Unscheduled road closures and events for provincial highways:

Unscheduled Events

EASTPORT DRIVE Northbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Northbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 21, 2017 20:00
Event End:January 23, 2017 05:00
Last Change: Entered 2017-01-05 08:02

Top of page Top of page


EASTPORT DRIVE Northbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Northbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 16, 2017 09:00
Event End:January 20, 2017 15:00
Last Change: Entered 2017-01-12 12:13

Top of page Top of page


EASTPORT DRIVE Northbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Northbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 16, 2017 20:00
Event End:January 21, 2017 05:00
Last Change: Entered 2016-12-12 10:04

Top of page Top of page


EASTPORT DRIVE Northbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Northbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 28, 2017 20:00
Event End:January 30, 2017 05:00
Last Change: Entered 2017-01-05 07:58

Top of page Top of page


EASTPORT DRIVE Northbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Northbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 23, 2017 20:00
Event End:January 28, 2017 05:00
Last Change: Entered 2016-12-12 10:07

Top of page Top of page


EASTPORT DRIVE Southbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Southbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 28, 2017 20:00
Event End:January 30, 2017 05:00
Last Change: Entered 2017-01-05 07:57

Top of page Top of page


EASTPORT DRIVE Southbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Southbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 16, 2017 20:00
Event End:January 21, 2017 05:00
Last Change: Entered 2016-12-12 10:03

Top of page Top of page


EASTPORT DRIVE Southbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Southbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 16, 2017 09:00
Event End:January 20, 2017 15:00
Last Change: Entered 2017-01-12 12:14

Top of page Top of page


EASTPORT DRIVE Southbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Southbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 21, 2017 20:00
Event End:January 23, 2017 05:00
Last Change: Entered 2017-01-05 07:56

Top of page Top of page


EASTPORT DRIVE Southbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Construction
Highway:EASTPORT DRIVE
Direction:Southbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 23, 2017 20:00
Event End:January 28, 2017 05:00
Last Change: Entered 2016-12-12 10:05

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Lane 1 closes Sunday from 5:00 to 23:59, Monday from 5:00 to 14:00, Tuesday to Thursday from 5:00 to 15:00 and Friday from 5:00 to 12:00.
Event Start:January 15, 2017 05:00
Event End:January 21, 2017 15:00
Last Change: Entered 2017-01-13 13:32

Top of page Top of page


HWY 11 Northbound [ SOUTH SPARROW LAKE ROAD - SEVERN RIVER BRIDGE/WEST BRANCH ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:SOUTH SPARROW LAKE ROAD
To:SEVERN RIVER BRIDGE/WEST BRANCH
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 17, 2017 10:00
Event End:January 19, 2017 16:00
Last Change: Entered 2017-01-15 18:46

Top of page Top of page


HWY 11 Southbound [ SEVERN RIVER BRIDGE/WEST BRANCH - SOUTH SPARROW LAKE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SEVERN RIVER BRIDGE/WEST BRANCH
To:SOUTH SPARROW LAKE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 17, 2017 10:00
Event End:January 19, 2017 16:00
Last Change: Entered 2017-01-15 18:48

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :One lane closes Sunday from 5:00 to 10:00, Monday from 05:00 to 14:00,Tuesday to Thursday from 5:00 to 15:00 and Friday from 5:00 to 12:00.On Saturday one lane closes from 05:00 to 10:00.
Event Start:January 15, 2017 05:00
Event End:January 21, 2017 15:00
Last Change: Entered 2017-01-13 13:40

Top of page Top of page


HWY 400 Northbound [ AURORA ROAD. - CANAL ROAD. ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:AURORA ROAD.
To:CANAL ROAD.
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Alternating left or right 2 lane closure. First lane closed at 19:00 Tuesday to Friday. Second lane closed at 20:00 Tuesday to Thursday, second lane closes 21:00 on Friday. First lane opens 06:00 Tuesday to Thursday. Second lane opens 11:00 Tuesday to Thursday. On Saturday, first lane opens 08:00, second lane opens 11:00. On-ramp closed daily 22:00 to 05:00, Tuesday Night to Saturday Morning.
Event Start:January 17, 2017 17:00
Event End:January 21, 2017 11:00
Last Change: Entered 2017-01-09 12:36

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Beginning with 1 lane from 00:00 to 23:59 on all days. Expanding to 2 lanes Sunday to Thursday 20:00 to 6:00, Friday and Saturday 22:00 to 10:00.
Event Start:January 15, 2017 00:00
Event End:January 21, 2017 23:59
Last Change: Entered 2017-01-13 13:29

Top of page Top of page


HWY 400 Northbound [ ESSA ROAD / SIMCOE ROAD 27 - DUNLOP STREET / SIMCOE ROAD 90 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:ESSA ROAD / SIMCOE ROAD 27
To:DUNLOP STREET / SIMCOE ROAD 90
Lanes Affected:2 Right Lane(s)
Traffic Impact :On-ramp from ESSA ROAD / SIMCOE ROAD 27 WB
ReasonRecurring-Construction
Comment :Lane one closes daily at 20:00 for one week starting Sunday. Expanding to 2 lane closure at at 22:00, daily, on Sunday, 21:00 on Monday and 22:00 Tuesday to Sunday. All lanes reopen at 07:00 Monday to Friday morning. All lanes open at 08:00 on Saturday morning. First lane opens at 09:00 on Sunday, all lanes open 11:00 Sunday morning. Off-ramp closed, daily, 23:00 Sunday to Friday, 23:59 Saturday. Off-ramp re-opens 05:00 every morning Monday to Sunday Morning.
Event Start:January 15, 2017 20:00
Event End:January 22, 2017 07:00
Last Change: Entered 2017-01-11 09:43

