Unscheduled road closures and events for provincial highways:
Unscheduled Events
Scheduled Events
EAST MAIN ST WELLAND Eastbound [ WELLINGTON ST - WELLAND TUNNEL ] - Construction
Highway:
EAST MAIN ST WELLAND
Direction:
Eastbound
From/At:
WELLINGTON ST
To:
WELLAND TUNNEL
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 21, 2013 00:30
Event End:
May 27, 2013 00:30
Last Change:
Entered 2013-05-16 13:26
Top of page
EAST MAIN ST WELLAND Westbound [ WELLAND TUNNEL - WELLINGTON ST ] - Construction
Highway:
EAST MAIN ST WELLAND
Direction:
Westbound
From/At:
WELLAND TUNNEL
To:
WELLINGTON ST
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 21, 2013 00:30
Event End:
May 27, 2013 00:30
Last Change:
Entered 2013-05-16 13:29
Top of page
HWY 11 Northbound [ SIMCOE ROAD 169 - SIMCOE ROAD 169 ] - Recurring-Engineering Investigation
Highway:
HWY 11
Direction:
Northbound
From/At:
SIMCOE ROAD 169
To:
SIMCOE ROAD 169
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 28, 2013 21:00
Event End:
May 30, 2013 06:00
Last Change:
Entered 2013-05-22 13:57
Top of page
HWY 11 Northbound [ SIMCOE ROAD 169 - SIMCOE ROAD 169 ] - Recurring-Maintenance
Highway:
HWY 11
Direction:
Northbound
From/At:
SIMCOE ROAD 169
To:
SIMCOE ROAD 169
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 26, 2013 21:00
Event End:
May 28, 2013 06:00
Last Change:
Entered 2013-05-16 13:35
Top of page
HWY 11 Southbound [ COOPER FALLS ROAD/CANAL ROAD/COUNTY ROAD 52 - COOPER FALLS ROAD/CANAL ROAD/COUNTY ROAD 52 ] - Recurring-Engineering Investigation
Highway:
HWY 11
Direction:
Southbound
From/At:
COOPER FALLS ROAD/CANAL ROAD/COUNTY ROAD 52
To:
COOPER FALLS ROAD/CANAL ROAD/COUNTY ROAD 52
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 28, 2013 21:00
Event End:
May 30, 2013 06:00
Last Change:
Entered 2013-05-22 13:49
Top of page
HWY 11 Southbound [ GOLDSTEIN ROAD - GOLDSTEIN ROAD ] - Recurring-Construction
Highway:
HWY 11
Direction:
Southbound
From/At:
GOLDSTEIN ROAD
To:
GOLDSTEIN ROAD
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 28, 2013 21:00
Event End:
May 30, 2013 06:00
Last Change:
Entered 2013-05-22 13:47
Top of page
HWY 11 Southbound [ SHOREVIEW DRIVE - SHOREVIEW DRIVE ] - Recurring-Engineering Investigation
Highway:
HWY 11
Direction:
Southbound
From/At:
SHOREVIEW DRIVE
To:
SHOREVIEW DRIVE
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 28, 2013 21:00
Event End:
May 30, 2013 06:00
Last Change:
Entered 2013-05-22 13:54
Top of page
HWY 11 Southbound [ SHOREVIEW DRIVE - SHOREVIEW DRIVE ] - Recurring-Maintenance
Highway:
HWY 11
Direction:
Southbound
From/At:
SHOREVIEW DRIVE
To:
SHOREVIEW DRIVE
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 26, 2013 21:00
Event End:
May 28, 2013 06:00
Last Change:
Entered 2013-05-16 13:32
Top of page
HWY 12 Northbound [ DUFFY DRIVE - STURGEON RIVER BRIDGE ] - Recurring-Construction
Highway:
HWY 12
Direction:
Northbound
From/At:
DUFFY DRIVE
To:
STURGEON RIVER BRIDGE
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 22, 2013 09:00
Event End:
May 24, 2013 12:00
Last Change:
Entered 2013-05-16 17:12
Top of page
HWY 12 Northbound [ TRIPLE BAY ROAD/RUMNEY ROAD - WYE VALLEY ROAD ] - Maintenance
Highway:
HWY 12
Direction:
Northbound
From/At:
TRIPLE BAY ROAD/RUMNEY ROAD
To:
WYE VALLEY ROAD
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Maintenance
Event Start:
May 24, 2013 05:00
Event End:
May 24, 2013 07:00
Last Change:
Entered 2013-05-22 15:28
Top of page
HWY 12 Southbound [ STURGEON RIVER BRIDGE - DUFFY DRIVE ] - Construction
Highway:
HWY 12
Direction:
Southbound
From/At:
STURGEON RIVER BRIDGE
To:
DUFFY DRIVE
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 23, 2013 09:00
Event End:
August 23, 2013 15:00
Last Change:
Entered 2013-05-23 13:04
Top of page
HWY 12 Southbound [ STURGEON RIVER BRIDGE - DUFFY DRIVE ] - Recurring-Construction
Highway:
HWY 12
Direction:
Southbound
From/At:
STURGEON RIVER BRIDGE
To:
DUFFY DRIVE
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 22, 2013 09:00
Event End:
May 24, 2013 15:00
Last Change:
Entered 2013-05-16 17:12
Top of page
HWY 12 Southbound [ WYE VALLEY ROAD - TRIPLE BAY ROAD/RUMNEY ROAD ] - Recurring-Construction
Highway:
HWY 12
Direction:
Southbound
From/At:
WYE VALLEY ROAD
To:
TRIPLE BAY ROAD/RUMNEY ROAD
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 27, 2013 09:00
Event End:
May 27, 2013 15:00
Last Change:
Entered 2013-05-22 15:34
Top of page
HWY 26 Eastbound [ LAKEVIEW AVENUE - SIDE ROAD 30-31 NOTAWASSAGA ] - Recurring-Construction
Highway:
HWY 26
Direction:
Eastbound
From/At:
LAKEVIEW AVENUE
To:
SIDE ROAD 30-31 NOTAWASSAGA
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 12:00
Event End:
May 24, 2013 15:00
Last Change:
Entered 2013-05-16 09:43
Top of page
HWY 26 Eastbound [ LAKEVIEW AVENUE - SIDE ROAD 30-31 NOTAWASSAGA ] - Recurring-Maintenance
Highway:
HWY 26
Direction:
Eastbound
From/At:
LAKEVIEW AVENUE
To:
SIDE ROAD 30-31 NOTAWASSAGA
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 27, 2013 06:00
Event End:
May 31, 2013 15:00
Last Change:
Entered 2013-05-23 11:08
Top of page
HWY 26 Westbound [ SIDE ROAD 30-31 NOTAWASSAGA - LAKEVIEW AVENUE ] - Recurring-Construction
Highway:
HWY 26
Direction:
Westbound
From/At:
SIDE ROAD 30-31 NOTAWASSAGA
To:
LAKEVIEW AVENUE
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 12:00
Event End:
May 24, 2013 15:00
Last Change:
Entered 2013-05-16 09:47
Top of page
HWY 26 Westbound [ SIDE ROAD 30-31 NOTAWASSAGA - LAKEVIEW AVENUE ] - Recurring-Maintenance
Highway:
HWY 26
Direction:
Westbound
From/At:
SIDE ROAD 30-31 NOTAWASSAGA
To:
LAKEVIEW AVENUE
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 27, 2013 06:00
Event End:
May 31, 2013 15:00
Last Change:
Entered 2013-05-23 11:12
Top of page
HWY 3 Eastbound [ BERNARD AVENUE - BARKER AVENUE ] - Moving Maintenance Closure
Highway:
HWY 3
Direction:
Eastbound
From/At:
BERNARD AVENUE
To:
BARKER AVENUE
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Moving Maintenance Closure
Event Start:
May 27, 2013 09:00
Event End:
May 27, 2013 16:00
Last Change:
Entered 2013-05-22 07:18
Top of page
HWY 33 BOTH DIRECTIONS [Glenora Ferry Dock - Glenora Ferry Dock - west] - Maintenance
Highway:
HWY 33
Direction:
BOTH DIRECTIONS
From/At:
Glenora Ferry Dock
To:
Glenora Ferry Dock - west
Lanes Affected:
Road closed
Traffic Impact :
Severe
Reason
Maintenance
Event Start:
May 27, 2013 10:00
Event End:
May 27, 2013 14:00
Last Change:
ENTERED 2013-05-23 07:39
Top of page
HWY 34 BOTH DIRECTIONS [Nixon Boundary Rd - ] - Daily construction
Highway:
HWY 34
Direction:
BOTH DIRECTIONS
From/At:
Nixon Boundary Rd
To:
Lanes Affected:
Left shoulder and 1 left lane and 1 right lane and right shoulder
Traffic Impact :
Serious
Reason
Daily construction
Event Start:
May 21, 2013 09:30
Event End:
May 27, 2013 17:30
Last Change:
ENTERED 2013-05-19 08:56
Top of page
HWY 400 Northbound [ AURORA ROAD. - HWY 9 ] - Recurring-Moving Maintenance Closure
Highway:
HWY 400
Direction:
Northbound
From/At:
AURORA ROAD.
To:
HWY 9
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Moving Maintenance Closure
Event Start:
May 21, 2013 08:00
Event End:
May 24, 2013 14:00
Last Change:
Entered 2013-05-15 11:30
Top of page
HWY 400 Northbound [ CANAL ROAD. - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Engineering Investigation
Highway:
HWY 400
Direction:
Northbound
From/At:
CANAL ROAD.
To:
INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 26, 2013 21:00
Event End:
May 31, 2013 07:00
Last Change:
Entered 2013-05-23 09:23
Top of page
HWY 400 Northbound [ CANAL ROAD. - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Engineering Investigation
Highway:
HWY 400
Direction:
Northbound
From/At:
CANAL ROAD.
