HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway: HWY 11
Direction: Northbound
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 02, 2015 18:00
Event End: February 07, 2015 23:59
Last Change: Entered 2015-01-26 09:24

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway: HWY 11
Direction: Northbound
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 02, 2015 00:00
Event End: February 07, 2015 11:00
Last Change: Entered 2015-01-26 09:22

Top of page Top of page


HWY 11 Northbound [ SIMCOE ROAD 169 - COOPER FALLS ROAD/CANAL ROAD/COUNTY ROAD 52 ] - Construction
Highway: HWY 11
Direction: Northbound
From/At: SIMCOE ROAD 169
To: COOPER FALLS ROAD/CANAL ROAD/COUNTY ROAD 52
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: February 02, 2015 00:00
Event End: February 06, 2015 10:00
Last Change: Entered 2015-01-27 07:24

Top of page Top of page


HWY 11 Northbound [ SUNDIAL DRIVE/CARLYN LINE - ANCHOR DRIVE ] - Maintenance
Highway: HWY 11
Direction: Northbound
From/At: SUNDIAL DRIVE/CARLYN LINE
To: ANCHOR DRIVE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: February 02, 2015 09:00
Event End: February 05, 2015 15:00
Last Change: Entered 2015-01-30 09:15

Top of page Top of page


HWY 11 Southbound [ ANCHOR DRIVE - SUNDIAL DRIVE/CARLYN LINE ] - Maintenance
Highway: HWY 11
Direction: Southbound
From/At: ANCHOR DRIVE
To: SUNDIAL DRIVE/CARLYN LINE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: February 02, 2015 09:00
Event End: February 05, 2015 15:00
Last Change: Entered 2015-01-30 09:17

Top of page Top of page


HWY 11 Southbound [ COOPER FALLS ROAD/CANAL ROAD/COUNTY ROAD 52 - SIMCOE ROAD 169 ] - Construction
Highway: HWY 11
Direction: Southbound
From/At: COOPER FALLS ROAD/CANAL ROAD/COUNTY ROAD 52
To: SIMCOE ROAD 169
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: February 02, 2015 19:00
Event End: February 06, 2015 23:59
Last Change: Entered 2015-01-27 07:31

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway: HWY 11
Direction: Southbound
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 02, 2015 00:00
Event End: February 07, 2015 23:59
Last Change: Entered 2015-01-26 09:20

Top of page Top of page


HWY 118 Eastbound [ LOVES RD - CLOSS DR ] - Recurring-Moving Maintenance Closure
Highway: HWY 118
Direction: Eastbound
From/At: LOVES RD
To: CLOSS DR
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment :
Event Start: February 02, 2015 07:00
Event End: March 30, 2015 17:00
Last Change: Entered 2015-01-23 09:15

Top of page Top of page


HWY 28 Northbound [ YORK RIVER BRIDGE - BELTON RD ] - Recurring-Maintenance
Highway: HWY 28
Direction: Northbound
From/At: YORK RIVER BRIDGE
To: BELTON RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: February 02, 2015 07:00
Event End: March 30, 2015 17:00
Last Change: Entered 2015-01-23 09:01

Top of page Top of page


HWY 3 Westbound [ CENTRALIA AVENUE - GORHAM ROAD/VICTORIA ROAD/NIAGARA ROAD 116 ] - Recurring-Construction
Highway: HWY 3
Direction: Westbound
From/At: CENTRALIA AVENUE
To: GORHAM ROAD/VICTORIA ROAD/NIAGARA ROAD 116
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 02, 2015 09:00
Event End: February 06, 2015 16:00
Last Change: Entered 2015-01-23 09:17

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - PARTRIDGE SKI TRAIL ROAD ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: DUCKWORTH STREET
To: PARTRIDGE SKI TRAIL ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 02, 2015 00:00
Event End: February 07, 2015 23:59
Last Change: Entered 2015-01-26 09:21

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - PARTRIDGE SKI TRAIL ROAD ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: DUCKWORTH STREET
To: PARTRIDGE SKI TRAIL ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 06, 2015 18:00
Event End: February 06, 2015 23:59
Last Change: Entered 2015-01-26 09:21

Top of page Top of page


HWY 400 Northbound [ HWY 12 N JCT - QUARRY ROAD/SIMCOE 59 ] - Maintenance
Highway: HWY 400
Direction: Northbound
From/At: HWY 12 N JCT
To: QUARRY ROAD/SIMCOE 59
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: February 02, 2015 09:00
Event End: February 02, 2015 15:00
Last Change: Entered 2015-01-30 09:24

Top of page Top of page


HWY 400 Northbound [ SIMCOE ROAD 88 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Maintenance
Highway: HWY 400
Direction: Northbound
From/At: SIMCOE ROAD 88
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: February 02, 2015 09:00
Event End: February 03, 2015 15:00
Last Change: Entered 2015-01-29 13:07

