Unscheduled road closures and events for provincial highways:

Unscheduled Events

EASTPORT DRIVE Northbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Northbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 09:00
Event End:April 28, 2017 15:30
Last Change: Entered 2017-04-13 08:58

Top of page Top of page


EASTPORT DRIVE Northbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Northbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 18, 2017 20:00
Event End:April 30, 2017 05:00
Last Change: Entered 2017-03-17 08:32

Top of page Top of page


EASTPORT DRIVE Southbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Southbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 18, 2017 20:00
Event End:April 30, 2017 05:00
Last Change: Entered 2017-03-17 08:33

Top of page Top of page


HWY 10 Northbound [ HWY. 24/CHARLESTON SIDEROAD - HWY. 9 SOUTH JCT ] - Recurring-Construction
Highway:HWY 10
Direction:Northbound
From/At:HWY. 24/CHARLESTON SIDEROAD
To:HWY. 9 SOUTH JCT
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Sunday, two lanes close at 20:00 and all lanes open at 12:00. From Monday to Thursday, two lanes close at 20:00 and all lanes open at 15:00. On Friday, two lanes close at 22:00 and all lanes open at 14:00. On Saturday, two lanes close at 20:00 and all lanes open at 12:00.
Event Start:April 30, 2017 20:00
Event End:May 07, 2017 12:00
Last Change: Entered 2017-04-25 07:25

Top of page Top of page


HWY 10 Northbound [ HWY. 24/CHARLESTON SIDEROAD - HWY. 9 SOUTH JCT ] - Recurring-Construction
Highway:HWY 10
Direction:Northbound
From/At:HWY. 24/CHARLESTON SIDEROAD
To:HWY. 9 SOUTH JCT
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Sunday, two lanes close at 20:00 and all lanes open at 12:00. From Monday to Thursday, two lanes close at 20:00 and all lanes open at 15:00. On Friday, two lanes close at 22:00 and all lanes open at 14:00. On Saturday, two lanes close at 20:00 and all lanes open at 12:00.
Event Start:April 23, 2017 20:00
Event End:April 30, 2017 12:00
Last Change: Entered 2017-04-19 07:55

Top of page Top of page


HWY 10 Northbound [ OLD SCHOOL ROAD - MCCANNEL AVENUE ] - Recurring-Maintenance
Highway:HWY 10
Direction:Northbound
From/At:OLD SCHOOL ROAD
To:MCCANNEL AVENUE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 24, 2017 09:30
Event End:April 28, 2017 15:00
Last Change: Entered 2017-04-18 08:49

Top of page Top of page


HWY 10 Southbound [ HWY. 9 SOUTH JCT - HWY. 24/CHARLESTON SIDEROAD ] - Recurring-Construction
Highway:HWY 10
Direction:Southbound
From/At:HWY. 9 SOUTH JCT
To:HWY. 24/CHARLESTON SIDEROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Sunday, two lanes close at 21:00 and all lanes open at 12:00. From Monday to Friday, first lane closes at 09:00 and expanding to second lane at 10:00, all lanes open at 05:00 the next day. On Saturday, two lanes closes at 21:00 and all lanes open at 12:00.
Event Start:April 30, 2017 21:00
Event End:May 07, 2017 12:00
Last Change: Entered 2017-04-25 07:27

Top of page Top of page


HWY 10 Southbound [ HWY. 9 SOUTH JCT - HWY. 24/CHARLESTON SIDEROAD ] - Recurring-Construction
Highway:HWY 10
Direction:Southbound
From/At:HWY. 9 SOUTH JCT
To:HWY. 24/CHARLESTON SIDEROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Sunday, two lanes close at 21:00 and all lanes open at 12:00. From Monday to Friday, first lane closes at 09:00 and expanding to second lane at 10:00, all lanes open at 05:00 the next day. On Saturday, two lanes closes at 21:00 and all lanes open at 12:00.
Event Start:April 23, 2017 21:00
Event End:April 30, 2017 12:00
Last Change: Entered 2017-04-19 07:55

Top of page Top of page


HWY 10 Southbound [ MCCANNEL AVENUE - OLD SCHOOL ROAD ] - Recurring-Maintenance
Highway:HWY 10
Direction:Southbound
From/At:MCCANNEL AVENUE
To:OLD SCHOOL ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 24, 2017 09:30
Event End:April 28, 2017 15:00
Last Change: Entered 2017-04-18 08:52

Top of page Top of page


HWY 11 Northbound [ ARDTREA DRIVE - NEW BRAILEY LINE/BAYOU ROAD ] - Maintenance
Highway:HWY 11
Direction:Northbound
From/At:ARDTREA DRIVE
To:NEW BRAILEY LINE/BAYOU ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:May 01, 2017 06:00
Event End:May 05, 2017 11:00
Last Change: Entered 2017-04-25 18:45

Top of page Top of page


HWY 11 Northbound [ GOLDSTEIN ROAD - ANCHOR DRIVE ] - Recurring-Maintenance
Highway:HWY 11
Direction:Northbound
From/At:GOLDSTEIN ROAD
To:ANCHOR DRIVE
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 09:00
Event End:May 04, 2017 15:00
Last Change: Entered 2017-04-26 14:25

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :One lane closes Monday from 5:00 to 14:00. From Tuesday to Thursday one lane closes from 5:00 to 15:00. On Friday one lane closes from 5:00 to 12:00. On Saturday one lane closes from 5:00 to 10:00. On Sunday one lane closes all day starting at 5:00.
Event Start:May 01, 2017 05:00
Event End:May 07, 2017 15:00
Last Change: Entered 2017-04-25 19:25

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 05:00
Event End:April 28, 2017 15:00
Last Change: Entered 2017-04-21 10:21

Top of page Top of page


HWY 11 Northbound [ LINE 6 - LINE 8/SIMCOE ROAD 20 ] - Construction
Highway:HWY 11
Direction:Northbound
From/At:LINE 6
To:LINE 8/SIMCOE ROAD 20
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 18, 2017 06:00
Event End:May 12, 2017 12:00
Last Change: Entered 2017-04-12 06:50

Top of page Top of page


HWY 11 Northbound [ SHOREVIEW DRIVE - SIMCOE ROAD 169 ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:SHOREVIEW DRIVE
To:SIMCOE ROAD 169
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 07:00
Event End:April 28, 2017 19:00
Last Change: Entered 2017-04-20 11:44

Top of page Top of page


HWY 11 Northbound [ SHOREVIEW DRIVE - SIMCOE ROAD 169 ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:SHOREVIEW DRIVE
To:SIMCOE ROAD 169
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:May 01, 2017 07:00
Event End:May 05, 2017 19:00
Last Change: Entered 2017-04-27 05:15

Top of page Top of page


HWY 11 Northbound [ SHOREVIEW DRIVE - SIMCOE ROAD 169 ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:SHOREVIEW DRIVE
To:SIMCOE ROAD 169
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 00:00
Event End:April 28, 2017 07:00
Last Change: Entered 2017-04-20 11:44

Top of page Top of page


HWY 11 Northbound [ SHOREVIEW DRIVE - SIMCOE ROAD 169 ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:SHOREVIEW DRIVE
To:SIMCOE ROAD 169
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 19:00
Event End:April 28, 2017 23:59
Last Change: Entered 2017-04-20 11:44

Top of page Top of page


HWY 11 Northbound [ SUNDIAL DRIVE/CARLYN LINE - SOULES ROAD/TELFORD LANE ] - Recurring-Maintenance
Highway:HWY 11
Direction:Northbound
From/At:SUNDIAL DRIVE/CARLYN LINE
To:SOULES ROAD/TELFORD LANE
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 09:00
Event End:May 04, 2017 15:00
Last Change: Entered 2017-04-26 13:59

Top of page Top of page


HWY 11 Southbound [ ANCHOR DRIVE - GOLDSTEIN ROAD ] - Recurring-Maintenance
Highway:HWY 11
Direction:Southbound
From/At:ANCHOR DRIVE
To:GOLDSTEIN ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 09:00
Event End:May 04, 2017 15:00
Last Change: Entered 2017-04-26 14:26

Top of page Top of page


HWY 11 Southbound [ LINE 8/SIMCOE ROAD 20 - LINE 6 ] - Construction
Highway:HWY 11
Direction:Southbound
From/At:LINE 8/SIMCOE ROAD 20
To:LINE 6
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 18, 2017 06:00
Event End:May 12, 2017 12:00
Last Change: Entered 2017-04-12 06:52

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 169 - SHOREVIEW DRIVE ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 169
To:SHOREVIEW DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 07:00
Event End:April 28, 2017 19:00
Last Change: Entered 2017-04-20 11:45

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 169 - SHOREVIEW DRIVE ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 169
To:SHOREVIEW DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from SIMCOE ROAD 169 NB
ReasonRecurring-Construction
Comment :
Event Start:May 01, 2017 19:00
Event End:May 05, 2017 23:59
Last Change: Entered 2017-04-27 05:17

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 169 - SHOREVIEW DRIVE ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 169
To:SHOREVIEW DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from SIMCOE ROAD 169 NB
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 00:00
Event End:April 28, 2017 07:00
Last Change: Entered 2017-04-20 11:45

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 169 - SHOREVIEW DRIVE ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 169
To:SHOREVIEW DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from SIMCOE ROAD 169 NB
ReasonRecurring-Construction
Comment :
Event Start:May 01, 2017 00:00
Event End:May 05, 2017 07:00
Last Change: Entered 2017-04-27 05:17

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 169 - SHOREVIEW DRIVE ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 169
To:SHOREVIEW DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from SIMCOE ROAD 169 NB
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 19:00
Event End:April 28, 2017 23:59
Last Change: Entered 2017-04-20 11:46

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 169 - SHOREVIEW DRIVE ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 169
To:SHOREVIEW DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:May 01, 2017 07:00
Event End:May 05, 2017 19:00
Last Change: Entered 2017-04-27 05:17

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 05:00
Event End:April 28, 2017 15:00
Last Change: Entered 2017-04-21 10:24

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :One lane closes Monday to Thursday daily from 5:00 to 15:00. On Friday One lane closes from 5:00 to 13:00. From Saturday to Sunday one lane closes daily from 5:00 to 10:00.
Event Start:May 01, 2017 05:00
Event End:May 13, 2017 15:00
Last Change: Entered 2017-04-25 19:30

Top of page Top of page


HWY 11 Southbound [ SOULES ROAD/TELFORD LANE - SUNDIAL DRIVE/CARLYN LINE ] - Recurring-Maintenance
Highway:HWY 11
Direction:Southbound
From/At:SOULES ROAD/TELFORD LANE
To:SUNDIAL DRIVE/CARLYN LINE
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 09:00
Event End:May 04, 2017 15:00
Last Change: Entered 2017-04-26 14:00

Top of page Top of page


HWY 11 Southbound [ SUNDIAL DRIVE/CARLYN LINE - HWY 12 NORTH JCT/COLDWATER ROAD ] - Construction
Highway:HWY 11
Direction:Southbound
From/At:SUNDIAL DRIVE/CARLYN LINE
To:HWY 12 NORTH JCT/COLDWATER ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from BURNSIDE LINE/WEST STREET EB
ReasonConstruction
Comment :
Event Start:April 28, 2017 22:00
Event End:April 29, 2017 06:00
Last Change: Entered 2017-04-25 12:02

Top of page Top of page


HWY 11 Southbound [ SUNDIAL DRIVE/CARLYN LINE - HWY 12 NORTH JCT/COLDWATER ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SUNDIAL DRIVE/CARLYN LINE
To:HWY 12 NORTH JCT/COLDWATER ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from BURNSIDE LINE/WEST STREET EB
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 22:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-19 06:57

Top of page Top of page


HWY 11 Southbound [ SUNDIAL DRIVE/CARLYN LINE - HWY 12 NORTH JCT/COLDWATER ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SUNDIAL DRIVE/CARLYN LINE
To:HWY 12 NORTH JCT/COLDWATER ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from BURNSIDE LINE/WEST STREET EB
ReasonRecurring-Construction
Comment :
Event Start:April 30, 2017 22:00
Event End:May 05, 2017 06:00
Last Change: Entered 2017-04-25 18:58

Top of page Top of page


HWY 12 Northbound [ VROOMAN CK BRIDGE - VROOMAN CK BRIDGE ] - Recurring-Construction
Highway:HWY 12
Direction:Northbound
From/At:VROOMAN CK BRIDGE
To:VROOMAN CK BRIDGE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :1 through lane maintained by flagging operation.
Event Start:May 01, 2017 07:00
Event End:May 04, 2017 20:00
Last Change: Entered 2017-04-26 11:38

Top of page Top of page


HWY 12 Southbound [ VROOMAN CK BRIDGE - VROOMAN CK BRIDGE ] - Recurring-Construction
Highway:HWY 12
Direction:Southbound
From/At:VROOMAN CK BRIDGE
To:VROOMAN CK BRIDGE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :1 through lane maintained by flagging operation.
Event Start:May 01, 2017 07:00
Event End:May 04, 2017 20:00
Last Change: Entered 2017-04-26 11:42

Top of page Top of page


HWY 21 Southbound [ County Road 10 North / Grey Bruce Line - County Road 10 North / Grey Bruce Line ] - Recurring-Maintenance
Highway:HWY 21
Direction:Southbound
From/At:County Road 10 North / Grey Bruce Line
To:County Road 10 North / Grey Bruce Line
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Highway 21 at the Alvanley Intersection/Roundabout on April 24th to April 28th at 0700 hours to 1900 hours daily will have alternating lane closures in all directions due to road maintenance.
Event Start:April 24, 2017 07:00
Event End:April 28, 2017 19:00
Last Change: Entered 2017-04-21 15:08

Top of page Top of page


HWY 23 Northbound [ Line 89 - Line 89 ] - Recurring-Construction
Highway:HWY 23
Direction:Northbound
From/At:Line 89
To:Line 89
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 23 northbound and southbound at 1.2 kilometers north of Line 89 to 2.2 kilometers north of line 89 from April 25th at 0800 hours to April 28th at 1700 hours will have a right lane closure due to road maintenance.
Event Start:April 25, 2017 08:00
Event End:April 28, 2017 17:00
Last Change: Entered 2017-04-24 13:31

Top of page Top of page


HWY 23 Northbound [ Line 90 - Line 90 ] - Construction
Highway:HWY 23
Direction:Northbound
From/At:Line 90
To:Line 90
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 11, 2017 00:00
Event End:July 20, 2017 23:59
Last Change: Entered 2017-04-10 20:43

Top of page Top of page


HWY 3 Eastbound [ Sunset Road - Waynefleet Dunnville Townline Road ] - Recurring-Maintenance
Highway:HWY 3
Direction:Eastbound
From/At:Sunset Road
To:Waynefleet Dunnville Townline Road
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Alternating eastbound and westbound lane closure.
Event Start:April 24, 2017 09:00
Event End:April 28, 2017 18:00
Last Change: Entered 2017-04-21 17:32

Top of page Top of page


HWY 35 Northbound [ BOUNDARY RD - Hwy 7 ] - Recurring-Engineering Investigation
Highway:HWY 35
Direction:Northbound
From/At:BOUNDARY RD
To:Hwy 7
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Traffic will encounter alternating single lane closures. Lindsay
Event Start:April 05, 2017 08:00
Event End:May 05, 2017 18:00
Last Change: Entered 2017-03-31 13:48

Top of page Top of page


HWY 35/115 Northbound [ 7TH ROAD/DURHAM ROAD 9 - 8TH ROAD ] - Construction
Highway:HWY 35/115
Direction:Northbound
From/At:7TH ROAD/DURHAM ROAD 9
To:8TH ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 28, 2017 08:00
Event End:April 28, 2017 14:00
Last Change: Entered 2017-04-27 14:24

Top of page Top of page


HWY 35/115 Southbound [ 8TH ROAD - 7TH ROAD/DURHAM ROAD 9 ] - Construction
Highway:HWY 35/115
Direction:Southbound
From/At:8TH ROAD
To:7TH ROAD/DURHAM ROAD 9
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 28, 2017 09:00
Event End:April 28, 2017 14:00
Last Change: Entered 2017-04-27 14:26

