Unscheduled road closures and events for provincial highways:

Unscheduled Events

Scheduled Events

HWY 11 Northbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - LINE 1 ] - Recurring-Maintenance
Highway: HWY 11
Direction: Northbound
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: LINE 1
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 27, 2016 09:00
Event End: September 28, 2016 15:00
Last Change: Entered 2016-09-22 10:07

Top of page Top of page


HWY 11 Northbound [ SOULES ROAD/TELFORD LANE - NEW BRAILEY LINE/BAYOU ROAD ] - Recurring-Maintenance
Highway: HWY 11
Direction: Northbound
From/At: SOULES ROAD/TELFORD LANE
To: NEW BRAILEY LINE/BAYOU ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 26, 2016 06:00
Event End: September 29, 2016 15:00
Last Change: Entered 2016-09-22 15:19

Top of page Top of page


HWY 11 Northbound [ SUNDIAL DRIVE/CARLYN LINE - SOULES ROAD/TELFORD LANE ] - Recurring-Maintenance
Highway: HWY 11
Direction: Northbound
From/At: SUNDIAL DRIVE/CARLYN LINE
To: SOULES ROAD/TELFORD LANE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 26, 2016 09:00
Event End: September 27, 2016 15:00
Last Change: Entered 2016-09-22 09:39

Top of page Top of page


HWY 11 Northbound Off-ramp [ - SEVERN RIVER BRIDGE/WEST BRANCH Northbound ] - Recurring-Maintenance
Highway: HWY 11
Direction: Northbound
From/At:
To: SEVERN RIVER BRIDGE/WEST BRANCH Northbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 25, 2016 20:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-20 08:55

Top of page Top of page


HWY 11 Northbound On-ramp [ HWY 400 Northbound - ] - Recurring-Maintenance
Highway: HWY 11
Direction: Northbound
From/At: HWY 400 Northbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 25, 2016 20:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-20 08:52

Top of page Top of page


HWY 11 Southbound [ LINE 1 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Maintenance
Highway: HWY 11
Direction: Southbound
From/At: LINE 1
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 27, 2016 09:00
Event End: September 28, 2016 15:00
Last Change: Entered 2016-09-22 10:09

Top of page Top of page


HWY 11 Southbound [ SOULES ROAD/TELFORD LANE - SUNDIAL DRIVE/CARLYN LINE ] - Recurring-Maintenance
Highway: HWY 11
Direction: Southbound
From/At: SOULES ROAD/TELFORD LANE
To: SUNDIAL DRIVE/CARLYN LINE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 26, 2016 09:00
Event End: September 27, 2016 15:00
Last Change: Entered 2016-09-22 09:43

Top of page Top of page


HWY 11 Southbound Off-ramp [ - HWY 400 Southbound ] - Recurring-Maintenance
Highway: HWY 11
Direction: Southbound
From/At:
To: HWY 400 Southbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 25, 2016 20:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-20 09:00

Top of page Top of page


HWY 11 Southbound On-ramp [ SEVERN RIVER BRIDGE/WEST BRANCH Southbound - ] - Recurring-Maintenance
Highway: HWY 11
Direction: Southbound
From/At: SEVERN RIVER BRIDGE/WEST BRANCH Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 25, 2016 20:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-20 08:58

Top of page Top of page


HWY 115 Northbound [ HWY 7A - COUNTY ROAD 28 ] - Recurring-Engineering Investigation
Highway: HWY 115
Direction: Northbound
From/At: HWY 7A
To: COUNTY ROAD 28
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Right lane closures Northbound and Southbound from Highway 7 to County Rd 11/Airport Road, with on & off ramp closures as required.
Event Start: September 25, 2016 18:00
Event End: September 29, 2016 07:00
Last Change: Entered 2016-09-16 08:40

Top of page Top of page


HWY 115 Northbound [ PETERBOROUGH RD 11 - HWY 7A ] - Recurring-Engineering Investigation
Highway: HWY 115
Direction: Northbound
From/At: PETERBOROUGH RD 11
To: HWY 7A
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Alternating lane closures on Hwy 115 in both directions from Hwy 7A to 1 km East of Airport Rd (Peterborough)
Event Start: September 25, 2016 18:00
Event End: September 30, 2016 07:00
Last Change: Entered 2016-09-15 13:52

Top of page Top of page


HWY 115 Northbound Off-ramp [ - HWY 7A Northbound/Southbound ] - Recurring-Engineering Investigation
Highway: HWY 115
Direction: Northbound
From/At:
To: HWY 7A Northbound/Southbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Northbound off-ramp and on-ramp closure.
Event Start: September 27, 2016 18:00
Event End: September 29, 2016 07:00
Last Change: Entered 2016-09-16 08:19

Top of page Top of page


HWY 115 Northbound On-ramp [ HWY 7A Northbound - ] - Recurring-Engineering Investigation
Highway: HWY 115
Direction: Northbound
From/At: HWY 7A Northbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Peterborough.
Event Start: September 25, 2016 18:00
Event End: September 27, 2016 07:00
Last Change: Entered 2016-09-15 14:36

Top of page Top of page


HWY 115 Southbound [ PETERBOROUGH RD 11 - PETERBOROUGH RD 11 ] - Recurring-Engineering Investigation
Highway: HWY 115
Direction: Southbound
From/At: PETERBOROUGH RD 11
To: PETERBOROUGH RD 11
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Peterborough
Event Start: September 25, 2016 18:00
Event End: September 29, 2016 07:00
Last Change: Entered 2016-09-20 09:21

Top of page Top of page


HWY 12 Southbound [ DURHAM ROAD 12 - DURHAM ROAD 12 ] - Recurring-Construction
Highway: HWY 12
Direction: Southbound
From/At: DURHAM ROAD 12
To: DURHAM ROAD 12
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : One through lane maintained by flagging operation.
Event Start: September 26, 2016 06:00
Event End: September 29, 2016 20:00
Last Change: Entered 2016-09-21 13:33

Top of page Top of page


HWY 127 Northbound [ Baragars Rd - FOSTERS RD ] - Engineering Investigation
Highway: HWY 127
Direction: Northbound
From/At: Baragars Rd
To: FOSTERS RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Engineering Investigation
Comment : Single lane closures N/B & S/B with flagging.
Event Start: September 28, 2016 08:00
Event End: September 28, 2016 17:00
Last Change: Entered 2016-09-23 14:10

Top of page Top of page


HWY 17 Eastbound [ CHENAUX RD/CTY RD 653 - STORYLAND RD ] - Recurring-Engineering Investigation
Highway: HWY 17
Direction: Eastbound
From/At: CHENAUX RD/CTY RD 653
To: STORYLAND RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Traffic may encounter single lane closures with flagging operation on Hwy 17 btwn Chenaux Rd and Storyland Rd (W/Renfrew)
Event Start: September 28, 2016 07:30
Event End: September 30, 2016 17:00
Last Change: Entered 2016-09-23 08:21

Top of page Top of page


HWY 17 Eastbound [ GREENWOOD RD - FORESTERS FALLS RD ] - Recurring-Engineering Investigation
Highway: HWY 17
Direction: Eastbound
From/At: GREENWOOD RD
To: FORESTERS FALLS RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Traffic may encounter single lane closures with flagging operation on Hwy 17 btwn Greenwood Rd and Foresters Falls Rd (Pembroke - Cobden)
Event Start: September 28, 2016 07:30
Event End: September 30, 2016 17:00
Last Change: Entered 2016-09-23 08:30

Top of page Top of page


HWY 17 Eastbound [ SCHEEL DR - CAMPBELL DR ] - Recurring-Construction
Highway: HWY 17
Direction: Eastbound
From/At: SCHEEL DR
To: CAMPBELL DR
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Traffic may encounter single lane closures with flagging operation on Hwy 17 in Arnprior
Event Start: September 26, 2016 07:30
Event End: September 30, 2016 18:30
Last Change: Entered 2016-09-23 12:41

Top of page Top of page


HWY 17 Eastbound Off-ramp [ - CAMPBELL DR Eastbound ] - Recurring-Construction
Highway: HWY 17
Direction: Eastbound
From/At:
To: CAMPBELL DR Eastbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 17 E/B Campbell Drive off ramp closed daily (Arnprior)
Event Start: September 26, 2016 07:30
Event End: September 29, 2016 18:30
Last Change: Entered 2016-09-23 12:46

Top of page Top of page


HWY 17 Eastbound On-ramp [ CAMPBELL DR Eastbound - ] - Recurring-Construction
Highway: HWY 17
Direction: Eastbound
From/At: CAMPBELL DR Eastbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 17 E/B Campbell Drive on ramp closed daily (Arnprior)
Event Start: September 26, 2016 07:30
Event End: September 29, 2016 18:30
Last Change: Entered 2016-09-23 12:49

Top of page Top of page


HWY 24 Northbound [ Maple Grove Road - Maple Grove Road ] - Recurring-Maintenance
Highway: HWY 24
Direction: Northbound
From/At: Maple Grove Road
To: Maple Grove Road
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment : Highway 24 northbound, from Maple Grove Road to 1 kilometre north of Maple Grove Road, north of Scotland, reduced to a single lane of traffic, Friday, September 23rd, 2016 until Tuesday, September 27th, 2016 (excluding weekend), daily, from 0800 hours until 1600 hours, for maintenance (ditching work) operations, traffic control provided by flag persons.
Event Start: September 23, 2016 08:00
Event End: September 27, 2016 16:00
Last Change: Entered 2016-09-22 20:45

Top of page Top of page


HWY 26 Eastbound [ County Road 2 - Longpoint Road / County Road 21 ] - Recurring-Construction
Highway: HWY 26
Direction: Eastbound
From/At: County Road 2
To: Longpoint Road / County Road 21
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating eastbound and westbound lane closures on Highway 26, from Grey County Road 21, Collingwood to grey County Road 2, Thornbury. Starting on Monday September 26, 2016 until Friday September 30, 2016, daily from 0700 hours until 1900 hours. Traffic to be controlled by flagging operations.
Event Start: September 26, 2016 07:00
Event End: September 30, 2016 19:00
Last Change: Entered 2016-09-23 12:56

Top of page Top of page


HWY 28 Northbound [ JULIAN LAKE RD - JULIAN LAKE RD ] - Construction
Highway: HWY 28
Direction: Northbound
From/At: JULIAN LAKE RD
To: JULIAN LAKE RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Alternating N/B & S/B lane closures with flaggers. South of Woodview.
Event Start: September 26, 2016 08:00
Event End: September 26, 2016 18:00
Last Change: Entered 2016-09-23 11:40

Top of page Top of page


HWY 3 Westbound [ Maidstone Avenue / Regional Road 8 - Malden Road ] - Construction
Highway: HWY 3
Direction: Westbound
From/At: Maidstone Avenue / Regional Road 8
To: Malden Road
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 3 westbound, from Essex Road 8 (Maidstone Avenue) to Malden Road, Maidstone, reduced to a single lane of traffic, Monday, September 19th, 2016 at 1000 hours until Monday, September 26th, 2016 at 1700 hours, for construction work operations.
Event Start: September 19, 2016 10:00
Event End: September 26, 2016 17:00
Last Change: Entered 2016-09-19 12:32

Top of page Top of page


HWY 33 Eastbound [ GLENORA FERRY DOCK - ROAD 1 RD ] - Recurring-Construction
Highway: HWY 33
Direction: Eastbound
From/At: GLENORA FERRY DOCK
To: ROAD 1 RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Nightly rolling closures on Hwy 33 btwn Conway and Glenora Ferry
Event Start: September 26, 2016 18:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-23 11:00

Top of page Top of page


HWY 40 Northbound [ Highway 401 - Highway 401 ] - Recurring-Construction
Highway: HWY 40
Direction: Northbound
From/At: Highway 401
To: Highway 401
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 40 1 km North of Hwy 401 will have short duration single lane closures from 0700-1900 hours daily March 17-November 25, 2016
Event Start: March 17, 2016 07:00
Event End: November 27, 2016 19:00
Last Change: Entered 2016-03-17 14:15

Top of page Top of page


HWY 400 Northbound [ 5TH LINE - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: 5TH LINE
To: INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB
Reason Recurring-Construction
Comment : One lane closes at 19:00, two lanes close at 23:00, One lane open at 6:00, all lanes open at 11:00. All Ramps closed from 23:00 to 05:00.
Event Start: September 25, 2016 19:00
Event End: September 26, 2016 11:00
Last Change: Entered 2016-09-21 16:54

Top of page Top of page


HWY 400 Northbound [ 5TH LINE - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: 5TH LINE
To: INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB
Reason Recurring-Construction
Comment : Monday though Wednesday, one lane closed at 20:00, two lanes closed at 23:00, one lane opens at 06:00, all lanes open at 11.00. On thursday, one lane closed at 20:00, two lanes close at 23:00. One lane opens at 6:00, all lanes open at 8:00.
Event Start: September 26, 2016 20:00
Event End: September 30, 2016 11:00
Last Change: Entered 2016-09-21 17:18

Top of page Top of page


HWY 400 Northbound [ AURORA ROAD. - CANAL ROAD. ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: AURORA ROAD.
To: CANAL ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
Reason Recurring-Construction
Comment : Monday to Thursday expanding to a two lane closure at 20:00, all lanes open at 5:00. On Friday lane 1 closes 22:00, opens at 5:00 & lane 2 closes midnight, opens at 5:00. Saturday one lane closes at 23:00 to 6:00 expanding to two lanes at 00:00 to 7.00. Sunday one lane closes at 22:00 to 7:00 expanding to two lanes at 00:00 to 7.00.
Event Start: September 19, 2016 20:00
Event End: September 26, 2016 08:00
Last Change: Entered 2016-09-15 13:57

Top of page Top of page


HWY 400 Northbound [ AURORA ROAD. - CANAL ROAD. ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: AURORA ROAD.
To: CANAL ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
Reason Recurring-Construction
Comment : Mainline: Monday to Thursday one lane closed at 20:00, two lanes closed at 22:00. All lanes open at 06:00. On Friday, one lane closes at 22:00, two lanes at 23:59, one lane reopens at 6:00 and all lanes open at 8:00. On Saturday, one lane closes at 23:00, two lanes close at 23:59, one lane reopens at 7:00 and all lanes open at 8:00. On Sunday, one lane closes at 22:00, two lanes at 23:59; one lane opens at 5:00, all lanes reopen at 6:00.
Event Start: September 26, 2016 20:00
Event End: October 03, 2016 08:00
Last Change: Entered 2016-09-22 10:55

Top of page Top of page


HWY 400 Northbound [ AURORA ROAD. - CANAL ROAD. ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: AURORA ROAD.
To: CANAL ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
Reason Recurring-Construction
Comment : Monday to Thursday expanding to a two lane closure at 00:00 all lanes open at 6:00. On Saturday one lane closed at 23;00 expanding to two lanes at 00:00 to 6.00. On Sunday two lanes closed from midnight to 7:000.
Event Start: September 19, 2016 20:00
Event End: September 26, 2016 08:00
Last Change: Entered 2016-09-15 13:57

