Unscheduled road closures and events for provincial highways:

Unscheduled Events

HWY 10 Southbound [ County Road 9 / Main Street - County Road 9 / Main Street ] - Construction
Highway:HWY 10
Direction:Southbound
From/At:County Road 9 / Main Street
To:County Road 9 / Main Street
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 10 Southbound at County Road 9 will have a right lane closure on December 18th from 0900 to 1600 hours.
Event Start:December 18, 2017 09:00
Event End:December 18, 2017 16:00
Last Change: Entered 2017-12-16 07:32

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday: 1 lane closure from 00:00 to 14:00.
Event Start:December 18, 2017 00:00
Event End:December 18, 2017 14:00
Last Change: Entered 2017-12-14 10:03

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-14 10:00

Top of page Top of page


HWY 11 Northbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - TOWNLINE ROAD 12-13 ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:TOWNLINE ROAD 12-13
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 18, 2017 21:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:42

Top of page Top of page


HWY 11 Northbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - TOWNLINE ROAD 12-13 ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:TOWNLINE ROAD 12-13
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: Shoulder closed 9:00-15:00. Friday: Shoulder closed 9:00-11:00.
Event Start:December 18, 2017 09:00
Event End:December 22, 2017 15:00
Last Change: Entered 2017-12-13 15:23

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Friday: 1 lane closure from 00:00 to 12:00.
Event Start:December 22, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-14 10:06

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-14 10:09

Top of page Top of page


HWY 11 Southbound [ TOWNLINE ROAD 12-13 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:TOWNLINE ROAD 12-13
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 18, 2017 21:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:44

Top of page Top of page


HWY 11 Southbound [ TOWNLINE ROAD 12-13 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:TOWNLINE ROAD 12-13
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: Shoulder closed 9:00-15:00. Friday: Shoulder closed 9:00-11:00.
Event Start:December 18, 2017 09:00
Event End:December 22, 2017 15:00
Last Change: Entered 2017-12-13 15:24

Top of page Top of page


HWY 15 Northbound [ HWY 401 - HWY 401 ] - Recurring-Construction
Highway:HWY 15
Direction:Northbound
From/At:HWY 401
To:HWY 401
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Alternating lane closure. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 07:00
Last Change: Entered 2017-12-09 06:44

Top of page Top of page


HWY 15 Southbound [ HWY 401 - HWY 401 ] - Recurring-Construction
Highway:HWY 15
Direction:Southbound
From/At:HWY 401
To:HWY 401
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Alternating lane closure. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 07:00
Last Change: Entered 2017-12-09 06:45

Top of page Top of page


HWY 26 Eastbound [ SUNNIDALE CORNERS - SUNNIDALE CORNERS ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:SUNNIDALE CORNERS
To:SUNNIDALE CORNERS
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 18, 2017 07:00
Event End:December 22, 2017 15:00
Last Change: Entered 2017-12-12 16:03

Top of page Top of page


HWY 26 Eastbound [ SUNNIDALE CORNERS - SUNNIDALE CORNERS ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:SUNNIDALE CORNERS
To:SUNNIDALE CORNERS
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 18, 2017 07:00
Event End:December 22, 2017 15:00
Last Change: Entered 2017-12-12 15:56

Top of page Top of page


HWY 35/115 Northbound [ 3RD ROAD - 5TH ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:3RD ROAD
To:5TH ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from 3RD ROAD WB, Off-ramp to 5TH ROAD EB, Off-ramp to 4TH ROAD EB
ReasonRecurring-Engineering Investigation
Comment :Mon-Thu: alternating 1 lane closure 0800-1400. Fri: alternating 1 lane closure 0800-1200.
Event Start:December 18, 2017 08:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-12 13:56

Top of page Top of page


HWY 35/115 Northbound [ 5TH ROAD - 7TH ROAD/DURHAM ROAD 9 ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:5TH ROAD
To:7TH ROAD/DURHAM ROAD 9
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from TAMBLYN ROAD WB, Off-ramp to TAMBLYN ROAD EB, Off-ramp to 7TH ROAD/DURHAM ROAD 9 EB
ReasonRecurring-Engineering Investigation
Comment :Mon-Thu: alternating 1 lane closure 0800-1400. Fri: alternating 1 lane closure 0800-1200.
Event Start:December 18, 2017 08:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-12 14:14