Top of page Top of page


HWY 4 Northbound [ Dinsley Terrace - Victoria Terrace ] - Recurring-Construction
Highway:HWY 4
Direction:Northbound
From/At:Dinsley Terrace
To:Victoria Terrace
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 4 northbound alternating southbound, between Dinsley Terrace and Victoria Terrace, Clinton, reduced to a single lane of traffic, Monday, May 1st, 2017 until Friday, May 5th, 2017, daily, from 0800 hours until 1800 hours, for construction work operations, weather permitting and traffic control provided by flag persons.
Event Start:May 01, 2017 08:00
Event End:May 05, 2017 18:00
Last Change: Entered 2017-04-27 11:21

Top of page Top of page


HWY 40 Northbound [ Highway 402 - Highway 402 ] - Maintenance
Highway:HWY 40
Direction:Northbound
From/At:Highway 402
To:Highway 402
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Highway 40 Northbound and Southbound from Highway 402 to Rokeby Line will have alternating lane closures on April 28th 2017, from 0730 to 1200 hours.
Event Start:April 28, 2017 07:30
Event End:April 28, 2017 12:00
Last Change: Entered 2017-04-27 16:52

Top of page Top of page


HWY 400 Northbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 20:00 and expanding to second lane at 21:00. First lane open at 07:00 and all lanes open at 10:00. From Monday to Thursday, first lane closes at 20:00 and expanding to second lane at 22:00. First lane opens at 07:00 and all lanes open at 10:00. On Friday, first lane closes at 22:00 and expanding to second lane at 23:00. First lane opens at 07:00 and all lanes open at 08:00. On Saturday, first lane closes at 20:00 and expanding to second lane at 23:00. First lane opens at 09:00 and all lanes open at 10:00.
Event Start:April 23, 2017 20:00
Event End:April 30, 2017 10:00
Last Change: Entered 2017-04-19 10:14

Top of page Top of page


HWY 400 Northbound [ 5TH LINE - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:5TH LINE
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 30, 2017 19:00
Event End:May 06, 2017 11:00
Last Change: Entered 2017-04-19 17:29

Top of page Top of page


HWY 400 Northbound [ 5TH LINE - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:5TH LINE
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 23, 2017 21:00
Event End:April 29, 2017 08:00
Last Change: Entered 2017-04-11 09:50

Top of page Top of page


HWY 400 Northbound [ 5TH LINE - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:5TH LINE
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Sunday, two lanes closes at 21:00 and first lane open at 06:00 and all lanes open at 11:00. Monday to Thursday, first lane closes at 19:00 and expanding to second lane at 21:00. First lane open at 06:00 and all lanes open at 11:00. On Friday, first lane closes at 21:00 and expanding to second lane at 22:00. First lane opens at 08:00 and all lanes open at 11:00.
Event Start:April 23, 2017 19:00
Event End:April 29, 2017 11:00
Last Change: Entered 2017-04-19 17:15

Top of page Top of page


HWY 400 Northbound [ AURORA ROAD. - HWY 9 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:AURORA ROAD.
To:HWY 9
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :This is an expanding closure. Monday to Thursday, Lane 1 closes at 19:00, lane 2 closes at 20:00. Lane 2 reopens at 6:00, lane 1 opens at 11:00. On Friday, lane 1 closes at 19:00, lane 2 closes at 21:00. Lane 2 reopens at 8:00, all lanes open at 11:00. On Saturday, Lane 1 closes at 17:00, lane 2 closes at 19:00. Lane 2 reopen at 10:00, lane 1 opens at 11:00. On Sunday, Lanes 1 and 2 close at 21:00. Lane 2 reopens at 6:00, lane 1 opens at 11:00.
Event Start:April 24, 2017 17:00
Event End:May 01, 2017 11:00
Last Change: Entered 2017-04-19 09:54

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :One lane closes all day from Monday to Saturday. From Monday to Thursday, second lane closes at 20:00 and opens at 06:00. On Friday, second lane closes at 22:00 and opens at 10:00. On Saturday a second lane closes at 22:00 and reopens at 10:00. On Sunday a second lane closes at 20:00 and reopens at 6:00.
Event Start:May 01, 2017 00:00
Event End:May 07, 2017 23:59
Last Change: Entered 2017-04-25 19:32

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :From Monday to Thursday, one lane closes all day and second lane closes at 20:00 and opens at 06:00. On Friday, one lane closes from 00:00 and reopens at 12:00. First lane closes again at 20:00 and opens at 23:59, second lane closes at 22:00 and opens at 10:00.
Event Start:April 24, 2017 00:00
Event End:April 28, 2017 23:59
Last Change: Entered 2017-04-21 10:10

Top of page Top of page


HWY 400 Northbound [ ESSA ROAD / SIMCOE ROAD 27 - DUNLOP STREET / SIMCOE ROAD 90 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:ESSA ROAD / SIMCOE ROAD 27
To:DUNLOP STREET / SIMCOE ROAD 90
Lanes Affected:2 Right Lane(s)
Traffic Impact :On-ramp from ESSA ROAD / SIMCOE ROAD 27 EB
ReasonRecurring-Construction
Comment :On Sunday first lane closed at 20:00, second lane closed at 22:00. Both lanes opened at 07:00 On Monday first lane closed at 20:00, second lane closed at 21:00. Both lanes open at 07:00. From Tuesday to Thursday first lane closed at 20:00, second lane closed at 22:00. Both lanes open at 07:00. On Friday first lane closed at 20:00, second lane closed at 22:00. Both lanes open at 08:00.
Event Start:April 23, 2017 20:00
Event End:April 29, 2017 07:00
Last Change: Entered 2017-04-20 07:36

Top of page Top of page


HWY 400 Northbound [ HWY 89/SIMCOE ROAD 89 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Maintenance
Highway:HWY 400
Direction:Northbound
From/At:HWY 89/SIMCOE ROAD 89
To:HWY 89/SIMCOE ROAD 89
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 22:00
Event End:May 04, 2017 05:00
Last Change: Entered 2017-03-22 07:45

Top of page Top of page


HWY 400 Northbound [ SEVERN RIVER BRIDGE - SEVERN RIVER BRIDGE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:SEVERN RIVER BRIDGE
To:SEVERN RIVER BRIDGE
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 08:00
Event End:April 28, 2017 18:00
Last Change: Entered 2017-04-20 15:16

Top of page Top of page


HWY 400 Northbound [ STEELES AVENUE - 407ETR ] - Recurring-Engineering Investigation
Highway:HWY 400
Direction:Northbound
From/At:STEELES AVENUE
To:407ETR
Lanes Affected:1 Left Lane(s)
Traffic Impact :Off-ramp to HIGHWAY 7 EB/WB
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 27, 2017 10:00
Event End:April 28, 2017 14:00
Last Change: Entered 2017-04-25 08:35

Top of page Top of page


HWY 400 Northbound On-ramp [ HWY 89/SIMCOE ROAD 89 Northbound - ] - Recurring-Maintenance
Highway:HWY 400
Direction:Northbound
From/At:HWY 89/SIMCOE ROAD 89 Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 22:00
Event End:May 04, 2017 05:00
Last Change: Entered 2017-03-22 09:42

Top of page Top of page


HWY 400 Southbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 21:00 and expanding to second lane at 22:00. All lanes open at 05:00. Monday to Thursday, first lane closes at 18:00 and expanding to second lane at 19:00. All lanes open at 05:00. On Friday, two lanes close at 19:00 and first lane open at 08:00 and all lanes open at 10:00. On Saturday, first lane closes at 21:00 and expanding to second lane at 22:00. First lane opens at 09:00 and all lanes open at 10:00.
Event Start:April 23, 2017 18:00
Event End:April 30, 2017 10:00
Last Change: Entered 2017-04-19 10:18

Top of page Top of page


HWY 400 Southbound [ 5TH LINE - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:5TH LINE
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 20:00 and expanding to second lane at 22:00. All lanes open at 05:00. Monday to Thursday, first lane closes at 11:00 and expanding to second lane at 19:00. All lanes open at 05:00. On Friday, first lane closes at 18:00 and expanding to second lane at 20:00. First lane opens at 08:00 and all lanes open at 10:00.
Event Start:April 23, 2017 20:00
Event End:April 29, 2017 10:00
Last Change: Entered 2017-04-19 17:26

Top of page Top of page


HWY 400 Southbound [ 5TH LINE - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:5TH LINE
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 23, 2017 19:00
Event End:April 29, 2017 08:00
Last Change: Entered 2017-04-11 09:55

Top of page Top of page


HWY 400 Southbound [ 5TH LINE - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:5TH LINE
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 30, 2017 20:00
Event End:May 06, 2017 10:00
Last Change: Entered 2017-04-19 17:32

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - HWY 9 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:CANAL ROAD.
To:HWY 9
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB, On-ramp from HWY 9 WB
ReasonRecurring-Construction
Comment : Monday to Thursday nights, first lane closes at 11:00, second lane alternating lane closes at 19:00. All lanes open 05:00. Friday night and Saturday night, first lane closes at 18:00, second lane closes at 20:00. Saturday morning, first lane opens 09:00, second lane opens 11:00. Sunday night, first lane closes 20:00, second lane closes 22:00. Both lanes open 05:00.
Event Start:April 24, 2017 11:00
Event End:May 01, 2017 11:00
Last Change: Entered 2017-04-19 10:03

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :One lane closes all day from Monday to Saturday. From Monday to Thursday, second lane closes at 20:00 and opens at 06:00. On Friday, second lane closes at 22:00 and opens at 09:00. On Saturday a second lane closes at 20:00. On Sunday one lane reopens at 9:00 and all lanes reopen at 11:00. One lane closes again at 21:00 expanding to two lanes close at 22:00. The second lane reopens at 6:00.
Event Start:May 01, 2017 00:00
Event End:May 07, 2017 23:59
Last Change: Entered 2017-04-25 19:33

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :One lane closes all day for a week. From Monday to Thursday, second lane closes at 20:00 and opens at 06:00. On Friday, second lane closes at 22:00 and opens at 09:00.
Event Start:April 24, 2017 00:00
Event End:April 28, 2017 23:59
Last Change: Entered 2017-04-21 10:16

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Maintenance
Highway:HWY 400
Direction:Southbound
From/At:HWY 89/SIMCOE ROAD 89
To:HWY 89/SIMCOE ROAD 89
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 22:00
Event End:May 04, 2017 05:00
Last Change: Entered 2017-03-22 08:25

Top of page Top of page


HWY 400 Southbound On-ramp [ HWY 9 Westbound - ] - Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 9 Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 03, 2017 22:00
Event End:June 02, 2017 05:00
Last Change: Entered 2017-03-28 16:39

Top of page Top of page


HWY 400 Southbound On-ramp [ LOWER BIG CHUTE ROAD Southbound - ] - Recurring-Maintenance
Highway:HWY 400
Direction:Southbound
From/At:LOWER BIG CHUTE ROAD Southbound
To:
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 09:00
Event End:May 04, 2017 15:00
Last Change: Entered 2017-04-26 14:07

Top of page Top of page


HWY 401 Eastbound [ BOWMANVILE CREEK - SOPER CREEK ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:BOWMANVILE CREEK
To:SOPER CREEK
Lanes Affected:1 Right Lane(s)
Traffic Impact :On-ramp from LIBERTY ST NB
ReasonRecurring-Maintenance
Comment :
Event Start:April 30, 2017 18:00
Event End:May 05, 2017 11:00
Last Change: Entered 2017-04-27 12:33

Top of page Top of page


HWY 401 Eastbound [ Bloomfield Road (81KM) - Kent Bridge Rd / Kent Road 15 (101KM) ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:Bloomfield Road (81KM)
To:Kent Bridge Rd / Kent Road 15 (101KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 29, 2017 18:00
Event End:April 29, 2017 20:00
Last Change: Entered 2017-04-25 16:54

Top of page Top of page


HWY 401 Eastbound [ Bloomfield Road (81KM) - Kent Bridge Rd / Kent Road 15 (101KM) ] - Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:Bloomfield Road (81KM)
To:Kent Bridge Rd / Kent Road 15 (101KM)
Lanes Affected:ALL LANES CLOSED
Traffic Impact :On-ramp from Highway 40 / Communication Road (90KM) EB, On-ramp from Highway 40 / Communication Road (90KM) WB, Off-ramp to Highway 40 / Communication Road (90KM) EB, Off-ramp to Highway 40 / Communication Road (90KM) WB
ReasonMaintenance
Comment :Highway 401 eastbound and westbound will have a full closure between Kent Bridge road and Bloomfield Road from April 29th at 2000 hours to April 30th at 1000 hours due to the demolition of the Highway 40 structure that is over Highway 401. On and off ramps in both eastbound and westbound at Communication road will also be closed.
Event Start:April 29, 2017 20:00
Event End:April 30, 2017 10:00
Last Change: Entered 2017-04-24 13:18

Top of page Top of page


HWY 401 Eastbound [ CATARAQUI RIVER BRIDGE - HWY 15 (IC 623) ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:CATARAQUI RIVER BRIDGE
To:HWY 15 (IC 623)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Closure in both directions. Kingston
Event Start:April 30, 2017 22:00
Event End:May 01, 2017 06:00
Last Change: Entered 2017-04-27 17:40

Top of page Top of page


HWY 401 Eastbound [ CATARAQUI RIVER BRIDGE - HWY 15 (IC 623) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:CATARAQUI RIVER BRIDGE
To:HWY 15 (IC 623)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Traffic will encounter single lane closures. Kingston
Event Start:May 01, 2017 19:00
Event End:May 05, 2017 06:00
Last Change: Entered 2017-04-25 21:27

Top of page Top of page


HWY 401 Eastbound [ COURTICE ROAD - HOLT ROAD ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:COURTICE ROAD
To:HOLT ROAD
Lanes Affected:2 Right Lane(s)
Traffic Impact :Off-ramp to COURTICE ROAD EB
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 22:00
Event End:May 03, 2017 05:00
Last Change: Entered 2017-04-25 13:18

Top of page Top of page


HWY 401 Eastbound [ GUELPH LINE - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GUELPH LINE
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Wednesday to Friday one lane closes at 22:00 and expanding to two lanes at 23:00. Thursday and Friday all lanes reopen at 5:00. On Saturday one lane reopens at 6:00 and all lanes reopen at 8:00.
Event Start:April 26, 2017 22:00
Event End:April 29, 2017 05:00
Last Change: Entered 2017-04-21 14:46

Top of page Top of page


HWY 401 Eastbound [ Gracey Side Road (52KM) - Dillon Rd (77KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Gracey Side Road (52KM)
To:Dillon Rd (77KM)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Alternating lane closure eastbound and westbound.
Event Start:March 27, 2017 07:00
Event End:May 15, 2017 23:59
Last Change: Entered 2017-03-25 20:46

Top of page Top of page


HWY 401 Eastbound [ Highway 8 / King Street E/Shantz Hill Rd (278KM) - Franklin Blvd (284KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Highway 8 / King Street E/Shantz Hill Rd (278KM)
To:Franklin Blvd (284KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 401 from King St. to Franklin Blvd will have the left lane closed in both directions April 24-27 2000-0600 hours and April 28 2100-0800 hours
Event Start:April 24, 2017 20:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-24 07:37

Top of page Top of page


HWY 401 Eastbound [ Kent Rd 10 / Charing Cross Road (86KM) - Kent Bridge Rd / Kent Road 15 (101KM) ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:Kent Rd 10 / Charing Cross Road (86KM)
To:Kent Bridge Rd / Kent Road 15 (101KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 26, 2017 07:30
Event End:April 29, 2017 18:00
Last Change: Entered 2017-04-25 16:52

