM, while on Friday and Saturday, those 2 lanes will close at 11:00PM.
Event Start: September 06, 2015 22:30
Event End: September 12, 2015 05:30
Last Change: Entered 2015-08-19 01:59

Top of page Top of page


HWY 401 Eastbound Collector [ ALLEN ROAD Collector - AVENUE ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: ALLEN ROAD Collector
To: AVENUE ROAD Collector
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:30
Event End: September 04, 2015 05:30
Last Change: Entered 2015-08-19 01:56

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 404 Collector - WARDEN AVE Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: HWY 404 Collector
To: WARDEN AVE Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from VICTORIA PARK AVE NB, On-ramp from VICTORIA PARK AVE SB, Off-ramp to WARDEN AVE NB/SB, Off-ramp to VICTORIA PARK AVE NB/SB
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:00
Event End: September 05, 2015 06:00
Last Change: Entered 2015-08-26 16:59

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 404 Collector - WARDEN AVE Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: HWY 404 Collector
To: WARDEN AVE Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from VICTORIA PARK AVE NB, On-ramp from VICTORIA PARK AVE SB, Off-ramp to VICTORIA PARK AVE NB/SB, Off-ramp to WARDEN AVE NB/SB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. On Monday, 1 lane will close at Midnight and a 2nd lane will close at 1:00AM on Tuesaday. From Tuesday to Friday, 1 lane will close at 10:00PM and a 2nd lane will close at 1:00AM.
Event Start: September 07, 2015 22:00
Event End: September 12, 2015 06:00
Last Change: Entered 2015-09-02 15:27

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 410 Collector - DIXIE ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: HWY 410 Collector
To: DIXIE ROAD Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DIXIE ROAD NB, Off-ramp to DIXIE ROAD EB
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 21:00
Event End: September 05, 2015 08:00
Last Change: Entered 2015-08-27 17:20

Top of page Top of page


HWY 401 Eastbound Collector [ RENFORTH DRIVE Collector - DIXON ROAD/MARTIN GROVE ROAD Collector ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At: RENFORTH DRIVE Collector
To: DIXON ROAD/MARTIN GROVE ROAD Collector
Lanes Affected: 2 Right Lane(s)
Traffic Impact : On-ramp from CARLINGVIEW DRIVE SB, Off-ramp to CARLINGVIEW DRIVE NB
Reason Construction
Comment :
Event Start: September 03, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-09-01 15:35

Top of page Top of page


HWY 401 Eastbound Collector [ RENFORTH DRIVE Collector - DIXON ROAD/MARTIN GROVE ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: RENFORTH DRIVE Collector
To: DIXON ROAD/MARTIN GROVE ROAD Collector
Lanes Affected: 3 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 01, 2015 23:59
Event End: September 03, 2015 05:00
Last Change: Entered 2015-08-28 09:39

Top of page Top of page


HWY 401 Eastbound Collector [ WESTON ROAD Collector - HWY 400/BLACK CREEK DRIVE Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: WESTON ROAD Collector
To: HWY 400/BLACK CREEK DRIVE Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from WESTON ROAD NB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. For all days, 1 lane will close at 10:00PM and a second lane will close at 11:00PM.
Event Start: August 30, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-27 07:10

Top of page Top of page


HWY 401 Eastbound Express [ HWY 400/BLACK CREEK DRIVE Express - HWY 400/BLACK CREEK DRIVE Express ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: HWY 400/BLACK CREEK DRIVE Express
To: HWY 400/BLACK CREEK DRIVE Express
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure. For all days, 1 lane will close at 10:00PM and a second lane will close at 11:00PM.
Event Start: August 30, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-27 07:08

Top of page Top of page


HWY 401 Eastbound Express [ HWY 404 Express - WARDEN AVE Express ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: HWY 404 Express
To: WARDEN AVE Express
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:00
Event End: September 05, 2015 06:00
Last Change: Entered 2015-08-26 16:54

Top of page Top of page


HWY 401 Eastbound Express [ HWY 404 Express - WARDEN AVE Express ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: HWY 404 Express
To: WARDEN AVE Express
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 3 lane closure. On Monday, 2 lanes will close at Midnight and a 3rd lane will close at 1:00AM on Tuesday morning. From Tuesday to Friday, 1 lane will close at 10:00PM, a 2nd lane will close at Midnight and a 3rd lane will close at 1:00AM.
Event Start: September 07, 2015 22:00
Event End: September 12, 2015 06:00
Last Change: Entered 2015-09-02 15:32

Top of page Top of page


HWY 401 Eastbound Express [ HWY 410 Express - DIXIE ROAD Express ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: HWY 410 Express
To: DIXIE ROAD Express
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 21:00
Event End: September 05, 2015 05:00
Last Change: Entered 2015-08-27 16:42

Top of page Top of page


HWY 401 Eastbound Express and Collector Off-ramp [ - HWY 404 Northbound/Southbound Express and Collector ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: HWY 404 Northbound/Southbound Express and Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 26, 2015 22:00
Event End: September 28, 2015 05:00
Last Change: Entered 2015-03-20 08:44

Top of page Top of page


HWY 401 Eastbound Off-ramp [ - ALLEN ROAD Northbound ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: ALLEN ROAD Northbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 06, 2015 22:30
Event End: September 12, 2015 05:30
Last Change: Entered 2015-08-19 02:21

Top of page Top of page


HWY 401 Eastbound Off-ramp [ - ALLEN ROAD Northbound ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: ALLEN ROAD Northbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:30
Event End: September 06, 2015 05:30
Last Change: Entered 2015-08-19 02:16

Top of page Top of page


HWY 401 Eastbound Off-ramp [ - ALLEN ROAD Northbound ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: ALLEN ROAD Northbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 06, 2015 22:30
Event End: September 12, 2015 05:30
Last Change: Entered 2015-08-19 02:17

Top of page Top of page


HWY 401 Eastbound On-ramp [ BROCK ROAD Southbound - ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At: BROCK ROAD Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: August 06, 2015 22:00
Event End: November 06, 2015 05:00
Last Change: Entered 2015-08-04 14:35

Top of page Top of page


HWY 401 Eastbound On-ramp [ THICKSON ROAD Southbound - ] - Engineering Investigation
Highway: HWY 401
Direction: Eastbound
From/At: THICKSON ROAD Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Engineering Investigation
Comment :
Event Start: September 02, 2015 23:59
Event End: September 03, 2015 05:00
Last Change: Entered 2015-08-31 16:35

Top of page Top of page


HWY 401 Eastbound On-ramp [ WESTNEY ROAD Eastbound - ] - Recurring-Maintenance
Highway: HWY 401
Direction: Eastbound
From/At: WESTNEY ROAD Eastbound
To:
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 02, 2015 10:00
Event End: September 03, 2015 12:00
Last Change: Entered 2015-08-28 09:40

Top of page Top of page


HWY 401 Westbound [ BOUNDARY ROAD - BENNETT ROAD ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: BOUNDARY ROAD
To: BENNETT ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 19:00
Event End: September 04, 2015 07:00
Last Change: Entered 2015-08-26 23:59

Top of page Top of page


HWY 401 Westbound [ BROCK ST - SALEM ROAD ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: BROCK ST
To: SALEM ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure. 1 lane will close at 10:00PM and a 2nd lane will close at 11:00PM.
Event Start: August 31, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-27 21:54

Top of page Top of page


HWY 401 Westbound [ TRAFALGAR ROAD - NASSAGWAEGA ROAD ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: TRAFALGAR ROAD
To: NASSAGWAEGA ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from JAMES SNOW PKWY NB, On-ramp from HWY 25 NB, On-ramp from JAMES SNOW PKWY SB, On-ramp from HWY 25 SB, Off-ramp to JAMES SNOW PKWY NB/SB, Off-ramp to HWY 25 NB/SB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. 1 lane will close at 10:00PM and a second lane will close at 11:00PM.
Event Start: August 31, 2015 22:00
Event End: September 05, 2015 05:00
Last Change: Entered 2015-08-28 12:54

Top of page Top of page


HWY 401 Westbound Collector Off-ramp [ - HWY 400/BLACK CREEK DRIVE Southbound ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At:
To: HWY 400/BLACK CREEK DRIVE Southbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 23:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-27 07:10

Top of page Top of page


HWY 401 Westbound Collector Off-ramp [ - KEELE ST Northbound/Southbound ] - Recurring-Maintenance
Highway: HWY 401
Direction: Westbound
From/At:
To: KEELE ST Northbound/Southbound
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 02, 2015 23:00
Event End: September 05, 2015 05:00
Last Change: Entered 2015-08-28 15:53

Top of page Top of page


HWY 401 Westbound Collector [ ALLEN ROAD Collector - ALLEN ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: ALLEN ROAD Collector
To: ALLEN ROAD Collector
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Left 2 lanes closure. From Sunday to Thursday, 2 lanes will close at 10:30PM, while on Friday and Saturday, those 2 lanes will close at 11:00PM.
Event Start: September 06, 2015 22:30
Event End: September 12, 2015 05:30
Last Change: Entered 2015-08-19 08:03

Top of page Top of page


HWY 401 Westbound Collector [ ALLEN ROAD Collector - ALLEN ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: ALLEN ROAD Collector
To: ALLEN ROAD Collector
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:30
Event End: September 05, 2015 05:30
Last Change: Entered 2015-08-19 08:02

Top of page Top of page


HWY 401 Westbound Collector [ DIXIE ROAD Collector - HWY 410 Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: DIXIE ROAD Collector
To: HWY 410 Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DIXIE ROAD NB/SB
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 21:00
Event End: September 05, 2015 08:00
Last Change: Entered 2015-08-27 17:25