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: DUCKWORTH STREET
To: HWY 11 JCT
Lanes Affected: 1 Right Lane(s)
Traffic Impact : On-ramp from HWY 11 JCT NB
Reason Construction
Comment :
Event Start: September 25, 2016 06:00
Event End: September 25, 2016 22:00
Last Change: Entered 2016-09-19 17:11

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: DUCKWORTH STREET
To: HWY 11 JCT
Lanes Affected: 1 Right Lane(s)
Traffic Impact : On-ramp from HWY 11 JCT NB
Reason Construction
Comment :
Event Start: September 26, 2016 06:00
Event End: September 26, 2016 17:30
Last Change: Entered 2016-09-23 14:12

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - WILLOW CREEK BRIDGE ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: DUCKWORTH STREET
To: WILLOW CREEK BRIDGE
Lanes Affected: 1 Right Lane(s)
Traffic Impact : On-ramp from HWY 11 JCT NB
Reason Recurring-Construction
Comment : One lane closes from Monday to Thursday from 18:00 to 15:00 and on Thursday closes from 18:00 to Friday 9:00. On Ramp closes Monday to Thursday from 18:00 to 15:00 and on Thursday closes from 18:00 to Friday 9:00.
Event Start: September 26, 2016 18:00
Event End: September 30, 2016 15:00
Last Change: Entered 2016-09-23 15:04

Top of page Top of page


HWY 400 Northbound [ ESSA ROAD / SIMCOE ROAD 27 - DUNLOP STREET / SIMCOE ROAD 90 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: ESSA ROAD / SIMCOE ROAD 27
To: DUNLOP STREET / SIMCOE ROAD 90
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from ESSA ROAD / SIMCOE ROAD 27 EB, On-ramp from ESSA ROAD / SIMCOE ROAD 27 WB, Off-ramp to DUNLOP STREET / SIMCOE ROAD 90 EB
Reason Recurring-Construction
Comment : On Monday expanding to two lanes closed at 22:00. on Tuesday to Thursday, one lane closure at 20:00, expanding to a 2 lane closure at 21:00. All lanes open at 06:00. On Friday, two lane closure at midnight. One lane opens at 06:00, all lanes open at 08:00. On Saturday, one lane closure at 19:00, expanding to a two lane closure at 23:00. One lane opens at 07:00, all lanes open at 09:00. On Sunday, one lane closure at 20:00, expanding to a two lane closure at 23:00. All lanes open at 06:00.
Event Start: September 25, 2016 23:00
Event End: October 01, 2016 23:59
Last Change: Entered 2016-09-21 11:19

Top of page Top of page


HWY 400 Northbound [ ESSA ROAD / SIMCOE ROAD 27 - DUNLOP STREET / SIMCOE ROAD 90 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: ESSA ROAD / SIMCOE ROAD 27
To: DUNLOP STREET / SIMCOE ROAD 90
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : On Monday expanding to two lanes closed at 22:00. on Tuesday to Thursday, one lane closure at 20:00, expanding to a 2 lane closure at 21:00. All lanes open at 06:00. On Friday, two lane closure at midnight. One lane opens at 06:00, all lanes open at 08:00. On Saturday, one lane closure at 19:00, expanding to a two lane closure at 23:00. One lane opens at 07:00, all lanes open at 09:00. On Sunday, one lane closure at 20:00, expanding to a two lane closure at 23:00. All lanes open at 06:00.
Event Start: September 18, 2016 20:00
Event End: September 25, 2016 23:00
Last Change: Entered 2016-09-14 16:05

Top of page Top of page


HWY 400 Northbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - MAPLEVIEW DRIVE ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: INNISFIL BEACH ROAD - SIMCOE ROAD 21
To: MAPLEVIEW DRIVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : On Sunday, one lane closes at 18:00, two lanes close at 21:00. Monday to Thursday, one lanes closes at 19:00, two lanes close at 21:00. On all days, one lane open at 7:00, all lanes open at 10:00.
Event Start: September 25, 2016 19:00
Event End: September 30, 2016 07:00
Last Change: Entered 2016-09-21 03:36

Top of page Top of page


HWY 400 Northbound [ MOONSTONE ROAD/SIMCOE ROAD 19 - MOONSTONE ROAD/SIMCOE ROAD 19 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: MOONSTONE ROAD/SIMCOE ROAD 19
To: MOONSTONE ROAD/SIMCOE ROAD 19
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 07:00
Event End: September 29, 2016 17:00
Last Change: Entered 2016-09-21 21:48

Top of page Top of page


HWY 400 Northbound [ PORT SEVERN ROAD - SEVERN RIVER BRIDGE ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: PORT SEVERN ROAD
To: SEVERN RIVER BRIDGE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 26, 2016 07:00
Event End: September 30, 2016 11:00
Last Change: Entered 2016-09-22 12:37

Top of page Top of page


HWY 400 Northbound Off-ramp [ - PORT SEVERN ROAD Northbound ] - Recurring-Maintenance
Highway: HWY 400
Direction: Northbound
From/At:
To: PORT SEVERN ROAD Northbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 25, 2016 22:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-20 08:30

Top of page Top of page


HWY 400 Northbound On-ramp [ HWY 11 JCT Northbound - ] - Recurring-Maintenance
Highway: HWY 400
Direction: Northbound
From/At: HWY 11 JCT Northbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 25, 2016 22:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-20 08:26

Top of page Top of page


HWY 400 Southbound [ AURORA ROAD. - KING ROAD ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: AURORA ROAD.
To: KING ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 19:00
Event End: October 01, 2016 05:00
Last Change: Entered 2016-09-19 15:11

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - AURORA ROAD. ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: CANAL ROAD.
To: AURORA ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 9 EB, Off-ramp to HWY 9 EB/WB
Reason Recurring-Construction
Comment : Mainline: Monday two lanes closes at 22:00, Tuesday to Thursday one lane closed at 19:00, two lanes closed at 22:00. All lanes open at 05:00. On Friday, one lane closes at 22:00, two lanes at 23:59, one lane reopens at 6:00 and all lanes open at 8:00. On Saturday, one lane closes at 23:00, two lanes close at 23:59, one lane reopens at 8:00 and all lanes open at 9:00. On Sunday, one lane closes at 23:00, two lanes at 23:59 and all lanes reopen at 5:00. On/Off-Ramp closure times: Monday 23:59-5:00, Tuesday to Thursday 23:00-5:00. Friday & Saturday 23:00-8:00, Sunday 23:00-5:00.
Event Start: September 19, 2016 19:00
Event End: September 26, 2016 09:00
Last Change: Entered 2016-09-15 14:09

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - AURORA ROAD. ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: CANAL ROAD.
To: AURORA ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 9 EB, Off-ramp to HWY 9 EB/WB
Reason Recurring-Construction
Comment : Mainline: Monday to Thursday one lane closed at 19:00, two lanes closed at 22:00. All lanes open at 05:00. On Friday, one lane closes at 22:00, two lanes at 23:59, one lane reopens at 6:00 and all lanes open at 8:00. On Saturday, one lane closes at 23:00, two lanes close at 23:59, one lane opens at 8:00 and all lanes open at 9:00. On Sunday, one lane closes at 23:00, two lanes at 23:59 and all lanes open at 5:00. On/Off-Ramp closure times: Monday 23:59-5:00, Tuesday to Thursday 23:00-5:00. Friday & Saturday 23:00-8:00, Sunday 23:00-5:00.
Event Start: September 26, 2016 19:00
Event End: October 03, 2016 09:00
Last Change: Entered 2016-09-22 11:03

Top of page Top of page


HWY 400 Southbound [ DUCKWORTH STREET - DUCKWORTH STREET ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: DUCKWORTH STREET
To: DUCKWORTH STREET
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 10:00
Event End: September 29, 2016 19:00
Last Change: Entered 2016-09-21 15:49

Top of page Top of page


HWY 400 Southbound [ DUNLOP STREET / SIMCOE ROAD 90 - ESSA ROAD / SIMCOE ROAD 27 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: DUNLOP STREET / SIMCOE ROAD 90
To: ESSA ROAD / SIMCOE ROAD 27
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternate two lane closure. On Monday to Thursday, one lane closes at 22:00, opens at 5:00 expanding to lane 2 closes at 22:00 and opens at 5:00. On Friday and Saturday One lane closes at 22:00 and opens at 07:00 & 6:00 expanding at lane 2 closes at 22:00 and opens at 7:00 & 5:00.
Event Start: September 26, 2016 21:00
Event End: October 02, 2016 05:00
Last Change: Entered 2016-09-21 11:00

Top of page Top of page


HWY 400 Southbound [ DUNLOP STREET / SIMCOE ROAD 90 - ESSA ROAD / SIMCOE ROAD 27 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: DUNLOP STREET / SIMCOE ROAD 90
To: ESSA ROAD / SIMCOE ROAD 27
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : On Monday to Friday, one lane closure at 20:00, expanding to a two lane at 22:00. One lane opens at 05:00, all lanes open at 06:00. On Saturday, one lane closure at 21:00, expanding to a two lane closure at 23:00. One lane opens 08:00, all lanes open at 09:00. On Sunday, one lane closure at 23:00, expanding for a two lane closure at 23:59. One lane opens at 05:00, all lanes open at 06:00.
Event Start: September 18, 2016 23:00
Event End: September 25, 2016 23:59
Last Change: Entered 2016-09-14 15:54

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: HWY 11 JCT
To: DUCKWORTH STREET
Lanes Affected: 1 Right Lane(s)
Traffic Impact : Off-ramp to HWY 11 JCT SB
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 18:00
Event End: September 30, 2016 15:00
Last Change: Entered 2016-09-23 14:02

Top of page Top of page


HWY 400 Southbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - 5TH LINE ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: INNISFIL BEACH ROAD - SIMCOE ROAD 21
To: 5TH LINE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB, On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, On-ramp from SERVICE CENTRE - COOKSTOWN ONROUTE SB EB/WB, Off-ramp to SERVICE CENTRE - COOKSTOWN ONROUTE SB EB/WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB
Reason Recurring-Construction
Comment : One lane closes at 11:00, two lanes close at 22:00, all lanes open at 05:00. All Ramps closed from 23:00 to 05:00.
Event Start: September 26, 2016 11:00
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-21 17:08

Top of page Top of page


HWY 400 Southbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - 5TH LINE ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: INNISFIL BEACH ROAD - SIMCOE ROAD 21
To: 5TH LINE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB, On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, On-ramp from SERVICE CENTRE - COOKSTOWN ONROUTE SB EB/WB, Off-ramp to SERVICE CENTRE - COOKSTOWN ONROUTE SB EB/WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB
Reason Recurring-Construction
Comment : Mainline Expanding Closure: one lane closes at 23:00, two lanes close at 23:59, all lanes open at 05:00. All Ramps closed from 23:00 to 05:00.
Event Start: September 25, 2016 23:00
Event End: September 26, 2016 05:00
Last Change: Entered 2016-09-21 15:46

Top of page Top of page


HWY 400 Southbound [ MAPLEVIEW DRIVE - 10TH LINE ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: MAPLEVIEW DRIVE
To: 10TH LINE
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 21:00
Event End: September 27, 2016 05:00
Last Change: Entered 2016-09-16 12:38

Top of page Top of page


HWY 400 Southbound [ MAPLEVIEW DRIVE - MAPLEVIEW DRIVE ] - Recurring-Engineering Investigation
Highway: HWY 400
Direction: Southbound
From/At: MAPLEVIEW DRIVE
To: MAPLEVIEW DRIVE
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment :
Event Start: September 26, 2016 21:00
Event End: September 28, 2016 05:00
Last Change: Entered 2016-09-16 12:42

Top of page Top of page


HWY 400 Southbound Off-ramp [ - HWY 11 JCT Southbound ] - Recurring-Maintenance
Highway: HWY 400
Direction: Southbound
From/At:
To: HWY 11 JCT Southbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 25, 2016 22:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-20 08:38

Top of page Top of page


HWY 400 Southbound On-ramp [ HWY 11 JCT Southbound - ] - Recurring-Maintenance
Highway: HWY 400
Direction: Southbound
From/At: HWY 11 JCT Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 25, 2016 20:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-20 08:45

Top of page Top of page


HWY 400 Southbound On-ramp [ HWY 9 Westbound - ] - Construction
Highway: HWY 400
Direction: Southbound
From/At: HWY 9 Westbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: June 05, 2016 23:00
Event End: November 30, 2016 05:00
Last Change: Entered 2016-05-31 18:22

Top of page Top of page


HWY 400 Southbound On-ramp [ PORT SEVERN ROAD Southbound - ] - Recurring-Maintenance
Highway: HWY 400
Direction: Southbound
From/At: PORT SEVERN ROAD Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 25, 2016 22:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-20 08:34

Top of page Top of page


HWY 401 Eastbound [ AULTSVILLE RD - AULTSVILLE RD ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: AULTSVILLE RD
To: AULTSVILLE RD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily left lane closures Hwy 401 E/B & W/B @ Aultsville Rd (Ingleside)
Event Start: September 28, 2016 07:00
Event End: September 30, 2016 18:30
Last Change: Entered 2016-09-21 12:53

Top of page Top of page


HWY 401 Eastbound [ CREDITVIEW ROAD - HWY 10 / HURONTARIO STREET Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: CREDITVIEW ROAD
To: HWY 10 / HURONTARIO STREET Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from MAVIS ROAD NB, On-ramp from MAVIS ROAD SB, Off-ramp to MAVIS ROAD NB/SB
Reason Recurring-Construction
Comment : Monday to Sunday one lane closes at 22:00, two lanes close at 23:00. One lane opens at 05:00, all lanes open at 5:30.
Event Start: September 26, 2016 23:00
Event End: October 03, 2016 05:30
Last Change: Entered 2016-09-22 12:54

Top of page Top of page


HWY 401 Eastbound [ Graham Rd / Elgin County Road 76 (137KM) - Highway 4 / Colonel Talbot Rd (177KM) ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: Graham Rd / Elgin County Road 76 (137KM)
To: Highway 4 / Colonel Talbot Rd (177KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 401 eastbound alternating westbound, between Elgin Road 76 (Graham Road) Interchange 137 and Highway 4 (Colonel Talbot Road) Interchange 177, West Lorne / London, at various locations, reduced from 2 lanes to a single lane of traffic, Tuesday, September 27th, 2016 until Friday, September 30th, 2016, daily, from 0700 hours until 1800 hours, for construction work operations, OPP on site, with construction zone speed reduction and expect delays.
Event Start: September 27, 2016 07:00
Event End: September 30, 2016 18:00
Last Change: Entered 2016-09-23 19:42

Top of page Top of page


HWY 401 Eastbound [ Homer Watson Blvd / Fountain St/Red Rd 28 (275KM) - Speedsville Road ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: Homer Watson Blvd / Fountain St/Red Rd 28 (275KM)
To: Speedsville Road
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 401 Eastbound and Westbound from Homer Watson Boulevard to Speedsville Road will have a left lane closure, September 26-29 between 2000-0700 hours and September 30 between 2100-0900 hours.
Event Start: September 26, 2016 20:00
Event End: October 01, 2016 06:00
Last Change: Entered 2016-09-24 09:06