To:
INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 20, 2013 23:59
Event End:
May 24, 2013 07:00
Last Change:
Entered 2013-05-15 11:38
Top of page
HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Construction
Highway:
HWY 400
Direction:
Northbound
From/At:
DUCKWORTH STREET
To:
HWY 11 JCT
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 21, 2013 07:00
Event End:
May 24, 2013 11:00
Last Change:
Entered 2013-05-15 15:39
Top of page
HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Construction
Highway:
HWY 400
Direction:
Northbound
From/At:
DUCKWORTH STREET
To:
HWY 11 JCT
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 27, 2013 06:00
Event End:
May 31, 2013 11:00
Last Change:
Entered 2013-05-22 17:12
Top of page
HWY 400 Northbound [ DUNLOP STREET / SIMCOE ROAD 90 - DUNLOP STREET / SIMCOE ROAD 90 ] - Recurring-Maintenance
Highway:
HWY 400
Direction:
Northbound
From/At:
DUNLOP STREET / SIMCOE ROAD 90
To:
DUNLOP STREET / SIMCOE ROAD 90
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Off-ramp to DUNLOP STREET / SIMCOE ROAD 90 WB
Reason
Recurring-Maintenance
Event Start:
May 23, 2013 22:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-23 07:40
Top of page
HWY 400 Northbound [ FORBES ROAD/SIMCOE ROAD 11 - FORBES ROAD/SIMCOE ROAD 11 ] - Recurring-Construction
Highway:
HWY 400
Direction:
Northbound
From/At:
FORBES ROAD/SIMCOE ROAD 11
To:
FORBES ROAD/SIMCOE ROAD 11
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 07:00
Event End:
May 23, 2013 23:59
Last Change:
Entered 2013-05-17 11:31
Top of page
HWY 400 Northbound [ HORSESHOE VALLEY ROAD/SIMCOE ROAD 22 - HORSESHOE VALLEY ROAD/SIMCOE ROAD 22 ] - Recurring-Construction
Highway:
HWY 400
Direction:
Northbound
From/At:
HORSESHOE VALLEY ROAD/SIMCOE ROAD 22
To:
HORSESHOE VALLEY ROAD/SIMCOE ROAD 22
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 07:00
Event End:
May 24, 2013 12:00
Last Change:
Entered 2013-05-16 11:29
Top of page
HWY 400 Northbound [ HWY 11 JCT - PARTRIDGE SKI TRAIL ROAD ] - Construction
Highway:
HWY 400
Direction:
Northbound
From/At:
HWY 11 JCT
To:
PARTRIDGE SKI TRAIL ROAD
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 21, 2013 07:00
Event End:
May 24, 2013 11:00
Last Change:
Entered 2013-05-15 15:45
Top of page
HWY 400 Northbound [ HWY 11 JCT - PARTRIDGE SKI TRAIL ROAD ] - Construction
Highway:
HWY 400
Direction:
Northbound
From/At:
HWY 11 JCT
To:
PARTRIDGE SKI TRAIL ROAD
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 27, 2013 06:00
Event End:
May 31, 2013 11:00
Last Change:
Entered 2013-05-22 17:11
Top of page
HWY 400 Northbound [ HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9 - MOONSTONE ROAD/SIMCOE ROAD 19 ] - Construction
Highway:
HWY 400
Direction:
Northbound
From/At:
HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9
To:
MOONSTONE ROAD/SIMCOE ROAD 19
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 21, 2013 06:00
Event End:
May 24, 2013 12:00
Last Change:
Entered 2013-05-16 20:35
Top of page
HWY 400 Northbound [ HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9 - MOONSTONE ROAD/SIMCOE ROAD 19 ] - Construction
Highway:
HWY 400
Direction:
Northbound
From/At:
HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9
To:
MOONSTONE ROAD/SIMCOE ROAD 19
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 27, 2013 00:00
Event End:
May 31, 2013 12:00
Last Change:
Entered 2013-05-22 22:12
Top of page
HWY 400 Northbound Express [ MAPLE LEAF DRIVE Express - HWY 9 Express ] - Recurring-Moving Maintenance Closure
Highway:
HWY 400
Direction:
Northbound
From/At:
MAPLE LEAF DRIVE Express
To:
HWY 9 Express
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Moving Maintenance Closure
Event Start:
May 26, 2013 22:00
Event End:
May 31, 2013 05:00
Last Change:
Entered 2013-05-23 09:54
Top of page
HWY 400 Southbound [ DUNLOP STREET / SIMCOE ROAD 90 - DUNLOP STREET / SIMCOE ROAD 90 ] - Recurring-Maintenance
Highway:
HWY 400
Direction:
Southbound
From/At:
DUNLOP STREET / SIMCOE ROAD 90
To:
DUNLOP STREET / SIMCOE ROAD 90
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Off-ramp to DUNLOP STREET / SIMCOE ROAD 90 WB
Reason
Recurring-Maintenance
Event Start:
May 22, 2013 21:00
Event End:
May 24, 2013 05:00
Last Change:
Entered 2013-05-21 10:22
Top of page
HWY 400 Southbound [ FORBES ROAD/SIMCOE ROAD 11 - FORBES ROAD/SIMCOE ROAD 11 ] - Recurring-Construction
Highway:
HWY 400
Direction:
Southbound
From/At:
FORBES ROAD/SIMCOE ROAD 11
To:
FORBES ROAD/SIMCOE ROAD 11
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 09:00
Event End:
May 23, 2013 23:59
Last Change:
Entered 2013-05-16 11:50
Top of page
HWY 400 Southbound [ HORSESHOE VALLEY ROAD/SIMCOE ROAD 22 - HORSESHOE VALLEY ROAD/SIMCOE ROAD 22 ] - Recurring-Construction
Highway:
HWY 400
Direction:
Southbound
From/At:
HORSESHOE VALLEY ROAD/SIMCOE ROAD 22
To:
HORSESHOE VALLEY ROAD/SIMCOE ROAD 22
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 09:00
Event End:
May 24, 2013 12:00
Last Change:
Entered 2013-05-16 11:36
Top of page
HWY 400 Southbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - CANAL ROAD. ] - Recurring-Engineering Investigation
Highway:
HWY 400
Direction:
Southbound
From/At:
INNISFIL BEACH ROAD - SIMCOE ROAD 21
To:
CANAL ROAD.
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 21, 2013 20:00
Event End:
May 24, 2013 05:00
Last Change:
Entered 2013-05-15 11:46
Top of page
HWY 400 Southbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - CANAL ROAD. ] - Recurring-Engineering Investigation
Highway:
HWY 400
Direction:
Southbound
From/At:
INNISFIL BEACH ROAD - SIMCOE ROAD 21
To:
CANAL ROAD.
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 27, 2013 20:00
Event End:
May 31, 2013 05:00
Last Change:
Entered 2013-05-23 09:25
Top of page
HWY 400 Southbound [ MOONSTONE ROAD/SIMCOE ROAD 19 - HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9 ] - Construction
Highway:
HWY 400
Direction:
Southbound
From/At:
MOONSTONE ROAD/SIMCOE ROAD 19
To:
HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 27, 2013 09:00
Event End:
May 31, 2013 19:00
Last Change:
Entered 2013-05-22 22:15
Top of page
HWY 400 Southbound [ MOONSTONE ROAD/SIMCOE ROAD 19 - HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9 ] - Construction
Highway:
HWY 400
Direction:
Southbound
From/At:
MOONSTONE ROAD/SIMCOE ROAD 19
To:
HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 21, 2013 09:00
Event End:
May 24, 2013 17:00
Last Change:
Entered 2013-05-16 20:30
Top of page
HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Construction
Highway:
HWY 400
Direction:
Southbound
From/At:
PARTRIDGE SKI TRAIL ROAD
To:
HWY 11 JCT
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 21, 2013 07:00
Event End:
May 24, 2013 12:00
Last Change:
Entered 2013-05-15 15:44
Top of page
HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Construction
Highway:
HWY 400
Direction:
Southbound
From/At:
PARTRIDGE SKI TRAIL ROAD
To:
HWY 11 JCT
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 27, 2013 06:00
Event End:
May 31, 2013 12:00
Last Change:
Entered 2013-05-22 17:12
Top of page
HWY 400 Southbound [ SEVERN RIVER BRIDGE - PORT SEVERN ROAD ] - Recurring-Construction
Highway:
HWY 400
Direction:
Southbound
From/At:
SEVERN RIVER BRIDGE
To:
PORT SEVERN ROAD
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 27, 2013 08:00
Event End:
May 30, 2013 17:00
Last Change:
Entered 2013-05-17 12:15
Top of page
HWY 400 Southbound Express [ HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9 Express - MAPLE LEAF DRIVE Express ] - Recurring-Moving Maintenance Closure
Highway:
HWY 400
Direction:
Southbound
From/At:
HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9 Express
To:
MAPLE LEAF DRIVE Express
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Moving Maintenance Closure
Event Start:
May 26, 2013 23:00
Event End:
May 30, 2013 05:00
Last Change:
Entered 2013-05-23 10:14
Top of page
HWY 401 BOTH DIRECTIONS [Cty Rd 2 - West/b - ] - Daily construction
Highway:
HWY 401
Direction:
BOTH DIRECTIONS
From/At:
Cty Rd 2 - West/b
To:
Lanes Affected:
Left shoulder and 1 left lane and 1 right lane and right shoulder
Traffic Impact :
Serious
Reason
Daily construction
Event Start:
May 20, 2013 07:00
Event End:
June 28, 2013 19:00
Last Change:
UPDATED 2013-05-22 08:26
Top of page
HWY 401 BOTH DIRECTIONS [Deseronto Rd Cty Rd 10 - Shannonville Rd] - Daily construction
Highway:
HWY 401
Direction:
BOTH DIRECTIONS