Top of page Top of page


HWY 401 Westbound Collector [ WARDEN AVE Collector - HWY 404 Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: WARDEN AVE Collector
To: HWY 404 Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from KENNEDY ROAD (SCARBOROUGH) NB/SB, On-ramp from VICTORIA PARK AVE NB/SB, On-ramp from WARDEN AVE NB/SB, Off-ramp to HWY 404 NB/SB
Reason Recurring-Construction
Comment : Nightly full closure from 10 p.m. to 5 a.m. from Monday August 24th to Friday August 28th. Full closure to occur from 10 p.m. on Friday August 28th to 7 a.m. on Saturday August 29th. And full closure to occur from 10 p.m. on Saturday August 29th to 8 a.m. on Sunday August 30th.
Event Start: August 31, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-27 07:32

Top of page Top of page


HWY 401 Westbound Collector [ WARDEN AVE Collector - HWY 404 Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: WARDEN AVE Collector
To: HWY 404 Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from KENNEDY ROAD (SCARBOROUGH) NB/SB, On-ramp from VICTORIA PARK AVE NB/SB, On-ramp from WARDEN AVE NB/SB, Off-ramp to HWY 404 NB/SB
Reason Recurring-Construction
Comment : Full 3 lane closure. On Friday all lanes will close at Midnight and on Saturday, all lanes will close at 10:00PM.
Event Start: September 04, 2015 22:00
Event End: September 06, 2015 05:00
Last Change: Entered 2015-08-31 10:27

Top of page Top of page


HWY 401 Westbound Collector [ YONGE ST Collector - YONGE ST Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: YONGE ST Collector
To: YONGE ST Collector
Lanes Affected: 2 Right Lane(s)
Traffic Impact : On-ramp from YONGE ST SB
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 23:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-27 16:37

Top of page Top of page


HWY 401 Westbound Express [ ALLEN ROAD Express - ALLEN ROAD Express ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: ALLEN ROAD Express
To: ALLEN ROAD Express
Lanes Affected: 2 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Right 2 lanes closure. From Sunday to Thursday, 2 lanes will close at 10:30PM, while on Friday and Saturday, those 2 lanes will close at 11:00PM.
Event Start: September 06, 2015 22:30
Event End: September 12, 2015 05:30
Last Change: Entered 2015-08-19 08:25

Top of page Top of page


HWY 401 Westbound Express [ ALLEN ROAD Express - ALLEN ROAD Express ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: ALLEN ROAD Express
To: ALLEN ROAD Express
Lanes Affected: 2 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:30
Event End: September 04, 2015 05:30
Last Change: Entered 2015-08-19 08:23

Top of page Top of page


HWY 401 Westbound Express [ DIXIE ROAD Express - HWY 410 Express ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: DIXIE ROAD Express
To: HWY 410 Express
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:00
Event End: September 05, 2015 08:00
Last Change: Entered 2015-08-27 17:01

Top of page Top of page


HWY 401 Westbound Express and Collector Off-ramp [ - HWY 404 Northbound/Southbound Express and Collector ] - Construction
Highway: HWY 401
Direction: Westbound
From/At:
To: HWY 404 Northbound/Southbound Express and Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 26, 2015 22:00
Event End: September 28, 2015 05:00
Last Change: Entered 2015-03-20 08:46

Top of page Top of page


HWY 401 Westbound Express and Collector On-ramp [ HWY 404 Southbound Express and Collector - ] - Recurring-Maintenance
Highway: HWY 401
Direction: Westbound
From/At: HWY 404 Southbound Express and Collector
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 02, 2015 23:59
Event End: September 03, 2015 05:00
Last Change: Entered 2015-09-02 10:14

Top of page Top of page


HWY 401 Westbound Off-ramp [ - ESSO SERVICE CENTRE WB Westbound ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At:
To: ESSO SERVICE CENTRE WB Westbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 01, 2015 23:00
Event End: September 03, 2015 06:00
Last Change: Entered 2015-08-27 00:18

Top of page Top of page


HWY 401 Westbound On-ramp [ ESSO SERVICE CENTRE WB Westbound - ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: ESSO SERVICE CENTRE WB Westbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 01, 2015 23:00
Event End: September 03, 2015 06:00
Last Change: Entered 2015-08-27 00:21

Top of page Top of page


HWY 401 Westbound On-ramp [ THICKSON ROAD Northbound - ] - Engineering Investigation
Highway: HWY 401
Direction: Westbound
From/At: THICKSON ROAD Northbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Engineering Investigation
Comment :
Event Start: September 02, 2015 23:59
Event End: September 03, 2015 05:00
Last Change: Entered 2015-08-31 16:36

Top of page Top of page


HWY 401 Westbound Transfer [ HWY 404 Express to Collector - ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: HWY 404 Express to Collector
To:
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 03, 2015 23:00
Event End: September 05, 2015 08:00
Last Change: Entered 2015-09-02 07:21

Top of page Top of page


HWY 402 Eastbound [ Hickory Drive (69KM) - Hickory Drive (69KM) ] - Recurring-Construction
Highway: HWY 402
Direction: Eastbound
From/At: Hickory Drive (69KM)
To: Hickory Drive (69KM)
Lanes Affected: 1 Right Lane(s)
Traffic Impact : On-ramp from Hickory Drive (69KM) EB, Off-ramp to Hickory Drive (69KM) EB
Reason Recurring-Construction
Comment : Highway 402 eastbound at Hickory Drive (interchange 69) will have the right lane, and on and off ramp closed from Friday August 21 to Saturday, November 21st for bridge work
Event Start: August 21, 2015 06:00
Event End: November 21, 2015 06:00
Last Change: Entered 2015-08-20 13:49

Top of page Top of page


HWY 402 Eastbound [ Miller Road - Miller Road ] - Recurring-Construction
Highway: HWY 402
Direction: Eastbound
From/At: Miller Road
To: Miller Road
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 402 eastbound and westbound will have daily alternating lane closures at the Miller Road Underpass from Monday, August 24th, 2015 to Friday, September 18th, 2015. from 0700 hours to 1900 hours for bridge work
Event Start: August 24, 2015 07:00
Event End: September 18, 2015 19:00
Last Change: Entered 2015-08-21 07:43

Top of page Top of page


HWY 402 Eastbound [ Sharon Drive - Sharon Drive ] - Recurring-Construction
Highway: HWY 402
Direction: Eastbound
From/At: Sharon Drive
To: Sharon Drive
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 402 eastbound and westbound will have daily alternating lane closures at the Sharon Drive Underpass from Monday, August 24th, 2015 to Friday, September 18th, 2015. from 0700 hours to 1900 hours for bridge work
Event Start: August 24, 2015 07:00
Event End: September 18, 2015 19:00
Last Change: Entered 2015-08-21 07:46

Top of page Top of page


HWY 402 Eastbound [ Westdel Bourne - Westdel Bourne ] - Recurring-Construction
Highway: HWY 402
Direction: Eastbound
From/At: Westdel Bourne
To: Westdel Bourne
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 402 eastbound and westbound will have daily alternating lane closures at the Westel Bourne Underpass from Monday, August 24th, 2015 to Friday, September 18th, 2015. from 0700 hours to 1900 hours for bridge work
Event Start: August 24, 2015 07:00
Event End: September 18, 2015 19:00
Last Change: Entered 2015-08-21 07:40

Top of page Top of page


HWY 402 Westbound [ Hickory Drive (69KM) - Hickory Drive (69KM) ] - Recurring-Construction
Highway: HWY 402
Direction: Westbound
From/At: Hickory Drive (69KM)
To: Hickory Drive (69KM)
Lanes Affected: 1 Right Lane(s)
Traffic Impact : Off-ramp to Hickory Drive (69KM) WB
Reason Recurring-Construction
Comment :
Event Start: August 27, 2015 00:00
Event End: November 15, 2015 23:59
Last Change: Entered 2015-08-26 07:21

Top of page Top of page


HWY 403 HAMILTON Eastbound [ LINCOLN M. ALEXANDER PARKWAY - ABERDEEN AVE ] - Recurring-Construction
Highway: HWY 403 HAMILTON
Direction: Eastbound
From/At: LINCOLN M. ALEXANDER PARKWAY
To: ABERDEEN AVE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 22:00
Event End: September 10, 2015 05:00
Last Change: Entered 2015-09-02 10:06

Top of page Top of page


HWY 403 HAMILTON Eastbound [ Wayne Gretzky Parkway (38KM) - Wayne Gretzky Parkway (38KM) ] - Recurring-Construction
Highway: HWY 403 HAMILTON
Direction: Eastbound
From/At: Wayne Gretzky Parkway (38KM)
To: Wayne Gretzky Parkway (38KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from Wayne Gretzky Parkway (38KM) EB/WB, Off-ramp to Wayne Gretzky Parkway (38KM) EB/WB, On-ramp from Wayne Gretzky Parkway (38KM) EB/WB, Off-ramp to Wayne Gretzky Parkway (38KM) EB/WB
Reason Recurring-Construction
Comment : Highway 403 at Wayne Gretzky Parkway, Brantford will have alternating lane closures from Monday, August 31, 2015 to Saturday, September 5, 2015 during the times of midnight to 7:00 a.m. and 6:00 p.m. to midnight on a daily basis. The on and off ramps will also have alternating closures during these dates and times.
Event Start: August 31, 2015 00:00
Event End: September 05, 2015 23:59
Last Change: Entered 2015-08-27 10:14

Top of page Top of page


HWY 403 HAMILTON Eastbound [ YORK BLVD - PLAINS ROAD ] - Recurring-Construction
Highway: HWY 403 HAMILTON
Direction: Eastbound
From/At: YORK BLVD
To: PLAINS ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 6 NORTH SB, Off-ramp to HWY 6 NORTH NB
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 21:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-27 17:49

Top of page Top of page


HWY 403 HAMILTON Westbound [ ABERDEEN AVE - LINCOLN M. ALEXANDER PARKWAY ] - Recurring-Maintenance
Highway: HWY 403 HAMILTON
Direction: Westbound
From/At: ABERDEEN AVE
To: LINCOLN M. ALEXANDER PARKWAY
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 08, 2015 20:00
Event End: September 10, 2015 07:00
Last Change: Entered 2015-09-02 10:12