Top of page Top of page


HWY 400 Northbound [ HWY 89/SIMCOE ROAD 89 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Maintenance
Highway:HWY 400
Direction:Northbound
From/At:HWY 89/SIMCOE ROAD 89
To:HWY 89/SIMCOE ROAD 89
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Right lane closed to off-ramp, daily, 22:00-05:00, Monday Night to Friday Morning.
Event Start:January 16, 2017 22:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-11 10:31

Top of page Top of page


HWY 400 Northbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - MAPLEVIEW DRIVE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:INNISFIL BEACH ROAD - SIMCOE ROAD 21
To:MAPLEVIEW DRIVE
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 16, 2017 09:00
Event End:January 19, 2017 15:00
Last Change: Entered 2017-01-10 10:03

Top of page Top of page


HWY 400 Northbound On-ramp [ HWY 89/SIMCOE ROAD 89 Northbound - ] - Recurring-Maintenance
Highway:HWY 400
Direction:Northbound
From/At:HWY 89/SIMCOE ROAD 89 Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Off-ramp will be closed daily from 22:00 to 05:00, Monday Night to Friday Morning.
Event Start:January 16, 2017 22:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-11 10:29

Top of page Top of page


HWY 400 Northbound On-ramp [ HWY 9 Eastbound/Westbound - ] - Construction
Highway:HWY 400
Direction:Northbound
From/At:HWY 9 Eastbound/Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:December 12, 2016 22:00
Event End:April 25, 2017 05:00
Last Change: Entered 2016-12-08 14:50

Top of page Top of page


HWY 400 Southbound [ 4TH LINE - 4TH LINE ] - Recurring-Engineering Investigation
Highway:HWY 400
Direction:Southbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:January 18, 2017 18:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-17 10:36

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - AURORA ROAD. ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:CANAL ROAD.
To:AURORA ROAD.
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB, On-ramp from HWY 9 WB
ReasonRecurring-Construction
Comment :Alternating Left and Right 2 lane closures, beginning with 1 lane closure Tuesday to Thursday from 11:00 to 5:00, & Friday from 18:00 until 11:00 Saturday. Expanding to 2 Lane closures from Monday to Thursday 19:00 to 05:00, Friday from 21:00 to 08:00 Saturday. Both on-ramps from Hwy 9 to SB Hwy 400 will be closed Tuesday to Thursday from 23:00 to 05:00, and on Friday from 23:00 until 08:00 Saturday.
Event Start:January 17, 2017 11:00
Event End:January 21, 2017 11:00
Last Change: Entered 2017-01-09 12:40

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On all days, 1 lane closure from 00:00 to 23:59. Expanding to 2 lanes, nightly, Monday to Thursday at 20:00. Second lane reopens at 06:00 Monday Morning to Friday Morning, and 09:00 on Saturday and Sunday Morning.
Event Start:January 15, 2017 00:00
Event End:January 21, 2017 23:59
Last Change: Entered 2017-01-13 13:23

Top of page Top of page


HWY 400 Southbound [ MAPLEVIEW DRIVE - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:MAPLEVIEW DRIVE
To:INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 16, 2017 09:00
Event End:January 19, 2017 15:00
Last Change: Entered 2017-01-10 10:05

Top of page Top of page


HWY 401 Eastbound [ GUELPH LINE - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GUELPH LINE
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Two lane closure each night. Two lanes close at 21:00 and both open at 05:00 on Sunday. One lane closes at 22:00 and two lanes close at 23:00. Friday and Saturday, one lane opens at 6:00 and all lanes reopen at 8:00. All other days, both lanes open at 5:00.
Event Start:January 15, 2017 22:00
Event End:January 21, 2017 05:00
Last Change: Entered 2017-01-13 05:55

Top of page Top of page


HWY 401 Eastbound [ HWY 137 (IC 661) - HWY 137 (IC 661) ] - Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:HWY 137 (IC 661)
To:HWY 137 (IC 661)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Right lane closures Hwy 401 E/B & W/B @ Hwy 137 (Gananoque)
Event Start:January 20, 2017 09:00
Event End:January 20, 2017 16:00
Last Change: Entered 2017-01-18 13:19

Top of page Top of page


HWY 401 Eastbound [ HWY 137 (IC 661) - HWY 137 (IC 661) ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:HWY 137 (IC 661)
To:HWY 137 (IC 661)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Lane reductions Hwy 401 E/B & W/B @ Hwy 137 (Gananoque)
Event Start:January 25, 2017 07:30
Event End:January 27, 2017 17:00
Last Change: Entered 2017-01-17 10:25

Top of page Top of page


HWY 401 Eastbound [ Highway 8 / King Street E/Shantz Hill Rd (278KM) - Franklin Blvd (284KM) ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:Highway 8 / King Street E/Shantz Hill Rd (278KM)
To:Franklin Blvd (284KM)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from Highway 8 / King Street E/Shantz Hill Rd (278KM) EB, Off-ramp to Highway 8 / King Street E/Shantz Hill Rd (278KM) EB
ReasonConstruction
Comment :Highway 401 eastbound from King Street to Franklin Boulevard will be reduced to one lane on January 20th at 2100 hours to January 21st at 0500 hours for construction. Highway 401 eastbound on and off ramp at King Street will be closed on January 20th from 2100 hours to January 21st at 0500 hours due to construction.
Event Start:January 20, 2017 21:00
Event End:January 21, 2017 05:00
Last Change: Entered 2017-01-18 12:31