Top of page Top of page


HWY 401 Eastbound [ LARUE MILLS RD - LARUE MILLS RD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:LARUE MILLS RD
To:LARUE MILLS RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:May 01, 2017 07:00
Event End:May 01, 2017 19:00
Last Change: Entered 2017-04-22 04:51

Top of page Top of page


HWY 401 Eastbound [ LARUE MILLS RD - LARUE MILLS RD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:LARUE MILLS RD
To:LARUE MILLS RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 28, 2017 07:00
Event End:April 28, 2017 19:00
Last Change: Entered 2017-04-22 04:48

Top of page Top of page


HWY 401 Eastbound [ LARUE MILLS RD - LARUE MILLS RD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:LARUE MILLS RD
To:LARUE MILLS RD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:May 02, 2017 07:00
Event End:May 02, 2017 19:00
Last Change: Entered 2017-04-22 04:53

Top of page Top of page


HWY 401 Eastbound [ LYNDE CREEK - STEVENSON ROAD ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:LYNDE CREEK
To:STEVENSON ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:May 01, 2017 21:00
Event End:May 05, 2017 07:00
Last Change: Entered 2017-04-05 16:00

Top of page Top of page


HWY 401 Eastbound [ MONTREAL ST (IC 619) - HWY 15 (IC 623) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:MONTREAL ST (IC 619)
To:HWY 15 (IC 623)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Nightly lane closures Hwy 401 E/B & W/B btwn Montreal St and Hwy 15 (Kingston)
Event Start:April 24, 2017 19:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-20 13:52

Top of page Top of page


HWY 401 Eastbound [ Norwich Ave / Oxford Road 59 (232KM) - Towerline Rd / County Road 15 (236KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Norwich Ave / Oxford Road 59 (232KM)
To:Towerline Rd / County Road 15 (236KM)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Eastbound and westbound left lane closure with shoulder closures.
Event Start:April 24, 2017 00:00
Event End:April 28, 2017 23:59
Last Change: Entered 2017-04-20 17:33

Top of page Top of page


HWY 401 Eastbound [ OLD WILTON RD - OLD WILTON RD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:OLD WILTON RD
To:OLD WILTON RD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Traffic will encounter single lane closures eastbound and westbound. Odessa
Event Start:April 27, 2017 00:00
Event End:May 01, 2017 23:59
Last Change: Entered 2017-04-27 09:49

Top of page Top of page


HWY 401 Eastbound [ TRAFALGAR ROAD - TRAFALGAR ROAD ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:TRAFALGAR ROAD
To:TRAFALGAR ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :Off-ramp to TRAFALGAR ROAD NB/SB
ReasonRecurring-Maintenance
Comment :
Event Start:April 24, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 10:31

Top of page Top of page


HWY 401 Eastbound [ Veterans Memorial Parkway (194KM) - Veterans Memorial Parkway (194KM) ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:Veterans Memorial Parkway (194KM)
To:Veterans Memorial Parkway (194KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :On-ramp from Veterans Memorial Parkway (194KM) EB/WB, Off-ramp to Veterans Memorial Parkway (194KM) EB/WB
ReasonConstruction
Comment :Highway 401 eastbound and westbound at Veterans Memorial Parkway will have a full on and off ramp closure and left lane closures starting on April 3rd, 2017 for 6 months due to construction.
Event Start:April 03, 2017 00:00
Event End:October 02, 2017 00:00
Last Change: Entered 2017-03-31 17:12

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - ALLEN ROAD Northbound/Southbound ] - Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:
To:ALLEN ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:May 05, 2017 22:00
Event End:May 07, 2017 10:00
Last Change: Entered 2017-03-27 13:56

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - BROCK ROAD Southbound ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:
To:BROCK ROAD Southbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 23, 2017 22:00
Event End:April 29, 2017 05:00
Last Change: Entered 2017-04-19 12:23

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - HWY 404 Northbound Collector ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:
To:HWY 404 Northbound Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Access to 404 Northbound will remain open. Only access to Sheppard Avenue is closed.
Event Start:April 21, 2017 23:00
Event End:November 17, 2017 05:00
Last Change: Entered 2017-04-18 17:56

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - HWY 427 Northbound ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:
To:HWY 427 Northbound
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 25, 2017 23:00
Event End:April 29, 2017 05:00
Last Change: Entered 2017-04-24 11:15

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 400/BLACK CREEK DRIVE Collector - MORNINGSIDE AVE Collector ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:HWY 400/BLACK CREEK DRIVE Collector
To:MORNINGSIDE AVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 26, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-25 11:01

Top of page Top of page


HWY 401 Eastbound Express [ HWY 400/BLACK CREEK DRIVE Express - MORNINGSIDE AVE Express ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:HWY 400/BLACK CREEK DRIVE Express
To:MORNINGSIDE AVE Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 26, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-25 11:01

Top of page Top of page


HWY 401 Eastbound Express [ HWY 404 Express - VICTORIA PARK AVE Express ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:HWY 404 Express
To:VICTORIA PARK AVE Express
Lanes Affected:2 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 26, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-06 08:08

Top of page Top of page


HWY 401 Eastbound Express [ JANE ST Express - AVENUE ROAD Express ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JANE ST Express
To:AVENUE ROAD Express
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 23:30
Event End:April 28, 2017 05:30
Last Change: Entered 2017-04-18 07:32

Top of page Top of page


HWY 401 Eastbound Express [ JANE ST Express - HWY 404 Express ] - Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:JANE ST Express
To:HWY 404 Express
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :Annual Spring Maintenance. Closure of Express from Jane Street to 404/DVP.
Event Start:April 29, 2017 23:00
Event End:April 30, 2017 08:00
Last Change: Entered 2017-03-20 08:09

Top of page Top of page


HWY 401 Eastbound Express [ MAVIS ROAD Express - DIXIE ROAD Express ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:MAVIS ROAD Express
To:DIXIE ROAD Express
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 23:59
Event End:April 29, 2017 05:00
Last Change: Entered 2017-04-20 10:07

Top of page Top of page


HWY 401 Eastbound Off-ramp [ - Franklin Blvd (284KM) Eastbound ] - Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:
To:Franklin Blvd (284KM) Eastbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :The Highway 401 Eastbound off-ramp to Franklin Boulevard will be closed on April 30th from from 0800-1000 hours in order to do a hydro pole repair //
Event Start:April 30, 2017 08:00
Event End:April 30, 2017 10:00
Last Change: Entered 2017-04-17 12:33

Top of page Top of page


HWY 401 Eastbound On-ramp [ LESLIE STREET Northbound - ] - Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:LESLIE STREET Northbound
To:
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:May 01, 2017 00:00
Event End:May 02, 2017 05:00
Last Change: Entered 2017-04-24 08:24

Top of page Top of page


HWY 401 Westbound [ HOLT ROAD - COURTICE ROAD ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:HOLT ROAD
To:COURTICE ROAD
Lanes Affected:2 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 18:00
Event End:May 06, 2017 06:00
Last Change: Entered 2017-04-25 09:37

Top of page Top of page


HWY 401 Westbound [ HWY 15 (IC 623) - CATARAQUI RIVER BRIDGE ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 15 (IC 623)
To:CATARAQUI RIVER BRIDGE
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Traffic will encounter single lane closures. Kingston
Event Start:May 01, 2017 19:00
Event End:May 05, 2017 06:00
Last Change: Entered 2017-04-25 21:28

Top of page Top of page


HWY 401 Westbound [ HWY 15 (IC 623) - CATARAQUI RIVER BRIDGE ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 15 (IC 623)
To:CATARAQUI RIVER BRIDGE
Lanes Affected:1 Right Lane(s)
Traffic Impact :On-ramp from CATARAQUI RIVER BRIDGE WB, Off-ramp to HWY 15 (IC 623) WB
ReasonRecurring-Construction
Comment :Right lane closure in both directions. Kingston
Event Start:May 08, 2017 19:00
Event End:May 12, 2017 06:00
Last Change: Entered 2017-04-27 17:55

Top of page Top of page


HWY 401 Westbound [ HWY 25 - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Wednesday to Friday one lane closes at 22:00 and expands to two lanes at 23:00. All lanes reopen Thursday and Friday at 6:00. On Saturday one lane reopens at 6:00 and all lanes reopen at 8:00.
Event Start:April 26, 2017 22:00
Event End:April 29, 2017 06:00
Last Change: Entered 2017-04-21 14:45

Top of page Top of page


HWY 401 Westbound [ Kent Bridge Rd / Kent Road 15 (101KM) - Bloomfield Road (81KM) ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:Kent Bridge Rd / Kent Road 15 (101KM)
To:Bloomfield Road (81KM)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Highway 401 eastbound and westbound from Kent Bridge Road to Bloomfield Road on April 30th starting at 1000 hours to November 24th at 1000 hours will have a right lane closure due to road maintenance.
Event Start:April 30, 2017 10:00
Event End:November 24, 2017 10:00
Last Change: Entered 2017-04-24 13:10

Top of page Top of page


HWY 401 Westbound [ OLD WILTON RD - OLD WILTON RD ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:OLD WILTON RD
To:OLD WILTON RD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Traffic will encounter single lane closures eastbound and westbound. Odessa
Event Start:April 27, 2017 00:00
Event End:May 01, 2017 23:59
Last Change: Entered 2017-04-27 09:51

Top of page Top of page


HWY 401 Westbound [ SOPER CREEK - BOWMANVILE CREEK ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:SOPER CREEK
To:BOWMANVILE CREEK
Lanes Affected:1 Right Lane(s)
Traffic Impact :On-ramp from LIBERTY ST SB, Off-ramp to LIBERTY ST NB
ReasonRecurring-Maintenance
Comment :
Event Start:April 30, 2017 18:00
Event End:May 05, 2017 06:00
Last Change: Entered 2017-04-27 12:40

Top of page Top of page


HWY 401 Westbound [ STEVENSON ROAD - LYNDE CREEK ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:STEVENSON ROAD
To:LYNDE CREEK
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:May 01, 2017 20:00
Event End:May 05, 2017 05:30
Last Change: Entered 2017-04-05 16:00

Top of page Top of page


HWY 401 Westbound Collector Off-ramp [ - ALLEN ROAD Northbound/Southbound ] - Maintenance
Highway:HWY 401
Direction:Westbound
From/At:
To:ALLEN ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:May 05, 2017 22:00
Event End:May 07, 2017 10:00
Last Change: Entered 2017-03-27 14:04

Top of page Top of page


HWY 401 Westbound Collector Off-ramp [ - BAYVIEW AVE Northbound/Southbound ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:BAYVIEW AVE Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :401 Westbound Off-Ramp to Bayview Avenue will be closed starting Friday Apr 28 at 23:00 until Monday May 1st at 5:00.
Event Start:April 28, 2017 23:00
Event End:May 01, 2017 05:00
Last Change: Entered 2017-04-25 14:28

Top of page Top of page


HWY 401 Westbound Collector Off-ramp [ - BROCK ROAD Southbound ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:BROCK ROAD Southbound
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 23, 2017 22:00
Event End:April 29, 2017 05:00
Last Change: Entered 2017-04-19 12:24

Top of page Top of page


HWY 401 Westbound Collector [ MORNINGSIDE AVE Collector - HWY 400/BLACK CREEK DRIVE Collector ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:MORNINGSIDE AVE Collector
To:HWY 400/BLACK CREEK DRIVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 26, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-25 11:03

Top of page Top of page


HWY 401 Westbound Collector [ YONGE ST Collector - ALLEN ROAD Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:YONGE ST Collector
To:ALLEN ROAD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 27, 2017 21:00
Event End:April 28, 2017 05:30
Last Change: Entered 2017-04-27 11:15

Top of page Top of page


HWY 401 Westbound Express [ HWY 404 Express - HWY 404 Express ] - Maintenance
Highway:HWY 401
Direction:Westbound
From/At:HWY 404 Express
To:HWY 404 Express
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:April 28, 2017 23:00
Event End:April 29, 2017 07:00
Last Change: Entered 2017-03-20 07:55

Top of page Top of page


HWY 401 Westbound Express [ MORNINGSIDE AVE Express - HWY 400/BLACK CREEK DRIVE Express ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:MORNINGSIDE AVE Express
To:HWY 400/BLACK CREEK DRIVE Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 26, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-25 11:02

Top of page Top of page


HWY 401 Westbound Off-ramp [ - HWY 15 (IC 623) Northbound/Southbound ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:HWY 15 (IC 623) Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Traffic will encounter full off ramp closure. Kingston
Event Start:May 01, 2017 19:00
Event End:May 05, 2017 06:00
Last Change: Entered 2017-04-25 21:40

Top of page Top of page


HWY 401 Westbound On-ramp [ Cty Rd 45 (IC 474) / Baltimore Rd Northbound/Southbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:Cty Rd 45 (IC 474) / Baltimore Rd Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Cobourg. Nightly ramp closures from 10pm-7am on Tuesday May 2, and Wednesday May 3. Only one ramp will be closed at any one time during this period. Access to emergency vehicles will be available if required.
Event Start:May 02, 2017 22:00
Event End:May 04, 2017 07:00
Last Change: Entered 2017-04-25 09:23

Top of page Top of page


HWY 401 Westbound On-ramp [ HWY 15 (IC 623) Westbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 15 (IC 623) Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Traffic will encounter full on ramp closure. Kingston
Event Start:May 01, 2017 19:00
Event End:May 05, 2017 06:00
Last Change: Entered 2017-04-25 21:38

Top of page Top of page


HWY 401 Westbound Transfer [ JANE ST Collector to Express - ] - Maintenance
Highway:HWY 401
Direction:Westbound
From/At:JANE ST Collector to Express
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:April 29, 2017 23:00
Event End:April 30, 2017 08:00
Last Change: Entered 2017-03-20 08:12

Top of page Top of page


HWY 402 Eastbound [ Adelaide Road - Miller Road ] - Construction
Highway:HWY 402
Direction:Eastbound
From/At:Adelaide Road
To:Miller Road
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 402 eastbound and westbound, between Adelaide Road and Miller Road, Delaware, continuously reduced from 2 lanes to a single lane of traffic, from Monday, April 3rd, 2017 at 0000 hours until Friday, July 21st, 2017 at 2400 hours, for construction work operations.
Event Start:April 03, 2017 00:00
Event End:July 21, 2017 23:59
Last Change: Entered 2017-03-29 13:13

Top of page Top of page


HWY 402 Eastbound [ Adelaide Road - Miller Road ] - Construction
Highway:HWY 402
Direction:Eastbound
From/At:Adelaide Road
To:Miller Road
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Alternating eastbound and westbound lane closures
Event Start:April 27, 2017 20:00
Event End:April 28, 2017 03:00
Last Change: Entered 2017-04-26 18:07

Top of page Top of page


HWY 402 Eastbound [ Adelaide Road - Miller Road ] - Construction
Highway:HWY 402
Direction:Eastbound
From/At:Adelaide Road
To:Miller Road
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Alternating eastbound and westbound lane closures.
Event Start:May 01, 2017 20:00
Event End:May 02, 2017 03:00
Last Change: Entered 2017-04-26 18:10

Top of page Top of page


HWY 402 Eastbound [ Canada/USA Border / Blue Water Bridge - Highway 401 (106KM) ] - Recurring-Maintenance
Highway:HWY 402
Direction:Eastbound
From/At:Canada/USA Border / Blue Water Bridge
To:Highway 401 (106KM)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Eastbound and westbound alternating lane closures.
Event Start:April 24, 2017 09:00
Event End:April 28, 2017 18:00
Last Change: Entered 2017-04-21 17:26

Top of page Top of page


HWY 402 Eastbound [ Highway 401 (106KM) - Highway 401 (106KM) ] - Construction
Highway:HWY 402
Direction:Eastbound
From/At:Highway 401 (106KM)
To:Highway 401 (106KM)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 402 eastbound, from 500 metres west to 200 metres east of Highway 401 (Interchange 183) eastbound flyover, London, reduced from 2 lanes to a single lane of traffic, Monday, April 3rd, 2017 at 0700 hours until Friday, June 30th, 2017 at 2400 hours, for construction work operations, with reduced speed and advanced signing in place.
Event Start:April 03, 2017 07:00
Event End:June 30, 2017 23:59
Last Change: Entered 2017-03-31 13:22