From/At:
Deseronto Rd Cty Rd 10
To:
Shannonville Rd
Lanes Affected:
Right shoulder
Traffic Impact :
Serious
Reason
Daily construction
Event Start:
May 21, 2013 07:30
Event End:
May 23, 2013 19:00
Last Change:
CLEARED 2013-05-23 19:00
Top of page
HWY 401 Eastbound [ HWY 6 SOUTH - JAMES SNOW PKWY ] - Recurring-Engineering Investigation
Highway:
HWY 401
Direction:
Eastbound
From/At:
HWY 6 SOUTH
To:
JAMES SNOW PKWY
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
On-ramp from JAMES SNOW PKWY NB, On-ramp from HWY 25 NB
Reason
Recurring-Engineering Investigation
Event Start:
May 26, 2013 20:00
Event End:
June 01, 2013 06:00
Last Change:
Entered 2013-05-17 15:10
Top of page
HWY 401 Eastbound [ MAVIS ROAD - HWY 410 ] - Recurring-Construction
Highway:
HWY 401
Direction:
Eastbound
From/At:
MAVIS ROAD
To:
HWY 410
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
On-ramp from HWY 10 / HURONTARIO STREET NB/SB, Off-ramp to HWY 410 NB, Off-ramp to HWY 10 / HURONTARIO STREET NB/SB
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-16 06:17
Top of page
HWY 401 Eastbound [ MILL ST - MILL ST ] - Recurring-Construction
Highway:
HWY 401
Direction:
Eastbound
From/At:
MILL ST
To:
MILL ST
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Off-ramp to MILL ST NB/SB
Reason
Recurring-Construction
Event Start:
May 26, 2013 18:00
Event End:
May 31, 2013 11:00
Last Change:
Entered 2013-05-22 16:27
Top of page
HWY 401 Eastbound [ MILL ST - MILL ST ] - Recurring-Construction
Highway:
HWY 401
Direction:
Eastbound
From/At:
MILL ST
To:
MILL ST
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Off-ramp to MILL ST NB/SB
Reason
Recurring-Construction
Event Start:
May 21, 2013 18:00
Event End:
May 25, 2013 11:00
Last Change:
Entered 2013-05-16 13:44
Top of page
HWY 401 Eastbound [ MORGANS ROAD - MORGANS ROAD ] - Recurring-Construction
Highway:
HWY 401
Direction:
Eastbound
From/At:
MORGANS ROAD
To:
MORGANS ROAD
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 18:00
Event End:
May 25, 2013 12:00
Last Change:
Entered 2013-05-16 13:52
Top of page
HWY 401 Eastbound [ MORGANS ROAD - MORGANS ROAD ] - Recurring-Construction
Highway:
HWY 401
Direction:
Eastbound
From/At:
MORGANS ROAD
To:
MORGANS ROAD
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 18:00
Event End:
May 31, 2013 12:00
Last Change:
Entered 2013-05-22 16:36
Top of page
HWY 401 Eastbound Collector [ LESLIE STREET Collector - DON MILLS ROAD Collector ] - Recurring-Maintenance
Highway:
HWY 401
Direction:
Eastbound
From/At:
LESLIE STREET Collector
To:
DON MILLS ROAD Collector
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 23, 2013 10:00
Event End:
May 24, 2013 14:00
Last Change:
Entered 2013-05-22 14:08
Top of page
HWY 401 Eastbound Collector [ TOMKEN ROAD Collector - DIXIE ROAD Collector ] - Recurring-Construction
Highway:
HWY 401
Direction:
Eastbound
From/At:
TOMKEN ROAD Collector
To:
DIXIE ROAD Collector
Lanes Affected:
2 Right Lane(s)
Traffic Impact :
On-ramp from DIXIE ROAD WB
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-16 06:48
Top of page
HWY 401 Eastbound Collector Off-ramp [ - DUFFERIN STREET Northbound/Southbound ] - Construction
Highway:
HWY 401
Direction:
Eastbound
From/At:
To:
DUFFERIN STREET Northbound/Southbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Construction
Event Start:
May 20, 2013 23:00
Event End:
May 25, 2013 05:30
Last Change:
Entered 2013-05-17 10:48
Top of page
HWY 401 Eastbound Collector Off-ramp [ - DUFFERIN STREET Northbound/Southbound ] - Construction
Highway:
HWY 401
Direction:
Eastbound
From/At:
To:
DUFFERIN STREET Northbound/Southbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Construction
Event Start:
May 25, 2013 23:59
Event End:
May 26, 2013 06:30
Last Change:
Entered 2013-05-22 14:18
Top of page
HWY 401 Eastbound Express [ TOMKEN ROAD Express - DIXIE ROAD Express ] - Recurring-Construction
Highway:
HWY 401
Direction:
Eastbound
From/At:
TOMKEN ROAD Express
To:
DIXIE ROAD Express
Lanes Affected:
2 Right Lane(s)
Traffic Impact :
On-ramp from HWY 403 NB
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-16 06:45
Top of page
HWY 401 Eastbound On-ramp [ MARKHAM ROAD Southbound - ] - Recurring-Maintenance
Highway:
HWY 401
Direction:
Eastbound
From/At:
MARKHAM ROAD Southbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 22, 2013 22:00
Event End:
May 24, 2013 05:00
Last Change:
Entered 2013-05-17 07:31
Top of page
HWY 401 Eastbound Transfer [ BAYVIEW AVE Express to Collector - ] - Recurring-Maintenance
Highway:
HWY 401
Direction:
Eastbound
From/At:
BAYVIEW AVE Express to Collector
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 23, 2013 00:00
Event End:
May 24, 2013 05:00
Last Change:
Entered 2013-05-21 09:05
Top of page
HWY 401 Westbound [ HOLT ROAD - HOLT ROAD ] - Recurring-Maintenance
Highway:
HWY 401
Direction:
Westbound
From/At:
HOLT ROAD
To:
HOLT ROAD
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
On-ramp from HOLT ROAD NB/SB
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 21:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-15 14:00
Top of page
HWY 401 Westbound [ HWY 410 - MAVIS ROAD ] - Recurring-Construction
Highway:
HWY 401
Direction:
Westbound
From/At:
HWY 410
To:
MAVIS ROAD
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
On-ramp from HWY 10 / HURONTARIO STREET NB, On-ramp from HWY 10 / HURONTARIO STREET SB, Off-ramp to HWY 10 / HURONTARIO STREET EB
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-16 06:59
Top of page
HWY 401 Westbound [ JAMES SNOW PKWY - HWY 6 SOUTH ] - Recurring-Engineering Investigation
Highway:
HWY 401
Direction:
Westbound
From/At:
JAMES SNOW PKWY
To:
HWY 6 SOUTH
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
On-ramp from JAMES SNOW PKWY SB, On-ramp from HWY 25 SB
Reason
Recurring-Engineering Investigation
Event Start:
May 26, 2013 20:00
Event End:
June 01, 2013 07:00
Last Change:
Entered 2013-05-17 15:58
Top of page
HWY 401 Westbound [ MILL ST - MILL ST ] - Recurring-Construction
Highway:
HWY 401
Direction:
Westbound
From/At:
MILL ST
To:
MILL ST
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 17:00
Event End:
May 25, 2013 14:00
Last Change:
Entered 2013-05-16 13:47
Top of page
HWY 401 Westbound [ MILL ST - MILL ST ] - Recurring-Construction
Highway:
HWY 401
Direction:
Westbound
From/At:
MILL ST
To:
MILL ST
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 17:00
Event End:
May 31, 2013 14:00
Last Change:
Entered 2013-05-22 16:30
Top of page
HWY 401 Westbound [ MORGANS ROAD - MORGANS ROAD ] - Recurring-Construction
Highway:
HWY 401
Direction:
Westbound
From/At:
MORGANS ROAD
To:
MORGANS ROAD
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 17:00
Event End:
May 25, 2013 14:00
Last Change:
Entered 2013-05-16 13:54
Top of page
HWY 401 Westbound [ MORGANS ROAD - MORGANS ROAD ] - Recurring-Construction
Highway:
HWY 401
Direction:
Westbound
From/At:
MORGANS ROAD
To:
MORGANS ROAD
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 17:00
Event End:
May 31, 2013 14:00
Last Change:
Entered 2013-05-22 16:38
Top of page
HWY 401 Westbound [Gardiners Cty Rd 38 - Camden East Rd] - Nightly construction
Highway:
HWY 401
Direction:
Westbound
From/At:
Gardiners Cty Rd 38
To:
Camden East Rd
Lanes Affected:
Left shoulder and 1 left lane
Traffic Impact :
Serious
Reason
Nightly construction
Event Start:
May 21, 2013 18:00
Event End:
May 24, 2013 12:00
Last Change:
ENTERED 2013-05-16 08:38
Top of page
HWY 401 Westbound Collector [ DIXIE ROAD Collector - TOMKEN ROAD Collector ] - Recurring-Construction
Highway:
HWY 401
Direction:
Westbound
From/At:
DIXIE ROAD Collector
To:
TOMKEN ROAD Collector
Lanes Affected:
2 Right Lane(s)
Traffic Impact :
Off-ramp to HWY 403 NB
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-16 06:36
Top of page
HWY 401 Westbound Express [ DIXIE ROAD Express - TOMKEN ROAD Express ] - Recurring-Construction
Highway:
HWY 401
Direction:
Westbound
From/At:
DIXIE ROAD Express
To:
TOMKEN ROAD Express
Lanes Affected:
2 Right Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-16 06:37
Top of page
HWY 401 Westbound On-ramp [ EGLINTON AVE Westbound - ] - Engineering Investigation
Highway:
HWY 401
Direction:
Westbound
From/At:
EGLINTON AVE Westbound
To:
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Engineering Investigation
Event Start:
May 23, 2013 21:00
Event End:
May 23, 2013 23:59
Last Change:
Entered 2013-05-21 14:24
Top of page