Top of page Top of page


HWY 35/115 Northbound [ 7TH ROAD/DURHAM ROAD 9 - 8TH ROAD ] - Recurring-Maintenance
Highway:HWY 35/115
Direction:Northbound
From/At:7TH ROAD/DURHAM ROAD 9
To:8TH ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:December 18, 2017 06:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-13 15:15

Top of page Top of page


HWY 35/115 Northbound Off-ramp [ - HWY 35 Northbound ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:
To:HWY 35 Northbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 18, 2017 21:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-14 11:18

Top of page Top of page


HWY 35/115 Northbound On-ramp [ HWY 35 Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:HWY 35 Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 18, 2017 21:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-14 11:20

Top of page Top of page


HWY 35/115 Southbound [ 5TH ROAD - 3RD ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:5TH ROAD
To:3RD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from STATION ST. EB, On-ramp from 4TH ROAD EB, On-ramp from 3RD ROAD EB, Off-ramp to STATION ST. WB, Off-ramp to 4TH ROAD WB, Off-ramp to 3RD ROAD WB
ReasonRecurring-Engineering Investigation
Comment :Mon-Thu: alternating 1 lane closure all day. Fri: alternating 1 lane closure 2359-1200.
Event Start:December 18, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-12 14:04

Top of page Top of page


HWY 35/115 Southbound [ 7TH ROAD/DURHAM ROAD 9 - 5TH ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:7TH ROAD/DURHAM ROAD 9
To:5TH ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from MILL ST EB, Off-ramp to MILL ST WB
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 18, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-12 14:21

Top of page Top of page


HWY 35/115 Southbound [ 8TH ROAD - 7TH ROAD/DURHAM ROAD 9 ] - Recurring-Construction
Highway:HWY 35/115
Direction:Southbound
From/At:8TH ROAD
To:7TH ROAD/DURHAM ROAD 9
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 18, 2017 09:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-13 15:18

Top of page Top of page


HWY 35/115 Southbound Off-ramp [ - HWY 35 Northbound ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:
To:HWY 35 Northbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 18, 2017 21:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-14 11:22

Top of page Top of page


HWY 35/115 Southbound On-ramp [ HWY 35 Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:HWY 35 Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 18, 2017 21:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-14 11:24

Top of page Top of page


HWY 37 Northbound [ Wiser Rd - Harmony Rd ] - Construction
Highway:HWY 37
Direction:Northbound
From/At:Wiser Rd
To:Harmony Rd
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Flagging operations. Vehicles will be able to get by.
Event Start:December 17, 2017 07:30
Event End:December 17, 2017 11:30
Last Change: Entered 2017-12-11 12:28

Top of page Top of page


HWY 40 Northbound [ Rokeby Line - Rokeby Line ] - Construction
Highway:HWY 40
Direction:Northbound
From/At:Rokeby Line
To:Rokeby Line
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 40 northbound at Rokeby Line on December 18th from 0900 hours to 1600 hours will have a right lane closure due to roadwork.
Event Start:December 18, 2017 09:00
Event End:December 18, 2017 16:00
Last Change: Entered 2017-12-15 14:57

Top of page Top of page


HWY 400 Northbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Wednesday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 7:00, full reopen at 10:00. Thursday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 7:00, full reopen at 9:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 7:00, full reopen at 8:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 23:00. 1 lane reopen at 9:00, full reopen at 10:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 21:00. 1 lane reopen at 7:00, full reopen at 10:00.
Event Start:December 11, 2017 20:00
Event End:December 18, 2017 10:00
Last Change: Entered 2017-12-06 18:40

Top of page Top of page


HWY 400 Northbound [ AURORA ROAD. - HWY 9 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:AURORA ROAD.
To:HWY 9
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 19:00, 2 lane closure at 20:00. 1 lane reopen at 6:00, full reopen at 11:00. Friday: 1 lane closure at 19:00, 2 lane closure at 21:00. 1 lane reopen at 8:00, full reopen at 11:00. Saturday: 1 lane closure at 17:00, 2 lane closure at 19:00. 1 lane reopen at 10:00, full reopen at 11:00. Sunday: 2 lane closure at 21:00. 1 lane reopen at 6:00, full reopen at 11:00.
Event Start:December 11, 2017 17:00
Event End:December 18, 2017 11:00
Last Change: Entered 2017-12-06 19:01