Top of page Top of page


HWY 403 HAMILTON Eastbound [ 403/401 (0KM) - Oxford County Rd 55 (5KM) ] - Recurring-Construction
Highway:HWY 403 HAMILTON
Direction:Eastbound
From/At:403/401 (0KM)
To:Oxford County Rd 55 (5KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Eastbound and westbound left lane closure.
Event Start:April 24, 2017 00:00
Event End:April 28, 2017 23:59
Last Change: Entered 2017-04-20 17:29

Top of page Top of page


HWY 403 HAMILTON Eastbound [ WILSON STREET - LINCOLN M. ALEXANDER PARKWAY ] - Recurring-Construction
Highway:HWY 403 HAMILTON
Direction:Eastbound
From/At:WILSON STREET
To:LINCOLN M. ALEXANDER PARKWAY
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 6 SOUTH NB, On-ramp from LINCOLN M. ALEXANDER PARKWAY WB, Off-ramp to LINCOLN M. ALEXANDER PARKWAY EB, Off-ramp to HWY 6 SOUTH NB/SB
ReasonRecurring-Construction
Comment :
Event Start:April 23, 2017 21:00
Event End:April 29, 2017 05:00
Last Change: Entered 2017-04-20 11:44

Top of page Top of page


HWY 403 HAMILTON Westbound [ ABERDEEN AVE - LINCOLN M. ALEXANDER PARKWAY ] - Recurring-Construction
Highway:HWY 403 HAMILTON
Direction:Westbound
From/At:ABERDEEN AVE
To:LINCOLN M. ALEXANDER PARKWAY
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from LINCOLN M. ALEXANDER PARKWAY WB, Off-ramp to LINCOLN M. ALEXANDER PARKWAY EB
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 20:00 and expanding to second lane at 22:00. Monday to Thursday, first lane closes at 20:00 and expanding to second lane at 23:59. On Friday, first lane closes at 20:00 and expanding to second lane at 23:00. For all days first lane open at 06:00 and all lanes open at 07:00.
Event Start:April 23, 2017 20:00
Event End:April 29, 2017 07:00
Last Change: Entered 2017-04-20 12:08

Top of page Top of page


HWY 403 HAMILTON Westbound [ LINCOLN M. ALEXANDER PARKWAY - WILSON STREET ] - Recurring-Construction
Highway:HWY 403 HAMILTON
Direction:Westbound
From/At:LINCOLN M. ALEXANDER PARKWAY
To:WILSON STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 6 SOUTH NB, Off-ramp to HWY 6 SOUTH SB
ReasonRecurring-Construction
Comment :
Event Start:April 23, 2017 22:00
Event End:April 29, 2017 06:00
Last Change: Entered 2017-04-20 12:23

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ EGLINTON AVE Collector - HWY 401 Collector ] - Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:EGLINTON AVE Collector
To:HWY 401 Collector
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 27, 2017 22:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-27 14:32

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ EGLINTON AVE Collector - MATHESON BLVD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:EGLINTON AVE Collector
To:MATHESON BLVD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from EGLINTON AVE EB, On-ramp from EGLINTON AVE WB
ReasonRecurring-Construction
Comment :Sunday to Friday, two alternative lanes close at 23:59 and all lanes open at 05:00.
Event Start:April 23, 2017 00:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 07:55

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ EGLINTON AVE Collector - MATHESON BLVD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:EGLINTON AVE Collector
To:MATHESON BLVD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from EGLINTON AVE EB, On-ramp from EGLINTON AVE WB
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 23:59
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 15:20

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ EGLINTON AVE Collector - MATHESON BLVD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:EGLINTON AVE Collector
To:MATHESON BLVD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from EGLINTON AVE EB, On-ramp from EGLINTON AVE WB
ReasonRecurring-Construction
Comment :Sunday to Friday, two alternative lanes close at 23:59 and all lanes open at 05:00.
Event Start:April 30, 2017 00:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-26 15:32

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Express [ EGLINTON AVE Express - HWY 401 Express ] - Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:EGLINTON AVE Express
To:HWY 401 Express
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 27, 2017 22:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-27 14:35

Top of page Top of page


HWY 404 Northbound [ VANDORF SIDEROAD - VANDORF SIDEROAD ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:VANDORF SIDEROAD
To:VANDORF SIDEROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :First lane closes 22:00 Monday to Friday, nightly. Second lane closes at 23:00. First lane opens at 05:00, second lane opens at 06:00.
Event Start:April 24, 2017 22:00
Event End:April 29, 2017 06:00
Last Change: Entered 2017-04-17 12:50

Top of page Top of page


HWY 404 Northbound [ YORK MILLS ROAD - HWY 401 ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:YORK MILLS ROAD
To:HWY 401
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to HWY 401 EB, Off-ramp to HWY 401 WB
ReasonRecurring-Construction
Comment :
Event Start:April 27, 2017 23:59
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-26 05:52

Top of page Top of page


HWY 404 Northbound Collector [ SHEPPARD AVE Collector - SHEPPARD AVE Collector ] - Recurring-Maintenance
Highway:HWY 404
Direction:Northbound
From/At:SHEPPARD AVE Collector
To:SHEPPARD AVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to SHEPPARD AVE EB
ReasonRecurring-Maintenance
Comment :On Sunday, first lane closes at 23:00 and expanding to second lane at 02:00. Monday to Thursday, first lane closes at 23:00 and expanding to second lane at 23:59. For all days all lanes reopen at 05:00.
Event Start:April 23, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-18 15:25

Top of page Top of page


HWY 404 Northbound Express [ FINCH AVE Express - MAJOR MACKENZIE DRIVE Express ] - Recurring-Moving Maintenance Closure
Highway:HWY 404
Direction:Northbound
From/At:FINCH AVE Express
To:MAJOR MACKENZIE DRIVE Express
Lanes Affected:3 Left Lane(s)
Traffic Impact :
ReasonRecurring-Moving Maintenance Closure
Comment :Work will be done between 1:00 and 5:00 between Finch and Steeles and only 2 lanes will be closed between 407 and Major Mackenzie.
Event Start:April 24, 2017 23:59
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 13:31

Top of page Top of page


HWY 404 Northbound Express [ SHEPPARD AVE Express - SHEPPARD AVE Express ] - Recurring-Maintenance
Highway:HWY 404
Direction:Northbound
From/At:SHEPPARD AVE Express
To:SHEPPARD AVE Express
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 23, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 11:57

Top of page Top of page


HWY 404 Southbound [ SHEPPARD AVE - SHEPPARD AVE ] - Construction
Highway:HWY 404
Direction:Southbound
From/At:SHEPPARD AVE
To:SHEPPARD AVE
Lanes Affected:1 Right Lane(s)
Traffic Impact :On-ramp from SHEPPARD AVE EB/WB
ReasonConstruction
Comment :
Event Start:April 27, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-24 11:49

Top of page Top of page


HWY 404 Southbound [ SHEPPARD AVE - SHEPPARD AVE ] - Recurring-Maintenance
Highway:HWY 404
Direction:Southbound
From/At:SHEPPARD AVE
To:SHEPPARD AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from FAIRVIEW MALL DRIVE / SHEPPARD AVE NB
ReasonRecurring-Maintenance
Comment :Sunday to Friday, two alternative lanes close at 23:59 and first lane opens at 05:00 and all lanes open at 06:00.
Event Start:April 23, 2017 00:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-18 15:30

Top of page Top of page


HWY 404 Southbound [ STOUFFVILLE ROAD - STOUFFVILLE ROAD ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:STOUFFVILLE ROAD
To:STOUFFVILLE ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STOUFFVILLE ROAD WB
ReasonRecurring-Construction
Comment :
Event Start:April 28, 2017 22:00
Event End:April 29, 2017 06:00
Last Change: Entered 2017-04-27 09:16

Top of page Top of page


HWY 404 Southbound [ VANDORF SIDEROAD - VANDORF SIDEROAD ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:VANDORF SIDEROAD
To:VANDORF SIDEROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :First lane closes at 22:00, Monday to Thursday night. Second alternating lane closes at 23:59. First lane opens 05:00, second lane opens 06:00. On Friday night, first lane closes 23:00, second lane closes 23:59. First lane opens 05:00. Second lane opens 06:00.
Event Start:April 24, 2017 22:00
Event End:April 29, 2017 06:00
Last Change: Entered 2017-04-17 12:55

Top of page Top of page


HWY 404 Southbound Express [ MAJOR MACKENZIE DRIVE Express - FINCH AVE Express ] - Recurring-Maintenance
Highway:HWY 404
Direction:Southbound
From/At:MAJOR MACKENZIE DRIVE Express
To:FINCH AVE Express
Lanes Affected:3 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Work will be done between 1:00 to 5:00 between Finch and Steeles. Between 407 and Major Mackenzie only 2 lanes will be closed.
Event Start:April 24, 2017 23:59
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-20 13:34

Top of page Top of page


HWY 406 Northbound [ EAST MAIN STREET - QEW ] - Recurring-Maintenance
Highway:HWY 406
Direction:Northbound
From/At:EAST MAIN STREET
To:QEW
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 30, 2017 18:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-27 10:09

Top of page Top of page


HWY 406 Northbound [ WESTCHESTER AVE - ST. PAUL STREET WEST / BURGOYNE BRIDGE ] - Construction
Highway:HWY 406
Direction:Northbound
From/At:WESTCHESTER AVE
To:ST. PAUL STREET WEST / BURGOYNE BRIDGE
Lanes Affected:1 Right Lane(s)
Traffic Impact :On-ramp from THE PARKWAY / RACE STREET EB/WB, On-ramp from GENEVA STREET SB
ReasonConstruction
Comment :
Event Start:May 01, 2017 06:00
Event End:May 31, 2017 23:59
Last Change: Entered 2017-04-25 09:29

Top of page Top of page


HWY 406 Northbound Off-ramp [ - QEW Eastbound ] - Construction
Highway:HWY 406
Direction:Northbound
From/At:
To:QEW Eastbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Long term full closure of off-ramp from Highway 406 NB to QEW Fort Erie bound.
Event Start:April 10, 2017 20:00
Event End:November 17, 2017 05:00
Last Change: Entered 2017-03-24 10:53

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - ST. PAUL STREET WEST / BURGOYNE BRIDGE ] - Construction
Highway:HWY 406
Direction:Southbound
From/At:4TH AVE
To:ST. PAUL STREET WEST / BURGOYNE BRIDGE
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:May 01, 2017 06:00
Event End:May 31, 2017 23:59
Last Change: Entered 2017-04-25 09:08

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER AVE ] - Recurring-Construction
Highway:HWY 406
Direction:Southbound
From/At:4TH AVE
To:WESTCHESTER AVE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :On-ramp from 4TH AVE EB/WB, Off-ramp to WESTCHESTER AVE EB/WB
ReasonRecurring-Construction
Comment :
Event Start:April 30, 2017 22:00
Event End:May 07, 2017 06:00
Last Change: Entered 2017-04-25 07:42

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER AVE ] - Recurring-Construction
Highway:HWY 406
Direction:Southbound
From/At:4TH AVE
To:WESTCHESTER AVE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :On-ramp from 4TH AVE EB/WB, Off-ramp to WESTCHESTER AVE EB/WB
ReasonRecurring-Construction
Comment :
Event Start:April 30, 2017 22:00
Event End:May 07, 2017 06:00
Last Change: Entered 2017-04-25 08:09

Top of page Top of page


HWY 406 Southbound [ QEW - EAST MAIN STREET ] - Recurring-Maintenance
Highway:HWY 406
Direction:Southbound
From/At:QEW
To:EAST MAIN STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 30, 2017 18:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-27 10:12

Top of page Top of page


HWY 407 ETR Westbound On-ramp [ THICKSON RD Northbound - ] - Maintenance
Highway:HWY 407 ETR
Direction:Westbound
From/At:THICKSON RD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:April 28, 2017 09:00
Event End:April 28, 2017 16:00
Last Change: Entered 2017-04-26 17:21

Top of page Top of page


HWY 410 Northbound [ CLARK BLVD - QUEEN STREET/S JCT HWY 7 ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:CLARK BLVD
To:QUEEN STREET/S JCT HWY 7
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
ReasonRecurring-Construction
Comment :Sunday to Thursday, two alternative lanes close at 23:59 and all lanes open at 05:00.
Event Start:April 23, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 11:25

Top of page Top of page


HWY 410 Northbound [ CLARK BLVD - QUEEN STREET/S JCT HWY 7 ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:CLARK BLVD
To:QUEEN STREET/S JCT HWY 7
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
ReasonRecurring-Construction
Comment :Sunday to Thursday, two alternative lanes close at 23:59 and all lanes open at 05:00.
Event Start:April 30, 2017 23:59
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-26 15:24

Top of page Top of page


HWY 410 Northbound [ COURTNEY PARK DRIVE - DERRY ROAD ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:COURTNEY PARK DRIVE
To:DERRY ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to DERRY ROAD EB/WB
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 23:00 and expanding to second lane at 23:59. First lane open at 05:00 and all lanes open at 06:00. Monday to Thursday, one lane closed at 22:00, two lanes closed at 23:00. One lane reopens at 5:00 and all lanes reopen at 6:00.
Event Start:April 30, 2017 22:00
Event End:May 05, 2017 06:00
Last Change: Entered 2017-04-26 15:21

Top of page Top of page


HWY 410 Northbound [ COURTNEY PARK DRIVE - DERRY ROAD ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:COURTNEY PARK DRIVE
To:DERRY ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to DERRY ROAD EB/WB
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 23:00 and expanding to second lane at 23:59. First lane open at 05:00 and all lanes open at 06:00. Monday to Thursday, one lane closed at 22:00, two lanes closed at 23:00. One lane reopens at 5:00 and all lanes reopen at 6:00.
Event Start:April 23, 2017 22:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-19 11:31

Top of page Top of page


HWY 410 Northbound [ DERRY ROAD - STEELES AVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:DERRY ROAD
To:STEELES AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from DERRY ROAD EB, On-ramp from DERRY ROAD EB/WB, On-ramp from DERRY ROAD WB, Off-ramp to STEELES AVE EB/WB
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 23:00 and expanding to second lane at 23:59. All lanes open at 05:00. Monday to Thursday, two lanes close at 23:00 and all lanes open at 05:00.
Event Start:April 30, 2017 23:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-26 15:22

Top of page Top of page


HWY 410 Northbound [ DERRY ROAD - STEELES AVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:DERRY ROAD
To:STEELES AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from DERRY ROAD EB, On-ramp from DERRY ROAD EB/WB, On-ramp from DERRY ROAD WB, Off-ramp to STEELES AVE EB/WB
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 23:00 and expanding to second lane at 23:59. All lanes open at 05:00. Monday to Thursday, two lanes close at 23:00 and all lanes open at 05:00.
Event Start:April 23, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 11:27

Top of page Top of page


HWY 410 Northbound [ HWY 401 - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401
To:COURTNEY PARK DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to COURTNEY PARK DRIVE EB/WB
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 22:00 and expanding to second lane at 23:59. All lanes open at 05:00. Monday to Thursday, first lane closes at 22:00 and expanding to second lane at 23:00. All lanes open at 05:00.
Event Start:April 23, 2017 22:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 11:31

Top of page Top of page


HWY 410 Northbound [ HWY 401 - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401
To:COURTNEY PARK DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to COURTNEY PARK DRIVE EB/WB
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 22:00 and expanding to second lane at 23:59. All lanes open at 05:00. Monday to Thursday, first lane closes at 22:00 and expanding to second lane at 23:00. All lanes open at 05:00.
Event Start:April 30, 2017 22:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-26 14:52