Top of page Top of page


HWY 403 HAMILTON Westbound [ LEMONVILLE ROAD - HWY 6 NORTH ] - Recurring-Construction
Highway: HWY 403 HAMILTON
Direction: Westbound
From/At: LEMONVILLE ROAD
To: HWY 6 NORTH
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to HWY 6 NORTH NB
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 22:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-27 17:52

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound [ EASTGATE DRIVE - CAWTHRA ROAD ] - Recurring-Construction
Highway: HWY 403 MISSISSAUGA
Direction: Eastbound
From/At: EASTGATE DRIVE
To: CAWTHRA ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 02, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-31 16:41

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound [ QEW - HWY 401 ] - Recurring-Moving Maintenance Closure
Highway: HWY 403 MISSISSAUGA
Direction: Eastbound
From/At: QEW
To: HWY 401
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 07, 2015 23:59
Event End: September 18, 2015 04:30
Last Change: Entered 2015-09-02 12:06

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound [ QEW - WINSTON CHURCHILL BLVD ] - Recurring-Construction
Highway: HWY 403 MISSISSAUGA
Direction: Eastbound
From/At: QEW
To: WINSTON CHURCHILL BLVD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from UPPER MIDDLE ROAD EB/WB, On-ramp from DUNDAS STREET SB, Off-ramp to DUNDAS STREET NB/SB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. 1 lane will close at 9:00PM and a 2nd lane will close at 10:00PM.
Event Start: August 31, 2015 21:00
Event End: September 05, 2015 10:00
Last Change: Entered 2015-08-28 12:37

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector Off-ramp [ - HWY 410 Northbound ] - Recurring-Construction
Highway: HWY 403 MISSISSAUGA
Direction: Eastbound
From/At:
To: HWY 410 Northbound
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 20:00
Event End: September 10, 2015 06:00
Last Change: Entered 2015-09-01 14:14

Top of page Top of page


HWY 403 MISSISSAUGA Westbound [ HWY 401 - QEW ] - Recurring-Moving Maintenance Closure
Highway: HWY 403 MISSISSAUGA
Direction: Westbound
From/At: HWY 401
To: QEW
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 07, 2015 23:59
Event End: September 18, 2015 04:30
Last Change: Entered 2015-09-02 12:09

Top of page Top of page


HWY 403 MISSISSAUGA Westbound [ WINSTON CHURCHILL BLVD - QEW ] - Recurring-Construction
Highway: HWY 403 MISSISSAUGA
Direction: Westbound
From/At: WINSTON CHURCHILL BLVD
To: QEW
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DUNDAS STREET SB, On-ramp from DUNDAS STREET NB, Off-ramp to DUNDAS STREET NB/SB, Off-ramp to UPPER MIDDLE ROAD NB/SB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. 1 lane will close at 9:00PM and a 2nd lane will close at 10:00PM.
Event Start: August 31, 2015 21:00
Event End: September 05, 2015 10:00
Last Change: Entered 2015-08-28 12:46

Top of page Top of page


HWY 404 Northbound [ 407ETR - 407ETR ] - Recurring-Construction
Highway: HWY 404
Direction: Northbound
From/At: 407ETR
To: 407ETR
Lanes Affected: 1 Right(with HOV) Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 02, 2015 23:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-31 09:37

Top of page Top of page


HWY 404 Northbound Collector [ STEELES AVE / WOODBINE AVE Collector - STEELES AVE / WOODBINE AVE Collector ] - Recurring-Construction
Highway: HWY 404
Direction: Northbound
From/At: STEELES AVE / WOODBINE AVE Collector
To: STEELES AVE / WOODBINE AVE Collector
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:00
Event End: September 05, 2015 09:00
Last Change: Entered 2015-08-27 11:06

Top of page Top of page


HWY 404 Northbound Collector [ STEELES AVE / WOODBINE AVE Collector - STEELES AVE / WOODBINE AVE Collector ] - Recurring-Construction
Highway: HWY 404
Direction: Northbound
From/At: STEELES AVE / WOODBINE AVE Collector
To: STEELES AVE / WOODBINE AVE Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:00
Event End: September 05, 2015 09:00
Last Change: Entered 2015-08-27 11:10

Top of page Top of page


HWY 404 Northbound Off-ramp [ - HWY 401 Westbound Collector ] - Recurring-Construction
Highway: HWY 404
Direction: Northbound
From/At:
To: HWY 401 Westbound Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 23:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-27 07:31

Top of page Top of page


HWY 404 Northbound On-ramp [ STEELES AVE / WOODBINE AVE Eastbound - ] - Recurring-Construction
Highway: HWY 404
Direction: Northbound
From/At: STEELES AVE / WOODBINE AVE Eastbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 23:59
Event End: September 05, 2015 08:00
Last Change: Entered 2015-08-27 13:10

Top of page Top of page


HWY 404 Southbound [ SHEPPARD AVE - SHEPPARD AVE ] - Construction
Highway: HWY 404
Direction: Southbound
From/At: SHEPPARD AVE
To: SHEPPARD AVE
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from FAIRVIEW MALL DRIVE / SHEPPARD AVE SB
Reason Construction
Comment :
Event Start: September 26, 2015 22:00
Event End: September 28, 2015 05:00
Last Change: Entered 2015-03-20 08:42

Top of page Top of page


HWY 404 Southbound Collector [ STEELES AVE / WOODBINE AVE Collector - STEELES AVE / WOODBINE AVE Collector ] - Recurring-Construction
Highway: HWY 404
Direction: Southbound
From/At: STEELES AVE / WOODBINE AVE Collector
To: STEELES AVE / WOODBINE AVE Collector
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact : On-ramp from STEELES AVE / WOODBINE AVE WB
Reason Recurring-Construction
Comment : Alternating 4 lane closure including the HOV lane. For all days, the HOV lane will close at Midnight. On Sunday, 2 lanes will close at 11:00PM while a third lane will close at Midnight. From Monday to Thursday, 1 lane will close at 10:00PM, a second lane will close at 11:00PM, and a third lane will close at Midnight. On Friday, 2 lanes will close at 11:00PM while a third lane will close at 1:00AM.
Event Start: August 30, 2015 22:00
Event End: September 05, 2015 09:00
Last Change: Entered 2015-08-27 12:50

Top of page Top of page


HWY 404 Southbound Collector [ STEELES AVE / WOODBINE AVE Collector - STEELES AVE / WOODBINE AVE Collector ] - Recurring-Construction
Highway: HWY 404
Direction: Southbound
From/At: STEELES AVE / WOODBINE AVE Collector
To: STEELES AVE / WOODBINE AVE Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 4 lane closure including the HOV lane. For all days, the HOV lane will close at Midnight. On Sunday, 2 lanes will close at 11:00PM while a third lane will close at Midnight. From Monday to Thursday, 1 lane will close at 10:00PM, a second lane will close at 11:00PM, and a third lane will close at Midnight. On Friday, 2 lanes will close at 11:00PM while a third lane will close at 1:00AM.
Event Start: August 30, 2015 23:00
Event End: September 05, 2015 06:00
Last Change: Entered 2015-08-27 12:52

Top of page Top of page


HWY 404 Southbound On-ramp [ STEELES AVE / WOODBINE AVE Southbound - ] - Recurring-Construction
Highway: HWY 404
Direction: Southbound
From/At: STEELES AVE / WOODBINE AVE Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 23:59
Event End: September 05, 2015 08:00
Last Change: Entered 2015-08-27 13:01

Top of page Top of page


HWY 406 Northbound [ EAST MAIN STREET - QEW ] - Recurring-Moving Maintenance Closure
Highway: HWY 406
Direction: Northbound
From/At: EAST MAIN STREET
To: QEW
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 08, 2015 00:00
Event End: September 12, 2015 05:00
Last Change: Entered 2015-09-01 11:46

Top of page Top of page


HWY 406 Northbound [ GLENDALE AVE - GLENDALE AVE ] - Recurring-Construction
Highway: HWY 406
Direction: Northbound
From/At: GLENDALE AVE
To: GLENDALE AVE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 18:00
Event End: September 04, 2015 07:00
Last Change: Entered 2015-08-26 11:53

Top of page Top of page


HWY 406 Southbound [ GLENDALE AVE - GLENDALE AVE ] - Recurring-Construction
Highway: HWY 406
Direction: Southbound
From/At: GLENDALE AVE
To: GLENDALE AVE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 18:30
Event End: September 04, 2015 14:00
Last Change: Entered 2015-08-26 11:55

Top of page Top of page


HWY 406 Southbound [ QEW - EAST MAIN STREET ] - Recurring-Moving Maintenance Closure
Highway: HWY 406
Direction: Southbound
From/At: QEW
To: EAST MAIN STREET
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment :
Event Start: September 08, 2015 00:00
Event End: September 12, 2015 05:00
Last Change: Entered 2015-09-01 11:49

Top of page Top of page


HWY 409 Eastbound [ HWY 427 - HWY 401 ] - Recurring-Moving Maintenance Closure
Highway: HWY 409
Direction: Eastbound
From/At: HWY 427
To: HWY 401
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 07, 2015 23:59
Event End: September 11, 2015 04:30
Last Change: Entered 2015-09-02 12:01

Top of page Top of page


HWY 409 Eastbound [ HWY 427 - HWY 427 ] - Recurring-Construction
Highway: HWY 409
Direction: Eastbound
From/At: HWY 427
To: HWY 427
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 22:00
Event End: September 05, 2015 06:00
Last Change: Entered 2015-08-27 08:46

Top of page Top of page


HWY 409 Westbound [ HWY 401 - HWY 427 ] - Recurring-Moving Maintenance Closure
Highway: HWY 409
Direction: Westbound
From/At: HWY 401
To: HWY 427
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 07, 2015 23:59
Event End: September 11, 2015 04:30
Last Change: Entered 2015-09-02 12:04