Top of page Top of page


HWY 400 Northbound Off-ramp [ - MAJOR MACKENZIE DRIVE Eastbound ] - Recurring-Maintenance
Highway: HWY 400
Direction: Northbound
From/At:
To: MAJOR MACKENZIE DRIVE Eastbound
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: January 31, 2015 09:00
Event End: February 01, 2015 11:00
Last Change: Entered 2015-01-27 09:55

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - SIMCOE ROAD 88 ] - Recurring-Maintenance
Highway: HWY 400
Direction: Southbound
From/At: HWY 89/SIMCOE ROAD 89
To: SIMCOE ROAD 88
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: February 02, 2015 09:00
Event End: February 03, 2015 15:00
Last Change: Entered 2015-01-29 13:03

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - SIMCOE ROAD 88 ] - Recurring-Maintenance
Highway: HWY 400
Direction: Southbound
From/At: HWY 89/SIMCOE ROAD 89
To: SIMCOE ROAD 88
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: February 02, 2015 09:00
Event End: February 03, 2015 15:00
Last Change: Entered 2015-01-29 13:06

Top of page Top of page


HWY 400 Southbound [ MAPLEVIEW DRIVE - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Maintenance
Highway: HWY 400
Direction: Southbound
From/At: MAPLEVIEW DRIVE
To: INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: February 02, 2015 09:00
Event End: February 03, 2015 15:00
Last Change: Entered 2015-01-29 13:09

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Construction
Highway: HWY 400
Direction: Southbound
From/At: PARTRIDGE SKI TRAIL ROAD
To: HWY 11 JCT
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: February 02, 2015 00:00
Event End: February 07, 2015 23:59
Last Change: Entered 2015-01-26 09:22

Top of page Top of page


HWY 401 Eastbound Collector [ DIXIE ROAD Collector - RENFORTH DRIVE Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: DIXIE ROAD Collector
To: RENFORTH DRIVE Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 01, 2015 21:00
Event End: February 07, 2015 05:00
Last Change: Entered 2015-01-30 13:52

Top of page Top of page


HWY 401 Eastbound Express [ MARKHAM ROAD Express - MEADOWVALE ROAD Express ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: MARKHAM ROAD Express
To: MEADOWVALE ROAD Express
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 01, 2015 22:00
Event End: February 03, 2015 05:00
Last Change: Entered 2015-01-30 14:10

Top of page Top of page


HWY 401 Westbound Collector [ BROCK ROAD Collector - BROCK ROAD Collector ] - Recurring-Maintenance
Highway: HWY 401
Direction: Westbound
From/At: BROCK ROAD Collector
To: BROCK ROAD Collector
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: January 31, 2015 07:00
Event End: February 01, 2015 11:00
Last Change: Entered 2015-01-27 15:39

Top of page Top of page


HWY 401 Westbound Collector [ RENFORTH DRIVE Collector - HWY 403 Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: RENFORTH DRIVE Collector
To: HWY 403 Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 01, 2015 21:00
Event End: February 07, 2015 05:00
Last Change: Entered 2015-01-30 13:50

Top of page Top of page


HWY 401 Westbound Collector [ VICTORIA PARK AVE Collector - HWY 404 Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: VICTORIA PARK AVE Collector
To: HWY 404 Collector
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 01, 2015 23:00
Event End: February 07, 2015 05:00
Last Change: Entered 2015-01-30 13:58

Top of page Top of page


HWY 401 Westbound Express [ DIXIE ROAD Express - HWY 403 Express ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: DIXIE ROAD Express
To: HWY 403 Express
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 01, 2015 21:00
Event End: February 07, 2015 05:30
Last Change: Entered 2015-01-30 16:25

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector Off-ramp [ - HWY 410 Northbound ] - Recurring-Construction
Highway: HWY 403 MISSISSAUGA
Direction: Eastbound
From/At:
To: HWY 410 Northbound
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 01, 2015 20:00
Event End: February 06, 2015 06:00
Last Change: Entered 2015-01-29 18:20

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Off-ramp [ - QEW Westbound ] - Recurring-Engineering Investigation
Highway: HWY 403 MISSISSAUGA
Direction: Westbound
From/At:
To: QEW Westbound
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment :
Event Start: February 02, 2015 00:00
Event End: February 06, 2015 05:00
Last Change: Entered 2015-01-29 11:31

Top of page Top of page


HWY 404 Northbound Collector [ BOAG ROAD Collector - WOODBINE AVE Collector ] - Maintenance
Highway: HWY 404
Direction: Northbound
From/At: BOAG ROAD Collector
To: WOODBINE AVE Collector
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: February 02, 2015 10:00
Event End: February 02, 2015 15:00
Last Change: Entered 2015-01-30 15:06