Top of page Top of page


HWY 410 Northbound [ STEELES AVE - CLARK BLVD ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:STEELES AVE
To:CLARK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to CLARK BLVD EB/WB
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 23:00 and expanding to second lane at 23:59. Monday to Thursday, alternating two lanes closure starts at 23:00. For all days one lane opens at 6:00 and all lanes open at 07:00.
Event Start:April 30, 2017 23:00
Event End:May 05, 2017 07:00
Last Change: Entered 2017-04-26 15:23

Top of page Top of page


HWY 410 Northbound [ STEELES AVE - CLARK BLVD ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:STEELES AVE
To:CLARK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to CLARK BLVD EB/WB
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 23:00 and expanding to second lane at 23:59. Monday to Thursday, alternating two lanes closure starts at 23:00. For all days first lane opens at 06:00 and all lanes open at 07:00.
Event Start:April 23, 2017 23:00
Event End:April 28, 2017 07:00
Last Change: Entered 2017-04-19 11:26

Top of page Top of page


HWY 410 Northbound On-ramp [ HWY 401 Eastbound - ] - Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401 Eastbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 28, 2017 03:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-24 16:03

Top of page Top of page


HWY 410 Northbound On-ramp [ HWY 401 Eastbound - ] - Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401 Eastbound
To:
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:May 11, 2016 23:00
Event End:November 15, 2017 23:59
Last Change: Entered 2016-05-09 13:11

Top of page Top of page


HWY 410 Northbound On-ramp [ HWY 401 Westbound - ] - Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401 Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 27, 2017 23:59
Event End:April 28, 2017 03:00
Last Change: Entered 2017-04-24 16:05

Top of page Top of page


HWY 410 Northbound On-ramp [ HWY 401 Westbound - ] - Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401 Westbound
To:
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:May 11, 2016 23:00
Event End:November 15, 2017 23:59
Last Change: Entered 2016-05-09 13:07

Top of page Top of page


HWY 410 Northbound On-ramp [ HWY 401 Westbound - ] - Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401 Westbound
To:
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:May 11, 2016 23:00
Event End:November 15, 2017 23:59
Last Change: Entered 2016-05-09 13:07

Top of page Top of page


HWY 410 Northbound On-ramp [ STEELES AVE Westbound - ] - Construction
Highway:HWY 410
Direction:Northbound
From/At:STEELES AVE Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :This is a long term closure of Steeles W-410 N Ramp.
Event Start:December 02, 2016 00:00
Event End:December 31, 2017 23:59
Last Change: Entered 2016-12-02 19:17

Top of page Top of page


HWY 410 Southbound [ CLARK BLVD - STEELES AVE ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:CLARK BLVD
To:STEELES AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to STEELES AVE EB/WB
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 22:00 and expanding to second lane at 23:00. Monday to Thursday, two lanes close at 22:00. On all days lanes open at 05:00.
Event Start:April 23, 2017 22:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 11:24

Top of page Top of page


HWY 410 Southbound [ COURTNEY PARK DRIVE - HWY 401 ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:COURTNEY PARK DRIVE
To:HWY 401
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Sunday, first lane closes at 20:00 and expanding to second lane at 23:59. Monday to Thursday, first lane closes at 20:00 and expanding to second lane at 23:00. On all days all lanes reopened at 05:00.
Event Start:April 23, 2017 20:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 11:01

Top of page Top of page


HWY 410 Southbound [ DERRY ROAD - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:DERRY ROAD
To:COURTNEY PARK DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from DERRY ROAD EB, On-ramp from COURTNEY PARK DRIVE EB/WB, On-ramp from DERRY ROAD WB
ReasonRecurring-Construction
Comment :Sunday to Thursday, two alternative lanes close at 23:59 and all lanes open at 05:00.
Event Start:April 23, 2017 23:59
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 11:02

Top of page Top of page


HWY 410 Southbound [ QUEEN STREET/S JCT HWY 7 - CLARK BLVD ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:QUEEN STREET/S JCT HWY 7
To:CLARK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from CLARK BLVD EB/WB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
ReasonRecurring-Construction
Comment :Sunday to Friday, alternating two lanes closure start at 23:59, and all lanes open at 05:00.
Event Start:April 23, 2017 23:59
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 11:24

Top of page Top of page


HWY 410 Southbound [ STEELES AVE - DERRY ROAD ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:STEELES AVE
To:DERRY ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to DERRY ROAD EB/WB
ReasonRecurring-Construction
Comment :Sunday to Thursday, two alternative lanes close at 23:59 and all lanes open at 05:00.
Event Start:April 23, 2017 23:59
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 11:23

Top of page Top of page


HWY 412 Northbound [ TAUNTON RD - TRUCK INSPECTION STATION ] - Maintenance
Highway:HWY 412
Direction:Northbound
From/At:TAUNTON RD
To:TRUCK INSPECTION STATION
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:April 28, 2017 22:00
Event End:April 29, 2017 06:00
Last Change: Entered 2017-04-25 11:20

Top of page Top of page


HWY 416 Northbound [ CENTURY RD / PRINCE OF WALES DR - BARNSDALE RD ] - Maintenance
Highway:HWY 416
Direction:Northbound
From/At:CENTURY RD / PRINCE OF WALES DR
To:BARNSDALE RD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Short duration lane reductions Hwy 416 N/B & S/B @ Barnsdale Rd and Century Rd (Ottawa)
Event Start:April 28, 2017 07:00
Event End:April 28, 2017 13:00
Last Change: Entered 2017-04-27 12:57

Top of page Top of page


HWY 417 Eastbound [ AVIATION PKWY (IC 113A) - HUNT CLUB RD (IC109) ] - Construction
Highway:HWY 417
Direction:Eastbound
From/At:AVIATION PKWY (IC 113A)
To:HUNT CLUB RD (IC109)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Lane reductions Hwy 417 E/B & W/B btwn Aviation Parkway and Hunt Club Rd. E/B Walkley on ramp and W/B Walkley off ramp closed as required (Ottawa)
Event Start:April 27, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-24 15:35

Top of page Top of page


HWY 417 Eastbound [ CYRVILLE RD W - WALKLEY RD (IC 110) ] - Recurring-Construction
Highway:HWY 417
Direction:Eastbound
From/At:CYRVILLE RD W
To:WALKLEY RD (IC 110)
Lanes Affected:2 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :STRUCTURE MAINTENANCE
Event Start:April 23, 2017 22:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-21 14:42

Top of page Top of page


HWY 417 Eastbound [ LIMOGES RD (IC 79) - LIMOGES RD (IC 79) ] - Maintenance
Highway:HWY 417
Direction:Eastbound
From/At:LIMOGES RD (IC 79)
To:LIMOGES RD (IC 79)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:April 28, 2017 08:00
Event End:April 28, 2017 19:00
Last Change: Entered 2017-04-27 13:39

Top of page Top of page


HWY 417 Eastbound [ RAMSAYVILLE RD - RAMSAYVILLE RD ] - Recurring-Construction
Highway:HWY 417
Direction:Eastbound
From/At:RAMSAYVILLE RD
To:RAMSAYVILLE RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :(Carlsbad Springs)
Event Start:May 14, 2017 21:00
Event End:May 19, 2017 06:00
Last Change: Entered 2017-04-26 20:59

Top of page Top of page


HWY 417 Eastbound [ RAMSAYVILLE RD - RAMSAYVILLE RD ] - Recurring-Construction
Highway:HWY 417
Direction:Eastbound
From/At:RAMSAYVILLE RD
To:RAMSAYVILLE RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :(Carlsbad Springs)
Event Start:May 23, 2017 21:00
Event End:May 26, 2017 06:00
Last Change: Entered 2017-04-26 21:01

Top of page Top of page


HWY 417 Eastbound [ RAMSAYVILLE RD - RAMSAYVILLE RD ] - Recurring-Construction
Highway:HWY 417
Direction:Eastbound
From/At:RAMSAYVILLE RD
To:RAMSAYVILLE RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :(Carlsbad Springs)
Event Start:May 29, 2017 21:00
Event End:June 02, 2017 06:00
Last Change: Entered 2017-04-26 21:03

Top of page Top of page


HWY 417 Eastbound [ RAMSAYVILLE RD - RAMSAYVILLE RD ] - Recurring-Construction
Highway:HWY 417
Direction:Eastbound
From/At:RAMSAYVILLE RD
To:RAMSAYVILLE RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :(Carlsbad Springs)
Event Start:May 07, 2017 21:00
Event End:May 12, 2017 06:00
Last Change: Entered 2017-04-26 20:55

Top of page Top of page


HWY 417 Westbound [ KENT ST (IC 120A) - ISLAND PARK DR E/B (IC 123) ] - Recurring-Engineering Investigation
Highway:HWY 417
Direction:Westbound
From/At:KENT ST (IC 120A)
To:ISLAND PARK DR E/B (IC 123)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Left lane closed Hwy 417 W/B btwn Kent and Island Park (Ottawa)
Event Start:April 26, 2017 21:00
Event End:April 29, 2017 06:00
Last Change: Entered 2017-04-18 11:27

Top of page Top of page


HWY 417 Westbound [ RAMSAYVILLE RD - RAMSAYVILLE RD ] - Recurring-Construction
Highway:HWY 417
Direction:Westbound
From/At:RAMSAYVILLE RD
To:RAMSAYVILLE RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :(Carlsbad Springs)
Event Start:June 05, 2017 21:00
Event End:June 09, 2017 06:00
Last Change: Entered 2017-04-26 21:22

Top of page Top of page


HWY 417 Westbound [ RAMSAYVILLE RD - RAMSAYVILLE RD ] - Recurring-Construction
Highway:HWY 417
Direction:Westbound
From/At:RAMSAYVILLE RD
To:RAMSAYVILLE RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :(Carlsbad Springs)
Event Start:May 29, 2017 21:00
Event End:June 02, 2017 06:00
Last Change: Entered 2017-04-26 21:19

Top of page Top of page


HWY 417 Westbound [ RAMSAYVILLE RD - RAMSAYVILLE RD ] - Recurring-Construction
Highway:HWY 417
Direction:Westbound
From/At:RAMSAYVILLE RD
To:RAMSAYVILLE RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :(Carlsbad Springs)
Event Start:June 12, 2017 21:00
Event End:June 16, 2017 06:00
Last Change: Entered 2017-04-26 21:24

Top of page Top of page


HWY 417 Westbound [ ROCHESTER ST (IC 121B) - ISLAND PARK DR E/B (IC 123) ] - Recurring-Engineering Investigation
Highway:HWY 417
Direction:Westbound
From/At:ROCHESTER ST (IC 121B)
To:ISLAND PARK DR E/B (IC 123)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Right lane closures Hwy 417 W/B btwn Rochester and Island Park (Ottawa); W/B Parkdale off and on ramps closed as required.
Event Start:April 23, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-12 07:59

Top of page Top of page


HWY 420 Eastbound [ MONTROSE ROAD - STANLEY AVE ] - Construction
Highway:HWY 420
Direction:Eastbound
From/At:MONTROSE ROAD
To:STANLEY AVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from QEW NB/SB
ReasonConstruction
Comment :
Event Start:April 30, 2017 23:59
Event End:May 05, 2017 06:00
Last Change: Entered 2017-04-24 14:58

Top of page Top of page


HWY 420 Eastbound [ MONTROSE ROAD - STANLEY AVE ] - Construction
Highway:HWY 420
Direction:Eastbound
From/At:MONTROSE ROAD
To:STANLEY AVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from QEW NB/SB
ReasonConstruction
Comment :
Event Start:April 23, 2017 23:59
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-21 14:52

Top of page Top of page


HWY 420 Eastbound [ MONTROSE ROAD - STANLEY AVE ] - Recurring-Construction
Highway:HWY 420
Direction:Eastbound
From/At:MONTROSE ROAD
To:STANLEY AVE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :On-ramp from QEW NB/SB, On-ramp from DORCHESTER ROAD/LUNDY'S LANE NB/SB, On-ramp from QEW SB, On-ramp from DRUMMOND ROAD NB/SB
ReasonRecurring-Construction
Comment :
Event Start:May 07, 2017 23:00
Event End:May 12, 2017 06:00
Last Change: Entered 2017-04-25 17:22

Top of page Top of page


HWY 420 Eastbound Off-ramp [ - QEW Northbound ] - Recurring-Construction
Highway:HWY 420
Direction:Eastbound
From/At:
To:QEW Northbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:May 07, 2017 21:00
Event End:May 12, 2017 07:00
Last Change: Entered 2017-04-25 17:26

Top of page Top of page


HWY 420 Eastbound Off-ramp [ - QEW Southbound ] - Recurring-Construction
Highway:HWY 420
Direction:Eastbound
From/At:
To:QEW Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:May 07, 2017 21:00
Event End:May 12, 2017 07:00
Last Change: Entered 2017-04-25 17:25

Top of page Top of page


HWY 420 Westbound [ DORCHESTER ROAD/LUNDY'S LANE - DORCHESTER ROAD/LUNDY'S LANE ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:DORCHESTER ROAD/LUNDY'S LANE
To:DORCHESTER ROAD/LUNDY'S LANE
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 25, 2017 23:59
Event End:November 17, 2017 06:00
Last Change: Entered 2017-04-12 09:53

Top of page Top of page


HWY 420 Westbound [ STANLEY AVE - MONTROSE ROAD ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:STANLEY AVE
To:MONTROSE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to QEW NB
ReasonConstruction
Comment :
Event Start:April 30, 2017 23:59
Event End:May 05, 2017 06:00
Last Change: Entered 2017-04-24 14:55

Top of page Top of page


HWY 420 Westbound [ STANLEY AVE - MONTROSE ROAD ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:STANLEY AVE
To:MONTROSE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to QEW NB
ReasonConstruction
Comment :
Event Start:April 23, 2017 23:59
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-21 14:45

Top of page Top of page


HWY 420 Westbound Off-ramp [ - QEW Northbound ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:
To:QEW Northbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:May 01, 2017 23:00
Event End:November 17, 2017 06:00
Last Change: Entered 2017-04-19 16:32

Top of page Top of page


HWY 420 Westbound Off-ramp [ - QEW Northbound ] - Recurring-Construction
Highway:HWY 420
Direction:Westbound
From/At:
To:QEW Northbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 26, 2017 23:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-24 14:24

Top of page Top of page


HWY 420 Westbound Off-ramp [ - QEW Southbound ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:
To:QEW Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Highway 420 westbound off-ramp to QEW southbound will be permanently closed from Friday November 18th, 2016 to September 1st, 2017.
Event Start:November 18, 2016 00:00
Event End:September 01, 2017 06:00
Last Change: Entered 2016-11-17 08:05

Top of page Top of page


HWY 420 Westbound On-ramp [ DORCHESTER ROAD/LUNDY'S LANE Westbound - ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:DORCHESTER ROAD/LUNDY'S LANE Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 23, 2017 23:59
Event End:November 17, 2017 06:00
Last Change: Entered 2017-04-11 15:20

Top of page Top of page


HWY 427 Northbound [ EGLINTON AVE - DIXON ROAD/AIRPORT ROAD ] - Recurring-Maintenance
Highway:HWY 427
Direction:Northbound
From/At:EGLINTON AVE
To:DIXON ROAD/AIRPORT ROAD
Lanes Affected:3 Left Lane(s)
Traffic Impact :On-ramp from EGLINTON AVE WB
ReasonRecurring-Maintenance
Comment :
Event Start:April 27, 2017 23:00
Event End:April 29, 2017 05:00
Last Change: Entered 2017-04-27 09:36

Top of page Top of page


HWY 427 Northbound [ EGLINTON AVE - DIXON ROAD/AIRPORT ROAD ] - Recurring-Maintenance
Highway:HWY 427
Direction:Northbound
From/At:EGLINTON AVE
To:DIXON ROAD/AIRPORT ROAD
Lanes Affected:2 Right Lane(s)
Traffic Impact :On-ramp from EGLINTON AVE WB
ReasonRecurring-Maintenance
Comment :Two lanes on highway 427 Northbound will be closed nightly Tuesday to Thursday from 23:00 to 5:00. On Friday both lanes will be closed from 23:59 to 7:00. The Eglington Avenue On-Ramp will be fully closed nightly from 23:00 to 5:00 from Tuesday to Thursday. On Friday it will be closed from 23:00 to 8:00.
Event Start:April 25, 2017 23:00
Event End:April 29, 2017 07:00
Last Change: Entered 2017-04-24 11:08