Top of page Top of page


HWY 409 Westbound [ HWY 427 - HWY 427 ] - Recurring-Construction
Highway: HWY 409
Direction: Westbound
From/At: HWY 427
To: HWY 427
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 22:00
Event End: September 05, 2015 06:00
Last Change: Entered 2015-08-27 08:48

Top of page Top of page


HWY 410 Northbound [ CLARK BLVD - QUEEN STREET/S JCT HWY 7 ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: CLARK BLVD
To: QUEEN STREET/S JCT HWY 7
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
Reason Recurring-Construction
Comment : No two consecutive on and off ramps will be closed at the same time as it is an alternating 2 lane closure.
Event Start: September 08, 2015 23:59
Event End: September 11, 2015 06:00
Last Change: Entered 2015-09-02 11:14

Top of page Top of page


HWY 410 Northbound [ CLARK BLVD - QUEEN STREET/S JCT HWY 7 ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: CLARK BLVD
To: QUEEN STREET/S JCT HWY 7
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
Reason Recurring-Construction
Comment : No two consecutive on and off ramps will be closed at the same time as it is an alternating 2 lane closure.
Event Start: August 30, 2015 23:59
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-26 06:41

Top of page Top of page


HWY 410 Northbound [ COURTNEY PARK DRIVE - DERRY ROAD ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: COURTNEY PARK DRIVE
To: DERRY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to DERRY ROAD EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. On Sunday, 1 lane will close at 11:00PM and a 2nd lane will close at Midnight. From Monday to Thursday, 1 lane will close at 10:00PM and a 2nd lane will close at 11:00PM.
Event Start: August 30, 2015 22:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-26 06:44

Top of page Top of page


HWY 410 Northbound [ COURTNEY PARK DRIVE - DERRY ROAD ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: COURTNEY PARK DRIVE
To: DERRY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to DERRY ROAD EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure starting at 11:00PM.
Event Start: September 08, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-02 11:12

Top of page Top of page


HWY 410 Northbound [ DERRY ROAD - STEELES AVE ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: DERRY ROAD
To: STEELES AVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DERRY ROAD EB, On-ramp from DERRY ROAD EB/WB, On-ramp from DERRY ROAD WB, Off-ramp to STEELES AVE EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure.
Event Start: September 08, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-02 11:13

Top of page Top of page


HWY 410 Northbound [ DERRY ROAD - STEELES AVE ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: DERRY ROAD
To: STEELES AVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DERRY ROAD EB, On-ramp from DERRY ROAD EB/WB, On-ramp from DERRY ROAD WB, Off-ramp to STEELES AVE EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure.
Event Start: August 30, 2015 23:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 06:44

Top of page Top of page


HWY 410 Northbound [ HWY 401 - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: HWY 401
To: COURTNEY PARK DRIVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to COURTNEY PARK DRIVE EB/WB
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 06:46

Top of page Top of page


HWY 410 Northbound [ HWY 401 - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: HWY 401
To: COURTNEY PARK DRIVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to COURTNEY PARK DRIVE EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure starting at 11:00PM.
Event Start: September 08, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-02 11:11

Top of page Top of page


HWY 410 Northbound [ STEELES AVE - CLARK BLVD ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: STEELES AVE
To: CLARK BLVD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to CLARK BLVD EB/WB
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-02 11:14

Top of page Top of page


HWY 410 Northbound [ STEELES AVE - CLARK BLVD ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: STEELES AVE
To: CLARK BLVD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to CLARK BLVD EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure.
Event Start: August 30, 2015 23:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 06:43

Top of page Top of page


HWY 410 Northbound On-ramp [ HWY 401 Eastbound - ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: HWY 401 Eastbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Periodic full closures of 15 minute durations assisted by OPP.
Event Start: September 08, 2015 23:00
Event End: September 10, 2015 05:00
Last Change: Entered 2015-09-01 13:23

Top of page Top of page


HWY 410 Northbound On-ramp [ HWY 401 Westbound - ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: HWY 401 Westbound
To:
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 23:00
Event End: September 10, 2015 05:00
Last Change: Entered 2015-09-01 13:29

Top of page Top of page


HWY 410 Southbound [ CLARK BLVD - STEELES AVE ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: CLARK BLVD
To: STEELES AVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to STEELES AVE EB/WB
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 06:49

Top of page Top of page


HWY 410 Southbound [ CLARK BLVD - STEELES AVE ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: CLARK BLVD
To: STEELES AVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to STEELES AVE EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure that will start at 11:00PM.
Event Start: September 08, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-02 10:58

Top of page Top of page


HWY 410 Southbound [ COURTNEY PARK DRIVE - HWY 401 ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: COURTNEY PARK DRIVE
To: HWY 401
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure that will start at 11:00PM.
Event Start: September 08, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-02 11:04

Top of page Top of page


HWY 410 Southbound [ COURTNEY PARK DRIVE - HWY 401 ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: COURTNEY PARK DRIVE
To: HWY 401
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure. On Sunday, 1 lane will close at 10:00PM while a 2nd lane will close at Midnight. From Monday to Thursday, 2 lanes will both close at 11:00PM.
Event Start: August 30, 2015 23:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 06:48

Top of page Top of page


HWY 410 Southbound [ DERRY ROAD - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: DERRY ROAD
To: COURTNEY PARK DRIVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DERRY ROAD EB, On-ramp from COURTNEY PARK DRIVE EB/WB, On-ramp from DERRY ROAD WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. On Sunday, 1 lane will close at 11:00PM and a 2nd lane will close at Midnight. From Monday to Thursday, 2 lanes will both close at 11:00PM.
Event Start: August 30, 2015 23:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 06:47

Top of page Top of page


HWY 410 Southbound [ DERRY ROAD - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: DERRY ROAD
To: COURTNEY PARK DRIVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DERRY ROAD EB, On-ramp from COURTNEY PARK DRIVE EB/WB, On-ramp from DERRY ROAD WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure starting at 11:00PM.
Event Start: September 07, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-02 11:10

Top of page Top of page


HWY 410 Southbound [ HWY 401 - HWY 401 ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: HWY 401
To: HWY 401
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 02, 2015 21:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-28 17:11

Top of page Top of page


HWY 410 Southbound [ QUEEN STREET/S JCT HWY 7 - CLARK BLVD ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: QUEEN STREET/S JCT HWY 7
To: CLARK BLVD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from CLARK BLVD EB/WB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure starting at Midnight.
Event Start: August 30, 2015 00:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 06:50

Top of page Top of page


HWY 410 Southbound [ QUEEN STREET/S JCT HWY 7 - CLARK BLVD ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: QUEEN STREET/S JCT HWY 7
To: CLARK BLVD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from CLARK BLVD EB/WB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure starting at Midnight.
Event Start: September 08, 2015 00:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-02 10:51

Top of page Top of page


HWY 410 Southbound [ STEELES AVE - DERRY ROAD ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: STEELES AVE
To: DERRY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to DERRY ROAD EB/WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure starting at 11:00PM.
Event Start: September 08, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-02 11:08

Top of page Top of page


HWY 410 Southbound [ STEELES AVE - DERRY ROAD ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: STEELES AVE
To: DERRY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to DERRY ROAD EB/WB
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 23:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 06:46

Top of page Top of page


HWY 416 Southbound [ HWY 16 (IC 1) - HWY 16 (IC 1) ] - Recurring-Construction
Highway: HWY 416
Direction: Southbound
From/At: HWY 16 (IC 1)
To: HWY 16 (IC 1)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Lane reductions Hwy 416 @ Hwy 16; Ramps closed as required (Johnstown)
Event Start: September 01, 2015 07:00
Event End: September 03, 2015 19:00
Last Change: Entered 2015-08-27 14:49

Top of page Top of page


HWY 416 Southbound [ HWY 16 (IC 1) - HWY 401 ] - Recurring-Construction
Highway: HWY 416
Direction: Southbound
From/At: HWY 16 (IC 1)
To: HWY 401
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Lane reductions Hwy 416 @ Hwy 16 and Hwy 401 interchanges; Ramps closed as required (Johnstown)
Event Start: September 09, 2015 07:00
Event End: September 10, 2015 19:00
Last Change: Entered 2015-09-02 10:51

Top of page Top of page


HWY 416 Southbound [ L & G RD 21 (IC 12) - L & G RD 21 (IC 12) ] - Recurring-Construction
Highway: HWY 416
Direction: Southbound
From/At: L & G RD 21 (IC 12)
To: L & G RD 21 (IC 12)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 416 S/B L&G Rd 21 on and off ramps closed as required (Spencerville)
Event Start: September 08, 2015 07:00
Event End: September 10, 2015 19:00
Last Change: Entered 2015-09-02 10:57

Top of page Top of page


HWY 417 Eastbound [ BEARBROOK BRIDGE - Piperville Rd ] - Recurring-Construction
Highway: HWY 417
Direction: Eastbound
From/At: BEARBROOK BRIDGE
To: Piperville Rd
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Hwy 417 @ Bearbrook Bridge (E/Ottawa); E/B closures 7am - 2:30pm; W/B closures 10am - 5pm
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 17:00
Last Change: Entered 2015-08-28 08:14

Top of page Top of page


HWY 417 Eastbound [ BRONSON AVE (IC 121A) - METCALFE ST (IC 119A) ] - Recurring-Construction
Highway: HWY 417
Direction: Eastbound
From/At: BRONSON AVE (IC 121A)
To: METCALFE ST (IC 119A)
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Nightly lane reductions 417 E/B & W/B @ Kent St (Ottawa); W/B O'Connor on ramp and E/B Kent off ramp closed as required
Event Start: August 30, 2015 22:00
Event End: September 03, 2015 06:00
Last Change: Entered 2015-08-28 14:33