Top of page Top of page


HWY 407 ETR Eastbound On-ramp [ HWY 10 Southbound - ] - Maintenance
Highway: HWY 407 ETR
Direction: Eastbound
From/At: HWY 10 Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Maintenance
Comment :
Event Start: February 03, 2015 01:00
Event End: February 03, 2015 06:00
Last Change: Entered 2015-01-30 16:37

Top of page Top of page


HWY 407 ETR Westbound On-ramp [ HWY 410 Northbound - ] - Maintenance
Highway: HWY 407 ETR
Direction: Westbound
From/At: HWY 410 Northbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Maintenance
Comment :
Event Start: February 02, 2015 20:00
Event End: February 03, 2015 01:00
Last Change: Entered 2015-01-30 17:01

Top of page Top of page


HWY 417 Eastbound [ DALKEITH RD - DALKEITH RD ] - Construction
Highway: HWY 417
Direction: Eastbound
From/At: DALKEITH RD
To: DALKEITH RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Lane reductions Hwy 417E/B & W/B @ Dalkeith Rd (KM 22) E/Vankleek Hill
Event Start: February 02, 2015 08:00
Event End: February 02, 2015 16:00
Last Change: Entered 2015-01-30 09:23

Top of page Top of page


HWY 417 Eastbound [ RICHMOND RD (IC 130) - PINECREST AVE / GREENBANK RD (IC 129) ] - Maintenance
Highway: HWY 417
Direction: Eastbound
From/At: RICHMOND RD (IC 130)
To: PINECREST AVE / GREENBANK RD (IC 129)
Lanes Affected: 2 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment : Ottawa 417 E/B Richmond Rd on-ramps also closed. There will be a full E/B closure for 15 minutes between 00:00-04:00 to erect a sign.
Event Start: February 02, 2015 23:00
Event End: February 03, 2015 05:00
Last Change: Entered 2015-01-29 10:26

Top of page Top of page


HWY 427 Northbound Collector [ EVANS AVE Collector - DUNDAS STREET Collector ] - Recurring-Construction
Highway: HWY 427
Direction: Northbound
From/At: EVANS AVE Collector
To: DUNDAS STREET Collector
Lanes Affected: 2 Left Lane(s)
Traffic Impact : On-ramp from QUEENSWAY AVENUE EB
Reason Recurring-Construction
Comment :
Event Start: February 01, 2015 23:00
Event End: February 07, 2015 05:00
Last Change: Entered 2015-01-30 13:56

Top of page Top of page


HWY 58 Northbound [ THOROLD TUNNEL - THOROLD TUNNEL ] - Recurring-Maintenance
Highway: HWY 58
Direction: Northbound
From/At: THOROLD TUNNEL
To: THOROLD TUNNEL
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: February 02, 2015 09:00
Event End: February 06, 2015 15:00
Last Change: Entered 2015-01-29 10:15

Top of page Top of page


HWY 58 Southbound [ THOROLD TUNNEL - THOROLD TUNNEL ] - Recurring-Maintenance
Highway: HWY 58
Direction: Southbound
From/At: THOROLD TUNNEL
To: THOROLD TUNNEL
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: February 02, 2015 09:00
Event End: February 06, 2015 15:00
Last Change: Entered 2015-01-29 10:20

Top of page Top of page


HWY 7 Eastbound [ BROCK ROAD - PICKERING SIDELINE 14 ] - Recurring-Construction
Highway: HWY 7
Direction: Eastbound
From/At: BROCK ROAD
To: PICKERING SIDELINE 14
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 02, 2015 09:00
Event End: February 06, 2015 13:00
Last Change: Entered 2015-01-29 15:09

Top of page Top of page


HWY 85 Southbound Off-ramp [ - KING ST IC-WATERLOO RD 15 Southbound ] - Construction
Highway: HWY 85
Direction: Southbound
From/At:
To: KING ST IC-WATERLOO RD 15 Southbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment : Highway 85 southbound off ramp to King St. will be closed February 2nd, 2015 between 0800 and 1200 hours, for construction work operations.
Event Start: February 02, 2015 08:00
Event End: February 02, 2015 12:00
Last Change: Entered 2015-01-30 11:25

Top of page Top of page


QEW Fort Erie Bound [ BURLOAK DRIVE - GUELPH LINE ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: BURLOAK DRIVE
To: GUELPH LINE
Lanes Affected: 1 Left(with HOV) Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 02, 2015 20:00
Event End: February 07, 2015 06:00
Last Change: Entered 2015-01-29 10:49