Top of page Top of page


HWY 427 Northbound [ EGLINTON AVENUE - DIXON ROAD/AIRPORT ROAD ] - Recurring-Maintenance
Highway:HWY 427
Direction:Northbound
From/At:EGLINTON AVENUE
To:DIXON ROAD/AIRPORT ROAD
Lanes Affected:3 Right Lane(s)
Traffic Impact :On-ramp from HWY 401 EB, Off-ramp to DIXON ROAD/AIRPORT ROAD EB/WB
ReasonRecurring-Maintenance
Comment :
Event Start:April 28, 2017 23:59
Event End:April 29, 2017 06:00
Last Change: Entered 2017-04-26 12:49

Top of page Top of page


HWY 427 Northbound Collector [ HWY 409 Collector - DISCO ROAD/GOREWAY Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:HWY 409 Collector
To:DISCO ROAD/GOREWAY Collector
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 27, 2017 21:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-27 16:31

Top of page Top of page


HWY 427 Northbound Collector [ REXDALE BLVD / DERRY ROAD Collector - FINCH AVENUE Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:REXDALE BLVD / DERRY ROAD Collector
To:FINCH AVENUE Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :On-ramp from REXDALE BLVD / DERRY ROAD WB, Off-ramp to FINCH AVENUE EB/WB
ReasonRecurring-Construction
Comment :
Event Start:April 27, 2017 22:00
Event End:April 29, 2017 06:00
Last Change: Entered 2017-04-27 11:06

Top of page Top of page


HWY 427 Northbound Collector [ WOODBINE RACETRACK ROAD Collector - REXDALE BLVD / DERRY ROAD Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:WOODBINE RACETRACK ROAD Collector
To:REXDALE BLVD / DERRY ROAD Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 27, 2017 20:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-27 10:29

Top of page Top of page


HWY 427 Northbound Express and Collector Off-ramp [ - HWY 401 Westbound Collector ] - Recurring-Maintenance
Highway:HWY 427
Direction:Northbound
From/At:
To:HWY 401 Westbound Collector
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 24, 2017 22:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-21 15:12

Top of page Top of page


HWY 427 Southbound [ QUEENSWAY AVENUE - GARDINER EXPRESSWAY ] - Recurring-Maintenance
Highway:HWY 427
Direction:Southbound
From/At:QUEENSWAY AVENUE
To:GARDINER EXPRESSWAY
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to GARDINER EXPRESSWAY EB
ReasonRecurring-Maintenance
Comment :
Event Start:April 23, 2017 23:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-18 17:41

Top of page Top of page


HWY 427 Southbound Collector [ FINCH AVENUE Collector - REXDALE BLVD / DERRY ROAD Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:FINCH AVENUE Collector
To:REXDALE BLVD / DERRY ROAD Collector
Lanes Affected:2 Right Lane(s)
Traffic Impact :Off-ramp to REXDALE BLVD / DERRY ROAD WB, Off-ramp to REXDALE BLVD / DERRY ROAD EB, On-ramp from FINCH AVENUE WB, On-ramp from FINCH AVENUE EB
ReasonRecurring-Construction
Comment :
Event Start:April 27, 2017 19:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-27 12:12

Top of page Top of page


HWY 427 Southbound Collector [ FINCH AVENUE Collector - REXDALE BLVD / DERRY ROAD Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:FINCH AVENUE Collector
To:REXDALE BLVD / DERRY ROAD Collector
Lanes Affected:2 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 27, 2017 19:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-27 10:56

Top of page Top of page


HWY 427 Southbound Collector [ REXDALE BLVD / DERRY ROAD Collector - HWY 409 Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:REXDALE BLVD / DERRY ROAD Collector
To:HWY 409 Collector
Lanes Affected:2 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 27, 2017 22:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-27 10:59

Top of page Top of page


HWY 48 Northbound [ AURORA ROAD - DAVIS DRIVE ] - Recurring-Construction
Highway:HWY 48
Direction:Northbound
From/At:AURORA ROAD
To:DAVIS DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation and 1 through lane will be maintained
Event Start:April 24, 2017 09:00
Event End:April 30, 2017 15:00
Last Change: Entered 2017-04-19 08:08

Top of page Top of page


HWY 48 Northbound [ AURORA ROAD - DAVIS DRIVE ] - Recurring-Construction
Highway:HWY 48
Direction:Northbound
From/At:AURORA ROAD
To:DAVIS DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation and 1 through lane will be maintained
Event Start:April 30, 2017 09:00
Event End:May 07, 2017 15:00
Last Change: Entered 2017-04-25 07:29

Top of page Top of page


HWY 48 Northbound [ DAVIS DRIVE - HERALD ROAD ] - Recurring-Construction
Highway:HWY 48
Direction:Northbound
From/At:DAVIS DRIVE
To:HERALD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation and 1 through lane will be maintained
Event Start:April 24, 2017 00:00
Event End:April 30, 2017 23:59
Last Change: Entered 2017-04-19 08:08

Top of page Top of page


HWY 48 Northbound [ DAVIS DRIVE - HERALD ROAD ] - Recurring-Construction
Highway:HWY 48
Direction:Northbound
From/At:DAVIS DRIVE
To:HERALD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation and 1 through lane will be maintained
Event Start:April 30, 2017 00:00
Event End:May 07, 2017 23:59
Last Change: Entered 2017-04-25 07:30

Top of page Top of page


HWY 48 Northbound [ HERALD ROAD - HIGH STREET ] - Recurring-Construction
Highway:HWY 48
Direction:Northbound
From/At:HERALD ROAD
To:HIGH STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation and 1 through lane will be maintained
Event Start:April 24, 2017 09:00
Event End:April 30, 2017 15:00
Last Change: Entered 2017-04-19 08:08

Top of page Top of page


HWY 48 Northbound [ HERALD ROAD - HIGH STREET ] - Recurring-Construction
Highway:HWY 48
Direction:Northbound
From/At:HERALD ROAD
To:HIGH STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation and 1 through lane will be maintained
Event Start:April 30, 2017 09:00
Event End:May 07, 2017 15:00
Last Change: Entered 2017-04-25 07:30

Top of page Top of page


HWY 58 Northbound [ HWY. 3/MAIN STREET (PORT COLBORNE) - HWY 406 ] - Recurring-Maintenance
Highway:HWY 58
Direction:Northbound
From/At:HWY. 3/MAIN STREET (PORT COLBORNE)
To:HWY 406
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 30, 2017 18:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-27 10:16

Top of page Top of page


HWY 58 Southbound [ HWY 406 - HWY. 3/MAIN STREET (PORT COLBORNE) ] - Recurring-Maintenance
Highway:HWY 58
Direction:Southbound
From/At:HWY 406
To:HWY. 3/MAIN STREET (PORT COLBORNE)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 30, 2017 18:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-27 10:18

Top of page Top of page


HWY 6 Northbound [ EAST FLAMBOROUGH TWP CON. 5 EAST - BINKLEY CRT. ] - Construction
Highway:HWY 6
Direction:Northbound
From/At:EAST FLAMBOROUGH TWP CON. 5 EAST
To:BINKLEY CRT.
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:May 03, 2017 22:00
Event End:May 04, 2017 05:00
Last Change: Entered 2017-04-25 15:19

Top of page Top of page


HWY 6 Northbound [ GOLFLAND ROAD - CALFASS ROAD ] - Recurring-Maintenance
Highway:HWY 6
Direction:Northbound
From/At:GOLFLAND ROAD
To:CALFASS ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 24, 2017 09:30
Event End:April 28, 2017 15:00
Last Change: Entered 2017-04-18 08:45

Top of page Top of page


HWY 6 Northbound [ GOLFLAND ROAD - CURRIE DRIVE/TELFER GLEN ] - Recurring-Maintenance
Highway:HWY 6
Direction:Northbound
From/At:GOLFLAND ROAD
To:CURRIE DRIVE/TELFER GLEN
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 09:30
Event End:May 05, 2017 15:00
Last Change: Entered 2017-04-26 15:56

Top of page Top of page


HWY 6 Southbound [ CURRIE DRIVE/TELFER GLEN - GOLFLAND ROAD ] - Recurring-Maintenance
Highway:HWY 6
Direction:Southbound
From/At:CURRIE DRIVE/TELFER GLEN
To:GOLFLAND ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 09:30
Event End:May 05, 2017 15:00
Last Change: Entered 2017-04-26 15:58

Top of page Top of page


HWY 6 Southbound [ CURRIE DRIVE/TELFER GLEN - GOLFLAND ROAD ] - Recurring-Maintenance
Highway:HWY 6
Direction:Southbound
From/At:CURRIE DRIVE/TELFER GLEN
To:GOLFLAND ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 24, 2017 09:30
Event End:April 28, 2017 15:00
Last Change: Entered 2017-04-18 08:39

Top of page Top of page


HWY 62 Northbound [ Hasting Rd 14 / Foxboro Stirling Rd / Ducette Rd - Moira Rd ] - Recurring-Construction
Highway:HWY 62
Direction:Northbound
From/At:Hasting Rd 14 / Foxboro Stirling Rd / Ducette Rd
To:Moira Rd
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Alternating single lane closures with flagging Northbound and Southbound. North of Foxboro
Event Start:April 24, 2017 07:00
Event End:April 28, 2017 17:00
Last Change: Entered 2017-04-20 10:11

Top of page Top of page


HWY 7 Eastbound [ Bruce Street - Greenhouse Road ] - Recurring-Maintenance
Highway:HWY 7
Direction:Eastbound
From/At:Bruce Street
To:Greenhouse Road
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Highway 7 from Weber Street to Greenhouse on April 26th to April 28th from 0900 hours to 1800 hours daily will have an alternating lane closure due to line painting.
Event Start:April 26, 2017 09:00
Event End:April 28, 2017 18:00
Last Change: Entered 2017-04-21 15:28

Top of page Top of page


HWY 7 Eastbound [ ERAMOSA TWP ROAD C 5-6 - HALTON HILLS MILTON TOWNLINE ROAD ] - Recurring-Construction
Highway:HWY 7
Direction:Eastbound
From/At:ERAMOSA TWP ROAD C 5-6
To:HALTON HILLS MILTON TOWNLINE ROAD
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 29, 2017 15:00
Event End:May 01, 2017 06:30
Last Change: Entered 2017-04-24 11:13

Top of page Top of page


HWY 7 Eastbound [ ERAMOSA TWP ROAD C 5-6 - N JCT HWY. 25 - MAIN ST ] - Recurring-Construction
Highway:HWY 7
Direction:Eastbound
From/At:ERAMOSA TWP ROAD C 5-6
To:N JCT HWY. 25 - MAIN ST
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :1 through lane will be maintained through flagging operations.
Event Start:April 24, 2017 18:30
Event End:April 29, 2017 12:00
Last Change: Entered 2017-04-24 09:56

Top of page Top of page


HWY 7 Eastbound [ ERAMOSA TWP ROAD C 5-6 - N JCT HWY. 25 - MAIN ST ] - Recurring-Construction
Highway:HWY 7
Direction:Eastbound
From/At:ERAMOSA TWP ROAD C 5-6
To:N JCT HWY. 25 - MAIN ST
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :1 through lane maintained by flagging operation.
Event Start:April 24, 2017 08:30
Event End:April 29, 2017 12:00
Last Change: Entered 2017-04-24 11:07

Top of page Top of page


HWY 7 Eastbound [ Eramosa/Milton Townline / Nassageweya 4th Line - Trafalgar Road North / County Road 3 ] - Recurring-Maintenance
Highway:HWY 7
Direction:Eastbound
From/At:Eramosa/Milton Townline / Nassageweya 4th Line
To:Trafalgar Road North / County Road 3
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Highway 7 from Eramosa Townline to Guelph on April 24th to April 28th from 0900 hours to 1800 hours daily will have an alternating lane closure due to line painting.
Event Start:April 24, 2017 09:00
Event End:April 28, 2017 18:00
Last Change: Entered 2017-04-21 15:34

Top of page Top of page


HWY 7 Eastbound [ Jones Baseline / Baseline Road - Jones Baseline / Baseline Road ] - Recurring-Maintenance
Highway:HWY 7
Direction:Eastbound
From/At:Jones Baseline / Baseline Road
To:Jones Baseline / Baseline Road
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Highway 7 at the roundabout for Jones Baseline on April 24th to May 25th will have lane reductions in all directions on different days due to road maintenance.
Event Start:April 24, 2017 07:00
Event End:May 25, 2017 18:00
Last Change: Entered 2017-04-21 10:43

Top of page Top of page


HWY 7 Eastbound [ LITTLE ROUGE CREEK - LITTLE ROUGE CREEK ] - Recurring-Construction
Highway:HWY 7
Direction:Eastbound
From/At:LITTLE ROUGE CREEK
To:LITTLE ROUGE CREEK
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday to Thursday, 1 through lane will be maintained by flagging operation from 08:00 to 19:00.
Event Start:May 01, 2017 08:00
Event End:May 04, 2017 19:00
Last Change: Entered 2017-04-25 16:59

Top of page Top of page


HWY 7 Westbound [ HALTON HILLS MILTON TOWNLINE ROAD - ERAMOSA TWP ROAD C 5-6 ] - Recurring-Construction
Highway:HWY 7
Direction:Westbound
From/At:HALTON HILLS MILTON TOWNLINE ROAD
To:ERAMOSA TWP ROAD C 5-6
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 29, 2017 15:00
Event End:May 01, 2017 06:30
Last Change: Entered 2017-04-24 11:15

Top of page Top of page


HWY 7 Westbound [ N JCT HWY. 25 - MAIN ST - ERAMOSA TWP ROAD C 5-6 ] - Recurring-Construction
Highway:HWY 7
Direction:Westbound
From/At:N JCT HWY. 25 - MAIN ST
To:ERAMOSA TWP ROAD C 5-6
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :1 through lane will be maintained through flagging operations.
Event Start:April 24, 2017 18:30
Event End:April 29, 2017 12:00
Last Change: Entered 2017-04-24 09:36

Top of page Top of page


HWY 7 Westbound [ N JCT HWY. 25 - MAIN ST - ERAMOSA TWP ROAD C 5-6 ] - Recurring-Construction
Highway:HWY 7
Direction:Westbound
From/At:N JCT HWY. 25 - MAIN ST
To:ERAMOSA TWP ROAD C 5-6
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :1 through lane will be maintained through flagging operations.
Event Start:April 24, 2017 08:30
Event End:April 29, 2017 16:30
Last Change: Entered 2017-04-24 09:39

Top of page Top of page


HWY 7/12 Northbound [ CONCESSION ROAD 2/BROCK TWP 2ND LINE - SCUGOG TWP 4TH LINE ] - Recurring-Construction
Highway:HWY 7/12
Direction:Northbound
From/At:CONCESSION ROAD 2/BROCK TWP 2ND LINE
To:SCUGOG TWP 4TH LINE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation and 1 through lane will be maintained. 1 lane will be closed daily Monday to Thursday 07:00 to 19:00. On Friday, 1 lane will be closed 07:00 to 12:00.
Event Start:April 24, 2017 07:00
Event End:April 28, 2017 19:00
Last Change: Entered 2017-04-19 12:31

Top of page Top of page


HWY 7/12 Northbound [ CONCESSION ROAD 2/BROCK TWP 2ND LINE - SCUGOG TWP 4TH LINE ] - Recurring-Construction
Highway:HWY 7/12
Direction:Northbound
From/At:CONCESSION ROAD 2/BROCK TWP 2ND LINE
To:SCUGOG TWP 4TH LINE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation and 1 through lane will be maintained. 1 lane will be closed daily Monday to Thursday 07:00 to 19:00. On Friday, 1 lane will be closed 07:00 to 12:00.
Event Start:May 01, 2017 07:00
Event End:May 05, 2017 19:00
Last Change: Entered 2017-04-26 07:28