Top of page Top of page


HWY 417 Eastbound [ BRONSON AVE (IC 121A) - METCALFE ST (IC 119A) ] - Recurring-Construction
Highway: HWY 417
Direction: Eastbound
From/At: BRONSON AVE (IC 121A)
To: METCALFE ST (IC 119A)
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Nightly lane reductions 417 E/B & W/B @ Kent St (Ottawa); W/B O'Connor on ramp closed nightly; E/B Kent off ramp closed Sept 8 to Oct 12
Event Start: September 06, 2015 22:00
Event End: September 12, 2015 06:00
Last Change: Entered 2015-09-02 13:15

Top of page Top of page


HWY 417 Eastbound [ DEVINE RD - DEVINE RD ] - Recurring-Construction
Highway: HWY 417
Direction: Eastbound
From/At: DEVINE RD
To: DEVINE RD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Hwy 417 west of Devine Rd (E/Ottawa); E/B closures 7am - 2:30pm; W/B closures 10am - 5pm
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 17:00
Last Change: Entered 2015-08-28 08:16

Top of page Top of page


HWY 417 Westbound [ MAITLAND AVE (IC 126) - MAITLAND AVE (IC 126) ] - Maintenance
Highway: HWY 417
Direction: Westbound
From/At: MAITLAND AVE (IC 126)
To: MAITLAND AVE (IC 126)
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment : Right lane closed 417W/B @ Maitland (Ottawa)
Event Start: September 03, 2015 10:00
Event End: September 03, 2015 14:00
Last Change: Entered 2015-08-28 15:27

Top of page Top of page


HWY 417 Westbound [ P&R CTY RD 17 (IC 9) - P&R CTY RD 17 (IC 9) ] - Recurring-Maintenance
Highway: HWY 417
Direction: Westbound
From/At: P&R CTY RD 17 (IC 9)
To: P&R CTY RD 17 (IC 9)
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment : Left lane closed daily 417 W/B east of Cty Rd 17 (W/QC Border)
Event Start: September 03, 2015 08:00
Event End: September 23, 2015 18:00
Last Change: Entered 2015-09-02 15:52

Top of page Top of page


HWY 417 Westbound [ ROCHESTER ST (IC 121B) - PARKDALE AVE (IC 122) ] - Recurring-Construction
Highway: HWY 417
Direction: Westbound
From/At: ROCHESTER ST (IC 121B)
To: PARKDALE AVE (IC 122)
Lanes Affected: 2 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Right lanes closed nightly 417W/B Rochester to Parkdale; W/B Rochester on ramp closed (Ottawa)
Event Start: September 08, 2015 23:00
Event End: September 11, 2015 05:00
Last Change: Entered 2015-09-02 11:46

Top of page Top of page


HWY 417 Westbound [ ROCHESTER ST (IC 121B) - PARKDALE AVE (IC 122) ] - Recurring-Construction
Highway: HWY 417
Direction: Westbound
From/At: ROCHESTER ST (IC 121B)
To: PARKDALE AVE (IC 122)
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Right lane closed nightly 417W/B Rochester to Parkdale; W/B Rochester on ramp closed (Ottawa)
Event Start: August 30, 2015 23:00
Event End: September 06, 2015 05:00
Last Change: Entered 2015-08-28 08:47

Top of page Top of page


HWY 417 Westbound Off-ramp [ - MOODIE DR (IC 134) Westbound ] - Construction
Highway: HWY 417
Direction: Westbound
From/At:
To: MOODIE DR (IC 134) Westbound
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment : Partial right lane closure on 417 W/B Moodie off-ramp until October 2015 (Ottawa)
Event Start: July 20, 2015 07:00
Event End: October 23, 2015 17:00
Last Change: Entered 2015-07-13 13:13

Top of page Top of page


HWY 427 Northbound Collector [ CAMPUS ROAD/FASKEN DRIVE Collector - REXDALE BLVD / DERRY ROAD Collector ] - Recurring-Construction
Highway: HWY 427
Direction: Northbound
From/At: CAMPUS ROAD/FASKEN DRIVE Collector
To: REXDALE BLVD / DERRY ROAD Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 409 WB
Reason Recurring-Construction
Comment : Alternating 2 lane closure. 1 lane will close at 7:00PM and a 2nd lane will close at 8:00PM.
Event Start: September 01, 2015 19:00
Event End: September 03, 2015 06:00
Last Change: Entered 2015-09-01 06:07

Top of page Top of page


HWY 427 Northbound Collector [ FINCH AVENUE Collector - HWY 407 ETR Collector ] - Recurring-Construction
Highway: HWY 427
Direction: Northbound
From/At: FINCH AVENUE Collector
To: HWY 407 ETR Collector
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 19:00
Event End: September 05, 2015 07:00
Last Change: Entered 2015-08-28 21:57

Top of page Top of page


HWY 427 Northbound Collector [ FINCH AVENUE Collector - STEELES AVE Collector ] - Recurring-Construction
Highway: HWY 427
Direction: Northbound
From/At: FINCH AVENUE Collector
To: STEELES AVE Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from FINCH AVENUE WB, On-ramp from FINCH AVENUE EB, Off-ramp to FINCH AVENUE EB/WB
Reason Recurring-Construction
Comment :
Event Start: September 01, 2015 19:00
Event End: September 03, 2015 07:00
Last Change: Entered 2015-09-01 05:52

Top of page Top of page


HWY 427 Northbound Express [ DUNDAS STREET Express - BLOOR STREET Express ] - Construction
Highway: HWY 427
Direction: Northbound
From/At: DUNDAS STREET Express
To: BLOOR STREET Express
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 02, 2015 22:00
Event End: September 03, 2015 05:00
Last Change: Entered 2015-09-01 15:13

Top of page Top of page


HWY 427 Northbound On-ramp [ GARDINER EXPRESSWAY Westbound - ] - Construction
Highway: HWY 427
Direction: Northbound
From/At: GARDINER EXPRESSWAY Westbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: October 23, 2015 22:00
Event End: October 26, 2015 05:00
Last Change: Entered 2015-03-20 09:02

Top of page Top of page


HWY 427 Southbound [ EGLINTON AVE - RATHBURN ROAD ] - Construction
Highway: HWY 427
Direction: Southbound
From/At: EGLINTON AVE
To: RATHBURN ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact : Off-ramp to HWY 401 WB
Reason Construction
Comment :
Event Start: September 04, 2015 22:00
Event End: September 05, 2015 06:00
Last Change: Entered 2015-09-02 16:51

Top of page Top of page


HWY 427 Southbound Collector Off-ramp [ - EGLINTON AVE Eastbound ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At:
To: EGLINTON AVE Eastbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 02, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-09-01 15:23

Top of page Top of page


HWY 427 Southbound Collector [ DISCO ROAD/GOREWAY Collector - HWY 409 Collector ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At: DISCO ROAD/GOREWAY Collector
To: HWY 409 Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure starting at 10:00PM.
Event Start: September 01, 2015 22:00
Event End: September 03, 2015 06:00
Last Change: Entered 2015-09-01 06:04

Top of page Top of page


HWY 427 Southbound Collector [ DIXON ROAD/AIRPORT ROAD Collector - RATHBURN ROAD Collector ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At: DIXON ROAD/AIRPORT ROAD Collector
To: RATHBURN ROAD Collector
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 01, 2015 21:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-28 09:50

Top of page Top of page


HWY 427 Southbound Collector [ FINCH AVENUE Collector - REXDALE BLVD / DERRY ROAD Collector ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At: FINCH AVENUE Collector
To: REXDALE BLVD / DERRY ROAD Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from REXDALE BLVD / DERRY ROAD EB, On-ramp from REXDALE BLVD / DERRY ROAD WB, Off-ramp to REXDALE BLVD / DERRY ROAD EB/WB
Reason Recurring-Construction
Comment :
Event Start: September 01, 2015 19:00
Event End: September 03, 2015 06:00
Last Change: Entered 2015-09-01 05:57

Top of page Top of page


HWY 427 Southbound Collector [ HWY 407 ETR Collector - FINCH AVENUE Collector ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At: HWY 407 ETR Collector
To: FINCH AVENUE Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from FINCH AVENUE EB, On-ramp from FINCH AVENUE WB, Off-ramp to FINCH AVENUE EB/WB
Reason Recurring-Construction
Comment :
Event Start: September 01, 2015 20:00
Event End: September 03, 2015 06:00
Last Change: Entered 2015-09-01 05:47

Top of page Top of page


HWY 427 Southbound Collector [ HWY 407 ETR Collector - HUMBER RIVER Collector ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At: HWY 407 ETR Collector
To: HUMBER RIVER Collector
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 20:00
Event End: September 05, 2015 06:00
Last Change: Entered 2015-08-28 21:54

Top of page Top of page


HWY 427 Southbound Express and Collector Off-ramp [ - GARDINER EXPRESSWAY Eastbound ] - Construction
Highway: HWY 427
Direction: Southbound
From/At:
To: GARDINER EXPRESSWAY Eastbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: October 23, 2015 22:00
Event End: October 26, 2015 05:00
Last Change: Entered 2015-03-20 08:56

Top of page Top of page


HWY 58 Northbound [ THOROLD TUNNEL - THOROLD TUNNEL ] - Recurring-Maintenance
Highway: HWY 58
Direction: Northbound
From/At: THOROLD TUNNEL
To: THOROLD TUNNEL
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 01, 2015 09:00
Event End: September 03, 2015 14:00
Last Change: Entered 2015-08-31 09:14

Top of page Top of page


HWY 6 Northbound [ GREEN'S ROAD - UPPER JAMES ] - Recurring-Construction
Highway: HWY 6
Direction: Northbound
From/At: GREEN'S ROAD
To: UPPER JAMES
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 10:00
Event End: September 12, 2015 06:00
Last Change: Entered 2015-09-02 10:39