Top of page Top of page


HWY 401 Eastbound [ JAMES SNOW PKWY - TRAFALGAR ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JAMES SNOW PKWY
To:TRAFALGAR ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :One lane closed at 22:00, two lanes closed at 23:00. All lanes opened at 5:00 Monday to Friday. Saturday, two lanes open at 06:00, all lanes open at 08:00.
Event Start:January 15, 2017 22:00
Event End:January 21, 2017 08:00
Last Change: Entered 2017-01-13 05:59

Top of page Top of page


HWY 401 Eastbound [ Veterans Memorial Parkway (194KM) - Veterans Memorial Parkway (194KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Veterans Memorial Parkway (194KM)
To:Veterans Memorial Parkway (194KM)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 401 at Veterans Memorial Parkway bridge will have a mobile operation on January 18th at 1900 hours eastbound to January 20th at 0600 hours westbound in both directions due to construction operations.
Event Start:January 18, 2017 19:00
Event End:January 20, 2017 06:00
Last Change: Entered 2017-01-17 13:42

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - LESLIE STREET Northbound/Southbound ] - Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:
To:LESLIE STREET Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonEngineering Investigation
Comment :
Event Start:January 22, 2017 23:00
Event End:January 23, 2017 05:00
Last Change: Entered 2017-01-17 15:35

Top of page Top of page


HWY 401 Eastbound Collector [ BAYVIEW AVE Collector - LESLIE STREET Collector ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:BAYVIEW AVE Collector
To:LESLIE STREET Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :On-ramp from BAYVIEW AVE NB
ReasonRecurring-Maintenance
Comment :
Event Start:January 16, 2017 23:00
Event End:January 21, 2017 05:00
Last Change: Entered 2017-01-11 07:46

Top of page Top of page


HWY 401 Eastbound Collector [ DIXIE ROAD Collector - RENFORTH DRIVE Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:DIXIE ROAD Collector
To:RENFORTH DRIVE Collector
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 22, 2017 22:00
Event End:January 24, 2017 05:00
Last Change: Entered 2017-01-17 15:16

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 400/BLACK CREEK DRIVE Collector - MORNINGSIDE AVE Collector ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:HWY 400/BLACK CREEK DRIVE Collector
To:MORNINGSIDE AVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:January 23, 2017 23:00
Event End:January 27, 2017 05:00
Last Change: Entered 2017-01-17 08:03

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 400/BLACK CREEK DRIVE Collector - MORNINGSIDE AVE Collector ] - Recurring-Moving Maintenance Closure
Highway:HWY 401
Direction:Eastbound
From/At:HWY 400/BLACK CREEK DRIVE Collector
To:MORNINGSIDE AVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Moving Maintenance Closure
Comment :
Event Start:January 16, 2017 23:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-11 07:30

Top of page Top of page


HWY 401 Eastbound Express [ DIXIE ROAD Express - DIXIE ROAD Express ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:DIXIE ROAD Express
To:DIXIE ROAD Express
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :From Tuesday to Friday, single lane will be closed at 21:00, two lanes will be closed at 23:00 and three lanes will be closed at 23:59.Two lanes reopen at 04:00 and all lanes reopen at 05:00 all days.
Event Start:January 17, 2017 21:00
Event End:January 21, 2017 05:00
Last Change: Entered 2017-01-16 10:35

Top of page Top of page


HWY 401 Eastbound Express [ DIXIE ROAD Express - RENFORTH DRIVE Express ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:DIXIE ROAD Express
To:RENFORTH DRIVE Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Two lanes closed at 22:00 and both lanes open at 05:00 from Sunday- Tuesday
Event Start:January 22, 2017 22:00
Event End:January 24, 2017 05:00
Last Change: Entered 2017-01-17 15:33

Top of page Top of page


HWY 401 Eastbound Express [ HWY 400/BLACK CREEK DRIVE Express - MORNINGSIDE AVE Express ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:HWY 400/BLACK CREEK DRIVE Express
To:MORNINGSIDE AVE Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:January 23, 2017 23:00
Event End:January 27, 2017 05:00
Last Change: Entered 2017-01-17 08:06

Top of page Top of page


HWY 401 Eastbound Express [ HWY 400/BLACK CREEK DRIVE Express - MORNINGSIDE AVE Express ] - Recurring-Moving Maintenance Closure
Highway:HWY 401
Direction:Eastbound
From/At:HWY 400/BLACK CREEK DRIVE Express
To:MORNINGSIDE AVE Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Moving Maintenance Closure
Comment :
Event Start:January 16, 2017 23:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-11 07:32

Top of page Top of page


HWY 401 Eastbound Express and Collector Off-ramp [ - HWY 404 Southbound Express and Collector ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:
To:HWY 404 Southbound Express and Collector
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 21, 2017 23:00
Event End:April 24, 2017 05:00
Last Change: Entered 2017-01-16 11:09

Top of page Top of page


HWY 401 Eastbound Express and Collector Off-ramp [ - HWY 404 Southbound Express and Collector ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:
To:HWY 404 Southbound Express and Collector
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 28, 2017 23:00
Event End:May 01, 2017 05:00
Last Change: Entered 2017-01-16 11:12