Top of page Top of page


HWY 7/12 Southbound [ WINCHESTER ROAD - CARNWITH DRIVE ] - Recurring-Construction
Highway:HWY 7/12
Direction:Southbound
From/At:WINCHESTER ROAD
To:CARNWITH DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation, 1 through lane will be maintained.
Event Start:May 01, 2017 09:00
Event End:May 04, 2017 14:00
Last Change: Entered 2017-04-26 07:28

Top of page Top of page


HWY 7/12 Southbound [ WINCHESTER ROAD - CARNWITH DRIVE ] - Recurring-Construction
Highway:HWY 7/12
Direction:Southbound
From/At:WINCHESTER ROAD
To:CARNWITH DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation, 1 through lane will be maintained.
Event Start:April 24, 2017 09:00
Event End:April 28, 2017 14:00
Last Change: Entered 2017-04-19 12:32

Top of page Top of page


HWY 7/8 Eastbound [ Road 109 - Nafziger Road / County Road 5 ] - Recurring-Maintenance
Highway:HWY 7/8
Direction:Eastbound
From/At:Road 109
To:Nafziger Road / County Road 5
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Highway 7/8 from Nafziger Road to Road 109 on April 26th to April 28th from 0900 hours to 1800 hours daily will have an alternating lane closure due to line painting.
Event Start:April 26, 2017 09:00
Event End:April 28, 2017 18:00
Last Change: Entered 2017-04-21 15:25

Top of page Top of page


HWY 7/8 Eastbound On-ramp [ Homer Watson Boulevard Southbound - ] - Maintenance
Highway:HWY 7/8
Direction:Eastbound
From/At:Homer Watson Boulevard Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :Highway 7/8 will have an on ramp closure from Homer Watson Boulevard on April 17th, 2017 for 5 weeks starting at 0900 hours everyday till 1700 hours due to road maintenance
Event Start:April 17, 2017 09:00
Event End:May 22, 2017 17:00
Last Change: Entered 2017-04-11 14:52

Top of page Top of page


HWY 7A Eastbound [ BROOK STREET - QUEEN STREET ] - Recurring-Construction
Highway:HWY 7A
Direction:Eastbound
From/At:BROOK STREET
To:QUEEN STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation. One through lane will be maintained.
Event Start:April 24, 2017 19:00
Event End:April 28, 2017 12:00
Last Change: Entered 2017-04-19 12:30

Top of page Top of page


HWY 7A Eastbound [ BROOK STREET - QUEEN STREET ] - Recurring-Construction
Highway:HWY 7A
Direction:Eastbound
From/At:BROOK STREET
To:QUEEN STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation. One through lane will be maintained.
Event Start:May 01, 2017 19:00
Event End:May 05, 2017 12:00
Last Change: Entered 2017-04-26 07:27

Top of page Top of page


HWY 85 Southbound [ WELLINGTON ST UP IC-KITCHENER - HWY 7 IC-VICTORIA ST-KITCHENER ] - Recurring-Construction
Highway:HWY 85
Direction:Southbound
From/At:WELLINGTON ST UP IC-KITCHENER
To:HWY 7 IC-VICTORIA ST-KITCHENER
Lanes Affected:1 Right Lane(s)
Traffic Impact :Off-ramp to HWY 7 IC-VICTORIA ST-KITCHENER SB
ReasonRecurring-Construction
Comment :The Highway 85 Southbound off-ramp to Edna Street (Victoria Street Exit) will be closed from March 6th - October 20th, 2017. Highway 85 Southbound from Wellington Street to Victoria Street will have a right lane closure from March 6th - October 20th, 2017. The Highway 85 Southbound on-ramp from Wellington Street will be closed from March 6th - October 20th, 2017.
Event Start:March 06, 2017 22:00
Event End:October 20, 2017 06:00
Last Change: Entered 2017-03-03 20:05

Top of page Top of page


HWY 89 Eastbound [ HWY 400 - HWY 400 ] - Recurring-Maintenance
Highway:HWY 89
Direction:Eastbound
From/At:HWY 400
To:HWY 400
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 24, 2017 22:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 08:18

Top of page Top of page


HWY 89 Eastbound [ HWY 400 - HWY 400 ] - Recurring-Maintenance
Highway:HWY 89
Direction:Eastbound
From/At:HWY 400
To:HWY 400
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 22:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-25 12:57

Top of page Top of page


HWY 89 Westbound [ 5 SIDE ROAD - SIMCOE ROAD 27/KING STREET (COOKSTOWN) ] - Recurring-Construction
Highway:HWY 89
Direction:Westbound
From/At:5 SIDE ROAD
To:SIMCOE ROAD 27/KING STREET (COOKSTOWN)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 21:00
Event End:April 29, 2017 05:00
Last Change: Entered 2017-04-21 10:47

Top of page Top of page


HWY 89 Westbound [ HWY 400 - HWY 400 ] - Recurring-Maintenance
Highway:HWY 89
Direction:Westbound
From/At:HWY 400
To:HWY 400
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 24, 2017 22:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 08:16

Top of page Top of page


HWY 89 Westbound [ HWY 400 - HWY 400 ] - Recurring-Maintenance
Highway:HWY 89
Direction:Westbound
From/At:HWY 400
To:HWY 400
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 22:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-25 12:56

Top of page Top of page


HWY 9 Eastbound [ TOTTEMHAM ROAD - SIMCOE ROAD 10 - CALEDON KING TOWNLINE/BOUNDARY ROAD ] - Recurring-Maintenance
Highway:HWY 9
Direction:Eastbound
From/At:TOTTEMHAM ROAD - SIMCOE ROAD 10
To:CALEDON KING TOWNLINE/BOUNDARY ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 09:00
Event End:May 03, 2017 15:00
Last Change: Entered 2017-04-25 15:20

Top of page Top of page


HWY 9 Westbound [ CALEDON KING TOWNLINE/BOUNDARY ROAD - TOTTEMHAM ROAD - SIMCOE ROAD 10 ] - Recurring-Maintenance
Highway:HWY 9
Direction:Westbound
From/At:CALEDON KING TOWNLINE/BOUNDARY ROAD
To:TOTTEMHAM ROAD - SIMCOE ROAD 10
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:May 01, 2017 09:00
Event End:May 03, 2017 15:00
Last Change: Entered 2017-04-25 15:21

Top of page Top of page


HWY 9 Westbound [ WEST CANAL BANK ROAD - KING TWP CONCESSION 8 ] - Recurring-Construction
Highway:HWY 9
Direction:Westbound
From/At:WEST CANAL BANK ROAD
To:KING TWP CONCESSION 8
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation and 1 through lane will be maintained.
Event Start:April 26, 2017 19:00
Event End:April 28, 2017 07:00
Last Change: Entered 2017-04-25 12:06

Top of page Top of page


QEW Fort Erie Bound [ BAKER ROAD - RIDGEMOUNT ROAD ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:BAKER ROAD
To:RIDGEMOUNT ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from NETHERBY ROAD NB, On-ramp from NETHERBY ROAD SB, Off-ramp to NETHERBY ROAD NB/SB
ReasonConstruction
Comment :
Event Start:May 01, 2017 07:00
Event End:May 20, 2017 23:59
Last Change: Entered 2017-04-27 13:40

Top of page Top of page


QEW Fort Erie Bound [ DIXIE ROAD - HWY 10/HURONTARIO ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:DIXIE ROAD
To:HWY 10/HURONTARIO
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Monday one lane closes nightly at 22:00 expanding to two lanes at 23:30. Both lanes reopen at 5:30. From Tuesday to Thursday two lanes close nightly at 23:30 and reopen daily at 5:30. On Friday two lanes close at 23:30. One lane reopens at 6:30 and all lanes reopen at 7:00. On Saturday one lane closes at 23:30 expanding to two lanes at 23:59. One lane reopens at 7:00 and all lanes reopen at 9:00. On Sunday one lane closes at 22:00 expanding to two lanes at 23:00. One lane reopens at 5:30 and all lanes reopen at 6:00.
Event Start:May 01, 2017 22:00
Event End:May 08, 2017 06:00
Last Change: Entered 2017-04-25 10:02

Top of page Top of page


QEW Fort Erie Bound [ EAST MALL - CAWTHRA ROAD ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:EAST MALL
To:CAWTHRA ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 30, 2017 22:00
Event End:May 06, 2017 05:00
Last Change: Entered 2017-04-27 13:03

Top of page Top of page


QEW Fort Erie Bound [ EAST MALL - DIXIE ROAD ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:EAST MALL
To:DIXIE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 23, 2017 23:00
Event End:April 29, 2017 05:00
Last Change: Entered 2017-04-21 11:50

Top of page Top of page


QEW Fort Erie Bound [ ERIN MILLS PKWY/SOUTHDOWN ROAD - FORD DRIVE ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:ERIN MILLS PKWY/SOUTHDOWN ROAD
To:FORD DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Monday one lane closes nightly at 21:00 expanding to two lanes at 23:30. One lane reopens at 5:00 and all lanes reopen at 5:30. From Tuesday to Thursday one lane close nightly at 21:30 expanding to two lanes at 23:59. One lane reopens daily at 5:00 and all lanes reopen daily at 5:30. On Friday one lane closes at 22:00 expanding to two lanes at 23:59. One lane reopens at 7:30 and all lanes reopen at 9:00. On Saturday one lane closes at 21:00 expanding to two lanes at 23:59. One lane reopens at 8:00 and all lanes reopen at 10:00. On Sunday one lane closes at 22:00 expanding to two lanes at 23:00. One lane reopens at 5:00 and all lanes reopen at 5:30.
Event Start:May 01, 2017 21:00
Event End:May 08, 2017 05:30
Last Change: Entered 2017-04-25 10:40

Top of page Top of page


QEW Fort Erie Bound [ ERIN MILLS PKWY/SOUTHDOWN ROAD - FORD DRIVE ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:ERIN MILLS PKWY/SOUTHDOWN ROAD
To:FORD DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :One lane closure Monday 21:00 - 05:30 Tuesday-Thursday 21:30 - 05:30 Friday 22:00 - 09:00 Saturday 21:00 -10:00 Sunday 22:00 - 05:30. Two lane closure Monday 23:30 - 05:00 Tuesday-Thursday 00:00 - 05:00 Friday 00:30 - 07:30 Saturday 01:00 -08:00 Sunday 23:00 - 05:00.
Event Start:April 24, 2017 21:00
Event End:May 01, 2017 05:30
Last Change: Entered 2017-04-19 15:36

Top of page Top of page


QEW Fort Erie Bound [ HWY 10/HURONTARIO - ERIN MILLS PKWY/SOUTHDOWN ROAD ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:HWY 10/HURONTARIO
To:ERIN MILLS PKWY/SOUTHDOWN ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Monday to Thursday, nightly, first lane closes at 23:00, second alternating lane closes at 23:59. First lane opens at 05:00, second lane opens at 06:00. Friday night, first lane closes at 23:00 and opens at 07:00 Saturday morning. Second lane closes at 01:00 and opens at 06:00 on Saturday morning. On Saturday one lane closes at 23:59 and opens at 9:00 on Sunday. On Sunday a second lane closes at 02:00 and reopens at 6:00. One lane closes again on Sunday at 23:00 and reopens at 6:00 on Monday. A second lane closes Sunday at 23:59 and reopens at 5:00 on Monday.
Event Start:April 28, 2017 23:00
Event End:May 05, 2017 06:00
Last Change: Entered 2017-04-21 18:19

Top of page Top of page


QEW Fort Erie Bound [ HWY 10/HURONTARIO - HWY 10/HURONTARIO ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:HWY 10/HURONTARIO
To:HWY 10/HURONTARIO
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 23:00
Event End:April 29, 2017 05:00
Last Change: Entered 2017-04-20 10:11

Top of page Top of page


QEW Fort Erie Bound [ LYONS CREEK ROAD - GILMORE ROAD ] - Maintenance
Highway:QEW
Direction:Fort Erie Bound
From/At:LYONS CREEK ROAD
To:GILMORE ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:April 27, 2017 21:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-27 08:22

Top of page Top of page


QEW Fort Erie Bound [ WELLAND RIVER BRIDGE - BECK ROAD ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:WELLAND RIVER BRIDGE
To:BECK ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from LYONS CREEK ROAD EB, On-ramp from LYONS CREEK ROAD WB, Off-ramp to LYONS CREEK ROAD EB/WB
ReasonConstruction
Comment :
Event Start:May 01, 2017 07:00
Event End:May 20, 2017 23:59
Last Change: Entered 2017-04-27 13:30

Top of page Top of page


QEW Fort Erie Bound [ WELLAND RIVER BRIDGE - RIDGEMOUNT ROAD ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:WELLAND RIVER BRIDGE
To:RIDGEMOUNT ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from LYONS CREEK ROAD WB, On-ramp from LYONS CREEK ROAD EB, Off-ramp to LYONS CREEK ROAD EB/WB, Off-ramp to NETHERBY ROAD NB/SB
ReasonRecurring-Construction
Comment :
Event Start:April 25, 2017 07:00
Event End:April 28, 2017 18:00
Last Change: Entered 2017-04-21 10:39

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - BURLOAK DRIVE Northbound/Southbound ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:BURLOAK DRIVE Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :First lane closes 22:00. Second lane closes 23:59. Both lanes open 05:00.
Event Start:April 24, 2017 22:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 08:54

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - FIFTY ROAD Southbound ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:FIFTY ROAD Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:March 24, 2017 10:00
Event End:May 19, 2017 05:00
Last Change: Entered 2017-03-22 13:28

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - MISSISSAUGA ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:MISSISSAUGA ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 28, 2017 23:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-21 18:27

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - TRAFALGAR ROAD Northbound/Southbound ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:TRAFALGAR ROAD Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 23, 2017 22:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 08:42

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - TRAFALGAR ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:TRAFALGAR ROAD Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 23, 2017 20:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 11:24

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - WINSTON CHURCHILL BLVD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:WINSTON CHURCHILL BLVD Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 23, 2017 20:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 11:50

Top of page Top of page


QEW Fort Erie Bound On-ramp [ CAWTHRA ROAD Northbound - ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:CAWTHRA ROAD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:May 01, 2017 23:00
Event End:May 08, 2017 05:00
Last Change: Entered 2017-04-25 10:14

Top of page Top of page


QEW Fort Erie Bound On-ramp [ CAWTHRA ROAD Northbound - ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:CAWTHRA ROAD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :On ramp from Cawthra Road Southbound to QEW Toronto Bound will be closed. From Wednesday to Thursday nightly at 23:00 to 5:00. Friday the ramp will be closed from 23:59 to 8:00. On Saturday the ramp will be closed from 23:59 to 8:00. On Sunday the ramp will be closed from 23:00 to 5:00.
Event Start:April 26, 2017 23:00
Event End:May 01, 2017 05:00
Last Change: Entered 2017-04-24 10:34

Top of page Top of page


QEW Fort Erie Bound On-ramp [ FORD DRIVE Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:FORD DRIVE Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 24, 2017 00:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 11:36

Top of page Top of page


QEW Fort Erie Bound On-ramp [ MISSISSAUGA ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:MISSISSAUGA ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 28, 2017 23:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-21 18:34

Top of page Top of page


QEW Fort Erie Bound On-ramp [ ROYAL WINDSOR DRIVE Westbound - ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:ROYAL WINDSOR DRIVE Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 24, 2017 00:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 11:32

Top of page Top of page


QEW Fort Erie Bound On-ramp [ TRAFALGAR ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:TRAFALGAR ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 24, 2017 00:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 11:26

Top of page Top of page


QEW Fort Erie Bound On-ramp [ WINSTON CHURCHILL BLVD Northbound - ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:WINSTON CHURCHILL BLVD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:May 01, 2017 23:00
Event End:May 08, 2017 05:00
Last Change: Entered 2017-04-25 10:16