Top of page Top of page


HWY 401 Eastbound [ Puce Rd / Essex Rd 25 (28KM) - Belle River Rd / Essex Rd 27 (34KM) ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At: Puce Rd / Essex Rd 25 (28KM)
To: Belle River Rd / Essex Rd 27 (34KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 401 eastbound, from Essex Road 25 (Puce Road) Interchange 28 to Essex Road 27 (Belle River Road) Interchange 34, Belle River, reduced from 2 lanes to a single lane of traffic, Monday, September 19th, 2016 at 1000 hours until Friday, September 26th, 2016 at 1700 hours, for construction work operations.
Event Start: September 19, 2016 10:00
Event End: September 26, 2016 17:00
Last Change: Entered 2016-09-19 11:01

Top of page Top of page


HWY 401 Eastbound [ WILTON RD (IC 599) - WILTON RD (IC 599) ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: WILTON RD (IC 599)
To: WILTON RD (IC 599)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Nightly lane reductions Hwy 401 E/B & W/B @ Wilton Rd (Odessa); E/B & W/B on ramps closed as required
Event Start: September 26, 2016 20:00
Event End: September 30, 2016 09:00
Last Change: Entered 2016-09-23 13:02

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - HWY 400/BLACK CREEK DRIVE Northbound ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: HWY 400/BLACK CREEK DRIVE Northbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 23:00
Event End: September 28, 2016 05:00
Last Change: Entered 2016-09-20 17:34

Top of page Top of page


HWY 401 Eastbound Collector [ ALLEN ROAD Collector - AVENUE ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: ALLEN ROAD Collector
To: AVENUE ROAD Collector
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 22:00
Event End: September 30, 2016 05:30
Last Change: Entered 2016-09-22 15:10

Top of page Top of page


HWY 401 Eastbound Collector [ BAYVIEW AVE Collector - LESLIE STREET Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: BAYVIEW AVE Collector
To: LESLIE STREET Collector
Lanes Affected: 1 Right Lane(s)
Traffic Impact : On-ramp from BAYVIEW AVE NB/SB
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 23:00
Event End: September 28, 2016 05:00
Last Change: Entered 2016-09-19 13:54

Top of page Top of page


HWY 401 Eastbound Collector [ DIXIE ROAD Collector - RENFORTH DRIVE Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: DIXIE ROAD Collector
To: RENFORTH DRIVE Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 22:00
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-20 13:04

Top of page Top of page


HWY 401 Eastbound Collector [ KEELE ST Collector - DUFFERIN STREET Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: KEELE ST Collector
To: DUFFERIN STREET Collector
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 22:00
Event End: September 27, 2016 05:30
Last Change: Entered 2016-09-20 17:03

Top of page Top of page


HWY 401 Eastbound Collector [ WELLINGTON ROAD 36 Collector - HWY 400/BLACK CREEK DRIVE Collector ] - Recurring-Maintenance
Highway: HWY 401
Direction: Eastbound
From/At: WELLINGTON ROAD 36 Collector
To: HWY 400/BLACK CREEK DRIVE Collector
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : Off-ramp to NASSAGWAEGA ROAD EB/WB, Off-ramp to GUELPH LINE EB/WB, Off-ramp to HALTON ROAD 8 EB/WB, Off-ramp to HALTON 22 EB/WB, Off-ramp to HWY 25 EB/WB, Off-ramp to JAMES SNOW PKWY EB/WB, Off-ramp to TRAFALGAR ROAD EB/WB, Off-ramp to WINSTON CHURCHILL BLVD EB/WB, Off-ramp to MISSISSAUGA ROAD EB/WB, Off-ramp to MAVIS ROAD EB/WB, Off-ramp to HWY 10 / HURONTARIO STREET EB/WB, Off-ramp to TOMKEN ROAD EB/WB, Off-ramp to DIXIE ROAD EB/WB,... There may be additional ramp and transfer closures.
Reason Recurring-Maintenance
Comment : Two consecutive ramps will not be closed at the same time.
Event Start: September 22, 2016 23:59
Event End: September 29, 2016 04:30
Last Change: Entered 2016-09-20 08:25

Top of page Top of page


HWY 401 Eastbound Express [ DIXIE ROAD Express - RENFORTH DRIVE Express ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: DIXIE ROAD Express
To: RENFORTH DRIVE Express
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 22:00
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-20 13:09

Top of page Top of page


HWY 401 Eastbound Express [ KIPLING AVE Express - KIPLING AVE Express ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: KIPLING AVE Express
To: KIPLING AVE Express
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact : On-ramp from DIXON ROAD/MARTIN GROVE ROAD WB
Reason Recurring-Construction
Comment : Closing times from Monday to Friday, Lane 1 closes at 22:00, lane 2 closes at 23:00, lane 3 closes at 23:59. From Monday to Thursday, Lanes 3 and 2 open at 5:00, all lanes open at 6:00. On Friday, lane 3 opens at 5:00, lane 2 opens at 7:00, all lanes open at 8:00.
Event Start: September 26, 2016 22:00
Event End: October 01, 2016 08:00
Last Change: Entered 2016-09-23 13:20

Top of page Top of page


HWY 401 Eastbound Express [ MCLAUGHLIN ROAD Express - HWY 10 / HURONTARIO STREET Express ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At: MCLAUGHLIN ROAD Express
To: HWY 10 / HURONTARIO STREET Express
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 25, 2016 23:59
Event End: September 26, 2016 05:00
Last Change: Entered 2016-09-23 16:48

Top of page Top of page


HWY 401 Eastbound Express [ WHITES ROAD Express - BROCK ROAD Express ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: WHITES ROAD Express
To: BROCK ROAD Express
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : One lane closed at 22:00, expanding to 2 lanes closed at 23:00, expanding to full closure at 23:59. All lanes reopen at 05.00
Event Start: September 26, 2016 22:00
Event End: October 01, 2016 05:00
Last Change: Entered 2016-09-20 11:09

Top of page Top of page


HWY 401 Eastbound Off-ramp [ - HWY 6 SOUTH Eastbound/Westbound ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: HWY 6 SOUTH Eastbound/Westbound
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 22, 2016 23:59
Event End: September 30, 2016 04:30
Last Change: Entered 2016-09-20 07:52

Top of page Top of page


HWY 401 Eastbound Off-ramp [ - POWER DAM DR (IC 786) Eastbound ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: POWER DAM DR (IC 786) Eastbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment : Hwy 401 E/B Power Dam Drive off ramp closed until September 30 (Cornwall)
Event Start: September 12, 2016 07:00
Event End: September 30, 2016 15:00
Last Change: Entered 2016-09-09 12:56

Top of page Top of page


HWY 401 Westbound [ Bloomfield Road (81KM) - Merlin Road / Kent Road 7 (69KM) ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: Bloomfield Road (81KM)
To: Merlin Road / Kent Road 7 (69KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from Bloomfield Road (81KM) WB, Off-ramp to Bloomfield Road (81KM) WB
Reason Recurring-Construction
Comment : Highway 401 westbound will have alternating lane closures from Bloomfield Road (interchange 81) to Merlin Road (interchange 69) from July 11th, 2016 to November 25th, 2016, for construction purposes. The westbound on and off ramps at Bloomfield Road (interchange 81) will also be closed from July 11th, 2016, to November 25th, 2016, for construction purposes
Event Start: July 11, 2016 12:00
Event End: November 25, 2016 19:00
Last Change: Entered 2016-07-11 10:57

Top of page Top of page


HWY 401 Westbound [ French Line Road / St Joachim Rd (40KM) - Puce Rd / Essex Rd 25 (28KM) ] - Construction
Highway: HWY 401
Direction: Westbound
From/At: French Line Road / St Joachim Rd (40KM)
To: Puce Rd / Essex Rd 25 (28KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 401 westbound, from Essex Road 31 (French Line Road / St Joachim Road) Interchange 40 to Essex Road 25 (Puce Road) Interchange 28, St Joachim / Belle River, reduced from 2 lanes to a single lane of traffic, Tuesday, September 20th, 2016 at 1000 hours until Tuesday, September 27th, 2016 at 1700 hours, for construction work operations.
Event Start: September 20, 2016 10:00
Event End: September 27, 2016 17:00
Last Change: Entered 2016-09-19 12:21

Top of page Top of page


HWY 401 Westbound [ Harwich Rd (94KM) - Kent Rd 10 / Charing Cross Road (86KM) ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: Harwich Rd (94KM)
To: Kent Rd 10 / Charing Cross Road (86KM)
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 14, 2016 07:00
Event End: November 25, 2016 23:59
Last Change: Entered 2016-06-13 16:33

Top of page Top of page


HWY 401 Westbound [ Queen's Line / Formerly Highway 2 (63KM) - Mill Street (56KM) ] - Construction
Highway: HWY 401
Direction: Westbound
From/At: Queen's Line / Formerly Highway 2 (63KM)
To: Mill Street (56KM)
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 401 westbound, from Queen's Line (Interchange 63) to Essex Road 42 (Interchange 56), Tilbury, reduced from 2 lanes to a single lane of traffic, Tuesday, August 22nd, 2016 at 0000 hours until Wednesday, November 30th, 2016 at 2400 hours, for construction work operations.
Event Start: August 23, 2016 00:00
Event End: November 30, 2016 23:59
Last Change: Entered 2016-08-22 12:15

Top of page Top of page


HWY 401 Westbound Collector [ HWY 10 / HURONTARIO STREET Collector - CREDITVIEW ROAD ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: HWY 10 / HURONTARIO STREET Collector
To: CREDITVIEW ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from MAVIS ROAD NB, On-ramp from MAVIS ROAD SB
Reason Recurring-Construction
Comment : Monday through Friday, and Sunday one lane closes at 22:00, two lanes close at 23:00, all lanes open at 06:00.
Event Start: September 26, 2016 23:00
Event End: October 03, 2016 06:00
Last Change: Entered 2016-09-22 12:56

Top of page Top of page


HWY 401 Westbound Collector [ HWY 404 Collector - AVENUE ROAD Collector ] - Construction
Highway: HWY 401
Direction: Westbound
From/At: HWY 404 Collector
To: AVENUE ROAD Collector
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : This is an expanding closure. Lanes 1 and 2 close at 21:00, lane 3 closes at 22:00. All lanes reopen at 5:30.
Event Start: September 25, 2016 21:00
Event End: September 26, 2016 05:30
Last Change: Entered 2016-09-23 05:58

Top of page Top of page


HWY 401 Westbound Collector [ HWY 404 Collector - AVENUE ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: HWY 404 Collector
To: AVENUE ROAD Collector
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact : Off-ramp to BAYVIEW AVE NB/SB, Off-ramp to YONGE ST NB/SB
Reason Recurring-Construction
Comment : This is an expanding closure. Lanes 1 and 2 close at 21:00, lane 3 closes at 22:00. All lanes reopen at 5:30.
Event Start: September 26, 2016 21:00
Event End: September 28, 2016 05:30
Last Change: Entered 2016-09-22 06:43

Top of page Top of page


HWY 401 Westbound Collector [ KEELE ST Collector - HWY 400/BLACK CREEK DRIVE Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: KEELE ST Collector
To: HWY 400/BLACK CREEK DRIVE Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Expanding two a two lane closure at 23:00. Highway will be fully closed from midnight to 5:00. All lanes open at 6:00
Event Start: September 25, 2016 22:00
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-22 10:46

Top of page Top of page


HWY 401 Westbound Collector [ WARDEN AVE Collector - HWY 404 Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: WARDEN AVE Collector
To: HWY 404 Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from HWY 404 NB, On-ramp from WARDEN AVE NB/SB, On-ramp from VICTORIA PARK AVE NB/SB, On-ramp from KENNEDY ROAD (SCARBOROUGH) SB, Off-ramp to HWY 404 NB/SB
Reason Recurring-Construction
Comment :
Event Start: September 24, 2016 22:00
Event End: September 26, 2016 05:00
Last Change: Entered 2016-09-21 15:42

Top of page Top of page


HWY 401 Westbound Express [ KIPLING AVE Express - KIPLING AVE Express ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: KIPLING AVE Express
To: KIPLING AVE Express
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Closing times from Monday to Friday, Lane 1 closes at 22:00, lane 2 closes at 23:00, lane 3 closes at 23:59. From Monday to Thursday, Lanes 3 and 2 open at 5:00, all lanes open at 6:00. On Friday, lane 3 opens at 5:00, lane 2 opens at 7:00, all lanes open at 8:00.
Event Start: September 26, 2016 22:00
Event End: October 01, 2016 08:00
Last Change: Entered 2016-09-23 13:00

Top of page Top of page


HWY 401 Westbound Express [ MIDLAND AVE Express - HWY 404 Express ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: MIDLAND AVE Express
To: HWY 404 Express
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : From Monday to Thursday, Lanes 1 and 2 closes at 22:00, full closure occurs at 23:00. All lanes reopen at 5:00. On Friday, Lanes 1 and 2 closes at 22:00, full closure occurs at 23:00. All lanes reopen at 8:00. On Saturday, full closure occurs at 22:00. All lanes reopen at 9:00.
Event Start: September 26, 2016 22:00
Event End: October 02, 2016 05:00
Last Change: Entered 2016-09-21 15:56

Top of page Top of page


HWY 401 Westbound Off-ramp [ - MAVIS ROAD Westbound ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At:
To: MAVIS ROAD Westbound
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: April 24, 2016 23:59
Event End: April 02, 2017 00:00
Last Change: Entered 2016-04-21 15:45

Top of page Top of page


HWY 401 Westbound On-ramp [ BAYVIEW AVE Northbound/Southbound - ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: BAYVIEW AVE Northbound/Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Monday to Thursday, ramp closes at 22:00, opens at 5:30. On Friday, ramp closes at 23:00, opens at 9:00 on Saturday morning.
Event Start: September 26, 2016 22:00
Event End: October 01, 2016 05:30
Last Change: Entered 2016-09-22 06:44

Top of page Top of page


HWY 401 Westbound On-ramp [ BROCK ROAD Northbound - ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: BROCK ROAD Northbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 22:00
Event End: October 01, 2016 05:00
Last Change: Entered 2016-09-20 11:18

Top of page Top of page


HWY 401 Westbound On-ramp [ MAVIS ROAD Northbound - ] - Construction
Highway: HWY 401
Direction: Westbound
From/At: MAVIS ROAD Northbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 25, 2016 22:00
Event End: September 26, 2016 06:00
Last Change: Entered 2016-09-23 16:53

Top of page Top of page


HWY 401 Westbound On-ramp [ YONGE ST Northbound/Southbound - ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: YONGE ST Northbound/Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Monday to Thursday, ramp closes at 22:00, opens at 5:30. On Friday, ramp closes at 23:00, opens at 9:00 on Saturday morning.
Event Start: September 26, 2016 22:00
Event End: October 01, 2016 05:30
Last Change: Entered 2016-09-22 06:45