Top of page Top of page


HWY 400 Northbound [ CANAL ROAD. - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:CANAL ROAD.
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 2 lanes closed at 21:00, one lane reopens at 06:00, all lanes open at 11:00. Monday-Thursday: 1 lane closed at 19:00 expanding to a 2 lane closure at 21:00, one lane reopens at 06:00, all lanes open at 11:00.
Event Start:December 17, 2017 21:00
Event End:December 22, 2017 11:00
Last Change: Entered 2017-12-13 19:30

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 06:00. Monday-Thursday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 06:00. Friday: 2 lane closure at 00:00. 1 lane reopens at 06:00 and full reopen at 12:00.
Event Start:December 17, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-14 09:46

Top of page Top of page


HWY 400 Northbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - MAPLEVIEW DRIVE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:INNISFIL BEACH ROAD - SIMCOE ROAD 21
To:MAPLEVIEW DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB, On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 WB, Off-ramp to MAPLEVIEW DRIVE EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 20:00, 2 lane closure at 21:00. Full reopen at 7:00. Friday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 8:00, full reopen at 9:00. Saturday: 1 lane closure at 19:00, 2 lane closure at 22:00. 1 lane reopen at 8:00, full reopen at 10:00. Sunday: 1 lane closure at 19:00, 2 lane closure at 22:00. Full reopen at 7:00.
Event Start:December 11, 2017 19:00
Event End:December 18, 2017 10:00
Last Change: Entered 2017-12-06 18:54

Top of page Top of page


HWY 400 Northbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - MAPLEVIEW DRIVE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:INNISFIL BEACH ROAD - SIMCOE ROAD 21
To:MAPLEVIEW DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB, On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 WB, Off-ramp to MAPLEVIEW DRIVE EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 20:00, 2 lane closure at 21:00. Full reopen at 7:00.
Event Start:December 18, 2017 20:00
Event End:December 22, 2017 07:00
Last Change: Entered 2017-12-15 06:30

Top of page Top of page


HWY 400 Southbound [ 401 - 401 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:401
To:401
Lanes Affected:ALL LANES CLOSED
Traffic Impact :Off-ramp to 401 WB
ReasonRecurring-Construction
Comment :Sunday-Wednesday: 1 lane closure at 21:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:December 17, 2017 21:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-14 06:53

Top of page Top of page


HWY 400 Southbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 18:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 2 lane closure at 19:00. 1 lane reopen at 8:00, full reopen at 10:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 21:00. 1 lane reopen at 9:00, full reopen at 10:00. Sunday: 1 lane closure at 21:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:December 11, 2017 18:00
Event End:December 18, 2017 10:00
Last Change: Entered 2017-12-06 18:46

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - AURORA ROAD. ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:CANAL ROAD.
To:AURORA ROAD.
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 11:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 1 lane closure at 18:00, 2 lane closure at 20:00. 1 lane reopen at 8:00, full reopen at 11:00. Saturday: 1 lane closure at 18:00, 2 lane closure at 20:00. 1 lane reopen at 9:00, full reopen at 11:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:December 11, 2017 11:00
Event End:December 18, 2017 11:00
Last Change: Entered 2017-12-06 19:02

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - AURORA ROAD. ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:CANAL ROAD.
To:AURORA ROAD.
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 11:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 1 lane closure at 18:00, 2 lane closure at 20:00. 1 lane reopen at 8:00, full reopen at 11:00.
Event Start:December 18, 2017 11:00
Event End:December 23, 2017 11:00
Last Change: Entered 2017-12-15 06:46

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 21:00
Event End:December 17, 2017 23:59
Last Change: Entered 2017-12-14 09:57

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 Lane closure from 00:00 to 11:00 and 2 lane closure from 22:00 to 06:00. Monday-Thursday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 6:00. Friday: 2 lane closure at 00:00. 1 lane reopens at 06:00 and full reopen at 12:00.
Event Start:December 17, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-14 09:57

Top of page Top of page


HWY 400 Southbound [ MAPLEVIEW DRIVE - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:MAPLEVIEW DRIVE
To:INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from MAPLEVIEW DRIVE EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 19:00, 2 lane closure at 21:00. 1 lane reopen at 5:00, full reopen at 6:00. Friday: 1 lane closure at 19:00, 2 lane closure at 21:00. 1 lane reopen at 8:00, full reopen at 9:00. Saturday: 1 lane closure at 19:00, 2 lane closure at 21:00. 1 lane reopen at 8:00, full reopen at 10:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 5:00, full reopen at 6:00.
Event Start:December 11, 2017 19:00
Event End:December 18, 2017 10:00
Last Change: Entered 2017-12-06 18:58