Top of page Top of page


HWY 401 Westbound [ HWY 25 - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :On Monday two lane closure starting at 21:00 and reopens by 6:00. From Tuesday to Thursday, one lane closes at 22:00 and two lanes close at 23:00 both lanes reopen at 6:00. On Friday, one lane closes at 22:00 and two lanes close at 23:00. Lane 2 opens at 6:00, all lanes reopen at 8:00.
Event Start:January 15, 2017 22:00
Event End:January 21, 2017 06:00
Last Change: Entered 2017-01-13 05:57

Top of page Top of page


HWY 401 Westbound [ THICKSON ROAD - BROCK ST ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:THICKSON ROAD
To:BROCK ST
Lanes Affected:1 Right Lane(s)
Traffic Impact :Off-ramp to BROCK ST EB/WB
ReasonRecurring-Maintenance
Comment :
Event Start:January 16, 2017 10:00
Event End:January 19, 2017 15:00
Last Change: Entered 2017-01-11 07:59

Top of page Top of page


HWY 401 Westbound [ TRAFALGAR ROAD - JAMES SNOW PKWY ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:TRAFALGAR ROAD
To:JAMES SNOW PKWY
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Beginning with a 1 lane closure at 22:00, expanding to 2 lanes at 23:00, all lanes open at 06:00 Monday to Friday. On Saturday 2 lane closure ends at 06:00 and all lanes are open at 08:00.
Event Start:January 15, 2017 22:00
Event End:January 21, 2017 08:00
Last Change: Entered 2017-01-13 05:58

Top of page Top of page


HWY 401 Westbound Collector [ MORNINGSIDE AVE Collector - HWY 400/BLACK CREEK DRIVE Collector ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:MORNINGSIDE AVE Collector
To:HWY 400/BLACK CREEK DRIVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:January 23, 2017 23:00
Event End:January 27, 2017 05:00
Last Change: Entered 2017-01-17 08:07

Top of page Top of page


HWY 401 Westbound Collector [ MORNINGSIDE AVE Collector - HWY 400/BLACK CREEK DRIVE Collector ] - Recurring-Moving Maintenance Closure
Highway:HWY 401
Direction:Westbound
From/At:MORNINGSIDE AVE Collector
To:HWY 400/BLACK CREEK DRIVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Moving Maintenance Closure
Comment :
Event Start:January 16, 2017 23:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-11 07:34

Top of page Top of page


HWY 401 Westbound Express [ MORNINGSIDE AVE Express - HWY 400/BLACK CREEK DRIVE Express ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:MORNINGSIDE AVE Express
To:HWY 400/BLACK CREEK DRIVE Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:January 23, 2017 23:00
Event End:January 27, 2017 05:00
Last Change: Entered 2017-01-17 08:10

Top of page Top of page


HWY 401 Westbound Express [ MORNINGSIDE AVE Express - HWY 400/BLACK CREEK DRIVE Express ] - Recurring-Moving Maintenance Closure
Highway:HWY 401
Direction:Westbound
From/At:MORNINGSIDE AVE Express
To:HWY 400/BLACK CREEK DRIVE Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Moving Maintenance Closure
Comment :
Event Start:January 16, 2017 23:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-11 07:36

Top of page Top of page


HWY 401 Westbound Express and Collector Off-ramp [ - HWY 404 Southbound Express and Collector ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:HWY 404 Southbound Express and Collector
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 21, 2017 23:00
Event End:April 24, 2017 05:00
Last Change: Entered 2017-01-16 11:10

Top of page Top of page


HWY 401 Westbound Express and Collector Off-ramp [ - HWY 404 Southbound Express and Collector ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:HWY 404 Southbound Express and Collector
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 28, 2017 23:00
Event End:May 01, 2017 05:00
Last Change: Entered 2017-01-16 11:12

Top of page Top of page


HWY 401 Westbound Off-ramp [ - BROCK ROAD Northbound/Southbound ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:BROCK ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 15, 2017 23:00
Event End:January 21, 2017 05:00
Last Change: Entered 2017-01-12 09:54

Top of page Top of page


HWY 401 Westbound Off-ramp [ - MAVIS ROAD Westbound ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:MAVIS ROAD Westbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:April 24, 2016 23:59
Event End:April 02, 2017 00:00
Last Change: Entered 2016-04-21 15:45

Top of page Top of page


HWY 402 Eastbound [ Longwoods Road (86KM) - Miller Road ] - Construction
Highway:HWY 402
Direction:Eastbound
From/At:Longwoods Road (86KM)
To:Miller Road
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 401 eastbound and westbound from Miller Road to Longwoods Road will have an alternating lane closure for short duration on January 20th from 0700 hours to 1700 hours due to construction.
Event Start:January 20, 2017 07:00
Event End:January 20, 2017 17:00
Last Change: Entered 2017-01-18 15:21

Top of page Top of page


HWY 403 HAMILTON Eastbound [ LINCOLN M. ALEXANDER PARKWAY - LINCOLN M. ALEXANDER PARKWAY ] - Maintenance
Highway:HWY 403 HAMILTON
Direction:Eastbound
From/At:LINCOLN M. ALEXANDER PARKWAY
To:LINCOLN M. ALEXANDER PARKWAY
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:January 19, 2017 20:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-17 14:59

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound [ WINSTON CHURCHILL BLVD - MAVIS ROAD ] - Recurring-Maintenance
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:WINSTON CHURCHILL BLVD
To:MAVIS ROAD
Lanes Affected:1 Left(with HOV) Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:January 16, 2017 20:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-13 10:37