HWY 401 Westbound On-ramp [ ISLINGTON AVE Northbound - ] - Recurring-Construction
Highway:
HWY 401
Direction:
Westbound
From/At:
ISLINGTON AVE Northbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 23, 2013 22:00
Event End:
May 25, 2013 08:00
Last Change:
Entered 2013-05-23 08:06
Top of page
HWY 401 Westbound On-ramp [ ISLINGTON AVE Southbound - ] - Recurring-Construction
Highway:
HWY 401
Direction:
Westbound
From/At:
ISLINGTON AVE Southbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 22:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-21 08:11
Top of page
HWY 403 HAMILTON Eastbound [ LEMONVILLE ROAD - LEMONVILLE ROAD ] - Recurring-Maintenance
Highway:
HWY 403 HAMILTON
Direction:
Eastbound
From/At:
LEMONVILLE ROAD
To:
LEMONVILLE ROAD
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 20:00
Event End:
May 25, 2013 07:00
Last Change:
Entered 2013-05-12 18:43
Top of page
HWY 403 HAMILTON Eastbound [ LEMONVILLE ROAD - WATERDOWN ROAD ] - Recurring-Construction
Highway:
HWY 403 HAMILTON
Direction:
Eastbound
From/At:
LEMONVILLE ROAD
To:
WATERDOWN ROAD
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 20:00
Event End:
June 01, 2013 07:00
Last Change:
Entered 2013-05-23 10:48
Top of page
HWY 403 HAMILTON Eastbound [ WATERDOWN ROAD - WATERDOWN ROAD ] - Recurring-Maintenance
Highway:
HWY 403 HAMILTON
Direction:
Eastbound
From/At:
WATERDOWN ROAD
To:
WATERDOWN ROAD
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 22:00
Event End:
May 25, 2013 07:00
Last Change:
Entered 2013-05-12 18:42
Top of page
HWY 403 HAMILTON Westbound [ LEMONVILLE ROAD - LEMONVILLE ROAD ] - Recurring-Maintenance
Highway:
HWY 403 HAMILTON
Direction:
Westbound
From/At:
LEMONVILLE ROAD
To:
LEMONVILLE ROAD
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 22:00
Event End:
May 25, 2013 08:00
Last Change:
Entered 2013-05-12 18:46
Top of page
HWY 403 HAMILTON Westbound [ WATERDOWN ROAD - LEMONVILLE ROAD ] - Recurring-Construction
Highway:
HWY 403 HAMILTON
Direction:
Westbound
From/At:
WATERDOWN ROAD
To:
LEMONVILLE ROAD
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 22:00
Event End:
June 01, 2013 08:00
Last Change:
Entered 2013-05-23 10:53
Top of page
HWY 403 HAMILTON Westbound [ WATERDOWN ROAD - WATERDOWN ROAD ] - Recurring-Maintenance
Highway:
HWY 403 HAMILTON
Direction:
Westbound
From/At:
WATERDOWN ROAD
To:
WATERDOWN ROAD
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 22:00
Event End:
May 25, 2013 08:00
Last Change:
Entered 2013-05-12 18:46
Top of page
HWY 403 MISSISSAUGA Eastbound [ FORD DRIVE/ROYAL WINDSOR DRIVE - HWY 407 ETR ] - Recurring-Construction
Highway:
HWY 403 MISSISSAUGA
Direction:
Eastbound
From/At:
FORD DRIVE/ROYAL WINDSOR DRIVE
To:
HWY 407 ETR
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Off-ramp to FORD DRIVE/ROYAL WINDSOR DRIVE EB, Off-ramp to DUNDAS STREET EB, Off-ramp to HWY 407 ETR EB
Reason
Recurring-Construction
Event Start:
May 21, 2013 23:00
Event End:
May 24, 2013 05:00
Last Change:
Entered 2013-05-10 13:15
Top of page
HWY 403 MISSISSAUGA Eastbound [ FORD DRIVE/ROYAL WINDSOR DRIVE - HWY 407 ETR ] - Recurring-Construction
Highway:
HWY 403 MISSISSAUGA
Direction:
Eastbound
From/At:
FORD DRIVE/ROYAL WINDSOR DRIVE
To:
HWY 407 ETR
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Off-ramp to DUNDAS STREET EB, Off-ramp to FORD DRIVE/ROYAL WINDSOR DRIVE EB, Off-ramp to HWY 407 ETR EB
Reason
Recurring-Construction
Event Start:
May 26, 2013 23:00
Event End:
May 31, 2013 05:00
Last Change:
Entered 2013-05-21 11:52
Top of page
HWY 403 MISSISSAUGA Eastbound Collector [ CAWTHRA ROAD Collector - EGLINTON AVE Collector ] - Recurring-Construction
Highway:
HWY 403 MISSISSAUGA
Direction:
Eastbound
From/At:
CAWTHRA ROAD Collector
To:
EGLINTON AVE Collector
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 23, 2013 23:00
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-15 16:24
Top of page
HWY 403 MISSISSAUGA Eastbound Collector [ EGLINTON AVE Collector - MATHESON BLVD Collector ] - Recurring-Construction
Highway:
HWY 403 MISSISSAUGA
Direction:
Eastbound
From/At:
EGLINTON AVE Collector
To:
MATHESON BLVD Collector
Lanes Affected:
3 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 23, 2013 23:00
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-15 15:48
Top of page
HWY 403 MISSISSAUGA Eastbound Collector [ MATHESON BLVD Collector - HWY 401 Collector ] - Recurring-Construction
Highway:
HWY 403 MISSISSAUGA
Direction:
Eastbound
From/At:
MATHESON BLVD Collector
To:
HWY 401 Collector
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 23, 2013 23:00
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-15 16:07
Top of page
HWY 403 MISSISSAUGA Eastbound On-ramp [ EGLINTON AVE Eastbound - ] - Recurring-Construction
Highway:
HWY 403 MISSISSAUGA
Direction:
Eastbound
From/At:
EGLINTON AVE Eastbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 23, 2013 23:00
Event End:
May 25, 2013 05:30
Last Change:
Entered 2013-05-15 15:32
Top of page
HWY 403 MISSISSAUGA Westbound [ BURNHAMTHORPE ROAD - DUNDAS STREET ] - Recurring-Construction
Highway:
HWY 403 MISSISSAUGA
Direction:
Westbound
From/At:
BURNHAMTHORPE ROAD
To:
DUNDAS STREET
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Off-ramp to DUNDAS STREET WB
Reason
Recurring-Construction
Event Start:
May 21, 2013 22:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-10 13:18
Top of page
HWY 403 MISSISSAUGA Westbound [ BURNHAMTHORPE ROAD - DUNDAS STREET ] - Recurring-Construction
Highway:
HWY 403 MISSISSAUGA
Direction:
Westbound
From/At:
BURNHAMTHORPE ROAD
To:
DUNDAS STREET
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Off-ramp to DUNDAS STREET WB
Reason
Recurring-Construction
Event Start:
May 26, 2013 22:00
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-21 11:54
Top of page
HWY 403 MISSISSAUGA Westbound Collector [ EGLINTON AVE Collector - EGLINTON AVE Collector ] - Construction
Highway:
HWY 403 MISSISSAUGA
Direction:
Westbound
From/At:
EGLINTON AVE Collector
To:
EGLINTON AVE Collector
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 23, 2013 23:00
Event End:
May 24, 2013 05:30
Last Change:
Entered 2013-05-23 15:12
Top of page
HWY 403 MISSISSAUGA Westbound Express [ HWY 401 Express - MATHESON BLVD Express ] - Recurring-Construction
Highway:
HWY 403 MISSISSAUGA
Direction:
Westbound
From/At:
HWY 401 Express
To:
MATHESON BLVD Express
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 22, 2013 23:59
Event End:
May 24, 2013 05:00
Last Change:
Entered 2013-05-15 14:04
Top of page
HWY 404 Southbound [ MAJOR MACKENZIE DRIVE - HWY 401 ] - Moving Maintenance Closure
Highway:
HWY 404
Direction:
Southbound
From/At:
MAJOR MACKENZIE DRIVE
To:
HWY 401
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
On-ramp from MAJOR MACKENZIE DRIVE SB
Reason
Moving Maintenance Closure
Event Start:
May 23, 2013 22:00
Event End:
May 24, 2013 05:00
Last Change:
Entered 2013-05-21 10:21
Top of page
HWY 404 Southbound Collector [ SHEPPARD AVE Collector - HWY 401 Collector ] - Maintenance
Highway:
HWY 404
Direction:
Southbound
From/At:
SHEPPARD AVE Collector
To:
HWY 401 Collector
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Maintenance
Event Start:
May 23, 2013 22:00
Event End:
May 24, 2013 05:00
Last Change:
Entered 2013-05-21 10:28
Top of page
HWY 405 Eastbound [ STANLEY AVE - LEWISTON QUEENSTON BRIDGE ] - Construction
Highway:
HWY 405
Direction:
Eastbound
From/At:
STANLEY AVE
To:
LEWISTON QUEENSTON BRIDGE
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 08, 2013 00:00
Event End:
August 31, 2013 17:00
Last Change:
Entered 2013-05-06 09:59
Top of page
HWY 406 Northbound [ BEAVERDAMS ROAD - ST DAVID'S ROAD ] - Recurring-Construction
Highway:
HWY 406
Direction:
Northbound
From/At:
BEAVERDAMS ROAD
To:
ST DAVID'S ROAD
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 00:00
Event End:
May 24, 2013 23:59
Last Change:
Entered 2013-05-15 15:00
Top of page
HWY 406 Northbound [ BEAVERDAMS ROAD - ST DAVID'S ROAD ] - Recurring-Construction
Highway:
HWY 406
Direction:
Northbound
From/At:
BEAVERDAMS ROAD
To:
ST DAVID'S ROAD
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 27, 2013 00:00
Event End:
May 31, 2013 12:00
Last Change:
Entered 2013-05-22 14:22
Top of page
HWY 406 Northbound Off-ramp [ - BEAVERDAMS ROAD Eastbound/Westbound ] - Recurring-Construction
Highway:
HWY 406
Direction:
Northbound
From/At:
To:
BEAVERDAMS ROAD Eastbound/Westbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 00:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-15 15:03
Top of page
HWY 406 Northbound Off-ramp [ - BEAVERDAMS ROAD Eastbound/Westbound ] - Recurring-Construction
Highway:
HWY 406
Direction:
Northbound
From/At:
To:
BEAVERDAMS ROAD Eastbound/Westbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 27, 2013 00:00
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-22 14:45
Top of page
HWY 406 Northbound Off-ramp [ - HWY 58 Eastbound ] - Recurring-Construction
Highway:
HWY 406
Direction:
Northbound
From/At:
To:
HWY 58 Eastbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 22:00
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-22 14:32
Top of page
HWY 406 Northbound Off-ramp [ - HWY 58 Eastbound ] - Recurring-Construction
Highway:
HWY 406
Direction:
Northbound
From/At:
To:
HWY 58 Eastbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-15 15:01
Top of page
HWY 406 Northbound Off-ramp [ - ST DAVID'S ROAD Westbound ] - Recurring-Construction
Highway:
HWY 406
Direction:
Northbound
From/At:
To:
ST DAVID'S ROAD Westbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 22:00
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-22 14:30
Top of page
HWY 406 Northbound Off-ramp [ - ST DAVID'S ROAD Westbound ] - Recurring-Construction
Highway:
HWY 406
Direction:
Northbound
From/At:
To:
ST DAVID'S ROAD Westbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-15 15:01
Top of page
HWY 406 Northbound On-ramp [ BEAVERDAMS ROAD Eastbound/Westbound - ] - Recurring-Construction
Highway:
HWY 406
Direction:
Northbound
From/At:
BEAVERDAMS ROAD Eastbound/Westbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 00:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-15 15:02
Top of page
HWY 406 Northbound On-ramp [ BEAVERDAMS ROAD Eastbound/Westbound - ] - Recurring-Construction
Highway:
HWY 406
Direction:
Northbound
From/At:
BEAVERDAMS ROAD Eastbound/Westbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 27, 2013 00:00
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-22 14:43
Top of page
HWY 406 Southbound [ PORT ROBINSON ROAD - WOODLAWN ROAD ] - Recurring-Maintenance
Highway:
HWY 406
Direction:
Southbound
From/At:
PORT ROBINSON ROAD
To:
WOODLAWN ROAD
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 22:00
Event End:
May 25, 2013 06:00
Last Change:
Entered 2013-05-17 07:35
Top of page
HWY 406 Southbound [ ST DAVID'S ROAD - BEAVERDAMS ROAD ] - Construction
Highway:
HWY 406
Direction:
Southbound
From/At:
ST DAVID'S ROAD
To:
BEAVERDAMS ROAD
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 27, 2013 00:00
Event End:
May 31, 2013 12:00
Last Change:
Entered 2013-05-22 14:21
Top of page
HWY 406 Southbound [ ST DAVID'S ROAD - BEAVERDAMS ROAD ] - Construction
Highway:
HWY 406
Direction:
Southbound
From/At:
ST DAVID'S ROAD
To:
BEAVERDAMS ROAD
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 21, 2013 00:00
Event End:
May 24, 2013 23:59
Last Change:
Entered 2013-05-15 14:59
Top of page
HWY 406 Southbound [ WOODLAWN ROAD - EAST MAIN STREET ] - Recurring-Construction
Highway:
HWY 406
Direction:
Southbound
From/At:
WOODLAWN ROAD
To:
EAST MAIN STREET
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 19:00
Event End:
May 25, 2013 06:00
Last Change:
Entered 2013-05-16 13:02
Top of page
HWY 406 Southbound Off-ramp [ - BEAVERDAMS ROAD Eastbound/Westbound ] - Recurring-Construction
Highway:
HWY 406
Direction:
Southbound
From/At:
To:
BEAVERDAMS ROAD Eastbound/Westbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 00:00
Event End:
May 24, 2013 23:30
Last Change:
Entered 2013-05-15 15:03
Top of page
HWY 406 Southbound Off-ramp [ - BEAVERDAMS ROAD Eastbound/Westbound ] - Recurring-Construction
Highway:
HWY 406
Direction:
Southbound
From/At:
To:
BEAVERDAMS ROAD Eastbound/Westbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 27, 2013 00:00
Event End:
May 31, 2013 23:59
Last Change:
Entered 2013-05-22 14:46
Top of page
HWY 406 Southbound Off-ramp [ - MERRITT ROAD Westbound ] - Maintenance
Highway:
HWY 406
Direction:
Southbound
From/At:
To:
MERRITT ROAD Westbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Maintenance
Event Start:
May 21, 2013 00:30
Event End:
May 27, 2013 00:30
Last Change:
Entered 2013-05-16 13:09
Top of page
HWY 406 Southbound On-ramp [ BEAVERDAMS ROAD Eastbound/Westbound - ] - Recurring-Construction
Highway:
HWY 406
Direction:
Southbound
From/At:
BEAVERDAMS ROAD Eastbound/Westbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 00:00
Event End:
May 24, 2013 00:00
Last Change:
Entered 2013-05-15 15:04
Top of page
HWY 406 Southbound On-ramp [ BEAVERDAMS ROAD Eastbound/Westbound - ] - Recurring-Construction
Highway:
HWY 406
Direction:
Southbound
From/At:
BEAVERDAMS ROAD Eastbound/Westbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 27, 2013 00:00
Event End:
May 31, 2013 23:59
Last Change:
Entered 2013-05-22 14:46
Top of page
HWY 406 Southbound On-ramp [ HWY 58 Westbound - ] - Recurring-Construction
Highway:
HWY 406
Direction:
Southbound
From/At:
HWY 58 Westbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-15 15:00
Top of page
HWY 406 Southbound On-ramp [ HWY 58 Westbound - ] - Recurring-Construction
Highway:
HWY 406
Direction:
Southbound
From/At:
HWY 58 Westbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 22:00
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-22 14:29
Top of page
HWY 406 Southbound On-ramp [ ST DAVID'S ROAD Eastbound/Westbound - ] - Recurring-Construction
Highway:
HWY 406
Direction:
Southbound
From/At:
ST DAVID'S ROAD Eastbound/Westbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-15 15:02
Top of page
HWY 406 Southbound On-ramp [ ST DAVID'S ROAD Eastbound/Westbound - ] - Recurring-Construction
Highway:
HWY 406
Direction:
Southbound
From/At:
ST DAVID'S ROAD Eastbound/Westbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 23:59
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-22 14:37
Top of page
HWY 407 ETR Eastbound [ BRONTE ROAD - YORK/DURHAM ROAD 30 ] - Moving Maintenance Closure
Highway:
HWY 407 ETR
Direction:
Eastbound
From/At:
BRONTE ROAD
To:
YORK/DURHAM ROAD 30
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Moving Maintenance Closure
Event Start:
May 21, 2013 21:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-21 13:23
Top of page
HWY 407 ETR Eastbound [ HWY 427 - HWY 427 ] - Recurring-Construction
Highway:
HWY 407 ETR
Direction:
Eastbound
From/At:
HWY 427
To:
HWY 427
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 09:00
Event End:
May 31, 2013 15:00
Last Change:
Entered 2013-05-17 14:05
Top of page
HWY 407 ETR Eastbound On-ramp [ GOREWAY DRIVE Northbound - ] - Recurring-Maintenance
Highway:
HWY 407 ETR
Direction:
Eastbound
From/At:
GOREWAY DRIVE Northbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 09:00
Event End:
May 24, 2013 15:00
Last Change:
Entered 2013-05-21 14:05
Top of page
HWY 407 ETR Westbound [ HWY 400 - HWY 400 ] - Recurring-Construction
Highway:
HWY 407 ETR
Direction:
Westbound
From/At:
HWY 400
To:
HWY 400
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 09:00
Event End:
May 31, 2013 15:00
Last Change:
Entered 2013-05-17 14:01
Top of page
HWY 407 ETR Westbound [ YORK/DURHAM ROAD 30 - BRONTE ROAD ] - Moving Maintenance Closure
Highway:
HWY 407 ETR
Direction:
Westbound
From/At:
YORK/DURHAM ROAD 30
To:
BRONTE ROAD
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Moving Maintenance Closure
Event Start:
May 21, 2013 21:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-21 13:25
Top of page
HWY 407 ETR Westbound On-ramp [ HWY 400 Northbound - ] - Maintenance
Highway:
HWY 407 ETR
Direction:
Westbound
From/At:
HWY 400 Northbound
To:
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Maintenance
Event Start:
May 24, 2013 21:00
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-22 11:09
Top of page
HWY 407 ETR Westbound On-ramp [ HWY 400 Northbound - ] - Recurring-Maintenance
Highway:
HWY 407 ETR
Direction:
Westbound
From/At:
HWY 400 Northbound
To:
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 03, 2013 09:00
Event End:
May 31, 2013 15:00
Last Change:
Entered 2013-05-03 11:07
Top of page
HWY 410 Northbound [ HWY 401 - HWY 401 ] - Recurring-Construction
Highway:
HWY 410
Direction:
Northbound
From/At:
HWY 401
To:
HWY 401
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-16 06:33
Top of page
HWY 410 Northbound [ HWY 401 - HWY 401 ] - Recurring-Construction