Top of page Top of page


HWY 402 Eastbound [ Adelaide Road - Miller Road ] - Recurring-Construction
Highway: HWY 402
Direction: Eastbound
From/At: Adelaide Road
To: Miller Road
Lanes Affected: 1 Right Lane(s)
Traffic Impact : Off-ramp to Longwoods Road (86KM) EB, Off-ramp to Longwoods Road (86KM) WB
Reason Recurring-Construction
Comment : The right lane of Highway 402 Eastbound and Westbound will be closed between Miller Road and Adelaide road from September 16th - December 23rd for road work. This includes the closure of the Highway 402 Eastbound and Westbound off-ramps to Longwoods Road.
Event Start: September 16, 2016 00:00
Event End: December 23, 2016 23:59
Last Change: Entered 2016-09-12 10:23

Top of page Top of page


HWY 402 Eastbound [ Carriage Road - Carriage Road ] - Recurring-Maintenance
Highway: HWY 402
Direction: Eastbound
From/At: Carriage Road
To: Carriage Road
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment : Highway 402, eastbound and westbound, at the Carriage Road Underpass, alternating right and left lane closures for bridge work, from Monday August 29th, 2016 until Friday September 30th, 2016, 0700 hours to 1900 hours daily. Only one lane closed at a time.
Event Start: August 29, 2016 07:00
Event End: September 30, 2016 19:00
Last Change: Entered 2016-08-24 09:08

Top of page Top of page


HWY 402 Eastbound [ Highway 21 North / Forest Road (34KM) - London Line ] - Construction
Highway: HWY 402
Direction: Eastbound
From/At: Highway 21 North / Forest Road (34KM)
To: London Line
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 26, 2016 07:00
Event End: September 26, 2016 18:00
Last Change: Entered 2016-09-21 12:04

Top of page Top of page


HWY 402 Eastbound [ Kerwood Road (56KM) - Kerwood Road (56KM) ] - Construction
Highway: HWY 402
Direction: Eastbound
From/At: Kerwood Road (56KM)
To: Kerwood Road (56KM)
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 402, eastbound, right lane closure from 2 kilometres west of Kerrwood Road to 2 kilometres east of Kerrwood Road, on Monday September 26, 2016, from 0600 hours until 1800 hours.
Event Start: September 26, 2016 06:00
Event End: September 26, 2016 18:00
Last Change: Entered 2016-09-23 14:50

Top of page Top of page


HWY 403 HAMILTON Eastbound [ DESJARDIN CANAL - DESJARDIN CANAL ] - Recurring-Construction (Cancelled for Today)
Highway: HWY 403 HAMILTON
Direction: Eastbound
From/At: DESJARDIN CANAL
To: DESJARDIN CANAL
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction (Cancelled for Today)
Comment : On Saturday: 1 lane closed at 20:00, expanding to 2 lanes closed at 21:00. One lane opens at 6:00, 2nd lane opens at 8:00. Sunday to Friday: 1 lane closed at 21:00, expanding to 2 lanes closed at 22:00. All lanes will reopen at 05:00.
Event Start: September 25, 2016 20:00
Event End: October 02, 2016 08:00
Last Change: Entered 2016-09-20 11:04

Top of page Top of page


HWY 403 HAMILTON Westbound [ HWY 6 NORTH - DESJARDIN CANAL ] - Recurring-Construction (Cancelled for Today)
Highway: HWY 403 HAMILTON
Direction: Westbound
From/At: HWY 6 NORTH
To: DESJARDIN CANAL
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction (Cancelled for Today)
Comment : Single lane closed at 22:00 expanding to two lanes at 23:00 from Saturday to Friday. One lane opens at 6:00 all lanes open at 8:00 on Sunday. Lane 1 opens at 5:00, all lanes open 6:00 Monday to Friday. One lane opens at 6:00, all lanes open at 7:00 on Saturday.
Event Start: September 24, 2016 22:00
Event End: October 02, 2016 08:00
Last Change: Entered 2016-09-20 10:54

Top of page Top of page


HWY 403 HAMILTON Westbound On-ramp [ LINCOLN M. ALEXANDER PARKWAY Westbound - ] - Recurring-Construction
Highway: HWY 403 HAMILTON
Direction: Westbound
From/At: LINCOLN M. ALEXANDER PARKWAY Westbound
To:
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 09:00
Event End: September 27, 2016 15:00
Last Change: Entered 2016-09-20 06:37

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound [ HURONTARIO STREET - HURONTARIO STREET ] - Recurring-Construction
Highway: HWY 403 MISSISSAUGA
Direction: Eastbound
From/At: HURONTARIO STREET
To: HURONTARIO STREET
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HURONTARIO STREET NB/SB
Reason Recurring-Construction
Comment : On Tuesday, Wednesday, Thursday, Sunday and Monday one lane closes 22.00, second lane closes at 23.59. All lanes reopen at 05.00. On Friday and Saturday one lane closes at 23.00, second lane closes at 01.00. On Friday one lane reopens at 06.00 second lane reopens at 07.00. On Saturday one lane reopens at 07.00, second lane reopens at 09.00. HURONTARIO ST. NB/SB On-ramp to HWY 403 closed from 23:00-05:00 on all days.
Event Start: September 06, 2016 22:00
Event End: September 30, 2016 05:30
Last Change: Entered 2016-08-31 17:42

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound On-ramp [ ERIN MILLS PKWY Southbound - ] - Recurring-Construction
Highway: HWY 403 MISSISSAUGA
Direction: Eastbound
From/At: ERIN MILLS PKWY Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 21, 2016 22:00
Event End: September 27, 2016 05:00
Last Change: Entered 2016-09-19 11:06

Top of page Top of page


HWY 403 MISSISSAUGA Westbound [ HURONTARIO STREET - HURONTARIO STREET ] - Recurring-Construction
Highway: HWY 403 MISSISSAUGA
Direction: Westbound
From/At: HURONTARIO STREET
To: HURONTARIO STREET
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HURONTARIO STREET NB/SB
Reason Recurring-Construction
Comment : On Tuesday, Wednesday, Thursday, Sunday and Monday one lane closes 22.00, second lane closes at 23.59. All lanes reopen at 05.00. On Friday and Saturday one lane closes at 23.00, second lane closes at 01.00. On Friday one lane reopens at 06.00 second lane reopens at 07.00. On Saturday one lane reopens at 07.00, second lane reopens at 09.00. On-ramp closed from 23:00 to 05:30 on all days.
Event Start: September 06, 2016 23:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-08-31 17:35

Top of page Top of page


HWY 403 MISSISSAUGA Westbound On-ramp [ ERIN MILLS PKWY Northbound - ] - Recurring-Construction
Highway: HWY 403 MISSISSAUGA
Direction: Westbound
From/At: ERIN MILLS PKWY Northbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 21, 2016 22:00
Event End: October 07, 2016 05:00
Last Change: Entered 2016-09-19 11:07

Top of page Top of page


HWY 404 Northbound [ AURORA ROAD - AURORA ROAD ] - Recurring-Construction
Highway: HWY 404
Direction: Northbound
From/At: AURORA ROAD
To: AURORA ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from AURORA ROAD EB
Reason Recurring-Construction
Comment : Alternate 1 lane closure. One lane closes Monday to Friday from 21:00 to 7:00. On Ramp closes Monday to Friday from 23:00 to 5:00.
Event Start: September 26, 2016 23:00
Event End: October 01, 2016 07:00
Last Change: Entered 2016-09-20 14:35

Top of page Top of page


HWY 404 Northbound [ HWY 7 - 16TH AVE ] - Recurring-Construction
Highway: HWY 404
Direction: Northbound
From/At: HWY 7
To: 16TH AVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 7 EB/WB, On-ramp from 407ETR EB/WB
Reason Recurring-Construction
Comment : 407ETR EB/WB On-ramp to Hwy 404 NB closed from 22:00 to 05:00. Hwy 7 EB/WB On-ramp to Hwy 404 NB closed from 22:00 to 05:00.
Event Start: September 26, 2016 21:00
Event End: October 01, 2016 05:00
Last Change: Entered 2016-09-22 06:48

Top of page Top of page


HWY 404 Northbound [ VANDORF SIDEROAD - VANDORF SIDEROAD ] - Recurring-Construction
Highway: HWY 404
Direction: Northbound
From/At: VANDORF SIDEROAD
To: VANDORF SIDEROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternate two lane closure. One lane closes from Monday to Thursday from 23:00 to 5:00 and on Friday closes from 23:00 to 7:00. Lane two closes from Monday to Thursday from 23:00 to 5:00 and on Friday closes from 23:00 to 7:00.
Event Start: September 26, 2016 21:00
Event End: October 01, 2016 07:00
Last Change: Entered 2016-09-20 14:50

Top of page Top of page


HWY 404 Southbound [ AURORA ROAD - AURORA ROAD ] - Recurring-Construction
Highway: HWY 404
Direction: Southbound
From/At: AURORA ROAD
To: AURORA ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from AURORA ROAD WB
Reason Recurring-Construction
Comment : Alternate 1 lane closure. One lane closes from Monday to Thursday from 23:59 to 5:00 and on Friday closes from 23:59 to 6:00. On Ramp closes Monday to Friday from 23:00 to 5:00.
Event Start: September 26, 2016 22:00
Event End: October 01, 2016 06:00
Last Change: Entered 2016-09-20 14:45

Top of page Top of page


HWY 404 Southbound [ QUEENSVILLE SIDEROAD - GREEN LANE ] - Recurring-Construction
Highway: HWY 404
Direction: Southbound
From/At: QUEENSVILLE SIDEROAD
To: GREEN LANE
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 10:00
Event End: September 30, 2016 22:00
Last Change: Entered 2016-09-19 07:01

Top of page Top of page


HWY 404 Southbound [ VANDORF SIDEROAD - VANDORF SIDEROAD ] - Recurring-Construction
Highway: HWY 404
Direction: Southbound
From/At: VANDORF SIDEROAD
To: VANDORF SIDEROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternate two lane closure. Lane 1 closes Monday to Thursday at 23:59 & opens at 5:00. On Friday lane 1 closes at 23:59 and opens Saturday at 6:00. Lane 2 closes Monday to Friday at 23:59 & opens at 5:00.
Event Start: September 26, 2016 23:59
Event End: October 01, 2016 06:00
Last Change: Entered 2016-09-20 14:58

Top of page Top of page


HWY 406 Northbound [ WESTCHESTER AVE - 4TH AVE ] - Construction
Highway: HWY 406
Direction: Northbound
From/At: WESTCHESTER AVE
To: 4TH AVE
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from THE PARKWAY / RACE STREET EB/WB, On-ramp from GENEVA STREET NB/SB, Off-ramp to GENEVA STREET NB/SB
Reason Construction
Comment :
Event Start: September 27, 2016 22:00
Event End: September 28, 2016 06:00
Last Change: Entered 2016-09-16 08:55

Top of page Top of page


HWY 406 Northbound [ WESTCHESTER AVE - 4TH AVE ] - Construction
Highway: HWY 406
Direction: Northbound
From/At: WESTCHESTER AVE
To: 4TH AVE
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from THE PARKWAY / RACE STREET EB/WB, On-ramp from GENEVA STREET NB/SB, Off-ramp to GENEVA STREET NB/SB
Reason Construction
Comment :
Event Start: September 28, 2016 22:00
Event End: September 29, 2016 06:00
Last Change: Entered 2016-09-16 08:58

Top of page Top of page


HWY 406 Northbound [ WESTCHESTER AVE - 4TH AVE ] - Construction
Highway: HWY 406
Direction: Northbound
From/At: WESTCHESTER AVE
To: 4TH AVE
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from THE PARKWAY / RACE STREET EB/WB, On-ramp from GENEVA STREET NB/SB, Off-ramp to GENEVA STREET NB/SB
Reason Construction
Comment :
Event Start: September 26, 2016 22:00
Event End: September 27, 2016 06:00
Last Change: Entered 2016-09-16 08:48

Top of page Top of page


HWY 406 Northbound [ WESTCHESTER AVE - 4TH AVE ] - Construction
Highway: HWY 406
Direction: Northbound
From/At: WESTCHESTER AVE
To: 4TH AVE
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from THE PARKWAY / RACE STREET EB/WB, On-ramp from GENEVA STREET NB/SB, Off-ramp to GENEVA STREET NB/SB
Reason Construction
Comment :
Event Start: September 30, 2016 22:00
Event End: October 01, 2016 06:00
Last Change: Entered 2016-09-16 09:06

Top of page Top of page


HWY 406 Northbound [ WESTCHESTER AVE - 4TH AVE ] - Construction
Highway: HWY 406
Direction: Northbound
From/At: WESTCHESTER AVE
To: 4TH AVE
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from THE PARKWAY / RACE STREET EB/WB, On-ramp from GENEVA STREET NB/SB, Off-ramp to GENEVA STREET NB/SB
Reason Construction
Comment :
Event Start: September 29, 2016 22:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-16 09:03

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER AVE ] - Construction
Highway: HWY 406
Direction: Southbound
From/At: 4TH AVE
To: WESTCHESTER AVE
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from 4TH AVE EB/WB, Off-ramp to WESTCHESTER AVE EB/WB
Reason Construction
Comment :
Event Start: September 29, 2016 22:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-16 09:04

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER AVE ] - Construction
Highway: HWY 406
Direction: Southbound
From/At: 4TH AVE
To: WESTCHESTER AVE
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from 4TH AVE EB/WB, Off-ramp to WESTCHESTER AVE EB/WB
Reason Construction
Comment :
Event Start: September 30, 2016 22:00
Event End: October 01, 2016 06:00
Last Change: Entered 2016-09-16 09:08

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER AVE ] - Construction
Highway: HWY 406
Direction: Southbound
From/At: 4TH AVE
To: WESTCHESTER AVE
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from 4TH AVE EB/WB, Off-ramp to WESTCHESTER AVE EB/WB
Reason Construction
Comment :
Event Start: September 27, 2016 22:00
Event End: September 28, 2016 06:00
Last Change: Entered 2016-09-16 08:57

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER AVE ] - Construction
Highway: HWY 406
Direction: Southbound
From/At: 4TH AVE
To: WESTCHESTER AVE
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from 4TH AVE EB/WB, Off-ramp to WESTCHESTER AVE EB/WB
Reason Construction
Comment :
Event Start: September 26, 2016 22:00
Event End: September 27, 2016 06:00
Last Change: Entered 2016-09-16 08:51

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER AVE ] - Construction
Highway: HWY 406
Direction: Southbound
From/At: 4TH AVE
To: WESTCHESTER AVE
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from 4TH AVE EB/WB, Off-ramp to WESTCHESTER AVE EB/WB
Reason Construction
Comment :
Event Start: September 28, 2016 22:00
Event End: September 29, 2016 06:00
Last Change: Entered 2016-09-16 09:01

Top of page Top of page


HWY 406 Southbound [ GENEVA STREET - HWY 58 ] - Recurring-Construction
Highway: HWY 406
Direction: Southbound
From/At: GENEVA STREET
To: HWY 58
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 20:00
Event End: September 29, 2016 06:00
Last Change: Entered 2016-09-22 13:23