Top of page Top of page


HWY 403 MISSISSAUGA Westbound [ MAVIS ROAD - WINSTON CHURCHILL BLVD ] - Recurring-Maintenance
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MAVIS ROAD
To:WINSTON CHURCHILL BLVD
Lanes Affected:1 Left(with HOV) Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:January 16, 2017 20:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-13 10:40

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Off-ramp [ - WINSTON CHURCHILL BLVD Northbound/Southbound ] - Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:
To:WINSTON CHURCHILL BLVD Northbound/Southbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:January 18, 2017 22:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-16 16:15

Top of page Top of page


HWY 403 MISSISSAUGA Westbound On-ramp [ WINSTON CHURCHILL BLVD Southbound - ] - Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:WINSTON CHURCHILL BLVD Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:January 18, 2017 22:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-18 11:52

Top of page Top of page


HWY 404 Northbound [ MAJOR MACKENZIE DRIVE - MAJOR MACKENZIE DRIVE ] - Construction
Highway:HWY 404
Direction:Northbound
From/At:MAJOR MACKENZIE DRIVE
To:MAJOR MACKENZIE DRIVE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :On-ramp from MAJOR MACKENZIE DRIVE EB
ReasonConstruction
Comment :
Event Start:January 19, 2017 23:59
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-12 16:03

Top of page Top of page


HWY 404 Northbound Express [ 16TH AVE Express - ROUGE RIVER Express ] - Recurring-Maintenance
Highway:HWY 404
Direction:Northbound
From/At:16TH AVE Express
To:ROUGE RIVER Express
Lanes Affected:2 Right Lane(s)
Traffic Impact :On-ramp from 16TH AVE NB
ReasonRecurring-Maintenance
Comment :Full closure of 16th ave on-ramp to 404NB from 23:59 to 0600
Event Start:January 19, 2017 23:59
Event End:January 20, 2017 06:00
Last Change: Entered 2017-01-16 16:20

Top of page Top of page


HWY 404 Southbound [ MAJOR MACKENZIE DRIVE - MAJOR MACKENZIE DRIVE ] - Construction
Highway:HWY 404
Direction:Southbound
From/At:MAJOR MACKENZIE DRIVE
To:MAJOR MACKENZIE DRIVE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :On-ramp from MAJOR MACKENZIE DRIVE WB
ReasonConstruction
Comment :15 min rolling closure between 23:59 - 05:00 OPP assisted.
Event Start:January 19, 2017 23:59
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-12 16:03

Top of page Top of page


HWY 404 Southbound Express and Collector Off-ramp [ - YORK MILLS ROAD Southbound ] - Construction
Highway:HWY 404
Direction:Southbound
From/At:
To:YORK MILLS ROAD Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 21, 2017 23:00
Event End:April 24, 2017 05:00
Last Change: Entered 2017-01-16 11:07

Top of page Top of page


HWY 404 Southbound Express and Collector Off-ramp [ - YORK MILLS ROAD Southbound ] - Construction
Highway:HWY 404
Direction:Southbound
From/At:
To:YORK MILLS ROAD Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:April 28, 2017 23:00
Event End:May 01, 2017 05:00
Last Change: Entered 2017-01-16 11:10

Top of page Top of page


HWY 407 ETR Eastbound [ SIDELINE 14 - HWY 412 ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:SIDELINE 14
To:HWY 412
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 18, 2017 09:00
Event End:January 20, 2017 15:00
Last Change: Entered 2017-01-13 10:10

Top of page Top of page


HWY 407 ETR Westbound [ HARMONY RD N - HWY 412 ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Westbound
From/At:HARMONY RD N
To:HWY 412
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 18, 2017 09:00
Event End:January 20, 2017 15:00
Last Change: Entered 2017-01-13 10:11

Top of page Top of page


HWY 410 Northbound [ HWY 401 - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401
To:COURTNEY PARK DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to COURTNEY PARK DRIVE EB/WB
ReasonRecurring-Construction
Comment :Lane 1 closed at 22:00, and lane 2 closed at 23:00. All lanes will open at 05:00 on Thursday and Friday.
Event Start:January 19, 2017 22:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-17 11:48

Top of page Top of page


HWY 410 Northbound On-ramp [ HWY 401 Eastbound - ] - Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401 Eastbound
To:
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:May 11, 2016 23:00
Event End:November 15, 2017 23:59
Last Change: Entered 2016-05-09 13:11

Top of page Top of page


HWY 410 Northbound On-ramp [ HWY 401 Westbound - ] - Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401 Westbound
To:
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:May 11, 2016 23:00
Event End:November 15, 2017 23:59
Last Change: Entered 2016-05-09 13:07

Top of page Top of page


HWY 410 Northbound On-ramp [ HWY 401 Westbound - ] - Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401 Westbound
To:
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:May 11, 2016 23:00
Event End:November 15, 2017 23:59
Last Change: Entered 2016-05-09 13:07

Top of page Top of page


HWY 410 Northbound On-ramp [ STEELES AVE Westbound - ] - Construction
Highway:HWY 410
Direction:Northbound
From/At:STEELES AVE Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :This is a long term closure of Steeles W-410 N Ramp.
Event Start:December 02, 2016 00:00
Event End:December 31, 2017 23:59
Last Change: Entered 2016-12-02 19:17

Top of page Top of page


HWY 410 Southbound [ QUEEN STREET/S JCT HWY 7 - QUEEN STREET/S JCT HWY 7 ] - Maintenance
Highway:HWY 410
Direction:Southbound
From/At:QUEEN STREET/S JCT HWY 7
To:QUEEN STREET/S JCT HWY 7
Lanes Affected:2 Right Lane(s)
Traffic Impact :On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from QUEEN STREET/S JCT HWY 7 WB
ReasonMaintenance
Comment :
Event Start:January 20, 2017 23:59
Event End:January 21, 2017 05:00
Last Change: Entered 2017-01-18 11:06