Top of page Top of page


HWY 6 Northbound [ GREEN'S ROAD - UPPER JAMES ] - Recurring-Construction
Highway: HWY 6
Direction: Northbound
From/At: GREEN'S ROAD
To: UPPER JAMES
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 19:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 11:27

Top of page Top of page


HWY 6 Northbound [ GREY RD 12-MARKDALE RD (E) - GREY RD 12-MARKDALE RD (E) ] - Recurring-Construction
Highway: HWY 6
Direction: Northbound
From/At: GREY RD 12-MARKDALE RD (E)
To: GREY RD 12-MARKDALE RD (E)
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 6 northbound lanes at the Rocky Saugeen River Bridge, will have a full closure from 1400 hours on Thursday, June 11th, 2015 until October 31st, 2015. Traffic will be controlled by temporary traffic signals.
Event Start: June 11, 2015 14:00
Event End: October 31, 2015 23:59
Last Change: Entered 2015-06-09 11:16

Top of page Top of page


HWY 6 Northbound [ HWY 5 - WEST FLAMBOROUGH TWP CON. 6 ROAD ] - Recurring-Construction
Highway: HWY 6
Direction: Northbound
From/At: HWY 5
To: WEST FLAMBOROUGH TWP CON. 6 ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 19:00
Event End: September 12, 2015 07:00
Last Change: Entered 2015-09-02 10:16

Top of page Top of page


HWY 6 Northbound [ HWY 5 - WEST FLAMBOROUGH TWP CON. 6 ROAD ] - Recurring-Construction
Highway: HWY 6
Direction: Northbound
From/At: HWY 5
To: WEST FLAMBOROUGH TWP CON. 6 ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 20:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-26 11:16

Top of page Top of page


HWY 6 Northbound [ Rocky Saugeen River - Rocky Saugeen River ] - Construction
Highway: HWY 6
Direction: Northbound
From/At: Rocky Saugeen River
To: Rocky Saugeen River
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment : Highway 6 Northbound will be closed until October 31, 2015 at Rocky Saugeen River Bridge. Both directions of traffic will be able to pass but delays may occur.
Event Start: August 20, 2015 20:00
Event End: October 31, 2015 23:59
Last Change: Entered 2015-08-20 20:07

Top of page Top of page


HWY 6 Southbound [ UPPER JAMES - GREEN'S ROAD ] - Recurring-Construction
Highway: HWY 6
Direction: Southbound
From/At: UPPER JAMES
To: GREEN'S ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Closure times changed to adhere to contract.
Event Start: September 08, 2015 19:00
Event End: September 12, 2015 10:00
Last Change: Entered 2015-09-02 10:45

Top of page Top of page


HWY 6 Southbound [ UPPER JAMES - GREEN'S ROAD ] - Recurring-Construction
Highway: HWY 6
Direction: Southbound
From/At: UPPER JAMES
To: GREEN'S ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 15:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-26 11:37

Top of page Top of page


HWY 6 Southbound [ WEST FLAMBOROUGH TWP CON. 6 ROAD - HWY 5 ] - Recurring-Construction
Highway: HWY 6
Direction: Southbound
From/At: WEST FLAMBOROUGH TWP CON. 6 ROAD
To: HWY 5
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 19:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-26 11:20

Top of page Top of page


HWY 6 Southbound [ WEST FLAMBOROUGH TWP CON. 6 ROAD - HWY 5 ] - Recurring-Construction
Highway: HWY 6
Direction: Southbound
From/At: WEST FLAMBOROUGH TWP CON. 6 ROAD
To: HWY 5
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 19:00
Event End: September 12, 2015 07:00
Last Change: Entered 2015-09-02 10:19

Top of page Top of page


HWY 6 Southbound On-ramp [ HWY 403 HAMILTON Westbound - ] - Construction
Highway: HWY 6
Direction: Southbound
From/At: HWY 403 HAMILTON Westbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 02, 2015 23:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-28 15:03

Top of page Top of page


HWY 6 Southbound On-ramp [ YORK ROAD Southbound - ] - Recurring-Maintenance
Highway: HWY 6
Direction: Southbound
From/At: YORK ROAD Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 08, 2015 23:00
Event End: September 10, 2015 05:00
Last Change: Entered 2015-09-02 10:41

Top of page Top of page


HWY 6/10 Southbound [ Story Book Park Road - Story Book Park Road ] - Recurring-Construction
Highway: HWY 6/10
Direction: Southbound
From/At: Story Book Park Road
To: Story Book Park Road
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 6/10 Southbound from 1.5 North of Story Book Park Road to Superior Street will have a left lane and shoulder closure, August 31-September 4 between 0700-1900 hours.
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 19:00
Last Change: Entered 2015-08-28 08:56

Top of page Top of page


HWY 7 Eastbound [ BROCK ROAD - PICKERING SIDELINE 14 ] - Construction
Highway: HWY 7
Direction: Eastbound
From/At: BROCK ROAD
To: PICKERING SIDELINE 14
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: March 26, 2015 13:00
Event End: October 01, 2015 13:00
Last Change: Entered 2015-03-30 10:57

Top of page Top of page


HWY 7 Eastbound [ County Road 9 / Line 9 - Line 29 / Gibb Road ] - Recurring-Construction
Highway: HWY 7
Direction: Eastbound
From/At: County Road 9 / Line 9
To: Line 29 / Gibb Road
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 07:00
Event End: September 11, 2015 19:00
Last Change: Entered 2015-09-02 11:58

Top of page Top of page


HWY 7 Eastbound [ DWYER HILL RD (IC) - DWYER HILL RD (IC) ] - Maintenance
Highway: HWY 7
Direction: Eastbound
From/At: DWYER HILL RD (IC)
To: DWYER HILL RD (IC)
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment : Right lane closed Hwy 7 E/B @ Dwyer Hill (E/Carleton Place)
Event Start: September 08, 2015 10:00
Event End: September 08, 2015 14:00
Last Change: Entered 2015-09-02 14:29

Top of page Top of page


HWY 7 Eastbound [ HALLS ROAD - CORONATION ROAD ] - Recurring-Construction
Highway: HWY 7
Direction: Eastbound
From/At: HALLS ROAD
To: CORONATION ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 03, 2015 09:00
Event End: September 04, 2015 15:00
Last Change: Entered 2015-09-02 14:13

Top of page Top of page


HWY 7 Eastbound [ Highway 23 / Mitchell Line - Adelaide Street ] - Maintenance
Highway: HWY 7
Direction: Eastbound
From/At: Highway 23 / Mitchell Line
To: Adelaide Street
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: September 09, 2015 08:00
Event End: September 09, 2015 16:00
Last Change: Entered 2015-09-02 13:30

Top of page Top of page


HWY 7 Eastbound [ Hwy 41 - Scott Rd ] - Recurring-Construction
Highway: HWY 7
Direction: Eastbound
From/At: Hwy 41
To: Scott Rd
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : daily alternating lane closures as required on Hwy 7 EB and WB, btwn Hwy 41 and Scott Rd fm 7am to 6pm (W/Kaladar)
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 18:00
Last Change: Entered 2015-08-28 10:51

Top of page Top of page


HWY 7 Westbound [ CORONATION ROAD - HALLS ROAD ] - Recurring-Construction
Highway: HWY 7
Direction: Westbound
From/At: CORONATION ROAD
To: HALLS ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 03, 2015 09:00
Event End: September 04, 2015 15:00
Last Change: Entered 2015-09-02 14:16

Top of page Top of page


HWY 7 Westbound [ PICKERING SIDELINE 14 - BROCK ROAD ] - Construction
Highway: HWY 7
Direction: Westbound
From/At: PICKERING SIDELINE 14
To: BROCK ROAD
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 02, 2015 10:00
Event End: September 03, 2015 05:00
Last Change: Entered 2015-09-01 14:56

Top of page Top of page


HWY 7 Westbound [ PICKERING SIDELINE 14 - BROCK ROAD ] - Recurring-Construction
Highway: HWY 7
Direction: Westbound
From/At: PICKERING SIDELINE 14
To: BROCK ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 24, 2015 09:00
Event End: September 18, 2015 13:00
Last Change: Entered 2015-08-19 08:54

Top of page Top of page


HWY 7/12 Northbound [ COLUMBUS ROAD - COLUMBUS ROAD ] - Recurring-Construction
Highway: HWY 7/12
Direction: Northbound
From/At: COLUMBUS ROAD
To: COLUMBUS ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 02, 2015 09:00
Event End: September 18, 2015 16:00
Last Change: Entered 2015-08-27 15:54

Top of page Top of page


HWY 7/8 Eastbound [ Fischer-Hallman Road - Fischer-Hallman Road ] - Recurring-Construction
Highway: HWY 7/8
Direction: Eastbound
From/At: Fischer-Hallman Road
To: Fischer-Hallman Road
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 7/8 (Conestoga Parkway) eastbound, from 500 metres east of 750 metres east of Waterloo Road 58 (Fischer-Hallman Road), Kitchener, reduced from 2 lanes to a single lane of traffic, Monday, August 31st, 2015 until Friday, September 4th, 2015, daily, from 0700 hours until 1700 hours, for construction (Changeable Message Sign Electrical Work) operations.
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 17:00
Last Change: Entered 2015-08-28 21:36

Top of page Top of page


HWY 7/8 Westbound [ Westmount Road - Westmount Road ] - Recurring-Construction
Highway: HWY 7/8
Direction: Westbound
From/At: Westmount Road
To: Westmount Road
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 03, 2015 09:00
Event End: September 04, 2015 16:00
Last Change: Entered 2015-09-02 10:12