Top of page Top of page


HWY 406 Southbound [ GENEVA STREET - HWY 58 ] - Recurring-Construction
Highway: HWY 406
Direction: Southbound
From/At: GENEVA STREET
To: HWY 58
Lanes Affected: 1 Right Lane(s)
Traffic Impact : On-ramp from GENEVA STREET EB/WB, On-ramp from WESTCHESTER AVE EB/WB, On-ramp from CHESTNUT ST EB/WB, On-ramp from GLENDALE AVE EB/WB, Off-ramp to GENEVA STREET EB/WB, Off-ramp to WESTCHESTER AVE EB/WB, Off-ramp to CHESTNUT ST EB/WB, Off-ramp to GLENDALE AVE EB/WB, Off-ramp to HWY 58 EB/WB
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 20:00
Event End: September 29, 2016 06:00
Last Change: Entered 2016-09-22 12:56

Top of page Top of page


HWY 407 ETR Eastbound Off-ramp [ - SIMCOE ST Northbound/Southbound ] - Recurring-Construction
Highway: HWY 407 ETR
Direction: Eastbound
From/At:
To: SIMCOE ST Northbound/Southbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 08:00
Event End: September 29, 2016 17:00
Last Change: Entered 2016-09-21 06:54

Top of page Top of page


HWY 407 ETR Westbound Off-ramp [ - SIMCOE ST Northbound/Southbound ] - Recurring-Construction
Highway: HWY 407 ETR
Direction: Westbound
From/At:
To: SIMCOE ST Northbound/Southbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 08:00
Event End: September 29, 2016 17:00
Last Change: Entered 2016-09-21 06:51

Top of page Top of page


HWY 409 Westbound [ HWY 427 - HWY 427 ] - Recurring-Construction
Highway: HWY 409
Direction: Westbound
From/At: HWY 427
To: HWY 427
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 09:00
Event End: September 30, 2016 14:00
Last Change: Entered 2016-09-22 14:04

Top of page Top of page


HWY 41 Northbound [ HWY 60 S JCT - HWY 17 ] - Recurring-Engineering Investigation
Highway: HWY 41
Direction: Northbound
From/At: HWY 60 S JCT
To: HWY 17
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Alternating N/B & S/B lane closures with flaggers. Eganville to Pembroke.
Event Start: September 28, 2016 07:30
Event End: September 30, 2016 17:00
Last Change: Entered 2016-09-23 08:34

Top of page Top of page


HWY 41 Northbound [ Spencer Ave - Snider Rd ] - Recurring-Engineering Investigation
Highway: HWY 41
Direction: Northbound
From/At: Spencer Ave
To: Snider Rd
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Alternating N/B & S/B lane closures with flaggers. Cloyne.
Event Start: September 28, 2016 07:30
Event End: September 30, 2016 17:00
Last Change: Entered 2016-09-23 08:39

Top of page Top of page


HWY 410 Northbound [ CLARK BLVD - QUEEN STREET/S JCT HWY 7 ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: CLARK BLVD
To: QUEEN STREET/S JCT HWY 7
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 23, 2016 23:59
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-21 18:05

Top of page Top of page


HWY 410 Northbound [ COURTNEY PARK DRIVE - DERRY ROAD ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: COURTNEY PARK DRIVE
To: DERRY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to DERRY ROAD EB/WB, Off-ramp to DERRY ROAD EB/WB
Reason Recurring-Construction
Comment : Mainline: On all days, two lanes close at 23:59 and open at 05:00. Off-ramp: On Monday, Tuesday and Wednesday, ramp closed from 23:59 to 05:00. No two consecutive on and off ramps will be closed at same time.
Event Start: September 23, 2016 23:59
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-21 18:15

Top of page Top of page


HWY 410 Northbound [ DERRY ROAD - STEELES AVE ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: DERRY ROAD
To: STEELES AVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DERRY ROAD EB, On-ramp from DERRY ROAD EB/WB, On-ramp from DERRY ROAD WB, Off-ramp to STEELES AVE EB/WB
Reason Recurring-Construction
Comment : Two consecutive on and off ramps will not be closed at same time.
Event Start: September 23, 2016 23:59
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-21 18:09

Top of page Top of page


HWY 410 Northbound [ HWY 401 - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: HWY 401
To: COURTNEY PARK DRIVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 23, 2016 23:59
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-21 17:56

Top of page Top of page


HWY 410 Northbound [ STEELES AVE - CLARK BLVD ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: STEELES AVE
To: CLARK BLVD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from STEELES AVE EB, Off-ramp to CLARK BLVD EB/WB
Reason Recurring-Construction
Comment :
Event Start: September 23, 2016 23:59
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-21 18:01

Top of page Top of page


HWY 410 Northbound Collector On-ramp [ HWY 401 Eastbound Collector - ] - Construction
Highway: HWY 410
Direction: Northbound
From/At: HWY 401 Eastbound Collector
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 25, 2016 23:00
Event End: September 26, 2016 02:00
Last Change: Entered 2016-09-20 14:41

Top of page Top of page


HWY 410 Northbound Collector On-ramp [ HWY 401 Westbound Collector - ] - Construction
Highway: HWY 410
Direction: Northbound
From/At: HWY 401 Westbound Collector
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 25, 2016 23:00
Event End: September 26, 2016 02:00
Last Change: Entered 2016-09-20 14:38

Top of page Top of page


HWY 410 Northbound On-ramp [ HWY 401 Eastbound - ] - Construction
Highway: HWY 410
Direction: Northbound
From/At: HWY 401 Eastbound
To:
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: May 11, 2016 23:00
Event End: November 15, 2017 23:59
Last Change: Entered 2016-05-09 13:11

Top of page Top of page


HWY 410 Northbound On-ramp [ HWY 401 Westbound - ] - Construction
Highway: HWY 410
Direction: Northbound
From/At: HWY 401 Westbound
To:
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: May 11, 2016 23:00
Event End: November 15, 2017 23:59
Last Change: Entered 2016-05-09 13:07

Top of page Top of page


HWY 410 Northbound On-ramp [ STEELES AVE Westbound - ] - Construction
Highway: HWY 410
Direction: Northbound
From/At: STEELES AVE Westbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: May 04, 2016 00:00
Event End: November 15, 2016 05:00
Last Change: Entered 2016-05-04 09:38

Top of page Top of page


HWY 410 Southbound [ CLARK BLVD - STEELES AVE ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: CLARK BLVD
To: STEELES AVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to STEELES AVE EB/WB
Reason Recurring-Construction
Comment :
Event Start: September 23, 2016 23:59
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-21 17:49

Top of page Top of page


HWY 410 Southbound [ COURTNEY PARK DRIVE - HWY 401 ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: COURTNEY PARK DRIVE
To: HWY 401
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 23, 2016 23:59
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-21 12:11

Top of page Top of page


HWY 410 Southbound [ DERRY ROAD - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: DERRY ROAD
To: COURTNEY PARK DRIVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DERRY ROAD EB, On-ramp from COURTNEY PARK DRIVE EB/WB, On-ramp from DERRY ROAD WB
Reason Recurring-Construction
Comment : No two consecutive on and off ramps will be closed at same time.
Event Start: September 23, 2016 23:59
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-21 17:41

Top of page Top of page


HWY 410 Southbound [ STEELES AVE - DERRY ROAD ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: STEELES AVE
To: DERRY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to DERRY ROAD EB/WB
Reason Recurring-Construction
Comment :
Event Start: September 23, 2016 23:59
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-21 12:05

Top of page Top of page


HWY 412 Northbound On-ramp [ HWY 401 Eastbound - ] - Recurring-Construction
Highway: HWY 412
Direction: Northbound
From/At: HWY 401 Eastbound
To:
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 09:00
Event End: September 29, 2016 15:00
Last Change: Entered 2016-09-20 14:49

Top of page Top of page


HWY 412 Northbound On-ramp [ TAUNTON RD Westbound - ] - Recurring-Construction
Highway: HWY 412
Direction: Northbound
From/At: TAUNTON RD Westbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 08:00
Event End: September 29, 2016 17:00
Last Change: Entered 2016-09-21 06:56

Top of page Top of page


HWY 412 Southbound Off-ramp [ - HWY 401 Eastbound ] - Recurring-Construction
Highway: HWY 412
Direction: Southbound
From/At:
To: HWY 401 Eastbound
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 09:00
Event End: September 29, 2016 15:00
Last Change: Entered 2016-09-20 14:52

Top of page Top of page


HWY 417 Eastbound [ ISLAND PARK DR E/B (IC 123) - NICHOLAS ST (IC 118) ] - Recurring-Construction
Highway: HWY 417
Direction: Eastbound
From/At: ISLAND PARK DR E/B (IC 123)
To: NICHOLAS ST (IC 118)
Lanes Affected: 2 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Nightly right lane closures Hwy 417 E/B btwn Island Park and Nicholas (Ottawa); On and off ramps closed as required
Event Start: September 25, 2016 21:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-22 19:35

Top of page Top of page


HWY 417 Eastbound [ LIMOGES RD (IC 79) - LIMOGES RD (IC 79) ] - Recurring-Construction
Highway: HWY 417
Direction: Eastbound
From/At: LIMOGES RD (IC 79)
To: LIMOGES RD (IC 79)
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Left lane closed Hwy 417 E/B @ Limoges Rd (E/Ottawa)
Event Start: September 28, 2016 07:00
Event End: September 30, 2016 15:00
Last Change: Entered 2016-09-23 06:52

Top of page Top of page


HWY 417 Eastbound [ MAITLAND AVE (IC 126) - MAITLAND AVE (IC 126) ] - Construction
Highway: HWY 417
Direction: Eastbound
From/At: MAITLAND AVE (IC 126)
To: MAITLAND AVE (IC 126)
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Left lanes closed Hwy 417 E/B & W/B @ Maitland Friday 10pm to Monday 6am (Ottawa)
Event Start: September 30, 2016 22:00
Event End: October 03, 2016 06:00
Last Change: Entered 2016-09-23 07:21

Top of page Top of page


HWY 417 Eastbound [ PINECREST AVE / GREENBANK RD (IC 129) - PINECREST AVE / GREENBANK RD (IC 129) ] - Recurring-Construction
Highway: HWY 417
Direction: Eastbound
From/At: PINECREST AVE / GREENBANK RD (IC 129)
To: PINECREST AVE / GREENBANK RD (IC 129)
Lanes Affected: 2 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Right lanes closed nightly Hwy 417 E/B @ Pinecrest (Ottawa); E/B Pinecrest curl on ramp closed as required.
Event Start: September 27, 2016 21:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-23 07:17

Top of page Top of page


HWY 417 Eastbound [ RICHMOND RD (IC 130) - MAITLAND AVE (IC 126) ] - Construction
Highway: HWY 417
Direction: Eastbound
From/At: RICHMOND RD (IC 130)
To: MAITLAND AVE (IC 126)
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Rolling left lane closures Hwy 417 E/B & W/B btwn Richmond Rd and Maitland (Ottawa)
Event Start: September 30, 2016 10:00
Event End: September 30, 2016 14:00
Last Change: Entered 2016-09-21 17:37

Top of page Top of page


HWY 417 Eastbound [ SOUTH NATION RIVER BRIDGE - SOUTH NATION RIVER BRIDGE ] - Recurring-Construction
Highway: HWY 417
Direction: Eastbound
From/At: SOUTH NATION RIVER BRIDGE
To: SOUTH NATION RIVER BRIDGE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Hwy 417 E/B @ South Nation River Bridge (W/Casselman)
Event Start: September 26, 2016 07:00
Event End: September 27, 2016 18:00
Last Change: Entered 2016-09-22 14:18

Top of page Top of page


HWY 417 Eastbound [ VANIER PKWY (IC 117) - BELFAST RD ] - Construction
Highway: HWY 417
Direction: Eastbound
From/At: VANIER PKWY (IC 117)
To: BELFAST RD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Lane reductions Hwy 417 E/B btwn Vanier and Belfast (Ottawa)
Event Start: September 27, 2016 22:00
Event End: September 28, 2016 06:00
Last Change: Entered 2016-09-22 11:07

Top of page Top of page


HWY 417 Eastbound [ WOODROFFE AVE (IC 127) - WOODROFFE AVE (IC 127) ] - Construction
Highway: HWY 417
Direction: Eastbound
From/At: WOODROFFE AVE (IC 127)
To: WOODROFFE AVE (IC 127)
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Left lanes closed Hwy 417 E/B & W/B @ Woodroffe Friday 10pm to Monday 6am (Ottawa)
Event Start: September 23, 2016 22:00
Event End: September 26, 2016 06:00
Last Change: Entered 2016-08-25 08:13

Top of page Top of page


HWY 417 Westbound [ BELFAST RD - VANIER PKWY (IC 117) ] - Construction
Highway: HWY 417
Direction: Westbound
From/At: BELFAST RD
To: VANIER PKWY (IC 117)
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Lane reductions Hwy 417 W/B btwn Belfast and Vanier (Ottawa); W/B Vanier off ramp will have single lane closures as required.
Event Start: September 26, 2016 21:00
Event End: September 27, 2016 06:00
Last Change: Entered 2016-09-22 11:16

Top of page Top of page


HWY 420 Eastbound [ DRUMMOND ROAD - STANLEY AVE ] - Recurring-Construction
Highway: HWY 420
Direction: Eastbound
From/At: DRUMMOND ROAD
To: STANLEY AVE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 23:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-21 00:32

Top of page Top of page


HWY 420 Eastbound [ QEW - QEW ] - Recurring-Construction
Highway: HWY 420
Direction: Eastbound
From/At: QEW
To: QEW
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : Off-ramp to QEW NB
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 23:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-21 00:10

Top of page Top of page


HWY 420 Westbound [ DORCHESTER ROAD/LUNDY'S LANE - QEW ] - Recurring-Construction
Highway: HWY 420
Direction: Westbound
From/At: DORCHESTER ROAD/LUNDY'S LANE
To: QEW
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : Off-ramp to QEW SB
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 23:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-21 00:13

Top of page Top of page


HWY 420 Westbound [ STANLEY AVE - DRUMMOND ROAD ] - Construction
Highway: HWY 420
Direction: Westbound
From/At: STANLEY AVE
To: DRUMMOND ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 06, 2016 23:00
Event End: November 18, 2016 06:00
Last Change: Entered 2016-08-31 12:40

Top of page Top of page


HWY 420 Westbound Off-ramp [ - QEW Northbound ] - Construction
Highway: HWY 420
Direction: Westbound
From/At:
To: QEW Northbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: August 08, 2016 23:00
Event End: November 18, 2016 06:00
Last Change: Entered 2016-08-04 09:03

Top of page Top of page


HWY 420 Westbound Off-ramp [ - QEW Southbound ] - Construction
Highway: HWY 420
Direction: Westbound
From/At:
To: QEW Southbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment : Highway 420 westbound off-ramp to QEW southbound will be permanently closed from Monday June 13th to Friday November 18th, 2016.
Event Start: June 13, 2016 23:00
Event End: November 18, 2016 06:00
Last Change: Entered 2016-06-02 16:50