Top of page Top of page


HWY 410 Southbound Off-ramp [ - HWY 401 Eastbound/Westbound ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:
To:HWY 401 Eastbound/Westbound
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Two lanes closed at 23:59 and both lanes open at 05:00 from Wednesday to Friday.
Event Start:January 18, 2017 23:59
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-17 11:46

Top of page Top of page


HWY 416 Northbound [ DILWORTH RD (IC 42) - BANKFIELD RD / BROPHY DR (IC 57) ] - Recurring-Engineering Investigation
Highway:HWY 416
Direction:Northbound
From/At:DILWORTH RD (IC 42)
To:BANKFIELD RD / BROPHY DR (IC 57)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Lane reductions Hwy 416 N/B btwn Dilworth Rd and Bankfield Rd (N/Kemptville)
Event Start:January 25, 2017 07:30
Event End:January 27, 2017 17:00
Last Change: Entered 2017-01-17 10:34

Top of page Top of page


HWY 416 Northbound [ HUNT CLUB RD (IC 72) - BASELINE RD ] - Recurring-Construction
Highway:HWY 416
Direction:Northbound
From/At:HUNT CLUB RD (IC 72)
To:BASELINE RD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Traffic may encounter intermittent lane reductions Hwy 416 N/B btwn Hunt Club and Baseline Rd (Ottawa)
Event Start:January 05, 2017 10:00
Event End:January 31, 2017 06:00
Last Change: Entered 2017-01-04 08:24

Top of page Top of page


HWY 417 Eastbound [ HWY 416 - RICHMOND RD (IC 130) ] - Construction
Highway:HWY 417
Direction:Eastbound
From/At:HWY 416
To:RICHMOND RD (IC 130)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Left lane closed Hwy 417 E/B @ Richmond Rd (Ottawa)
Event Start:January 20, 2017 10:00
Event End:January 20, 2017 14:30
Last Change: Entered 2017-01-17 15:08

Top of page Top of page


HWY 417 Eastbound [ ROCHESTER ST (IC 121B) - METCALFE ST (IC 119A) ] - Recurring-Construction
Highway:HWY 417
Direction:Eastbound
From/At:ROCHESTER ST (IC 121B)
To:METCALFE ST (IC 119A)
Lanes Affected:2 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Right lane closures Hwy 417 E/B btwn Rochester and Metcalfe (Ottawa); E/B Kent St off ramp closed
Event Start:January 15, 2017 21:00
Event End:January 21, 2017 06:00
Last Change: Entered 2017-01-13 09:56

Top of page Top of page


HWY 417 Eastbound On-ramp [ MARCH RD (IC 155) Eastbound/Westbound - ] - Maintenance
Highway:HWY 417
Direction:Eastbound
From/At:MARCH RD (IC 155) Eastbound/Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :Hwy 417 E/B & W/B March Rd curl around on ramps closed (W/Ottawa)
Event Start:January 19, 2017 09:00
Event End:January 19, 2017 16:00
Last Change: Entered 2017-01-18 19:57

Top of page Top of page


HWY 420 Westbound Off-ramp [ - QEW Southbound ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:
To:QEW Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Highway 420 westbound off-ramp to QEW southbound will be permanently closed from Friday November 18th, 2016 to September 1st, 2017.
Event Start:November 18, 2016 00:00
Event End:September 01, 2017 06:00
Last Change: Entered 2016-11-17 08:05

Top of page Top of page


HWY 427 Northbound [ FINCH AVENUE - HWY 407 ETR ] - Recurring-Maintenance
Highway:HWY 427
Direction:Northbound
From/At:FINCH AVENUE
To:HWY 407 ETR
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:January 19, 2017 23:00
Event End:January 21, 2017 05:00
Last Change: Entered 2017-01-16 09:56

Top of page Top of page


HWY 427 Southbound [ HWY 401 - HWY 401 ] - Maintenance
Highway:HWY 427
Direction:Southbound
From/At:HWY 401
To:HWY 401
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:January 19, 2017 23:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-16 10:32

Top of page Top of page


HWY 427 Southbound [ HWY 7 - FINCH AVENUE ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:HWY 7
To:FINCH AVENUE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 19, 2017 22:00
Event End:January 21, 2017 08:00
Last Change: Entered 2017-01-17 15:35

Top of page Top of page


HWY 427 Southbound On-ramp [ HWY 7 Westbound - ] - Recurring-Maintenance
Highway:HWY 427
Direction:Southbound
From/At:HWY 7 Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Hwy 7 WB on-ramp to Hwy 427 SB full closure, Tuesday to Friday, from midnight to 5am
Event Start:January 24, 2017 23:59
Event End:January 27, 2017 05:00
Last Change: Entered 2017-01-16 12:39

Top of page Top of page


HWY 6 Northbound [ HWY 5/CLAPPISONS CORNERS - MILLGROVE ROAD ] - Recurring-Construction
Highway:HWY 6
Direction:Northbound
From/At:HWY 5/CLAPPISONS CORNERS
To:MILLGROVE ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 16, 2017 07:00
Event End:January 20, 2017 18:00
Last Change: Entered 2017-01-11 14:51