Top of page Top of page


HWY 8 Eastbound [ Sanctuary Line - Sanctuary Line ] - Recurring-Construction
Highway: HWY 8
Direction: Eastbound
From/At: Sanctuary Line
To: Sanctuary Line
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 8 Eastbound and Westbound 500 meters East of Sanctuary Line will have a right lane closure, August 11 - September 15 between 0700-1700 hours.
Event Start: August 11, 2015 07:00
Event End: September 15, 2015 17:00
Last Change: Entered 2015-08-10 11:07

Top of page Top of page


HWY 85 Southbound [ LANCASTER ST UP IC-KITCHENER - HWY 7 IC-VICTORIA ST-KITCHENER ] - Recurring-Construction
Highway: HWY 85
Direction: Southbound
From/At: LANCASTER ST UP IC-KITCHENER
To: HWY 7 IC-VICTORIA ST-KITCHENER
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 7/85 and 85 Southbound will have a full express lanes closure from Lancaster Street to Krug Street, August 30-September 1 between 2000-0600 hours. The Southbound collector lanes will have the same closure from August 31-September 3 between 2000-0600 hours. Various ramp closures at Wellington Street and Edna Street.
Event Start: August 30, 2015 20:00
Event End: September 03, 2015 06:00
Last Change: Entered 2015-08-28 13:32

Top of page Top of page


HWY 89 Westbound [ 5 SIDE ROAD - SIMCOE ROAD 27/KING STREET (COOKSTOWN) ] - Recurring-Construction
Highway: HWY 89
Direction: Westbound
From/At: 5 SIDE ROAD
To: SIMCOE ROAD 27/KING STREET (COOKSTOWN)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : This is a flagging operation and 1 through lane will be maintained.
Event Start: September 08, 2015 00:00
Event End: September 13, 2015 05:00
Last Change: Entered 2015-08-31 11:48

Top of page Top of page


HWY 89 Westbound [ 5 SIDE ROAD - SIMCOE ROAD 27/KING STREET (COOKSTOWN) ] - Recurring-Construction
Highway: HWY 89
Direction: Westbound
From/At: 5 SIDE ROAD
To: SIMCOE ROAD 27/KING STREET (COOKSTOWN)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : This is a flagging operation and 1 through lane will be maintained.
Event Start: September 08, 2015 21:00
Event End: September 13, 2015 23:59
Last Change: Entered 2015-08-31 11:48

Top of page Top of page


HWY 89 Westbound [ 5 SIDE ROAD - SIMCOE ROAD 27/KING STREET (COOKSTOWN) ] - Recurring-Construction
Highway: HWY 89
Direction: Westbound
From/At: 5 SIDE ROAD
To: SIMCOE ROAD 27/KING STREET (COOKSTOWN)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : This is a flagging operation and 1 through lane will be maintained.
Event Start: August 31, 2015 00:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-25 11:56

Top of page Top of page


HWY 89 Westbound [ 5 SIDE ROAD - SIMCOE ROAD 27/KING STREET (COOKSTOWN) ] - Recurring-Construction
Highway: HWY 89
Direction: Westbound
From/At: 5 SIDE ROAD
To: SIMCOE ROAD 27/KING STREET (COOKSTOWN)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : This is a flagging operation and 1 through lane will be maintained.
Event Start: August 31, 2015 21:00
Event End: September 03, 2015 23:59
Last Change: Entered 2015-08-25 11:56

Top of page Top of page


HWY 9 Eastbound [ HWY 27 - HWY 400 ] - Recurring-Construction
Highway: HWY 9
Direction: Eastbound
From/At: HWY 27
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 07, 2015 19:00
Event End: September 30, 2015 07:00
Last Change: Entered 2015-09-01 10:16

Top of page Top of page


HWY 9 Eastbound [ Kincardine-Kinloss Townline Road - Kincardine-Kinloss Townline Road ] - Recurring-Construction
Highway: HWY 9
Direction: Eastbound
From/At: Kincardine-Kinloss Townline Road
To: Kincardine-Kinloss Townline Road
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 9 eastbound alternating westbound, 0.83 kilometres west of Kincardine-Kinloss Townline Road, Kincardine area, reduced to a single lane of traffic, Monday, August 28th, 2015 until Friday, September 4th, 2015, daily, from 0700 hours until 1900 hours for construction work operations, traffic control provided by flag persons.
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 19:00
Last Change: Entered 2015-08-28 21:19

Top of page Top of page


HWY 9 Eastbound [ Kincardine-Kinloss Townline Road - Kincardine-Kinloss Townline Road ] - Recurring-Construction
Highway: HWY 9
Direction: Eastbound
From/At: Kincardine-Kinloss Townline Road
To: Kincardine-Kinloss Townline Road
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 9 eastbound alternating westbound, 0.83 kilometres west of Kincardine-Kinloss Townline Road, Kincardine area, reduced to a single lane of traffic, Monday, August 31st, 2015 until Friday, Septmeber 4th, 2015, daily, from 0700 hours until 1900 hours, for construction work operations.
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 19:00
Last Change: Entered 2015-08-28 21:10

Top of page Top of page


HWY 9 Westbound [ HWY 400 - HWY 27 ] - Recurring-Construction
Highway: HWY 9
Direction: Westbound
From/At: HWY 400
To: HWY 27
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 19:00
Event End: September 30, 2015 07:00
Last Change: Entered 2015-09-01 10:16

Top of page Top of page


HWY 93 Northbound [ HWY 400 - VASEY ROAD (WAVERLEY)/SIMCOE ROAD 27/SIMCOE ROAD 23 ] - Recurring-Construction
Highway: HWY 93
Direction: Northbound
From/At: HWY 400
To: VASEY ROAD (WAVERLEY)/SIMCOE ROAD 27/SIMCOE ROAD 23
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 31, 2015 06:00
Event End: September 04, 2015 10:00
Last Change: Entered 2015-08-26 21:41

Top of page Top of page


QEW Fort Erie Bound [ APPLEBY LINE - APPLEBY LINE ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: APPLEBY LINE
To: APPLEBY LINE
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 01, 2015 22:00
Event End: September 03, 2015 06:00
Last Change: Entered 2015-08-25 13:34

Top of page Top of page


QEW Fort Erie Bound [ BRONTE ROAD - PEACE BRIDGE ] - Recurring-Moving Maintenance Closure
Highway: QEW
Direction: Fort Erie Bound
From/At: BRONTE ROAD
To: PEACE BRIDGE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 08, 2015 00:00
Event End: September 12, 2015 05:00
Last Change: Entered 2015-09-01 11:37

Top of page Top of page


QEW Fort Erie Bound [ CASABLANCA BLVD. - MAPLE AVENUE ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: CASABLANCA BLVD.
To: MAPLE AVENUE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure. From Monday to Thursday, 1 lane will close at 7:30PM while a second lane will close at 10:00PM. Respective lanes will open at 6:30AM & 5:30AM.
Event Start: August 31, 2015 19:30
Event End: September 04, 2015 06:30
Last Change: Entered 2015-08-25 14:33

Top of page Top of page


QEW Fort Erie Bound [ GARDEN CITY SKYWAY - GARDEN CITY SKYWAY ] - Maintenance
Highway: QEW
Direction: Fort Erie Bound
From/At: GARDEN CITY SKYWAY
To: GARDEN CITY SKYWAY
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: September 02, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-25 12:07

Top of page Top of page


QEW Fort Erie Bound [ GARDEN CITY SKYWAY - GARDEN CITY SKYWAY ] - Maintenance
Highway: QEW
Direction: Fort Erie Bound
From/At: GARDEN CITY SKYWAY
To: GARDEN CITY SKYWAY
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: September 02, 2015 21:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-25 12:06

Top of page Top of page


QEW Fort Erie Bound [ GLENDALE AVENUE - HWY 405 ] - Maintenance
Highway: QEW
Direction: Fort Erie Bound
From/At: GLENDALE AVENUE
To: HWY 405
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: September 03, 2015 19:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-09-01 07:14

Top of page Top of page


QEW Fort Erie Bound [ LYONS CREEK ROAD - GILMORE ROAD ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: LYONS CREEK ROAD
To: GILMORE ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: August 30, 2015 07:00
Event End: September 03, 2015 19:00
Last Change: Entered 2015-08-25 13:15

Top of page Top of page


QEW Fort Erie Bound [ LYONS CREEK ROAD - GILMORE ROAD ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: LYONS CREEK ROAD
To: GILMORE ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 10, 2015 06:00
Event End: September 11, 2015 22:00
Last Change: Entered 2015-09-01 14:47

Top of page Top of page


QEW Fort Erie Bound [ NORTHSHORE BLVD/HWY 2 - BURLINGTON ST ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: NORTHSHORE BLVD/HWY 2
To: BURLINGTON ST
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact : On-ramp from EASTPORT DRIVE SB
Reason Recurring-Construction
Comment : Alternating 3 lane closure. From Monday to Thursday, 1 lane will close at 8:00PM, a 2nd lane will close at 9:00PM and a 3rd lane will close at 11:00PM. On Friday, 1 lane will close at 9:00PM, a 2nd lane will close at 10:00PM and the 3rd lane will close at 11:00PM.
Event Start: August 31, 2015 20:00
Event End: September 05, 2015 06:00
Last Change: Entered 2015-08-28 09:09

Top of page Top of page


QEW Fort Erie Bound [ NORTHSHORE BLVD/HWY 2 - EASTPORT DRIVE ] - Moving Maintenance Closure
Highway: QEW
Direction: Fort Erie Bound
From/At: NORTHSHORE BLVD/HWY 2
To: EASTPORT DRIVE
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Moving Maintenance Closure
Comment :
Event Start: September 02, 2015 08:00
Event End: September 03, 2015 19:00
Last Change: Entered 2015-08-28 14:57

Top of page Top of page


QEW Fort Erie Bound [ ONTARIO STEET (BEAMSVILLE) - VICTORIA AVENUE ] - Recurring-Maintenance
Highway: QEW
Direction: Fort Erie Bound
From/At: ONTARIO STEET (BEAMSVILLE)
To: VICTORIA AVENUE
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: August 30, 2015 21:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-27 15:41