Highway:
HWY 410
Direction:
Northbound
From/At:
HWY 401
To:
HWY 401
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 22:00
Event End:
June 01, 2013 05:00
Last Change:
Entered 2013-05-23 13:27
Top of page
HWY 410 Southbound [ HWY 401 - HWY 401 ] - Recurring-Construction
Highway:
HWY 410
Direction:
Southbound
From/At:
HWY 401
To:
HWY 401
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Off-ramp to HWY 401 EB
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-16 06:31
Top of page
HWY 417 Eastbound [Boundary Rd - ] - Daily construction
Highway:
HWY 417
Direction:
Eastbound
From/At:
Boundary Rd
To:
Lanes Affected:
Left shoulder and 1 left lane
Traffic Impact :
Serious
Reason
Daily construction
Event Start:
May 21, 2013 07:00
Event End:
May 31, 2013 15:00
Last Change:
ENTERED 2013-05-15 09:32
Top of page
HWY 417 Eastbound [Richmond Rd - Pinecrest Ave] - Nightly construction
Highway:
HWY 417
Direction:
Eastbound
From/At:
Richmond Rd
To:
Pinecrest Ave
Lanes Affected:
Left shoulder and 1 left lane and 1 right lane and right shoulder
Traffic Impact :
Serious
Reason
Nightly construction
Event Start:
June 10, 2013 22:00
Event End:
June 14, 2013 06:00
Last Change:
ENTERED 2013-05-22 11:19
Top of page
HWY 417 Eastbound [Rochester St East - Bronson Ave] - Nightly construction
Highway:
HWY 417
Direction:
Eastbound
From/At:
Rochester St East
To:
Bronson Ave
Lanes Affected:
1 right lane and right shoulder
Traffic Impact :
Serious
Reason
Nightly construction
Event Start:
May 22, 2013 23:00
Event End:
May 25, 2013 05:00
Last Change:
UPDATED 2013-05-22 11:15
Top of page
HWY 417 Westbound [Moodie Dr - ] - Maintenance
Highway:
HWY 417
Direction:
Westbound
From/At:
Moodie Dr
To:
Lanes Affected:
1 right lane and right shoulder
Traffic Impact :
Moderate
Reason
Maintenance
Event Start:
May 24, 2013 10:00
Event End:
May 24, 2013 14:30
Last Change:
ENTERED 2013-05-23 15:12
Top of page
HWY 420 Eastbound [ MONTROSE ROAD - STANLEY AVE ] - Moving Maintenance Closure
Highway:
HWY 420
Direction:
Eastbound
From/At:
MONTROSE ROAD
To:
STANLEY AVE
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Moving Maintenance Closure
Event Start:
May 27, 2013 19:00
Event End:
May 28, 2013 06:00
Last Change:
Entered 2013-05-23 09:37
Top of page
HWY 420 Westbound [ STANLEY AVE - MONTROSE ROAD ] - Moving Maintenance Closure
Highway:
HWY 420
Direction:
Westbound
From/At:
STANLEY AVE
To:
MONTROSE ROAD
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Moving Maintenance Closure
Event Start:
May 27, 2013 19:00
Event End:
May 28, 2013 07:00
Last Change:
Entered 2013-05-23 10:19
Top of page
HWY 427 Northbound Collector [ BROWN'S LINE Collector - HWY 401 Collector ] - Recurring-Construction
Highway:
HWY 427
Direction:
Northbound
From/At:
BROWN'S LINE Collector
To:
HWY 401 Collector
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Off-ramp to BURNHAMTHORPE ROAD EB/WB, On-ramp from DUNDAS STREET EB, On-ramp from EVANS AVE EB/WB, On-ramp from QUEENSWAY AVENUE EB, On-ramp from QUEENSWAY AVENUE WB, On-ramp from DUNDAS STREET WB, On-ramp from GIBBS ROAD WB, Off-ramp to VALHALLA ROAD EB, Off-ramp to DUNDAS STREET EB/WB, On-ramp from BROWN'S LINE NB
Reason
Recurring-Construction
Event Start:
May 26, 2013 20:00
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-22 19:50
Top of page
HWY 427 Northbound Collector [ BROWN'S LINE Collector - HWY 401 Collector ] - Recurring-Construction
Highway:
HWY 427
Direction:
Northbound
From/At:
BROWN'S LINE Collector
To:
HWY 401 Collector
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
On-ramp from DUNDAS STREET EB, On-ramp from EVANS AVE EB/WB, On-ramp from BROWN'S LINE NB, On-ramp from DUNDAS STREET WB, Off-ramp to DUNDAS STREET EB/WB, Off-ramp to BURNHAMTHORPE ROAD EB/WB
Reason
Recurring-Construction
Event Start:
May 21, 2013 21:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-15 14:36
Top of page
HWY 427 Northbound Collector Off-ramp [ - EGLINTON AVE Westbound ] - Maintenance
Highway:
HWY 427
Direction:
Northbound
From/At:
To:
EGLINTON AVE Westbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Maintenance
Event Start:
April 08, 2013 00:00
Event End:
August 05, 2013 06:00
Last Change:
Entered 2013-04-08 14:02
Top of page
HWY 427 Northbound Collector Off-ramp [ - RATHBURN ROAD Westbound ] - Construction
Highway:
HWY 427
Direction:
Northbound
From/At:
To:
RATHBURN ROAD Westbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Construction
Event Start:
May 27, 2013 00:00
Event End:
June 09, 2013 23:59
Last Change:
Entered 2013-05-22 20:07
Top of page
HWY 427 Northbound Express [ QUEENSWAY AVENUE Express - RATHBURN ROAD Express ] - Recurring-Construction
Highway:
HWY 427
Direction:
Northbound
From/At:
QUEENSWAY AVENUE Express
To:
RATHBURN ROAD Express
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 20:00
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-22 19:35
Top of page
HWY 427 Northbound Off-ramp [ - HWY 401 Westbound ] - Recurring-Engineering Investigation
Highway:
HWY 427
Direction:
Northbound
From/At:
To:
HWY 401 Westbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 24, 2013 00:00
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-13 13:10
Top of page
HWY 427 Northbound Transfer [ DUNDAS STREET Collector to Express - ] - Recurring-Construction
Highway:
HWY 427
Direction:
Northbound
From/At:
DUNDAS STREET Collector to Express
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 20:00
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-22 19:54
Top of page
HWY 427 Northbound Transfer [ DUNDAS STREET Express to Collector - ] - Recurring-Construction
Highway:
HWY 427
Direction:
Northbound
From/At:
DUNDAS STREET Express to Collector
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 20:00
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-22 19:53
Top of page
HWY 427 Southbound Collector [ BURNHAMTHORPE ROAD Collector - BLOOR STREET Collector ] - Recurring-Maintenance
Highway:
HWY 427
Direction:
Southbound
From/At:
BURNHAMTHORPE ROAD Collector
To:
BLOOR STREET Collector
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 21:00
Event End:
May 25, 2013 06:00
Last Change:
Entered 2013-05-15 16:41
Top of page
HWY 427 Southbound Collector [ BURNHAMTHORPE ROAD Collector - BURNHAMTHORPE ROAD Collector ] - Recurring-Construction
Highway:
HWY 427
Direction:
Southbound
From/At:
BURNHAMTHORPE ROAD Collector
To:
BURNHAMTHORPE ROAD Collector
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
On-ramp from BURNHAMTHORPE ROAD EB, On-ramp from BURNHAMTHORPE ROAD WB, Off-ramp to BURNHAMTHORPE ROAD EB/WB, Off-ramp to BURNHAMTHORPE ROAD EB/WB
Reason
Recurring-Construction
Event Start:
May 21, 2013 21:00
Event End:
May 25, 2013 06:00
Last Change:
Entered 2013-05-15 16:49
Top of page
HWY 427 Southbound Collector [ DUNDAS STREET Collector - NORTH QUEEN STREET Collector ] - Recurring-Construction
Highway:
HWY 427
Direction:
Southbound
From/At:
DUNDAS STREET Collector
To:
NORTH QUEEN STREET Collector
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
On-ramp from DUNDAS STREET WB
Reason
Recurring-Construction
Event Start:
May 21, 2013 21:00
Event End:
May 25, 2013 06:00
Last Change:
Entered 2013-05-21 10:39
Top of page
HWY 427 Southbound Collector [ DUNDAS STREET Collector - QUEENSWAY AVENUE Collector ] - Construction
Highway:
HWY 427
Direction:
Southbound
From/At:
DUNDAS STREET Collector
To:
QUEENSWAY AVENUE Collector
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 25, 2013 06:00
Event End:
May 26, 2013 06:00
Last Change:
Entered 2013-05-22 14:51
Top of page
HWY 427 Southbound Collector [ DUNDAS STREET Collector - QUEENSWAY AVENUE Collector ] - Recurring-Construction
Highway:
HWY 427
Direction:
Southbound
From/At:
DUNDAS STREET Collector
To:
QUEENSWAY AVENUE Collector
Lanes Affected:
2 Right Lane(s)
Traffic Impact :
Off-ramp to QUEENSWAY AVENUE EB/WB
Reason
Recurring-Construction
Event Start:
May 23, 2013 21:00
Event End:
May 25, 2013 06:00
Last Change:
Entered 2013-05-22 14:45
Top of page
HWY 427 Southbound Collector [ ERINGATE DRIVE Collector - ERINGATE DRIVE Collector ] - Recurring-Construction
Highway:
HWY 427
Direction:
Southbound
From/At:
ERINGATE DRIVE Collector
To:
ERINGATE DRIVE Collector
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 21:00
Event End:
May 25, 2013 06:00
Last Change:
Entered 2013-05-21 10:32
Top of page
HWY 427 Southbound Collector [ RATHBURN ROAD Collector - RATHBURN ROAD Collector ] - Recurring-Maintenance