Top of page Top of page


HWY 6 Southbound [ MILLGROVE ROAD - HWY 5/CLAPPISONS CORNERS ] - Recurring-Construction
Highway:HWY 6
Direction:Southbound
From/At:MILLGROVE ROAD
To:HWY 5/CLAPPISONS CORNERS
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 16, 2017 07:00
Event End:January 20, 2017 18:00
Last Change: Entered 2017-01-11 14:51

Top of page Top of page


HWY 60 Eastbound [ BROWNS CRESCENT - BROWNS CRESCENT ] - Recurring-Engineering Investigation
Highway:HWY 60
Direction:Eastbound
From/At:BROWNS CRESCENT
To:BROWNS CRESCENT
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Alternating single lane closures with flagging. East of Deacon.
Event Start:January 16, 2017 08:00
Event End:January 20, 2017 16:30
Last Change: Entered 2017-01-11 13:28

Top of page Top of page


HWY 7 Eastbound [ County Road 20 / Line 20 - County Road 20 / Line 20 ] - Construction
Highway:HWY 7
Direction:Eastbound
From/At:County Road 20 / Line 20
To:County Road 20 / Line 20
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 7 eastbound and westbound at Perth Line 20 will have alternating right lane closures on January 19th from 0800 hours to 1700 hours for roadwork.
Event Start:January 19, 2017 08:00
Event End:January 19, 2017 17:00
Last Change: Entered 2017-01-18 11:45

Top of page Top of page


HWY 7/12 Northbound [ CONCESSION ROAD 2/BROCK TWP 2ND LINE - SCUGOG TWP 4TH LINE ] - Recurring-Construction
Highway:HWY 7/12
Direction:Northbound
From/At:CONCESSION ROAD 2/BROCK TWP 2ND LINE
To:SCUGOG TWP 4TH LINE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation and 1 through lane will be maintained. 1 lane will be closed daily Monday to Thursday 07:00 to 19:00. On Friday, 1 lane will be closed 07:00 to 12:00.
Event Start:January 16, 2017 07:00
Event End:January 20, 2017 19:00
Last Change: Entered 2017-01-11 15:46

Top of page Top of page


HWY 7/12 Southbound [ WINCHESTER ROAD - CARNWITH DRIVE ] - Recurring-Construction
Highway:HWY 7/12
Direction:Southbound
From/At:WINCHESTER ROAD
To:CARNWITH DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 16, 2017 09:00
Event End:January 19, 2017 14:00
Last Change: Entered 2017-01-11 15:45

Top of page Top of page


HWY 7/8 Eastbound [ Road 102 - Wilmot Easthope Road (Huron Street) / County Road 1 ] - Recurring-Construction
Highway:HWY 7/8
Direction:Eastbound
From/At:Road 102
To:Wilmot Easthope Road (Huron Street) / County Road 1
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 7/8 eastbound and westbound, between 0.8 kilometres east of Road 102 and 1.3 kilometres west of Wilmot Easthope Road, Shakespeare / New Hamburg, closed to traffic, Tuesday, January 17th, 2017 until Saturday, February 4th, 2017, nightly, from 2130 hours until 0630 hours, except weekends re-opened to traffic at 0730 hours, for construction (bridge structure work) operations, weather permitting and advanced signing in place.
Event Start:January 17, 2017 21:30
Event End:February 04, 2017 06:30
Last Change: Entered 2017-01-13 17:01

Top of page Top of page


QEW Fort Erie Bound [ GARDEN CITY SKYWAY - GLENDALE AVENUE ] - Recurring-Maintenance
Highway:QEW
Direction:Fort Erie Bound
From/At:GARDEN CITY SKYWAY
To:GLENDALE AVENUE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :One lane closed nightly at 20:00, Tuesday Night to Thursday Night. Alternating second lane closed nightly at 22:00. All lanes open daily at 06:00 Wednesday Morning to Friday Morning.
Event Start:January 17, 2017 20:00
Event End:January 20, 2017 06:00
Last Change: Entered 2017-01-13 08:55

Top of page Top of page


QEW Fort Erie Bound [ HWY 427 - DIXIE ROAD ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:HWY 427
To:DIXIE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:January 23, 2017 23:00
Event End:January 27, 2017 06:00
Last Change: Entered 2017-01-13 08:37

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - TRAFALGAR ROAD Northbound/Southbound ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:TRAFALGAR ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :From Monday to Thursday, single lane will be closed at 22:00 and full closure will be at 23:59. All lanes reopen at 05:00. From Friday to Sunday, Single lane will be closed at 23:00 and full closure will be at 23:59. All lanes reopen at 05:00 on Saturday, single lane reopens at 05:00 and all lanes reopens at 06:00 on Sunday. All lanes reopen at 05:00 on Monday.
Event Start:January 16, 2017 00:00
Event End:January 22, 2017 05:00
Last Change: Entered 2017-01-16 10:14

Top of page Top of page


QEW Fort Erie Bound On-ramp [ TRAFALGAR ROAD Northbound/Southbound - ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:TRAFALGAR ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 16, 2017 23:00
Event End:January 22, 2017 05:00
Last Change: Entered 2017-01-16 09:54

Top of page Top of page


QEW Toronto bound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 18, 2017 23:00
Event End:January 21, 2017 05:00
Last Change: Entered 2017-01-16 13:44

Top of page Top of page


QEW Toronto bound [ DIXIE ROAD - HWY 427 ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:DIXIE ROAD
To:HWY 427
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from DIXIE ROAD EB
ReasonRecurring-Construction
Comment :
Event Start:January 16, 2017 23:00
Event End:January 20, 2017 05:00
Last Change: Entered 2017-01-13 08:40