Top of page Top of page


HWY 427 Northbound [ EGLINTON AVENUE - DIXON ROAD/AIRPORT ROAD ] - Recurring-Maintenance
Highway: HWY 427
Direction: Northbound
From/At: EGLINTON AVENUE
To: DIXON ROAD/AIRPORT ROAD
Lanes Affected: 2 Right Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 26, 2016 10:00
Event End: September 28, 2016 14:00
Last Change: Entered 2016-09-21 15:49

Top of page Top of page


HWY 427 Northbound [ STEELES AVE - HWY 407 ETR ] - Recurring-Construction
Highway: HWY 427
Direction: Northbound
From/At: STEELES AVE
To: HWY 407 ETR
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : 1 lane closed from 22:00 to 06:00 on Monday to Thursday and 21:00 to 08:00 on Saturday.
Event Start: September 19, 2016 22:00
Event End: September 26, 2016 06:00
Last Change: Entered 2016-09-14 23:52

Top of page Top of page


HWY 427 Northbound Express [ DUNDAS STREET Express - HWY 401 Express ] - Recurring-Construction
Highway: HWY 427
Direction: Northbound
From/At: DUNDAS STREET Express
To: HWY 401 Express
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : This is an expanding closure. From Sunday to Thursday, lane 1 closes at 21:30, lane 2 closes at 22:30. All lanes open at 5:30. On Friday, lane 1 closes at 21:30, lane 2 closes at 23:59. lane 2 opens at 6:30, all lanes open at 7:30. On Saturday, lane 1 closes at 21:30, lane 2 closes at 22:30. lane 1 opens at 7:30, all lanes reopen at 8:30.
Event Start: September 21, 2016 21:30
Event End: September 28, 2016 05:30
Last Change: Entered 2016-09-19 16:14

Top of page Top of page


HWY 427 Northbound Express [ QEW Express - DUNDAS STREET Express ] - Recurring-Construction
Highway: HWY 427
Direction: Northbound
From/At: QEW Express
To: DUNDAS STREET Express
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : This is an expanding closure. From Sunday to Thursday, lane 1 closes at 20:30, lane 2 closes at 21:30, lane 3 closes at 22:30. Lane 3 and 2 open at 5:30, All lanes open at 6:30. On Friday, lane 1 closes at 20:30, lane 2 closes at 21:30, lane 3 closes at 23:59. Lanes 3 and 2 open at 6:30, all lanes open at 7:30. On Saturday, lane 1 closes at 20:30, lane 2 closes at 21:30, lane 3 closes at 22:30. lane 3 and 2 opens at 7:30, all lanes reopen at 8:30.
Event Start: September 21, 2016 20:30
Event End: September 28, 2016 06:30
Last Change: Entered 2016-09-19 16:05

Top of page Top of page


HWY 427 Northbound Off-ramp [ - GARDINER EXPRESSWAY Northbound ] - Maintenance
Highway: HWY 427
Direction: Northbound
From/At:
To: GARDINER EXPRESSWAY Northbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Maintenance
Comment :
Event Start: October 22, 2016 02:00
Event End: October 24, 2016 05:00
Last Change: Entered 2016-06-14 09:15

Top of page Top of page


HWY 427 Northbound On-ramp [ GARDINER EXPRESSWAY Westbound - ] - Maintenance
Highway: HWY 427
Direction: Northbound
From/At: GARDINER EXPRESSWAY Westbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Maintenance
Comment :
Event Start: October 22, 2016 02:00
Event End: October 24, 2016 05:00
Last Change: Entered 2016-06-14 09:04

Top of page Top of page


HWY 427 Northbound On-ramp [ GARDINER EXPRESSWAY Westbound - ] - Recurring-Construction
Highway: HWY 427
Direction: Northbound
From/At: GARDINER EXPRESSWAY Westbound
To:
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : One lane closed till 8:30 a.m. on Saturday and 9:30 a.m. on Sunday.
Event Start: September 21, 2016 22:30
Event End: September 26, 2016 05:30
Last Change: Entered 2016-09-21 13:14

Top of page Top of page


HWY 427 Northbound On-ramp [ QEW Eastbound - ] - Recurring-Construction
Highway: HWY 427
Direction: Northbound
From/At: QEW Eastbound
To:
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : One lane closed till 8:30 a.m. on Saturday and 9:30 a.m. on Sunday.
Event Start: September 21, 2016 22:30
Event End: September 26, 2016 05:30
Last Change: Entered 2016-09-21 13:10

Top of page Top of page


HWY 427 Southbound [ HWY 7 - STEELES AVE ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At: HWY 7
To: STEELES AVE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Monday to Friday, one lane closed at 22:00. All lanes open at 5:00 Monday to Thursday. Saturday and Sunday, one lane closes at 21:00. On Saturday, all lanes open at 8:00. On Sunday all lanes open at 9:00.
Event Start: September 26, 2016 22:00
Event End: October 03, 2016 05:00
Last Change: Entered 2016-09-21 17:16

Top of page Top of page


HWY 427 Southbound [ HWY 7 - STEELES AVE ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At: HWY 7
To: STEELES AVE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : 1 lane closed from 22:00 to 05:00 on Monday to Thursday and 21:00 to 08:00 on Saturday.
Event Start: September 19, 2016 22:00
Event End: September 26, 2016 05:00
Last Change: Entered 2016-09-14 23:54

Top of page Top of page


HWY 427 Southbound Collector Off-ramp [ - DUNDAS STREET Eastbound/Westbound ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At:
To: DUNDAS STREET Eastbound/Westbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 23, 2016 22:30
Event End: September 27, 2016 05:30
Last Change: Entered 2016-09-22 15:52

Top of page Top of page


HWY 427 Southbound Collector [ DUNDAS STREET Collector - DUNDAS STREET Collector ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At: DUNDAS STREET Collector
To: DUNDAS STREET Collector
Lanes Affected: 1 Right Lane(s)
Traffic Impact : On-ramp from DUNDAS STREET EB, On-ramp from DUNDAS STREET WB
Reason Recurring-Construction
Comment :
Event Start: September 23, 2016 21:30
Event End: September 28, 2016 05:30
Last Change: Entered 2016-09-22 16:22

Top of page Top of page


HWY 427 Southbound Express [ BURNHAMTHORPE ROAD Express - DUNDAS STREET Collector ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At: BURNHAMTHORPE ROAD Express
To: DUNDAS STREET Collector
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: May 06, 2016 00:00
Event End: October 28, 2016 23:59
Last Change: Entered 2016-05-05 16:22

Top of page Top of page


HWY 427 Southbound Express [ HWY 401 Express - RATHBURN ROAD Express ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At: HWY 401 Express
To: RATHBURN ROAD Express
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : This is an expanding closure. From Sunday to Thursday, lane 1 closes at 20:30, lane 2 closes at 21:30, lane 3 closes at 22:30. Lane 3 and 2 open at 5:30, All lanes open at 6:30. On Friday, lane 1 closes at 20:30, lane 2 closes at 21:30, lane 3 closes at 23:59. Lanes 3 and 2 open at 6:30, all lanes open at 7:30. On Saturday, lane 1 closes at 20:30, lane 2 closes at 21:30, lane 3 closes at 22:30. lane 3 and 2 opens at 7:30, all lanes reopen at 8:30.
Event Start: September 21, 2016 20:30
Event End: September 28, 2016 06:30
Last Change: Entered 2016-09-19 15:40

Top of page Top of page


HWY 427 Southbound Express [ RATHBURN ROAD Express - QEW Express ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At: RATHBURN ROAD Express
To: QEW Express
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : This is an expanding closure. From Sunday to Thursday, lane 1 closes at 21:30, lane 2 closes at 22:30. All lanes open at 5:30. On Friday, lane 1 closes at 21:30, lane 2 closes at 23:59. lane 2 opens at 6:30, all lanes open at 7:30. On Saturday, lane 1 closes at 21:30, lane 2 closes at 22:30. lane 1 opens at 7:30, all lanes reopen at 8:30.
Event Start: September 21, 2016 21:30
Event End: September 28, 2016 05:30
Last Change: Entered 2016-09-19 15:51

Top of page Top of page


HWY 427 Southbound Off-ramp [ - GARDINER EXPRESSWAY Eastbound ] - Maintenance
Highway: HWY 427
Direction: Southbound
From/At:
To: GARDINER EXPRESSWAY Eastbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Maintenance
Comment :
Event Start: October 22, 2016 02:00
Event End: October 24, 2016 05:00
Last Change: Entered 2016-06-14 09:07

Top of page Top of page


HWY 48 Northbound [ DURHAM ROAD 23/LAKERIDGE ROAD - HIGHWAY 12 SOUTH JUNCTION ] - Recurring-Construction
Highway: HWY 48
Direction: Northbound
From/At: DURHAM ROAD 23/LAKERIDGE ROAD
To: HIGHWAY 12 SOUTH JUNCTION
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 19, 2016 00:00
Event End: September 26, 2016 23:59
Last Change: Entered 2016-09-14 07:52

Top of page Top of page


HWY 48 Northbound [ HERALD ROAD - HIGH STREET ] - Recurring-Construction
Highway: HWY 48
Direction: Northbound
From/At: HERALD ROAD
To: HIGH STREET
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 18:00
Event End: October 03, 2016 06:00
Last Change: Entered 2016-09-21 05:58

Top of page Top of page


HWY 48 Northbound [ HERALD ROAD - HIGH STREET ] - Recurring-Construction
Highway: HWY 48
Direction: Northbound
From/At: HERALD ROAD
To: HIGH STREET
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 19, 2016 19:00
Event End: September 26, 2016 06:00
Last Change: Entered 2016-09-14 07:48

Top of page Top of page


HWY 48 Northbound [ HIGH STREET - VIRGINIA BOULEVARD ] - Recurring-Construction
Highway: HWY 48
Direction: Northbound
From/At: HIGH STREET
To: VIRGINIA BOULEVARD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Flagging operation, 1 through lane will be maintained at all times. On Tuesday and Wednesday, one lane closed from 19:00 to 12:00. On Thursday, one lane closed from 19:00 to 10:00. On Friday, one lane closed from 21:00 to 10:00. On Saturday, one lane closed from 18:00 to 10:00. On Sunday, one lane closed from 22:00 to 10:00.
Event Start: September 26, 2016 19:00
Event End: October 03, 2016 12:00
Last Change: Entered 2016-09-21 06:00

Top of page Top of page


HWY 48 Northbound [ HIGH STREET - VIRGINIA BOULEVARD ] - Recurring-Construction
Highway: HWY 48
Direction: Northbound
From/At: HIGH STREET
To: VIRGINIA BOULEVARD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Flagging operation, 1 through lane will be maintained at all times. On Tuesday and Wednesday, one lane closed from 19:00 to 12:00. On Thursday, one lane closed from 19:00 to 10:00. On Friday, one lane closed from 21:00 to 10:00. On Saturday, one lane closed from 18:00 to 10:00. On Sunday, one lane closed from 22:00 to 10:00.
Event Start: September 19, 2016 19:00
Event End: September 26, 2016 10:00
Last Change: Entered 2016-09-14 07:49

Top of page Top of page


HWY 48 Northbound [ RIVERVIEW BEACH ROAD - DURHAM ROAD 23/LAKERIDGE ROAD ] - Engineering Investigation
Highway: HWY 48
Direction: Northbound
From/At: RIVERVIEW BEACH ROAD
To: DURHAM ROAD 23/LAKERIDGE ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Engineering Investigation
Comment :
Event Start: September 26, 2016 09:00
Event End: September 26, 2016 16:00
Last Change: Entered 2016-09-20 11:48

Top of page Top of page


HWY 48 Northbound [ VIRGINIA BOULEVARD - WOODFIELD ROAD ] - Recurring-Construction
Highway: HWY 48
Direction: Northbound
From/At: VIRGINIA BOULEVARD
To: WOODFIELD ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 19, 2016 00:00
Event End: September 26, 2016 23:59
Last Change: Entered 2016-09-14 07:51

Top of page Top of page


HWY 48 Northbound [ VIRGINIA BOULEVARD - WOODFIELD ROAD ] - Recurring-Construction
Highway: HWY 48
Direction: Northbound
From/At: VIRGINIA BOULEVARD
To: WOODFIELD ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 00:00
Event End: October 03, 2016 23:59
Last Change: Entered 2016-09-21 06:03

Top of page Top of page


HWY 48 Northbound [ WOODFIELD ROAD - DURHAM ROAD 23/LAKERIDGE ROAD ] - Recurring-Construction
Highway: HWY 48
Direction: Northbound
From/At: WOODFIELD ROAD
To: DURHAM ROAD 23/LAKERIDGE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Flagging operation, 1 through lane will be maintained at all times. Monday to Thursday: One lane closure from 18:00 to 12:00. Friday: One lane closure from 21:00 to 10:00. Saturday: One lane closure from 17:00 to 10:00. Sunday: One lane closure from 21:00 to 14:00.
Event Start: September 26, 2016 18:00
Event End: October 03, 2016 14:00
Last Change: Entered 2016-09-21 05:57

Top of page Top of page


HWY 48 Northbound [ WOODFIELD ROAD - DURHAM ROAD 23/LAKERIDGE ROAD ] - Recurring-Construction
Highway: HWY 48
Direction: Northbound
From/At: WOODFIELD ROAD
To: DURHAM ROAD 23/LAKERIDGE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Flagging operation, 1 through lane will be maintained at all times. Monday to Thursday: One lane closure from 18:00 to 12:00. Friday: One lane closure from 21:00 to 10:00. Saturday: One lane closure from 17:00 to 10:00. Sunday: One lane closure from 21:00 to 14:00.
Event Start: September 19, 2016 18:00
Event End: September 26, 2016 10:00
Last Change: Entered 2016-09-14 07:54

Top of page Top of page


HWY 5 Eastbound [ OFIELD ROAD / W FLAMBORO TWP ROAD 13/14 - ROCK CHAPEL ROAD / W FLAMBORO TWP ROAD L 21 ] - Recurring-Construction
Highway: HWY 5
Direction: Eastbound
From/At: OFIELD ROAD / W FLAMBORO TWP ROAD 13/14
To: ROCK CHAPEL ROAD / W FLAMBORO TWP ROAD L 21
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : One through lane maintained by flagging operation.
Event Start: September 25, 2016 18:00
Event End: October 02, 2016 09:00
Last Change: Entered 2016-09-23 07:45

Top of page Top of page


HWY 58 Northbound [ THOROLD TUNNEL - THOROLD TUNNEL ] - Recurring-Maintenance
Highway: HWY 58
Direction: Northbound
From/At: THOROLD TUNNEL
To: THOROLD TUNNEL
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 26, 2016 09:00
Event End: September 30, 2016 15:00
Last Change: Entered 2016-09-21 15:02