Top of page Top of page


QEW Fort Erie Bound [ THOROLD STONE ROAD - HWY 420 ] - Recurring-Maintenance
Highway: QEW
Direction: Fort Erie Bound
From/At: THOROLD STONE ROAD
To: HWY 420
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: August 31, 2015 21:00
Event End: September 04, 2015 07:00
Last Change: Entered 2015-08-28 13:26

Top of page Top of page


QEW Fort Erie Bound [ VICTORIA AVENUE - FIFTEEN MILE CREEK ] - Recurring-Maintenance
Highway: QEW
Direction: Fort Erie Bound
From/At: VICTORIA AVENUE
To: FIFTEEN MILE CREEK
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: August 31, 2015 21:00
Event End: September 04, 2015 07:00
Last Change: Entered 2015-08-27 09:46

Top of page Top of page


QEW Fort Erie Bound On-ramp [ TRAFALGAR ROAD Northbound - ] - Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: TRAFALGAR ROAD Northbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 02, 2015 23:00
Event End: September 03, 2015 05:00
Last Change: Entered 2015-09-02 13:22

Top of page Top of page


QEW Toronto bound [ APPLEBY LINE - APPLEBY LINE ] - Construction
Highway: QEW
Direction: Toronto bound
From/At: APPLEBY LINE
To: APPLEBY LINE
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 03, 2015 22:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-09-02 09:54

Top of page Top of page


QEW Toronto bound [ APPLEBY LINE - APPLEBY LINE ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: APPLEBY LINE
To: APPLEBY LINE
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 01, 2015 22:00
Event End: September 03, 2015 05:00
Last Change: Entered 2015-08-25 13:41

Top of page Top of page


QEW Toronto bound [ GARDEN CITY SKYWAY - GARDEN CITY SKYWAY ] - Maintenance
Highway: QEW
Direction: Toronto bound
From/At: GARDEN CITY SKYWAY
To: GARDEN CITY SKYWAY
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: September 02, 2015 23:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-25 12:07

Top of page Top of page


QEW Toronto bound [ GARDEN CITY SKYWAY - NIAGARA STREET ] - Maintenance
Highway: QEW
Direction: Toronto bound
From/At: GARDEN CITY SKYWAY
To: NIAGARA STREET
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: September 02, 2015 22:00
Event End: September 04, 2015 05:00
Last Change: Entered 2015-08-25 12:07

Top of page Top of page


QEW Toronto bound [ GILMORE ROAD - LYONS CREEK ROAD ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: GILMORE ROAD
To: LYONS CREEK ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 03, 2015 07:00
Event End: September 03, 2015 21:00
Last Change: Entered 2015-09-02 14:21

Top of page Top of page


QEW Toronto bound [ GILMORE ROAD - LYONS CREEK ROAD ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: GILMORE ROAD
To: LYONS CREEK ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 08, 2015 07:00
Event End: September 11, 2015 21:00
Last Change: Entered 2015-09-01 14:29

Top of page Top of page


QEW Toronto bound [ MAPLE AVENUE - CASABLANCA BLVD. ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: MAPLE AVENUE
To: CASABLANCA BLVD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure. From Monday to Thursday, 1 lane will close at 7:00PM while a second lane will close at 10:00PM. Respective lanes will open at 5:30AM & 5:00AM.
Event Start: August 31, 2015 20:00
Event End: September 04, 2015 05:30
Last Change: Entered 2015-08-25 14:35

Top of page Top of page


QEW Toronto bound [ PEACE BRIDGE - BRONTE ROAD ] - Recurring-Moving Maintenance Closure
Highway: QEW
Direction: Toronto bound
From/At: PEACE BRIDGE
To: BRONTE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment :
Event Start: September 08, 2015 00:00
Event End: September 12, 2015 05:00
Last Change: Entered 2015-09-01 11:34

Top of page Top of page


QEW Toronto bound [ SEVENTH STREET - TWENTY MILE CREEK ] - Recurring-Maintenance
Highway: QEW
Direction: Toronto bound
From/At: SEVENTH STREET
To: TWENTY MILE CREEK
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from JORDAN ROAD WB
Reason Recurring-Maintenance
Comment : Alternating 2 lane closure. 1 lane will close at 11:00PM and a 2nd lane will close at Midnight.
Event Start: August 31, 2015 23:00
Event End: September 04, 2015 06:00
Last Change: Entered 2015-08-27 09:34

Top of page Top of page


QEW Toronto bound [ VICTORIA AVENUE - VICTORIA AVENUE ] - Moving Maintenance Closure
Highway: QEW
Direction: Toronto bound
From/At: VICTORIA AVENUE
To: VICTORIA AVENUE
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Moving Maintenance Closure
Comment : There may be periodic total closures of 15 minute durations.
Event Start: September 08, 2015 23:59
Event End: September 09, 2015 05:00
Last Change: Entered 2015-09-01 14:14

Top of page Top of page


QEW Toronto bound On-ramp [ BROWN'S LINE Eastbound - ] - Construction
Highway: QEW
Direction: Toronto bound
From/At: BROWN'S LINE Eastbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: October 23, 2015 22:00
Event End: October 26, 2015 05:00
Last Change: Entered 2015-03-23 14:11

Top of page Top of page


QEW Toronto bound On-ramp [ WEST MALL/EVANS AVE Eastbound - ] - Construction
Highway: QEW
Direction: Toronto bound
From/At: WEST MALL/EVANS AVE Eastbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: October 23, 2015 22:00
Event End: October 26, 2015 05:00
Last Change: Entered 2015-03-23 14:09

Top of page Top of page


Thousand Island Parkway Eastbound [ HWY 401- IC647 - HWY 137 ] - Recurring-Construction
Highway: Thousand Island Parkway
Direction: Eastbound
From/At: HWY 401- IC647
To: HWY 137
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Thousand Island Parkway E/B & W/B @ Hwy 137 and Hwy 401 E/B structures (Gananoque)
Event Start: August 31, 2015 07:00
Event End: September 04, 2015 17:00
Last Change: Entered 2015-08-28 08:04

Top of page Top of page


Thousand Island Parkway Eastbound [ HWY 401- IC647 - HWY 137 ] - Recurring-Construction
Highway: Thousand Island Parkway
Direction: Eastbound
From/At: HWY 401- IC647
To: HWY 137
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Thousand Island Parkway E/B & W/B @ Hwy 137 and Hwy 401 E/B structures (Gananoque)
Event Start: September 08, 2015 07:00
Event End: September 11, 2015 17:00
Last Change: Entered 2015-08-31 14:36

Top of page Top of page


HWY 141 Both Directions [ CARDWELL TWP RD L 32 C 3 - ] - Emergency Roadwork
Highway: HWY 141
Direction: Both Directions
From/At: CARDWELL TWP RD L 32 C 3
To:
Lanes Affected: All lanes closed
Traffic Impact :
Reason Emergency Roadwork
Comment : HWY 141 CLOSED 5 KMS EAST OF ROSSEAU AT ROSSEAU RIVER BRIDGE. DETOUR FOR HUNTSVILLE: TAKE CARDWELL RD TO HWY 11. DETOUR FOR BRACEBRIDGE: TAKE HWY 632 TO HWY 118W TO HWY 11. UPDATED SEPTEMBER 2, 2015 AT 15:00 HRS
Event Start: August 27, 2015 08:36
Event End:
Last Change: Updated 2015-09-02 15:06

Top of page Top of page


HWY 401 Eastbound [ MAITLAND RD (IC 705) - EDWARD ST (IC 716) ] - Collision
Highway: HWY 401
Direction: Eastbound
From/At: MAITLAND RD (IC 705)
To: EDWARD ST (IC 716)
Lanes Affected: All lanes closed
Traffic Impact :
Reason Collision
Comment : Maitland, West of Prescott - Detour Information: South on Maitland Rd, East on Cty Rd 2, then North on Edward St and back on HWY 401. **Tractor Trailers use HWY 16 to HWY 401**
Event Start: September 02, 2015 14:38
Event End:
Last Change: Updated 2015-09-02 15:31

Top of page Top of page


HWY 525 Northbound [ WHITE DOG FALLS DAM BR - ] - Other
Highway: HWY 525
Direction: Northbound
From/At: WHITE DOG FALLS DAM BR
To:
Lanes Affected: lane closed
Traffic Impact :
Reason Other
Comment : Ontario Power Generation will be resurfacing the road on the Whitedog Dam. As a result, Highway 525 at the dam will be closed for 10 hours each night 7:00 pm to 5:00 am Monday evening through Friday morning. The work begins July 6th and is expected to be completed October 23, 2015. Please note that during this construction period, all vehicles that cross the dam will be restricted to (five) metric tonnes per axle. We appreciate your patience while this work is being performed. For more information, please contact Ontario Power Generation at 807-346-5334.
Event Start: July 16, 2015 09:18
Event End:
Last Change: Updated 2015-08-28 08:14

Top of page Top of page


HWY 671 Southbound [ HWY 17A - ] - Other
Highway: HWY 671
Direction: Southbound
From/At: HWY 17A
To:
Lanes Affected: lane blocked
Traffic Impact :
Reason Other
Comment : On Hwy 671 approx 30 km North of Hwy 17A at John Lake the south bound lane is blocked for culvert replacement. One lane blockage will be in effect until Friday Sept 4th or till culvert replacement is completed.
Event Start: August 27, 2015 13:00
Event End:
Last Change: Updated 2015-08-31 12:56

Top of page Top of page


This information is provided as a public service. Although we endeavor to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.

Road information by phone

  • Provincial Call Centre: 1-800-268-4686
  • In GTA: 416-235-4686
  • Provincial TTY: 1-866-471-8929
  • Niagara Region TTY: 905-704-2426

See also:

Ontario 511 Logo