Top of page Top of page


HWY 400 Southbound [ MAPLEVIEW DRIVE - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:MAPLEVIEW DRIVE
To:INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from MAPLEVIEW DRIVE EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 19:00, 2 lane closure at 21:00. 1 lane reopens at 5:00, full reopen at 6:00.
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-15 06:32

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:PARTRIDGE SKI TRAIL ROAD
To:HWY 11 JCT
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-14 09:54

Top of page Top of page


HWY 400 Southbound [ SIMCOE ROAD 88 - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:SIMCOE ROAD 88
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closed at 20:00 expanding to a 2 lane closure at 22:00. Full reopen at 05:00. Monday-Thursday: 1 lane closed at 11:00 expanding to a 2 lane closure at 19:00. Full reopen at 05:00.
Event Start:December 17, 2017 20:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 19:33

Top of page Top of page


HWY 401 Eastbound [ CATARAQUI RIVER BRIDGE - JOHN F. SCOTT RD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:CATARAQUI RIVER BRIDGE
To:JOHN F. SCOTT RD
Lanes Affected:2 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Two left lanes closed. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 06:29

Top of page Top of page


HWY 401 Eastbound [ GARDINERS RD/ CTY RD 38 (IC 611) - GARDINERS RD/ CTY RD 38 (IC 611) ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:GARDINERS RD/ CTY RD 38 (IC 611)
To:GARDINERS RD/ CTY RD 38 (IC 611)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Lane reductions Hwy 401 E/B & W/B west of Gardiners Rd (Kingston)
Event Start:December 13, 2017 06:00
Event End:December 21, 2017 14:00
Last Change: Entered 2017-12-06 11:45

Top of page Top of page


HWY 401 Eastbound [ GARDINERS RD/ CTY RD 38 (IC 611) - SYDENHAM RD (IC 613) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GARDINERS RD/ CTY RD 38 (IC 611)
To:SYDENHAM RD (IC 613)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Left lane closed. Kingston
Event Start:October 13, 2017 06:00
Event End:December 22, 2017 19:00
Last Change: Entered 2017-12-09 07:21

Top of page Top of page


HWY 401 Eastbound [ GARDINERS RD/ CTY RD 38 (IC 611) - SYDENHAM RD (IC 613) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GARDINERS RD/ CTY RD 38 (IC 611)
To:SYDENHAM RD (IC 613)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Right lane closed. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 06:42

Top of page Top of page


HWY 401 Eastbound [ GARDINERS RD/ CTY RD 38 (IC 611) - SYDENHAM RD (IC 613) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GARDINERS RD/ CTY RD 38 (IC 611)
To:SYDENHAM RD (IC 613)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Left lane closed. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 06:51

Top of page Top of page


HWY 401 Eastbound [ GUELPH LINE - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GUELPH LINE
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 05:00
Last Change: Entered 2017-12-14 07:01

Top of page Top of page


HWY 401 Eastbound [ HWY 25 - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 25
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 25 SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 6:00, full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 05:00
Last Change: Entered 2017-12-14 08:30

Top of page Top of page


HWY 401 Eastbound [ HWY 412 - BROCK ST ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 412
To:BROCK ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 20:30, 2 lane closure at 22:30. 1 lane reopen at 6:00, full reopen at 7:00. Friday: 1 lane closure at 20:30, 2 lane closure at 22:30. 1 lane reopen at 7:00, full reopen at 8:00. Saturday: 1 lane closure at 20:30, 2 lane closure at 22:30. 1 lane reopen at 8:00, full reopen at 10:00. Sunday: 1 lane closure at 20:30, 2 lane closure at 22:00. 1 lane reopen at 6:00, full reopen at 7:00.
Event Start:December 11, 2017 21:00
Event End:December 18, 2017 07:00
Last Change: Entered 2017-12-07 08:11