Highway:
HWY 427
Direction:
Southbound
From/At:
RATHBURN ROAD Collector
To:
RATHBURN ROAD Collector
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
On-ramp from RATHBURN ROAD EB, On-ramp from RATHBURN ROAD WB
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 21:00
Event End:
May 25, 2013 06:00
Last Change:
Entered 2013-05-15 16:45
Top of page
HWY 427 Southbound Collector Off-ramp [ - DUNDAS STREET Eastbound ] - Construction
Highway:
HWY 427
Direction:
Southbound
From/At:
To:
DUNDAS STREET Eastbound
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Construction
Event Start:
May 23, 2013 22:00
Event End:
May 24, 2013 05:00
Last Change:
Entered 2013-05-21 17:37
Top of page
HWY 427 Southbound Collector Off-ramp [ - DUNDAS STREET Eastbound ] - Recurring-Construction
Highway:
HWY 427
Direction:
Southbound
From/At:
To:
DUNDAS STREET Eastbound
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 23, 2013 22:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-16 15:54
Top of page
HWY 427 Southbound Collector Off-ramp [ - EGLINTON AVE Eastbound ] - Construction
Highway:
HWY 427
Direction:
Southbound
From/At:
To:
EGLINTON AVE Eastbound
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Construction
Event Start:
April 08, 2013 00:00
Event End:
August 05, 2013 06:00
Last Change:
Entered 2013-04-08 13:59
Top of page
HWY 427 Southbound Collector Off-ramp [ - QUEENSWAY AVENUE Eastbound/Westbound ] - Recurring-Maintenance
Highway:
HWY 427
Direction:
Southbound
From/At:
To:
QUEENSWAY AVENUE Eastbound/Westbound
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 21:00
Event End:
May 25, 2013 06:00
Last Change:
Entered 2013-05-16 15:27
Top of page
HWY 427 Southbound On-ramp [ EGLINTON AVENUE Westbound - ] - Construction
Highway:
HWY 427
Direction:
Southbound
From/At:
EGLINTON AVENUE Westbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Construction
Event Start:
April 08, 2013 00:00
Event End:
August 05, 2013 06:00
Last Change:
Entered 2013-04-08 14:03
Top of page
HWY 427 Southbound On-ramp [ EVA ROAD Eastbound - ] - Recurring-Construction
Highway:
HWY 427
Direction:
Southbound
From/At:
EVA ROAD Eastbound
To:
Lanes Affected:
ALL LANES CLOSED
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 21:00
Event End:
May 25, 2013 06:00
Last Change:
Entered 2013-05-16 15:50
Top of page
HWY 427 Southbound Transfer [ BLOOR STREET Express to Collector - ] - Recurring-Construction
Highway:
HWY 427
Direction:
Southbound
From/At:
BLOOR STREET Express to Collector
To:
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 21:00
Event End:
May 25, 2013 06:00
Last Change:
Entered 2013-05-21 10:35
Top of page
HWY 5 Westbound [ SPENCER CREEK - SPENCER CREEK ] - Recurring-Maintenance
Highway:
HWY 5
Direction:
Westbound
From/At:
SPENCER CREEK
To:
SPENCER CREEK
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 27, 2013 07:00
Event End:
May 31, 2013 17:30
Last Change:
Entered 2013-05-23 09:35
Top of page
HWY 5 Westbound [ SPENCER CREEK - SPENCER CREEK ] - Recurring-Maintenance
Highway:
HWY 5
Direction:
Westbound
From/At:
SPENCER CREEK
To:
SPENCER CREEK
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 07:00
Event End:
May 24, 2013 17:30
Last Change:
Entered 2013-05-15 09:30
Top of page
HWY 58 Northbound [ HWY 58A / HUMBERSTONE ROAD - PINE STREET ] - Recurring-Construction
Highway:
HWY 58
Direction:
Northbound
From/At:
HWY 58A / HUMBERSTONE ROAD
To:
PINE STREET
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 09:00
Event End:
May 24, 2013 16:00
Last Change:
Entered 2013-05-16 10:59
Top of page
HWY 58 Southbound [ COLLIER ROAD - PINE STREET ] - Maintenance
Highway:
HWY 58
Direction:
Southbound
From/At:
COLLIER ROAD
To:
PINE STREET
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Maintenance
Event Start:
May 21, 2013 09:00
Event End:
May 24, 2013 16:00
Last Change:
Entered 2013-05-16 17:15
Top of page
HWY 60 BOTH DIRECTIONS [TWIN MAPLE LN - ] - Daily maintenance
Highway:
HWY 60
Direction:
BOTH DIRECTIONS
From/At:
TWIN MAPLE LN
To:
Lanes Affected:
1 right lane and right shoulder
Traffic Impact :
Moderate
Reason
Daily maintenance
Event Start:
May 21, 2013 09:30
Event End:
May 24, 2013 17:30
Last Change:
ENTERED 2013-05-21 09:08
Top of page
HWY 7 BOTH DIRECTIONS [Road 509 - Scott Rd] - Daily maintenance
Highway:
HWY 7
Direction:
BOTH DIRECTIONS
From/At:
Road 509
To:
Scott Rd
Lanes Affected:
1 right lane and right shoulder
Traffic Impact :
Moderate
Reason
Daily maintenance
Event Start:
May 22, 2013 07:00
Event End:
May 24, 2013 15:00
Last Change:
ENTERED 2013-05-21 08:29
Top of page
HWY 7 Eastbound [ BROCK ROAD - HWY 12 BROOKLIN/BALDWIN STREET ] - Recurring-Engineering Investigation
Highway:
HWY 7
Direction:
Eastbound
From/At:
BROCK ROAD
To:
HWY 12 BROOKLIN/BALDWIN STREET
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 27, 2013 19:00
Event End:
May 30, 2013 06:00
Last Change:
Entered 2013-05-22 09:47
Top of page
HWY 7 Eastbound [ BROCK ROAD - HWY 12 BROOKLIN/BALDWIN STREET ] - Recurring-Engineering Investigation
Highway:
HWY 7
Direction:
Eastbound
From/At:
BROCK ROAD
To:
HWY 12 BROOKLIN/BALDWIN STREET
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 27, 2013 19:00
Event End:
May 30, 2013 06:00
Last Change:
Entered 2013-05-22 09:42
Top of page
HWY 7 Westbound [ HWY 12 BROOKLIN/BALDWIN STREET - BROCK ROAD ] - Recurring-Engineering Investigation
Highway:
HWY 7
Direction:
Westbound
From/At:
HWY 12 BROOKLIN/BALDWIN STREET
To:
BROCK ROAD
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 27, 2013 19:00
Event End:
May 30, 2013 06:00
Last Change:
Entered 2013-05-22 09:44
Top of page
HWY 7 Westbound [ HWY 12 BROOKLIN/BALDWIN STREET - BROCK ROAD ] - Recurring-Engineering Investigation
Highway:
HWY 7
Direction:
Westbound
From/At:
HWY 12 BROOKLIN/BALDWIN STREET
To:
BROCK ROAD
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 27, 2013 10:00
Event End:
May 30, 2013 14:00
Last Change:
Entered 2013-05-22 09:47
Top of page
HWY 9 Eastbound [ NORTH JCT HWY 10-BUENA VISTA DRIVE - JANE STREET ] - Recurring-Moving Maintenance Closure
Highway:
HWY 9
Direction:
Eastbound
From/At:
NORTH JCT HWY 10-BUENA VISTA DRIVE
To:
JANE STREET
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Moving Maintenance Closure
Event Start:
May 21, 2013 00:00
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-15 15:39
Top of page
HWY 9 Eastbound [ PEEL REGIONAL ROAD 50 - JANE STREET ] - Recurring-Maintenance
Highway:
HWY 9
Direction:
Eastbound
From/At:
PEEL REGIONAL ROAD 50
To:
JANE STREET
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 26, 2013 20:00
Event End:
June 01, 2013 05:00
Last Change:
Entered 2013-05-23 09:59
Top of page
HWY 9 Westbound [ JANE STREET - PEEL REGIONAL ROAD 50 ] - Recurring-Moving Maintenance Closure
Highway:
HWY 9
Direction:
Westbound
From/At:
JANE STREET
To:
PEEL REGIONAL ROAD 50
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Moving Maintenance Closure
Event Start:
May 21, 2013 00:00
Event End:
May 25, 2013 05:00
Last Change:
Entered 2013-05-15 15:39
Top of page
HWY 93 Northbound [ FLOS ROAD 4 WEST - FLOS ROAD 4 WEST ] - Recurring-Construction
Highway:
HWY 93
Direction:
Northbound
From/At:
FLOS ROAD 4 WEST
To:
FLOS ROAD 4 WEST
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 27, 2013 07:00
Event End:
May 31, 2013 19:00
Last Change:
Entered 2013-05-21 14:27
Top of page
QEW Fort Erie Bound [ GUELPH LINE - CENTENNIAL PKWY ] - Maintenance
Highway:
QEW
Direction:
Fort Erie Bound
From/At:
GUELPH LINE
To:
CENTENNIAL PKWY
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Maintenance
Event Start:
May 23, 2013 21:00
Event End:
May 24, 2013 05:00
Last Change:
Entered 2013-05-23 04:51
Top of page
QEW Fort Erie Bound [ HWY 10/HURONTARIO - MISSISSAUGA ROAD ] - Recurring-Construction
Highway:
QEW
Direction:
Fort Erie Bound
From/At:
HWY 10/HURONTARIO
To:
MISSISSAUGA ROAD
Lanes Affected:
2 Right Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 21:30
Event End:
May 25, 2013 09:00
Last Change:
Entered 2013-05-13 09:28
Top of page
QEW Fort Erie Bound [ HWY 10/HURONTARIO - MISSISSAUGA ROAD ] - Recurring-Construction
Highway:
QEW
Direction:
Fort Erie Bound
From/At:
HWY 10/HURONTARIO
To:
MISSISSAUGA ROAD
Lanes Affected:
2 Left Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 21:00
Event End:
June 01, 2013 09:00
Last Change:
Entered 2013-05-23 00:46
Top of page
QEW Fort Erie Bound [ HWY 10/HURONTARIO - MISSISSAUGA ROAD ] - Recurring-Construction