Top of page Top of page


QEW Toronto bound [ MOUNTAIN ROAD - GLENDALE AVENUE ] - Recurring-Maintenance
Highway:QEW
Direction:Toronto bound
From/At:MOUNTAIN ROAD
To:GLENDALE AVENUE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :First lane closes daily 19:00 Monday Night to Friday Morning. Alternating second lane closes daily at 22:00 Monday Night to Friday Morning. All lanes open daily 06:00 Tuesday Morning to Friday Morning.
Event Start:January 16, 2017 19:00
Event End:January 20, 2017 06:00
Last Change: Entered 2017-01-13 08:57

Top of page Top of page


QEW Toronto bound [ THOROLD STONE ROAD - THOROLD STONE ROAD ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:THOROLD STONE ROAD
To:THOROLD STONE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 420 EB/WB, Off-ramp to HWY 420 NB/SB
ReasonRecurring-Construction
Comment :Between 23:00 and 06:00, full closures will be limited to a maximum of 15 minutes per 1 hour period.
Event Start:January 23, 2017 23:00
Event End:January 26, 2017 06:00
Last Change: Entered 2017-01-11 12:36

Top of page Top of page


QEW Toronto bound Off-ramp [ - ROYAL WINDSOR DRIVE Eastbound ] - Maintenance
Highway:QEW
Direction:Toronto bound
From/At:
To:ROYAL WINDSOR DRIVE Eastbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:January 23, 2017 23:59
Event End:January 24, 2017 05:00
Last Change: Entered 2017-01-16 11:57

Top of page Top of page


QEW Toronto bound Off-ramp [ - TRAFALGAR ROAD Northbound/Southbound ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:
To:TRAFALGAR ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :From Monday to Thursday, single lane will be closed at 22:00 and full closure will be at 23:59. All lanes reopen at 05:00. Single lane will be closed at 23:00 on Friday and at 22:00 on Saturday and full closure will be at 23:59. All lanes reopen at 06:00 on Saturday and at 07:00 on Sunday.
Event Start:January 16, 2017 22:00
Event End:January 22, 2017 05:00
Last Change: Entered 2017-01-16 10:03

Top of page Top of page


QEW Toronto bound On-ramp [ BURLOAK DRIVE Southbound - ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:BURLOAK DRIVE Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Toronto bound QEW on-ramp from Burloak Dr. southbound closed from Monday-Thursday starting at 23:00 to 5:00, Friday starting at 23:00 to 6:00 and Saturday starting at 0:00 to 7:00.
Event Start:January 16, 2017 23:00
Event End:January 22, 2017 05:00
Last Change: Entered 2017-01-16 09:39

Top of page Top of page


QEW Toronto bound On-ramp [ TRAFALGAR ROAD Northbound/Southbound - ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:TRAFALGAR ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:January 16, 2017 23:00
Event End:January 22, 2017 05:00
Last Change: Entered 2017-01-16 09:51

Top of page Top of page


401 Westbound Express [ MORNINGSIDE AVE - ] - Disabled Vehicle
Highway:401
Direction:Westbound
From/At:MORNINGSIDE AVE
To:
Lanes Affected:1 RIGHT LANE(S)
Traffic Impact :
ReasonDisabled Vehicle
Comment :
Event Start:January 19, 2017 07:21
Event End:
Last Change: ENTERED 2017-01-19 07:21

Top of page Top of page


HWY 141 Eastbound [ MARINA RD - ] - Other
Highway:HWY 141
Direction:Eastbound
From/At:MARINA RD
To:
Lanes Affected: lane blocked
Traffic Impact :
ReasonOther
Comment :NO ROAD OR LANE CLOSURE: CAUTIONARY LOAD POSTING OF THE SHADOW RIVER BRIDGE IN PLACE. ADVISORY LOAD WEIGHTS ARE LIMITED TO 14 TONNES FOR SINGLE-UNIT VEHICLES, 16 TONNES FOR TWO-UNIT VEHICLES, AND 22 TONNES FOR VEHICLE TRAINS. UPDATED JANUARY 19TH AT 0700 HRS
Event Start:December 15, 2016 14:20
Event End:
Last Change: Updated 2017-01-19 06:59

Top of page Top of page


HWY 7044 Both Directions [ Hwy 144 Windy Lake - ] - Other
Highway:HWY 7044
Direction:Both Directions
From/At:Hwy 144 Windy Lake
To:
Lanes Affected:All lanes closed
Traffic Impact :
ReasonOther
Comment :HWY 7044 CLOSED 13.6 KM NORTH OF HWY 144 WINDY LAKE ON THE NORTH SIDE OF FOX LAKE ROAD AND 5.8 KM SOUTH OF HWY 144 CARTIER ENTRANCE AT THE MOUSSEAU LAKE PARKING LOT. THERE IS AMPLE SPACE FOR MOTORISTS TO TURN THEIR VEHICLES AT BOTH LOCATIONS. TOTAL LENGTH OF THE CLOSURE IS 4.3 KM - UPDATED JANUARY 19TH AT 0700 HRS
Event Start:January 13, 2017 10:05
Event End:
Last Change: Updated 2017-01-19 06:59

Top of page Top of page


This information is provided as a public service. Although we endeavor to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.

Road information by phone

  • Provincial Call Centre: 1-800-268-4686
  • In GTA: 416-235-4686
  • Provincial TTY: 1-866-471-8929
  • Niagara Region TTY: 905-704-2426

See also:

Ontario 511 Logo