Top of page Top of page


HWY 58 Southbound [ THOROLD TUNNEL - THOROLD TUNNEL ] - Recurring-Maintenance
Highway: HWY 58
Direction: Southbound
From/At: THOROLD TUNNEL
To: THOROLD TUNNEL
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: September 26, 2016 09:00
Event End: September 30, 2016 15:00
Last Change: Entered 2016-09-21 15:01

Top of page Top of page


HWY 58 Southbound On-ramp [ HWY 406 Southbound - ] - Construction
Highway: HWY 58
Direction: Southbound
From/At: HWY 406 Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 13, 2016 00:00
Event End: December 16, 2016 23:59
Last Change: Entered 2016-09-16 15:29

Top of page Top of page


HWY 6 Northbound [ Eastnor-Lindsay Townline / Cherry Hill Road - Clarke's Road / Lindsay Road 5 ] - Construction
Highway: HWY 6
Direction: Northbound
From/At: Eastnor-Lindsay Townline / Cherry Hill Road
To: Clarke's Road / Lindsay Road 5
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Alternating northbound and southbound lane closures on Highway 6, from Cherry Hill Road to Clarke's Road, from Monday September 26, 2016 at 0600 hours until Friday September 30, 2016 at 2400 hours. A single lane of traffic will be maintained within the vicinity by flagging operations.
Event Start: September 26, 2016 06:00
Event End: September 30, 2016 23:59
Last Change: Entered 2016-09-23 14:44

Top of page Top of page


HWY 6 Northbound [ Sligo Road / County Road 6 - Grey Road 9 / Concession 12 ] - Construction
Highway: HWY 6
Direction: Northbound
From/At: Sligo Road / County Road 6
To: Grey Road 9 / Concession 12
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 6 northbound alternating southbound, between 0.4 kilometres south of Grey Road 9 (North Junction) / Concession 12 and Mount Forest north limits, continuously reduced to a single lane of traffic, Monday, September 26th 2016 at 0600 hours until Friday, September 30th, 2016 at 2400 hours, for construction work operations.
Event Start: September 26, 2016 06:00
Event End: September 30, 2016 23:59
Last Change: Entered 2016-09-22 22:07

Top of page Top of page


HWY 6 Northbound [ South Water Street / Murphy Street - Miller Street ] - Recurring-Construction
Highway: HWY 6
Direction: Northbound
From/At: South Water Street / Murphy Street
To: Miller Street
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Possible flagging needed from August 12 to October 28 for project completion.
Event Start: August 12, 2016 00:00
Event End: October 28, 2016 23:59
Last Change: Entered 2016-06-14 10:24

Top of page Top of page


HWY 6 Northbound [ WEST FLAMBOROUGH TWP CON. 6 ROAD - EAST FLAMBOROUGH TWP ROAD CON. 11 ] - Recurring-Construction
Highway: HWY 6
Direction: Northbound
From/At: WEST FLAMBOROUGH TWP CON. 6 ROAD
To: EAST FLAMBOROUGH TWP ROAD CON. 11
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 18:00
Event End: October 02, 2016 10:00
Last Change: Entered 2016-09-19 12:15

Top of page Top of page


HWY 6 Southbound [ EAST FLAMBOROUGH TWP ROAD CON. 11 - WEST FLAMBOROUGH TWP CON. 6 ROAD ] - Recurring-Construction
Highway: HWY 6
Direction: Southbound
From/At: EAST FLAMBOROUGH TWP ROAD CON. 11
To: WEST FLAMBOROUGH TWP CON. 6 ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 20:00
Event End: October 02, 2016 09:00
Last Change: Entered 2016-09-19 12:20

Top of page Top of page


HWY 6/21 Northbound [ Highway 6 / County Road 18 - Highway 6 / County Road 18 ] - Recurring-Construction
Highway: HWY 6/21
Direction: Northbound
From/At: Highway 6 / County Road 18
To: Highway 6 / County Road 18
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 6 0.8 km East of Grey Rd 18 to 1.4 km East of Grey Rd. 18 will have daily flagging operations Sept 6 at 0700 hours -October 7 at 1700 hours. Flagging operations and reduced speed only when traffic is narrowed down to one lane.
Event Start: September 06, 2016 07:00
Event End: October 07, 2016 17:00
Last Change: Entered 2016-08-31 13:43

Top of page Top of page


HWY 60 Eastbound [ Old Barrys Bay Rd - Pinnacle Rd ] - Recurring-Construction
Highway: HWY 60
Direction: Eastbound
From/At: Old Barrys Bay Rd
To: Pinnacle Rd
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating lane closures Eastbound and Westbound from Old Barry's Bay Rd to Pinnacle Rd flagging. (Barry's Bay - Renfrew)
Event Start: September 22, 2016 07:00
Event End: September 30, 2016 19:00
Last Change: Entered 2016-09-21 09:54

Top of page Top of page


HWY 7 Eastbound [ BROCK ROAD - PICKERING SIDELINE 14 ] - Construction
Highway: HWY 7
Direction: Eastbound
From/At: BROCK ROAD
To: PICKERING SIDELINE 14
Lanes Affected: 1 Left Lane(s)
Traffic Impact : On-ramp from BROCK ROAD SB
Reason Construction
Comment :
Event Start: June 18, 2016 06:00
Event End: September 30, 2016 13:00
Last Change: Entered 2016-06-15 17:42

Top of page Top of page


HWY 7 Eastbound [ Belmont 4Th Line - Belmont 3Rd Line ] - Engineering Investigation
Highway: HWY 7
Direction: Eastbound
From/At: Belmont 4Th Line
To: Belmont 3Rd Line
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Engineering Investigation
Comment : Single lane closures E/B & W/B with flagging.
Event Start: September 28, 2016 08:00
Event End: September 28, 2016 17:00
Last Change: Entered 2016-09-21 11:33

Top of page Top of page


HWY 7 Eastbound [ Cameron St - Maloney St ] - Recurring-Construction
Highway: HWY 7
Direction: Eastbound
From/At: Cameron St
To: Maloney St
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Marmora. Traffic may encounter single lane closures with flagging E/B & W/B.
Event Start: September 13, 2016 07:00
Event End: November 04, 2016 19:00
Last Change: Entered 2016-09-09 08:01

Top of page Top of page


HWY 7 Eastbound [ County Road 20 / Line 20 - County Road 20 / Line 20 ] - Recurring-Construction
Highway: HWY 7
Direction: Eastbound
From/At: County Road 20 / Line 20
To: County Road 20 / Line 20
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 7 eastbound alternating westbound, between 1.1 kilometres west and 1.1 kilometres east of Perth Line 20, Stratford / St Marys, reduced to a single lane of traffic, Monday, September 26th, 2016 until Friday, September 30th, 2016, daily, from 0700 hours until 1900 hours, for construction work operations.
Event Start: September 26, 2016 07:00
Event End: September 30, 2016 21:00
Last Change: Entered 2016-09-22 21:40

Top of page Top of page


HWY 7 Eastbound [ Drummond Line - Providence Line ] - Engineering Investigation
Highway: HWY 7
Direction: Eastbound
From/At: Drummond Line
To: Providence Line
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Engineering Investigation
Comment : Single lane closures E/B & W/B with flagging. Peterborough.
Event Start: September 28, 2016 08:00
Event End: September 28, 2016 17:00
Last Change: Entered 2016-09-23 14:07

Top of page Top of page


HWY 7 Eastbound [ Hwy 41 - Scott Rd ] - Recurring-Engineering Investigation
Highway: HWY 7
Direction: Eastbound
From/At: Hwy 41
To: Scott Rd
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Alternating E/B & W/B lane closures with flaggers. Kaladar.
Event Start: September 28, 2016 07:30
Event End: September 30, 2016 17:00
Last Change: Entered 2016-09-23 08:56

Top of page Top of page


HWY 7 Eastbound [ Jones Baseline / Baseline Road - Jones Baseline / Baseline Road ] - Recurring-Construction
Highway: HWY 7
Direction: Eastbound
From/At: Jones Baseline / Baseline Road
To: Jones Baseline / Baseline Road
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 7 at Jones Baseline road will be reduced to a single lane of traffic eastbound and westbound from Sept 6th, 2016, to October 24th, 2016, for construction
Event Start: September 06, 2016 00:00
Event End: October 24, 2016 23:59
Last Change: Entered 2016-09-03 14:43

Top of page Top of page


HWY 7 Eastbound [ WILSON ST W - INNISVILLE ST S ] - Recurring-Engineering Investigation
Highway: HWY 7
Direction: Eastbound
From/At: WILSON ST W
To: INNISVILLE ST S
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Traffic may encounter single lane closures with flagging operation on Hwy 7 btwn Wilson St and Innisville St (Perth - Innisville)
Event Start: September 28, 2016 07:30
Event End: September 30, 2016 17:00
Last Change: Entered 2016-09-23 08:40

Top of page Top of page


HWY 7 Eastbound [ Wellington Street / Wyndham Street - Ontario Street ] - Recurring-Construction
Highway: HWY 7
Direction: Eastbound
From/At: Wellington Street / Wyndham Street
To: Ontario Street
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Both lanes will be closed until October, at which time one lane will open in an alternating flagging operation.
Event Start: July 04, 2016 00:00
Event End: October 31, 2016 23:59
Last Change: Entered 2016-06-15 14:05

Top of page Top of page


HWY 7 Westbound [ LITTLE ROUGE CREEK - LITTLE ROUGE CREEK ] - Construction
Highway: HWY 7
Direction: Westbound
From/At: LITTLE ROUGE CREEK
To: LITTLE ROUGE CREEK
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: August 30, 2016 00:00
Event End: November 25, 2016 23:59
Last Change: Entered 2016-08-25 10:22

Top of page Top of page


HWY 7 Westbound [ Ontario Street - Wellington Street / Wyndham Street ] - Recurring-Construction
Highway: HWY 7
Direction: Westbound
From/At: Ontario Street
To: Wellington Street / Wyndham Street
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating lane closures with a flagging operation from October 2016 until project completion in December 2016.
Event Start: October 01, 2016 00:00
Event End: November 30, 2016 23:59
Last Change: Entered 2016-06-15 14:31

Top of page Top of page


HWY 7 Westbound [ PICKERING SIDELINE 14 - BROCK ROAD ] - Construction
Highway: HWY 7
Direction: Westbound
From/At: PICKERING SIDELINE 14
To: BROCK ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: June 18, 2016 06:00
Event End: September 30, 2016 13:00
Last Change: Entered 2016-06-15 17:17

Top of page Top of page


HWY 7/12 Northbound [ CARNWITH DRIVE - WINCHESTER ROAD ] - Recurring-Construction
Highway: HWY 7/12
Direction: Northbound
From/At: CARNWITH DRIVE
To: WINCHESTER ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Flagging operation, 1 through lane will be maintained.
Event Start: September 26, 2016 12:00
Event End: September 29, 2016 14:00
Last Change: Entered 2016-09-21 07:29

Top of page Top of page


HWY 7/12 Northbound [ CONCESSION ROAD 2/BROCK TWP 2ND LINE - SCUGOG TWP 4TH LINE ] - Recurring-Construction
Highway: HWY 7/12
Direction: Northbound
From/At: CONCESSION ROAD 2/BROCK TWP 2ND LINE
To: SCUGOG TWP 4TH LINE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Flagging operation, 1 through lane will be maintained at all times. Monday to Friday, one lane closed from 7:00 to 12:00.
Event Start: September 26, 2016 07:00
Event End: September 30, 2016 12:00
Last Change: Entered 2016-09-21 07:27

Top of page Top of page


HWY 7/12 Southbound [ SCUGOG TWP 4TH LINE - CONCESSION ROAD 2/BROCK TWP 2ND LINE ] - Recurring-Construction
Highway: HWY 7/12
Direction: Southbound
From/At: SCUGOG TWP 4TH LINE
To: CONCESSION ROAD 2/BROCK TWP 2ND LINE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Flagging operation, 1 through lane will be maintained at all times. Monday to Thursday, one lane closed from 12:00 to 19:00.
Event Start: September 26, 2016 12:00
Event End: September 30, 2016 19:00
Last Change: Entered 2016-09-21 07:25

Top of page Top of page


HWY 7/12 Southbound [ WINCHESTER ROAD - CARNWITH DRIVE ] - Recurring-Construction
Highway: HWY 7/12
Direction: Southbound
From/At: WINCHESTER ROAD
To: CARNWITH DRIVE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : This is a flagging operation, 1 through lane will be maintained.
Event Start: September 26, 2016 09:00
Event End: September 29, 2016 12:00
Last Change: Entered 2016-09-21 07:30

Top of page Top of page


HWY 7A Eastbound [ HWY 7/12 MANCHESTER - QUEEN STREET ] - Recurring-Construction
Highway: HWY 7A
Direction: Eastbound
From/At: HWY 7/12 MANCHESTER
To: QUEEN STREET
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Flagging operation, 1 through lane will be maintained at all times, Monday to Thursday from 00:00 to 12:00. Friday from 00:00 to 09:00.
Event Start: September 26, 2016 00:00
Event End: September 30, 2016 12:00
Last Change: Entered 2016-09-21 07:35

Top of page Top of page


HWY 7A Eastbound [ Peterborough Rd 10 - Gravel Rd / Cavan Station Rd ] - Recurring-Engineering Investigation
Highway: HWY 7A
Direction: Eastbound
From/At: Peterborough Rd 10
To: Gravel Rd / Cavan Station Rd
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Cavan.
Event Start: September 25, 2016 18:00
Event End: September 29, 2016 07:00
Last Change: Entered 2016-09-15 14:11

Top of page Top of page


HWY 7A Eastbound [ QUEEN STREET - CANADIAN TIRE PLAZA ] - Recurring-Construction
Highway: HWY 7A
Direction: Eastbound
From/At: QUEEN STREET
To: CANADIAN TIRE PLAZA
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : 1 through lane maintained by flagging operation
Event Start: September 26, 2016 20:00
Event End: September 30, 2016 23:59
Last Change: Entered 2016-09-21 07:33

Top of page Top of page


HWY 7A Westbound [ CANADIAN TIRE PLAZA - QUEEN STREET ] - Recurring-Construction
Highway: HWY 7A
Direction: Westbound
From/At: CANADIAN TIRE PLAZA
To: QUEEN STREET
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Flagging operation, 1 through lane will be maintained at all times.
Event Start: September 26, 2016 00:00
Event End: September 30, 2016 09:00
Last Change: Entered 2016-09-21 07:32

Top of page Top of page


HWY 7A Westbound [ QUEEN STREET - HWY 7/12 MANCHESTER ] - Recurring-Construction
Highway: HWY 7A
Direction: Westbound
From/At: QUEEN STREET
To: HWY 7/12 MANCHESTER
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : 1 through lane maintained by flagging operation.
Event Start: September 26, 2016 19:00
Event End: September 30, 2016 23:59
Last Change: Entered 2016-09-21 07:38