Highway:
QEW
Direction:
Fort Erie Bound
From/At:
HWY 10/HURONTARIO
To:
MISSISSAUGA ROAD
Lanes Affected:
2 Left Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 21, 2013 21:30
Event End:
May 25, 2013 09:00
Last Change:
Entered 2013-05-13 09:26
Top of page
QEW Fort Erie Bound [ HWY 10/HURONTARIO - MISSISSAUGA ROAD ] - Recurring-Construction
Highway:
QEW
Direction:
Fort Erie Bound
From/At:
HWY 10/HURONTARIO
To:
MISSISSAUGA ROAD
Lanes Affected:
2 Right Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 26, 2013 21:00
Event End:
June 01, 2013 09:00
Last Change:
Entered 2013-05-23 00:56
Top of page
QEW Fort Erie Bound [ MOUNTAIN ROAD - HWY 420 ] - Maintenance
Highway:
QEW
Direction:
Fort Erie Bound
From/At:
MOUNTAIN ROAD
To:
HWY 420
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Maintenance
Event Start:
May 26, 2013 20:00
Event End:
May 27, 2013 06:00
Last Change:
Entered 2013-05-23 09:30
Top of page
QEW Fort Erie Bound [ VICTORIA AVENUE - SEVENTH STREET ] - Recurring-Construction
Highway:
QEW
Direction:
Fort Erie Bound
From/At:
VICTORIA AVENUE
To:
SEVENTH STREET
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
On-ramp from VICTORIA AVENUE NB/SB, On-ramp from SEVENTH STREET NB/SB, Off-ramp to VICTORIA AVENUE NB/SB, Off-ramp to SEVENTH STREET NB/SB
Reason
Recurring-Construction
Event Start:
May 20, 2013 23:59
Event End:
May 24, 2013 07:00
Last Change:
Entered 2013-05-16 08:19
Top of page
QEW Fort Erie Bound [ WEST MALL/EVANS AVE - DIXIE ROAD ] - Recurring-Construction
Highway:
QEW
Direction:
Fort Erie Bound
From/At:
WEST MALL/EVANS AVE
To:
DIXIE ROAD
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Off-ramp to DIXIE ROAD WB
Reason
Recurring-Construction
Event Start:
May 21, 2013 23:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-10 12:55
Top of page
QEW Fort Erie Bound [ WEST MALL/EVANS AVE - DIXIE ROAD ] - Recurring-Construction
Highway:
QEW
Direction:
Fort Erie Bound
From/At:
WEST MALL/EVANS AVE
To:
DIXIE ROAD
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Off-ramp to DIXIE ROAD WB
Reason
Recurring-Construction
Event Start:
May 26, 2013 23:00
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-21 11:35
Top of page
QEW Fort Erie Bound [ WINSTON CHURCHILL BLVD - FORD DRIVE ] - Recurring-Engineering Investigation
Highway:
QEW
Direction:
Fort Erie Bound
From/At:
WINSTON CHURCHILL BLVD
To:
FORD DRIVE
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Recurring-Engineering Investigation
Event Start:
May 22, 2013 22:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-09 13:30
Top of page
QEW Fort Erie Bound [ WINSTON CHURCHILL BLVD - FORD DRIVE ] - Recurring-Engineering Investigation
Highway:
QEW
Direction:
Fort Erie Bound
From/At:
WINSTON CHURCHILL BLVD
To:
FORD DRIVE
Lanes Affected:
1 Right Lane(s)
Traffic Impact :
Off-ramp to FORD DRIVE EB/WB, On-ramp from FORD DRIVE WB
Reason
Recurring-Engineering Investigation
Event Start:
May 26, 2013 22:00
Event End:
May 31, 2013 06:00
Last Change:
Entered 2013-05-09 13:24
Top of page
QEW Toronto bound [ CAWTHRA ROAD - HWY 427 ] - Recurring-Construction
Highway:
QEW
Direction:
Toronto bound
From/At:
CAWTHRA ROAD
To:
HWY 427
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Off-ramp to WEST MALL/EVANS AVE EB
Reason
Recurring-Construction
Event Start:
May 26, 2013 22:00
Event End:
May 31, 2013 05:00
Last Change:
Entered 2013-05-21 11:38
Top of page
QEW Toronto bound [ CENTENNIAL PKWY - GUELPH LINE ] - Recurring-Moving Maintenance Closure
Highway:
QEW
Direction:
Toronto bound
From/At:
CENTENNIAL PKWY
To:
GUELPH LINE
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Moving Maintenance Closure
Event Start:
May 27, 2013 20:00
Event End:
May 30, 2013 05:00
Last Change:
Entered 2013-05-23 04:36
Top of page
QEW Toronto bound [ DIXIE ROAD - HWY 427 ] - Recurring-Construction
Highway:
QEW
Direction:
Toronto bound
From/At:
DIXIE ROAD
To:
HWY 427
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Off-ramp to WEST MALL/EVANS AVE EB
Reason
Recurring-Construction
Event Start:
May 21, 2013 22:00
Event End:
May 24, 2013 05:00
Last Change:
Entered 2013-05-10 12:58
Top of page
QEW Toronto bound [ GLENDALE AVENUE - GARDEN CITY SKYWAY ] - Recurring-Construction
Highway:
QEW
Direction:
Toronto bound
From/At:
GLENDALE AVENUE
To:
GARDEN CITY SKYWAY
Lanes Affected:
2 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Construction
Event Start:
May 22, 2013 20:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-15 16:25
Top of page
QEW Toronto bound [ HWY 420 - MOUNTAIN ROAD ] - Recurring-Moving Maintenance Closure
Highway:
QEW
Direction:
Toronto bound
From/At:
HWY 420
To:
MOUNTAIN ROAD
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Moving Maintenance Closure
Event Start:
May 26, 2013 20:00
Event End:
May 27, 2013 06:00
Last Change:
Entered 2013-05-23 09:27
Top of page
QEW Toronto bound [ MAPLE AVENUE - MAPLE AVENUE ] - Recurring-Maintenance
Highway:
QEW
Direction:
Toronto bound
From/At:
MAPLE AVENUE
To:
MAPLE AVENUE
Lanes Affected:
1 Alternating Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 23:00
Event End:
May 24, 2013 06:00
Last Change:
Entered 2013-05-14 13:58
Top of page
QEW Toronto bound [ MISSISSAUGA ROAD - HWY 10/HURONTARIO ] - Recurring-Construction
Highway:
QEW
Direction:
Toronto bound
From/At:
MISSISSAUGA ROAD
To:
HWY 10/HURONTARIO
Lanes Affected:
2 Right Lane(s)
Traffic Impact :
On-ramp from MISSISSAUGA ROAD SB
Reason
Recurring-Construction
Event Start:
May 21, 2013 22:00
Event End:
May 25, 2013 07:30
Last Change:
Entered 2013-05-13 09:34
Top of page
QEW Toronto bound [ MISSISSAUGA ROAD - HWY 10/HURONTARIO ] - Recurring-Construction
Highway:
QEW
Direction:
Toronto bound
From/At:
MISSISSAUGA ROAD
To:
HWY 10/HURONTARIO
Lanes Affected:
2 Right Lane(s)
Traffic Impact :
On-ramp from MISSISSAUGA ROAD SB
Reason
Recurring-Construction
Event Start:
May 26, 2013 21:00
Event End:
June 01, 2013 09:00
Last Change:
Entered 2013-05-23 00:49
Top of page
QEW Toronto bound [ MISSISSAUGA ROAD - HWY 10/HURONTARIO ] - Recurring-Construction
Highway:
QEW
Direction:
Toronto bound
From/At:
MISSISSAUGA ROAD
To:
HWY 10/HURONTARIO
Lanes Affected:
2 Left Lane(s)
Traffic Impact :
On-ramp from MISSISSAUGA ROAD SB
Reason
Recurring-Construction
Event Start:
May 26, 2013 21:00
Event End:
June 01, 2013 09:00
Last Change:
Entered 2013-05-23 00:42
Top of page
QEW Toronto bound [ MISSISSAUGA ROAD - HWY 10/HURONTARIO ] - Recurring-Maintenance
Highway:
QEW
Direction:
Toronto bound
From/At:
MISSISSAUGA ROAD
To:
HWY 10/HURONTARIO
Lanes Affected:
2 Left Lane(s)
Traffic Impact :
On-ramp from MISSISSAUGA ROAD SB
Reason
Recurring-Maintenance
Event Start:
May 21, 2013 21:00
Event End:
May 25, 2013 08:00
Last Change:
Entered 2013-05-04 06:05
Top of page
QEW Toronto bound [ THOROLD STONE ROAD - MOUNTAIN ROAD ] - Recurring-Maintenance
Highway:
QEW
Direction:
Toronto bound
From/At:
THOROLD STONE ROAD
To:
MOUNTAIN ROAD
Lanes Affected:
1 Left Lane(s)
Traffic Impact :
Reason
Recurring-Maintenance
Event Start:
May 28, 2013 00:00
Event End:
May 30, 2013 06:00
Last Change:
Entered 2013-05-23 10:22
Top of page
Highway 129 - road closure
Highway:
Highway 129
Location:
Chapleau and Highway 667
Traffic Impact :
Description:
Highway 129 is closed from Chapleau to highway 667.
Detour:
Event Start:
May 23, 2013 08:45:00
Event End:
Last Updated:
2013-05-23 08:45:00
Top of page
Highway 537
Highway:
Highway 537
Location:
Jumbo Creek
Traffic Impact :
Description:
Highway 537 is closed 9 kilometres south of highway 17 junction at Jumbo Creek.
Detour:
Event Start:
May 23, 2013 11:05:00
Event End:
Last Updated:
2013-05-23 11:05:00
Top of page
Highway 593
Highway:
Highway 593
Location:
Traffic Impact :
Description:
Hwy 593 is closed 6.1 kilometres north of highway 61.
Detour:
Event Start:
May 23, 2013 10:00:00
Event End:
Last Updated:
2013-05-23 10:00:00
Top of page
Highway 637
Highway:
Highway 637
Location:
Wolf Creek
Traffic Impact :
Description:
Highway 637 is closed to a single lane at Wolf Creek (Tyson Lake Area).
Detour:
Event Start:
May 23, 2013 11:10:00
Event End:
Last Updated:
2013-05-23 11:10:00
Top of page
This information is provided as a public service. Although we endeavor to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.
Road information by phone
Provincial Call Centre: 1-800-268-4686
In GTA: 416-235-4686
Provincial TTY: 1-866-471-8929
Niagara Region TTY: 905-704-2426