Top of page Top of page


QEW Fort Erie Bound [ GRAYS ROAD - FRUITLAND ROAD ] - Recurring-Maintenance
Highway: QEW
Direction: Fort Erie Bound
From/At: GRAYS ROAD
To: FRUITLAND ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: January 31, 2015 19:00
Event End: February 06, 2015 06:00
Last Change: Entered 2015-01-29 07:05

Top of page Top of page


QEW Fort Erie Bound [ LAKE STREET - GARDEN CITY SKYWAY ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: LAKE STREET
To: GARDEN CITY SKYWAY
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 02, 2015 17:00
Event End: February 06, 2015 07:00
Last Change: Entered 2015-01-27 13:29

Top of page Top of page


QEW Fort Erie Bound [ MISSISSAUGA ROAD - ERIN MILLS PKWY/SOUTHDOWN ROAD ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: MISSISSAUGA ROAD
To: ERIN MILLS PKWY/SOUTHDOWN ROAD
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 01, 2015 21:00
Event End: February 07, 2015 05:00
Last Change: Entered 2015-01-30 13:43

Top of page Top of page


QEW Fort Erie Bound On-ramp [ FORD DRIVE Westbound - ] - Recurring-Engineering Investigation
Highway: QEW
Direction: Fort Erie Bound
From/At: FORD DRIVE Westbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment :
Event Start: February 02, 2015 00:00
Event End: February 06, 2015 05:00
Last Change: Entered 2015-01-29 11:36

Top of page Top of page


QEW Toronto bound [ ERIN MILLS PKWY/SOUTHDOWN ROAD - ERIN MILLS PKWY/SOUTHDOWN ROAD ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: ERIN MILLS PKWY/SOUTHDOWN ROAD
To: ERIN MILLS PKWY/SOUTHDOWN ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: January 31, 2015 21:00
Event End: February 01, 2015 09:30
Last Change: Entered 2015-01-30 10:31

Top of page Top of page


QEW Toronto bound [ ERIN MILLS PKWY/SOUTHDOWN ROAD - ERIN MILLS PKWY/SOUTHDOWN ROAD ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: ERIN MILLS PKWY/SOUTHDOWN ROAD
To: ERIN MILLS PKWY/SOUTHDOWN ROAD
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: February 01, 2015 21:00
Event End: February 07, 2015 05:30
Last Change: Entered 2015-01-30 13:40

Top of page Top of page


QEW Toronto bound [ FRUITLAND ROAD - GRAYS ROAD ] - Recurring-Maintenance
Highway: QEW
Direction: Toronto bound
From/At: FRUITLAND ROAD
To: GRAYS ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: January 31, 2015 21:00
Event End: February 06, 2015 05:00
Last Change: Entered 2015-01-29 07:07

Top of page Top of page


QEW Toronto bound [ GARDEN CITY SKYWAY - LAKE STREET ] - Construction
Highway: QEW
Direction: Toronto bound
From/At: GARDEN CITY SKYWAY
To: LAKE STREET
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: February 02, 2015 19:00
Event End: February 06, 2015 07:00
Last Change: Entered 2015-01-27 13:04

Top of page Top of page


QEW Toronto bound [ TRAFALGAR ROAD - WINSTON CHURCHILL BLVD ] - Recurring-Engineering Investigation
Highway: QEW
Direction: Toronto bound
From/At: TRAFALGAR ROAD
To: WINSTON CHURCHILL BLVD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment :
Event Start: February 02, 2015 22:00
Event End: February 06, 2015 05:00
Last Change: Entered 2015-01-29 11:39

Top of page Top of page


QEW Toronto bound Off-ramp [ - HWY 403 OAKVILLE Northbound ] - Recurring-Engineering Investigation
Highway: QEW
Direction: Toronto bound
From/At:
To: HWY 403 OAKVILLE Northbound
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment :
Event Start: February 02, 2015 00:00
Event End: February 06, 2015 05:00
Last Change: Entered 2015-01-29 11:28

Top of page Top of page


401 Eastbound Collector(s) [ KENNEDY RD -SCARBOROUGH - BRIMLEY ROAD ] - Disable Vehicle
Highway: 401
Direction: Eastbound
From/At: KENNEDY RD -SCARBOROUGH
To: BRIMLEY ROAD
Lanes Affected: 1 RIGHT LANE(S) AND RIGHT SHOULDER
Traffic Impact :
Reason Disable Vehicle
Comment : TORONTO
Event Start: January 31, 2015 23:57
Event End:
Last Change: ENTERED 2015-01-31 23:57

Top of page Top of page


This information is provided as a public service. Although we endeavor to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.

Road information by phone

  • Provincial Call Centre: 1-800-268-4686
  • In GTA: 416-235-4686
  • Provincial TTY: 1-866-471-8929
  • Niagara Region TTY: 905-704-2426

See also:

Ontario 511 Logo