Top of page Top of page


QEW Fort Erie Bound On-ramp [ WINSTON CHURCHILL BLVD Northbound - ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:WINSTON CHURCHILL BLVD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 23:00
Event End:May 01, 2017 05:00
Last Change: Entered 2017-04-19 15:37

Top of page Top of page


QEW Fort Erie Bound On-ramp [ WINSTON CHURCHILL BLVD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:WINSTON CHURCHILL BLVD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 24, 2017 00:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 11:51

Top of page Top of page


QEW Toronto bound [ 3RD STREET LOUTH - SEVENTH STREET ] - Maintenance
Highway:QEW
Direction:Toronto bound
From/At:3RD STREET LOUTH
To:SEVENTH STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :There will be 15 minute OPP assisted full closures during these hours.
Event Start:April 29, 2017 23:59
Event End:April 30, 2017 01:00
Last Change: Entered 2017-04-26 08:23

Top of page Top of page


QEW Toronto bound [ BECK ROAD - WELLAND RIVER BRIDGE ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:BECK ROAD
To:WELLAND RIVER BRIDGE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to LYONS CREEK ROAD EB/WB
ReasonConstruction
Comment :
Event Start:May 01, 2017 07:00
Event End:May 20, 2017 23:59
Last Change: Entered 2017-04-27 13:34

Top of page Top of page


QEW Toronto bound [ BOWEN ROAD - WELLAND RIVER BRIDGE ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:BOWEN ROAD
To:WELLAND RIVER BRIDGE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from NETHERBY ROAD NB, On-ramp from NETHERBY ROAD SB, Off-ramp to NETHERBY ROAD NB/SB, Off-ramp to LYONS CREEK ROAD EB/WB
ReasonRecurring-Construction
Comment :
Event Start:April 25, 2017 07:00
Event End:April 28, 2017 18:00
Last Change: Entered 2017-04-21 10:43

Top of page Top of page


QEW Toronto bound [ BRONTE ROAD - EAST MALL ] - Recurring-Maintenance
Highway:QEW
Direction:Toronto bound
From/At:BRONTE ROAD
To:EAST MALL
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to BRONTE ROAD EB/WB, Off-ramp to THIRD LINE EB/WB, Off-ramp to DORVAL DRIVE EB/WB, Off-ramp to KERR STREET EB/WB, Off-ramp to TRAFALGAR ROAD EB/WB, Off-ramp to ROYAL WINDSOR DRIVE EB/WB, Off-ramp to FORD DRIVE EB/WB, Off-ramp to WINSTON CHURCHILL BLVD EB/WB, Off-ramp to ERIN MILLS PKWY/SOUTHDOWN ROAD EB/WB, Off-ramp to MISSISSAUGA ROAD EB/WB, Off-ramp to HWY 10/HURONTARIO EB/WB, Off-ramp to CAWTHRA ROAD EB/WB, Off-ramp to DIXIE ROAD EB/WB, Off-ramp to WEST MALL/EVANS AVE EB/WB
ReasonRecurring-Maintenance
Comment :Sunday to Friday, off-ramps along QEW Toronto bound from Bronte Road to Winston Churchill Blvd will close alternatively one lane out of three lanes . Two adjacent off ramps will not be closed at the same time. The access to the off ramps is available.
Event Start:April 23, 2017 00:00
Event End:April 28, 2017 04:30
Last Change: Entered 2017-04-18 09:08

Top of page Top of page


QEW Toronto bound [ CAWTHRA ROAD - EAST MALL ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:CAWTHRA ROAD
To:EAST MALL
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 30, 2017 22:00
Event End:May 06, 2017 05:00
Last Change: Entered 2017-04-27 13:06

Top of page Top of page


QEW Toronto bound [ ERIN MILLS PKWY/SOUTHDOWN ROAD - HWY 10/HURONTARIO ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:ERIN MILLS PKWY/SOUTHDOWN ROAD
To:HWY 10/HURONTARIO
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Monday to Thursday, nightly, first lane closes at 23:00, second alternating lane closes at 23:59. First lane opens at 04:30, second lane opens at 05:00. Friday night, first lane closes at 23:00 and opens at 07:00 Saturday morning. Second lane closes at 01:00 and opens at 06:00 on Saturday morning. On Saturday one lane closes at 23:00 and opens at 9:00 on Sunday. On Sunday a second lane closes at 02:00 and reopens at 6:00. One lane closes again on Sunday at 23:00 and reopens at 5:00 on Monday. A second lane closes Sunday at 23:59 and reopens at 4:30 on Monday.
Event Start:April 28, 2017 23:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-21 18:22

Top of page Top of page


QEW Toronto bound [ FORD DRIVE - ERIN MILLS PKWY/SOUTHDOWN ROAD ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:FORD DRIVE
To:ERIN MILLS PKWY/SOUTHDOWN ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :One lane closure Monday 21:00-05:00 Tuesday-Thursday 21:30 - 05:00 Friday 22:00 -09:00 Saturday 23:00- 09:30 Sunday 23:30 - 05:00. Two lane closure Monday 23:30 - 05:00 Tuesday - Thursday 23:30 - 05:00 Friday 00:00 - 07:00 Saturday 00:30 - 00:830 Sunday 01:00 - 05:00.
Event Start:April 24, 2017 21:00
Event End:May 01, 2017 05:00
Last Change: Entered 2017-04-19 15:36

Top of page Top of page


QEW Toronto bound [ FORD DRIVE - ERIN MILLS PKWY/SOUTHDOWN ROAD ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:FORD DRIVE
To:ERIN MILLS PKWY/SOUTHDOWN ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :From Monday to Thursday one lane closes nightly at 21:00 expanding to two lanes at 23:30. Both lanes reopen daily at 5:00. On Friday one lane closes at 22:00 and expands to two lanes at 23:59. One lane reopens at 7:00 and all lanes reopen at 9:00. On Saturday one lane closes at 23:00 expanding to two lanes at 23:59. One lane reopens at 8:30 and all lanes reopen at 9:30. On Sunday one lane closes at 23:30 expanding to two lanes at 23:59. All lanes reopen at 5:00.
Event Start:May 01, 2017 21:00
Event End:May 08, 2017 05:00
Last Change: Entered 2017-04-25 10:32

Top of page Top of page


QEW Toronto bound [ HWY 10/HURONTARIO - DIXIE ROAD ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:HWY 10/HURONTARIO
To:DIXIE ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Monday one lane closes nightly at 20:30 expanding to two lanes at 22:00. Both lanes reopen at 5:00. From Tuesday to Thursday one lane closes nightly at 21:00 expanding to two lanes at 22:00. Both lanes reopen daily at 5:00. On Friday two lanes close at 22:00. Both lanes reopen at 7:00. On Saturday one lane closes at 23:00 expanding to two lanes at 23:59. One lane reopens at 7:00 and all lanes reopen at 8:00. On Sunday one lane closes at 22:30 expanding to two lanes at 23:59. All lanes reopen at 5:00.
Event Start:May 01, 2017 20:30
Event End:May 08, 2017 05:00
Last Change: Entered 2017-04-25 10:10

Top of page Top of page


QEW Toronto bound [ HWY 10/HURONTARIO - HWY 10/HURONTARIO ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:HWY 10/HURONTARIO
To:HWY 10/HURONTARIO
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 23:00
Event End:April 29, 2017 05:00
Last Change: Entered 2017-04-20 10:07

Top of page Top of page


QEW Toronto bound [ HWY 420 - HWY 420 ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:HWY 420
To:HWY 420
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 24, 2017 23:59
Event End:May 19, 2017 12:00
Last Change: Entered 2017-04-11 15:25

Top of page Top of page


QEW Toronto bound [ RIDGEMOUNT ROAD - BAKER ROAD ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:RIDGEMOUNT ROAD
To:BAKER ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from NETHERBY ROAD NB, On-ramp from NETHERBY ROAD SB, Off-ramp to NETHERBY ROAD NB/SB
ReasonConstruction
Comment :
Event Start:May 01, 2017 07:00
Event End:May 20, 2017 23:59
Last Change: Entered 2017-04-27 13:42

Top of page Top of page


QEW Toronto bound [ SODOM ROAD - BECK ROAD ] - Recurring-Maintenance
Highway:QEW
Direction:Toronto bound
From/At:SODOM ROAD
To:BECK ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:April 24, 2017 09:00
Event End:April 28, 2017 16:00
Last Change: Entered 2017-04-20 07:05

Top of page Top of page


QEW Toronto bound Off-ramp [ - FIFTY ROAD Southbound ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:
To:FIFTY ROAD Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:March 24, 2017 10:00
Event End:May 19, 2017 05:00
Last Change: Entered 2017-03-22 13:36

Top of page Top of page


QEW Toronto bound Off-ramp [ - FORD DRIVE Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:
To:FORD DRIVE Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 23, 2017 20:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 11:34

Top of page Top of page


QEW Toronto bound Off-ramp [ - HWY 403 OAKVILLE Eastbound ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:
To:HWY 403 OAKVILLE Eastbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 23, 2017 20:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 11:53

Top of page Top of page


QEW Toronto bound Off-ramp [ - MISSISSAUGA ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:
To:MISSISSAUGA ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 28, 2017 23:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-21 18:24

Top of page Top of page


QEW Toronto bound Off-ramp [ - ROYAL WINDSOR DRIVE Eastbound ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:
To:ROYAL WINDSOR DRIVE Eastbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 23, 2017 20:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 11:30

Top of page Top of page


QEW Toronto bound Off-ramp [ - TRAFALGAR ROAD Eastbound ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:
To:TRAFALGAR ROAD Eastbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 23, 2017 20:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 14:30

Top of page Top of page


QEW Toronto bound Off-ramp [ - TRAFALGAR ROAD Northbound/Southbound ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:
To:TRAFALGAR ROAD Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 23, 2017 22:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 08:46

Top of page Top of page


QEW Toronto bound Off-ramp [ - WINSTON CHURCHILL BLVD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:
To:WINSTON CHURCHILL BLVD Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 23, 2017 20:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 11:41

Top of page Top of page


QEW Toronto bound On-ramp [ CAWTHRA ROAD Southbound - ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:CAWTHRA ROAD Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :On ramp from Cawthra Road Southbound to QEW Toronto Bound will be closed Wednesday to Thursday nightly at 23:00 to 5:00. Friday the ramp will be closed from 23:59 to 5:00. On Saturday the ramp will be closed from 23:59 to 8:00.
Event Start:April 26, 2017 23:00
Event End:May 01, 2017 05:00
Last Change: Entered 2017-04-24 10:29

Top of page Top of page


QEW Toronto bound On-ramp [ CAWTHRA ROAD Southbound - ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:CAWTHRA ROAD Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:May 01, 2017 23:00
Event End:May 08, 2017 05:00
Last Change: Entered 2017-04-25 10:12

Top of page Top of page


QEW Toronto bound On-ramp [ FORD DRIVE Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:FORD DRIVE Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 24, 2017 00:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 11:37

Top of page Top of page


QEW Toronto bound On-ramp [ MISSISSAUGA ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:MISSISSAUGA ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 28, 2017 23:00
Event End:May 05, 2017 05:00
Last Change: Entered 2017-04-21 18:25

Top of page Top of page


QEW Toronto bound On-ramp [ SEVENTH STREET Northbound/Southbound - ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:SEVENTH STREET Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 20:00
Event End:April 28, 2017 06:00
Last Change: Entered 2017-04-20 11:48

Top of page Top of page


QEW Toronto bound On-ramp [ TRAFALGAR ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:TRAFALGAR ROAD Northbound/Southbound
To:
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 23, 2017 23:59
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-19 14:44

Top of page Top of page


QEW Toronto bound On-ramp [ WINSTON CHURCHILL BLVD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:WINSTON CHURCHILL BLVD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:April 24, 2017 00:00
Event End:April 28, 2017 05:00
Last Change: Entered 2017-04-20 11:42

Top of page Top of page


QEW Toronto bound On-ramp [ WINSTON CHURCHILL BLVD Southbound - ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:WINSTON CHURCHILL BLVD Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:May 01, 2017 23:00
Event End:May 08, 2017 05:00
Last Change: Entered 2017-04-25 10:18

Top of page Top of page


QEW Toronto bound On-ramp [ WINSTON CHURCHILL BLVD Southbound - ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:WINSTON CHURCHILL BLVD Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2017 23:00
Event End:May 01, 2017 05:00
Last Change: Entered 2017-04-19 15:36

Top of page Top of page


HWY 11 Northbound [ TCPL COMP STA 84 RD(S) - ] - Disabled Vehicle
Highway:HWY 11
Direction:Northbound
From/At:TCPL COMP STA 84 RD(S)
To:
Lanes Affected: lane blocked
Traffic Impact :
ReasonDisabled Vehicle
Comment :The west bound lane of Hwy 11 is blocked at Klotz Lake due to disabled tractor trailer unit. Apr. 28, 2017 at 12:10 A.M.
Event Start:April 27, 2017 10:23
Event End:
Last Change: Updated 2017-04-28 00:10

Top of page Top of page


HWY 17 Both Directions [ BEAUMONT PARK RD-AWERES TWP (W) - ] - Collision
Highway:HWY 17
Direction:Both Directions
From/At:BEAUMONT PARK RD-AWERES TWP (W)
To:
Lanes Affected:All lanes closed
Traffic Impact :
ReasonCollision
Comment :HWY 17 CLOSED IN THE HEYDEN AREA. UPDATED APRIL 27TH 2017 AT 2300 HOURS
Event Start:April 27, 2017 22:01
Event End:
Last Change: Updated 2017-04-27 22:53

Top of page Top of page


HWY 17 Westbound [ ORPHAN LK TRAIL-LAKE SUPERIOR PROV PK - ] - Road Conditions
Highway:HWY 17
Direction:Westbound
From/At:ORPHAN LK TRAIL-LAKE SUPERIOR PROV PK
To:
Lanes Affected: lane closed
Traffic Impact :
ReasonRoad Conditions
Comment :HWY 17 NORTHBOUND LANE CLOSURE NEAR AGAWA BAY. UPDATED APRIL 27TH 2017 AT 2300 HOURS
Event Start:April 27, 2017 16:29
Event End:
Last Change: Updated 2017-04-27 22:53

Top of page Top of page


HWY 672 Both Directions [ HWY 66 - HWY 101(END OF HWY) ] - Other
Highway:HWY 672
Direction:Both Directions
From/At:HWY 66
To:HWY 101(END OF HWY)
Lanes Affected:All lanes closed
Traffic Impact :
ReasonOther
Comment :HWY 672 CLOSED IN THE KIRKLAND LAKE AREA. NO DETOUR AVAILABLE. UPDATED APRIL 27 AT 2300 HRS
Event Start:April 17, 2017 16:40
Event End:
Last Change: Updated 2017-04-27 22:52

Top of page Top of page


HWY 7044 Both Directions [ Hwy 144 Windy Lake - ] - Other
Highway:HWY 7044
Direction:Both Directions
From/At:Hwy 144 Windy Lake
To:
Lanes Affected:All lanes closed
Traffic Impact :
ReasonOther
Comment :HWY 7044 CLOSED 13.6 KM NORTH OF HWY 144 WINDY LAKE ON THE NORTH SIDE OF FOX LAKE ROAD AND 5.8 KM SOUTH OF HWY 144 CARTIER ENTRANCE AT THE MOUSSEAU LAKE PARKING LOT. THERE IS AMPLE SPACE FOR MOTORISTS TO TURN THEIR VEHICLES AT BOTH LOCATIONS. TOTAL LENGTH OF THE 2300 HRS
Event Start:January 13, 2017 10:05
Event End:
Last Change: Updated 2017-04-27 22:52

Top of page Top of page


This information is provided as a public service. Although we endeavor to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.

Road information by phone

  • Provincial Call Centre: 1-800-268-4686
  • In GTA: 416-235-4686
  • Provincial TTY: 1-866-471-8929
  • Niagara Region TTY: 905-704-2426

See also:

Ontario 511 Logo