Top of page Top of page


HWY 401 Eastbound [ Homer Watson Blvd / Fountain St/Red Rd 28 (275KM) - Highway 8 / King Street E/Shantz Hill Rd (278KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Homer Watson Blvd / Fountain St/Red Rd 28 (275KM)
To:Highway 8 / King Street E/Shantz Hill Rd (278KM)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 401 eastbound and westbound between Homer Watson Boulevard and Shantz Hill Road on December 18th to December 19th will have a right lane closure from 0730 hours to 1700 hours daily due to road work.
Event Start:December 18, 2017 07:30
Event End:December 19, 2017 17:00
Last Change: Entered 2017-12-15 14:51

Top of page Top of page


HWY 401 Eastbound [ NASSAGWAEGA ROAD - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:NASSAGWAEGA ROAD
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 05:00
Last Change: Entered 2017-12-14 07:02

Top of page Top of page


HWY 401 Eastbound [ PITT ST - PITT ST ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:PITT ST
To:PITT ST
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Left lane closed Hwy 401 E/B @ Pitt St (Cornwall)
Event Start:December 18, 2017 07:30
Event End:December 22, 2017 16:00
Last Change: Entered 2017-12-14 14:48

Top of page Top of page


HWY 401 Eastbound [ REYNOLDS ROAD - REYNOLDS ROAD ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:REYNOLDS ROAD
To:REYNOLDS ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Right lane closed Hwy 401 E/B west of Reynolds Rd (Gananoque)
Event Start:December 19, 2017 08:00
Event End:December 21, 2017 16:00
Last Change: Entered 2017-12-15 13:43

Top of page Top of page


HWY 401 Eastbound [ SYDENHAM RD (IC 613) - MONTREAL ST (IC 619) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:SYDENHAM RD (IC 613)
To:MONTREAL ST (IC 619)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Alternating nightly lane closures. (Kingston)
Event Start:December 18, 2017 21:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 07:24

Top of page Top of page


HWY 401 Eastbound Collector [ TOMKEN ROAD Collector - RENFORTH DRIVE Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Collector
To:RENFORTH DRIVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun: 1 lane closes at 2100, expanding to 2 lanes at 2300. Full reopen at 0500. Mon-ThU: 1 lane closes at 2200, expanding to 2 lanes at 2300, Full reopen at 0500.
Event Start:December 17, 2017 22:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-14 16:57

Top of page Top of page


HWY 401 Eastbound Express [ TOMKEN ROAD Express - RENFORTH DRIVE Express ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Express
To:RENFORTH DRIVE Express
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :1 lane closes at 2100, expanding to 2 lanes at 2200, expanding to 3 lanes at 2359. Full reopen at 0500.
Event Start:December 17, 2017 21:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-14 17:01

Top of page Top of page


HWY 401 Eastbound Express [ WARDEN AVE Express - KENNEDY ROAD (SCARBOROUGH) Express ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:WARDEN AVE Express
To:KENNEDY ROAD (SCARBOROUGH) Express
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 13:30

Top of page Top of page


HWY 401 Eastbound On-ramp [ COURTICE ROAD Northbound/Southbound - ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:COURTICE ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:June 05, 2017 23:00
Event End:December 05, 2018 05:00
Last Change: Entered 2017-05-30 15:24

Top of page Top of page


HWY 401 Eastbound On-ramp [ SIR JOHN A MACDONALD BLVD (IC 615) Eastbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:SIR JOHN A MACDONALD BLVD (IC 615) Eastbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :HWY 401 eastbound on ramp from Sir John A MacDonald will be closed. (Kingston)
Event Start:December 18, 2017 21:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 07:27

Top of page Top of page


HWY 401 Eastbound Transfer [ MIDLAND AVE Collector to Express - ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:MIDLAND AVE Collector to Express
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 13:31

Top of page Top of page


HWY 401 Westbound [ BROCK ST - BROCK ST ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:BROCK ST
To:BROCK ST
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 23:00
Event End:December 19, 2017 05:00
Last Change: Entered 2017-12-15 14:37

Top of page Top of page


HWY 401 Westbound [ BROCK ST - HENRY ST ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:BROCK ST
To:HENRY ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from BROCK ST SB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 20:00, 2 lane closure at 23:00. 1 lane reopen at 5:00, full reopen at 5:30. Friday: 1 lane closure at 21:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 7:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 23:00. 1 lane reopen at 8:00, full reopen at 9:00. Sunday: 1 lane closure at 21:00, 2 lane closure at 23:00. 1 lane reopen at 5:00, full reopen at 5:30.
Event Start:December 11, 2017 20:00
Event End:December 18, 2017 05:30
Last Change: Entered 2017-12-07 08:20