Top of page Top of page


HWY 8 Eastbound [ MORRISON ROAD - HWY 5/PETER'S CORNERS ] - Recurring-Construction
Highway: HWY 8
Direction: Eastbound
From/At: MORRISON ROAD
To: HWY 5/PETER'S CORNERS
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : On Monday to Friday, one lane closure from 09:00 to 15:00. On Saturday and Sunday, one lane closure from 00:00 to 23:59.
Event Start: September 18, 2016 00:00
Event End: September 25, 2016 23:59
Last Change: Entered 2016-09-16 09:06

Top of page Top of page


HWY 8 Eastbound [ MORRISON ROAD - HWY 5/PETER'S CORNERS ] - Recurring-Construction
Highway: HWY 8
Direction: Eastbound
From/At: MORRISON ROAD
To: HWY 5/PETER'S CORNERS
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : One through lane maintained by flagging operation.
Event Start: September 26, 2016 00:00
Event End: October 02, 2016 23:59
Last Change: Entered 2016-09-23 07:57

Top of page Top of page


HWY 85 Northbound [ WELLINGTON ST UP IC-KITCHENER - WELLINGTON ST UP IC-KITCHENER ] - Recurring-Construction
Highway: HWY 85
Direction: Northbound
From/At: WELLINGTON ST UP IC-KITCHENER
To: WELLINGTON ST UP IC-KITCHENER
Lanes Affected: 1 Right Lane(s)
Traffic Impact : On-ramp from WELLINGTON ST UP IC-KITCHENER NB/SB
Reason Recurring-Construction
Comment :
Event Start: September 06, 2016 00:00
Event End: October 07, 2016 23:59
Last Change: Entered 2016-09-01 16:33

Top of page Top of page


HWY 85 Southbound On-ramp [ NORTHFIELD DR IC-WATERLOO RD 50 Eastbound/Westbound - ] - Construction
Highway: HWY 85
Direction: Southbound
From/At: NORTHFIELD DR IC-WATERLOO RD 50 Eastbound/Westbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment : Northfield Drive on ramp to Highway 85 (Conestoga Parkway) southbound, Waterloo, closed to traffic commenced Monday, February 8th, 2016 for approximately 9 months, for construction work operations.
Event Start: February 08, 2016 00:00
Event End: November 08, 2016 23:59
Last Change: Entered 2016-02-03 08:34

Top of page Top of page


HWY 89 Eastbound [ NOTTAWASAGA INN - SIMCOE COUNTY ROAD 56 ] - Recurring-Construction
Highway: HWY 89
Direction: Eastbound
From/At: NOTTAWASAGA INN
To: SIMCOE COUNTY ROAD 56
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : One through lane will be remained open through flagging operations.
Event Start: September 20, 2016 20:00
Event End: September 27, 2016 05:00
Last Change: Entered 2016-09-15 11:55

Top of page Top of page


HWY 9 Eastbound [ WEST CANAL BANK ROAD - HWY 400 ] - Recurring-Maintenance
Highway: HWY 9
Direction: Eastbound
From/At: WEST CANAL BANK ROAD
To: HWY 400
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment : One through lane maintained by flagging operation.
Event Start: September 26, 2016 10:00
Event End: September 29, 2016 16:30
Last Change: Entered 2016-09-22 15:47

Top of page Top of page


HWY 9 Westbound [ ADJALA TWP ROAD 7TH LINE/FINNERTY ROAD - ADJALA TWP 5TH LINE ] - Recurring-Construction
Highway: HWY 9
Direction: Westbound
From/At: ADJALA TWP ROAD 7TH LINE/FINNERTY ROAD
To: ADJALA TWP 5TH LINE
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 09:00
Event End: September 30, 2016 15:00
Last Change: Entered 2016-09-23 12:16

Top of page Top of page


QEW Fort Erie Bound [ APPLEBY LINE - APPLEBY LINE ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: APPLEBY LINE
To: APPLEBY LINE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from APPLEBY LINE NB, On-ramp from BURLOAK DRIVE SB
Reason Recurring-Construction
Comment :
Event Start: September 23, 2016 22:00
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-22 13:52

Top of page Top of page


QEW Fort Erie Bound [ BAKER ROAD - TOWNLINE ROAD ] - Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: BAKER ROAD
To: TOWNLINE ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact : On-ramp from NETHERBY ROAD EB, On-ramp from NETHERBY ROAD WB
Reason Construction
Comment : Two consecutive on and off ramps will not be closed at the same time. Ramps closed from 00:00 to 23:59. Closure is from May 21st to November 30th.
Event Start: May 21, 2016 00:00
Event End: November 30, 2016 23:59
Last Change: Entered 2016-05-18 13:41

Top of page Top of page


QEW Fort Erie Bound [ DIXIE ROAD - HWY 10/HURONTARIO ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: DIXIE ROAD
To: HWY 10/HURONTARIO
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure. Lane 1 closes Monday to Thursday at 22:00, 22:30 opens at 5:30. Friday closes at 22:30, opens Saturday at 7:00. lane 2 Closes Monday to Thursday at 22:30,23:00, 23:00, 23:00 opens at 5:30. Friday closes at 23:00, opens Saturday at 6:30.
Event Start: September 26, 2016 22:00
Event End: October 01, 2016 07:00
Last Change: Entered 2016-09-20 08:41

Top of page Top of page


QEW Fort Erie Bound [ HWY 420 - HWY 420 ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: HWY 420
To: HWY 420
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 420 WB
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 23:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-21 00:23

Top of page Top of page


QEW Fort Erie Bound [ MOUNTAINVIEW ROAD - VICTORIA AVENUE ] - Recurring-Maintenance
Highway: QEW
Direction: Fort Erie Bound
From/At: MOUNTAINVIEW ROAD
To: VICTORIA AVENUE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from VICTORIA AVENUE NB/SB, On-ramp from ONTARIO STEET (BEAMSVILLE) SB
Reason Recurring-Maintenance
Comment : Beginning with 1 lane closure at 22:00, expanding to 23:00. Lane 1 opens at 7:00 and lane 2 opens at 5:00.
Event Start: September 11, 2016 20:00
Event End: September 30, 2016 07:00
Last Change: Entered 2016-09-09 10:14

Top of page Top of page


QEW Fort Erie Bound [ WELLAND RIVER BRIDGE - BECK ROAD ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: WELLAND RIVER BRIDGE
To: BECK ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact : On-ramp from LYONS CREEK ROAD EB, On-ramp from LYONS CREEK ROAD WB
Reason Recurring-Construction
Comment : From 24th to 28th, one lane will be closed QEW Fort Erie Bound. On-ramps from Lyons Creek Rd will also be closed.
Event Start: May 29, 2016 00:00
Event End: November 30, 2016 23:59
Last Change: Entered 2016-05-25 22:19

Top of page Top of page


QEW Fort Erie Bound On-ramp [ FRUITLAND ROAD Southbound - ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: FRUITLAND ROAD Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : On ramp closes at 23:00 on all days. Monday through Friday, ramp opens at 6:00. Saturday and Sunday ramp opens at 8:00.
Event Start: September 25, 2016 23:00
Event End: October 03, 2016 06:00
Last Change: Entered 2016-09-23 08:15

Top of page Top of page


QEW Toronto bound [ APPLEBY LINE - APPLEBY LINE ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: APPLEBY LINE
To: APPLEBY LINE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from APPLEBY LINE SB, On-ramp from WALKERS LINE NB
Reason Recurring-Construction
Comment :
Event Start: September 23, 2016 22:00
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-22 14:01

Top of page Top of page


QEW Toronto bound [ APPLEBY LINE - BURLOAK DRIVE ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: APPLEBY LINE
To: BURLOAK DRIVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to BURLOAK DRIVE NB/SB, On-ramp from APPLEBY LINE NB, On-ramp from BURLOAK DRIVE SB
Reason Recurring-Construction
Comment :
Event Start: September 19, 2016 22:00
Event End: September 26, 2016 05:00
Last Change: Entered 2016-09-17 13:51

Top of page Top of page


QEW Toronto bound [ APPLEBY LINE - BURLOAK DRIVE ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: APPLEBY LINE
To: BURLOAK DRIVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from APPLEBY LINE NB, On-ramp from BURLOAK DRIVE SB
Reason Recurring-Construction
Comment : 1 lane will be closed on the mainline from 22:00 - 05:00 and 2 lanes from 23:59 - 05:00 (Monday-Thursday). 1 lane closed on the mainline from 23:00 - 06:00 and 2 lanes from 23:59 - 06:00 (Fridays). 1 lane closed on on mainline from 22:00 - 08:30 and 2 lanes from 23:59 - 07:00 (Sat) and 1 lane will be closed from 22:00 - 05:00 and 23:00 - 05:00 (Sun). Toronto-bound on ramps at Appleby Line and Burloak Dr. will be closed from 23:00 - 05:00 (Sunday - Monday).
Event Start: September 23, 2016 22:00
Event End: September 30, 2016 05:00
Last Change: Entered 2016-09-22 14:11

Top of page Top of page


QEW Toronto bound [ BECK ROAD - LYONS CREEK ROAD ] - Construction
Highway: QEW
Direction: Toronto bound
From/At: BECK ROAD
To: LYONS CREEK ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact : On-ramp from LYONS CREEK ROAD EB, On-ramp from LYONS CREEK ROAD WB, Off-ramp to LYONS CREEK ROAD EB/WB
Reason Construction
Comment :
Event Start: May 20, 2016 00:00
Event End: November 30, 2016 23:59
Last Change: Entered 2016-05-18 13:44

Top of page Top of page


QEW Toronto bound [ CASABLANCA BLVD. - FRUITLAND ROAD ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: CASABLANCA BLVD.
To: FRUITLAND ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from CASABLANCA BLVD. NB, On-ramp from FIFTY ROAD NB, On-ramp from CASABLANCA BLVD. SB, On-ramp from FIFTY ROAD SB, Off-ramp to CASABLANCA BLVD. EB, Off-ramp to FIFTY ROAD EB, Off-ramp to FRUITLAND ROAD EB
Reason Recurring-Construction
Comment : On Sunday, one lanes closes at 21:00, two lanes close at 22:00. Monday through Friday: one lane closes at 20:00, two lanes close at 21:00; all lanes open at 5:00. On Sunday, one lane opens at 7:00, all lanes open at 8:00.
Event Start: September 25, 2016 21:00
Event End: October 02, 2016 08:00
Last Change: Entered 2016-09-20 22:38

Top of page Top of page


QEW Toronto bound [ CENTRAL AVENUE - THOMPSON ROAD ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: CENTRAL AVENUE
To: THOMPSON ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: September 26, 2016 09:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-22 07:56

Top of page Top of page


QEW Toronto bound [ DORVAL DRIVE - TRAFALGAR ROAD ] - Recurring-Maintenance
Highway: QEW
Direction: Toronto bound
From/At: DORVAL DRIVE
To: TRAFALGAR ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to TRAFALGAR ROAD NB/SB, On-ramp from DORVAL DRIVE NB, On-ramp from TRAFALGAR ROAD SB
Reason Recurring-Maintenance
Comment :
Event Start: September 20, 2016 22:00
Event End: September 27, 2016 05:00
Last Change: Entered 2016-09-09 17:55

Top of page Top of page


QEW Toronto bound [ HWY 10/HURONTARIO - DIXIE ROAD ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: HWY 10/HURONTARIO
To: DIXIE ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure. Closed Lane 1 Monday to Thursday at 20:30, 21:00, 21:00,21:00 opens at 5:00. Friday closes at 22:00, opens Saturday at 7:00. lane 2 Closes Monday to Thursday at 22:00, opens at 5:00. Friday closes at 22:00, opens Saturday at 7:00.
Event Start: September 26, 2016 20:30
Event End: October 01, 2016 07:00
Last Change: Entered 2016-09-20 08:39

Top of page Top of page


QEW Toronto bound [ HWY 420 - HWY 420 ] - Construction
Highway: QEW
Direction: Toronto bound
From/At: HWY 420
To: HWY 420
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: September 09, 2016 12:00
Event End: October 07, 2016 12:00
Last Change: Entered 2016-09-07 23:25

Top of page Top of page


QEW Toronto bound [ HWY 420 - HWY 420 ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: HWY 420
To: HWY 420
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 420 EB
Reason Recurring-Construction
Comment :
Event Start: September 25, 2016 23:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-21 00:19

Top of page Top of page


QEW Toronto bound [ RIDGEMOUNT ROAD - NETHERBY ROAD ] - Construction
Highway: QEW
Direction: Toronto bound
From/At: RIDGEMOUNT ROAD
To: NETHERBY ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact : Off-ramp to NETHERBY ROAD EB/WB
Reason Construction
Comment : Two consecutive on and off ramps will not be closed at the same time. Ramps closed from 00:00 to 23:59. Closure is from May 21st to November 30th.
Event Start: May 21, 2016 00:00
Event End: November 30, 2016 23:59
Last Change: Entered 2016-05-18 13:34

Top of page Top of page


QEW Toronto bound [ VICTORIA AVENUE - MOUNTAINVIEW ROAD ] - Recurring-Maintenance
Highway: QEW
Direction: Toronto bound
From/At: VICTORIA AVENUE
To: MOUNTAINVIEW ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from ONTARIO STEET (BEAMSVILLE) NB, On-ramp from VICTORIA AVENUE NB/SB
Reason Recurring-Maintenance
Comment : Beginning with 1 lane closure at 22:00, expanding to 2 lanes at 23:00. On Friday, lane 2 closure begins at 00:00 and on Saturday at 1:00.
Event Start: September 11, 2016 21:00
Event End: September 30, 2016 06:00
Last Change: Entered 2016-09-09 10:20

Top of page Top of page


QEW Toronto bound Off-ramp [ - BROWN'S LINE Eastbound ] - Maintenance
Highway: QEW
Direction: Toronto bound
From/At:
To: BROWN'S LINE Eastbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Maintenance
Comment :
Event Start: October 22, 2016 02:00
Event End: October 24, 2016 05:00
Last Change: Entered 2016-06-14 09:10

Top of page Top of page


QEW Toronto bound Off-ramp [ - HWY 406 Southbound ] - Construction
Highway: QEW
Direction: Toronto bound
From/At:
To: HWY 406 Southbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: May 24, 2016 22:00
Event End: October 14, 2016 22:00
Last Change: Entered 2016-05-17 10:44

Top of page Top of page


HWY 595 Both Directions [ SEC HWY 590(END OF HWY 595) - ] - Other
Highway: HWY 595
Direction: Both Directions
From/At: SEC HWY 590(END OF HWY 595)
To:
Lanes Affected: All lanes closed
Traffic Impact :
Reason Other
Comment : Hwy 590 Kakabeka both lanes closed for culvert replacement. The closure is at the Intersection of Hwy 590 and 595 Jct. Detour via Hwy 595. Work to be completed by October 7, 2016.
Event Start: September 12, 2016 08:33
Event End:
Last Change: Entered 2016-09-12 08:33

Top of page Top of page


This information is provided as a public service. Although we endeavor to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.

Road information by phone

  • Provincial Call Centre: 1-800-268-4686
  • In GTA: 416-235-4686
  • Provincial TTY: 1-866-471-8929
  • Niagara Region TTY: 905-704-2426

See also:

Ontario 511 Logo