Top of page Top of page


HWY 401 Westbound [ COURTICE ROAD - COURTICE ROAD ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:COURTICE ROAD
To:COURTICE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:December 18, 2017 10:00
Event End:December 20, 2017 14:00
Last Change: Entered 2017-12-15 15:42

Top of page Top of page


HWY 401 Westbound [ GUELPH LINE - HWY 6 SOUTH ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:GUELPH LINE
To:HWY 6 SOUTH
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 06:00
Last Change: Entered 2017-12-14 07:02

Top of page Top of page


HWY 401 Westbound [ HWY 137 (IC 661) - HWY 137 (IC 661) ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:HWY 137 (IC 661)
To:HWY 137 (IC 661)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Left lane closed Hwy 401 W/B east of Hwy 137 (Gananoque)
Event Start:December 19, 2017 08:00
Event End:December 21, 2017 16:00
Last Change: Entered 2017-12-15 13:50

Top of page Top of page


HWY 401 Westbound [ HWY 25 - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 06:00
Last Change: Entered 2017-12-14 07:00

Top of page Top of page


HWY 401 Westbound [ HWY 25 - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 25 NB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00. Full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 06:00
Last Change: Entered 2017-12-14 08:30

Top of page Top of page


HWY 401 Westbound [ Highway 24 / Hespeler Rd (282KM) - Highway 8 / King Street E/Shantz Hill Rd (278KM) ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:Highway 24 / Hespeler Rd (282KM)
To:Highway 8 / King Street E/Shantz Hill Rd (278KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 401 Westbound from Hespeler Road to Highway 8 will have a left lane closure from December 18th at 2000 hours until December 19th at 0700 hours.
Event Start:December 18, 2017 20:00
Event End:December 19, 2017 07:00
Last Change: Entered 2017-12-16 07:27

Top of page Top of page


HWY 401 Westbound [ JOHN F. SCOTT RD - CATARAQUI RIVER BRIDGE ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:JOHN F. SCOTT RD
To:CATARAQUI RIVER BRIDGE
Lanes Affected:2 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Two left lanes closed. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 06:30

Top of page Top of page


HWY 401 Westbound [ SYDENHAM RD (IC 613) - GARDINERS RD/ CTY RD 38 (IC 611) ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:SYDENHAM RD (IC 613)
To:GARDINERS RD/ CTY RD 38 (IC 611)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Left lane closed. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 06:50

Top of page Top of page


HWY 401 Westbound [ SYDENHAM RD (IC 613) - GARDINERS RD/ CTY RD 38 (IC 611) ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:SYDENHAM RD (IC 613)
To:GARDINERS RD/ CTY RD 38 (IC 611)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Left lane closed. Kingston
Event Start:October 13, 2017 06:00
Event End:December 22, 2017 19:00
Last Change: Entered 2017-12-09 07:18

Top of page Top of page


HWY 401 Westbound [ SYDENHAM RD (IC 613) - GARDINERS RD/ CTY RD 38 (IC 611) ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:SYDENHAM RD (IC 613)
To:GARDINERS RD/ CTY RD 38 (IC 611)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Right lane closed. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 06:41

Top of page Top of page


HWY 401 Westbound [ THICKSON ROAD - THICKSON ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:THICKSON ROAD
To:THICKSON ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 22:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-15 08:49

Top of page Top of page


HWY 401 Westbound [ Wallbridge Loyalist Rd (IC 538) - Aikens Rd ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:Wallbridge Loyalist Rd (IC 538)
To:Aikens Rd
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:December 20, 2017 07:00
Event End:December 20, 2017 12:00
Last Change: Entered 2017-12-15 10:29

Top of page Top of page


HWY 401 Westbound Collector Off-ramp [ - HWY 400/BLACK CREEK DRIVE Southbound ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:HWY 400/BLACK CREEK DRIVE Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 22:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-14 06:55

Top of page Top of page


HWY 401 Westbound Collector [ VICTORIA PARK AVE Collector - HWY 404 Collector ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:VICTORIA PARK AVE Collector
To:HWY 404 Collector
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 404 NB
ReasonConstruction
Comment :
Event Start:December 16, 2017 22:00
Event End:December 17, 2017 08:00
Last Change: Entered 2017-12-14 08:33

Top of page Top of page


HWY 401 Westbound Express [ BRIMLEY ROAD Express - BRIMLEY ROAD Express ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:BRIMLEY ROAD Express
To:BRIMLEY ROAD Express
Lanes Affected:2 Right Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Sunday: 1 lane closure at 22:00, 2 lane closure at 23:59. Full reopen at 5:00. No two consecutive on/off ramps or transfers will be closed simultaneously.
Event Start:December 17, 2017 22:00
Event End:December 18, 2017 05:00
Last Change: Entered 2017-12-13 16:01

Top of page Top of page


HWY 401 Westbound Express [ RENFORTH DRIVE Express - DIXIE ROAD Express ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:RENFORTH DRIVE Express
To:DIXIE ROAD Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closes at 2100, expanding to 2 lanes at 2300. 1 lane reopens at 0500, full reopen at 0530.
Event Start:December 17, 2017 21:00
Event End:December 22, 2017 05:30
Last Change: Entered 2017-12-14 17:07

Top of page Top of page


HWY 401 Westbound Off-ramp [ - BENNETT ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:BENNETT ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:02

Top of page Top of page


HWY 401 Westbound Off-ramp [ - COURTICE ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:COURTICE ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:21

Top of page Top of page


HWY 401 Westbound Off-ramp [ - HARMONY ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:HARMONY ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:14

Top of page Top of page


HWY 401 Westbound Off-ramp [ - LIBERTY ST Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:LIBERTY ST Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:07

Top of page Top of page


HWY 401 Westbound Off-ramp [ - RITSON ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:RITSON ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:18

Top of page Top of page


HWY 401 Westbound Off-ramp [ - STEVENSON ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:STEVENSON ROAD Northbound/Southbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 22:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:24

Top of page Top of page


HWY 401 Westbound Off-ramp [ - WAVERLY ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:WAVERLY ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:12

Top of page Top of page


HWY 401 Westbound On-ramp [ BENNETT ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:BENNETT ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:05

Top of page Top of page


HWY 401 Westbound On-ramp [ BROCK ROAD Northbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:BROCK ROAD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 23:59
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-15 08:46

Top of page Top of page


HWY 401 Westbound On-ramp [ COURTICE ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:COURTICE ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:23

Top of page Top of page


HWY 401 Westbound On-ramp [ HARMONY ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:HARMONY ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:16

Top of page Top of page


HWY 401 Westbound On-ramp [ HOLT ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:HOLT ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:19

Top of page Top of page


HWY 401 Westbound On-ramp [ LIBERTY ST Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:LIBERTY ST Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:08

Top of page Top of page


HWY 401 Westbound On-ramp [ RITSON ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:RITSON ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:19

Top of page Top of page


HWY 401 Westbound On-ramp [ SIMCOE ST Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:SIMCOE ST Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:22

Top of page Top of page


HWY 401 Westbound On-ramp [ STEVENSON ROAD Northbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:STEVENSON ROAD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:25

Top of page Top of page


HWY 401 Westbound On-ramp [ STEVENSON ROAD Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:STEVENSON ROAD Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:27

Top of page Top of page


HWY 401 Westbound On-ramp [ WAVERLY ROAD Northbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:WAVERLY ROAD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:16

Top of page Top of page


HWY 401 Westbound On-ramp [ WAVERLY ROAD Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:WAVERLY ROAD Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:13

Top of page Top of page


HWY 403 HAMILTON Westbound [ YORK BLVD - YORK BLVD ] - Recurring-Construction
Highway:HWY 403 HAMILTON
Direction:Westbound
From/At:YORK BLVD
To:YORK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to YORK BLVD EB
ReasonRecurring-Construction
Comment :1 lane closes at 2200, expanding to 2 lanes at 2300. 1 lane reopens at 0500, full reopen at 0600.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 07:00
Last Change: Entered 2017-12-15 06:37

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ EGLINTON AVE Collector - MATHESON BLVD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:EGLINTON AVE Collector
To:MATHESON BLVD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from EGLINTON AVE EB, On-ramp from EGLINTON AVE WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:December 17, 2017 22:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:45

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ ERIN MILLS PKWY Collector - MAVIS ROAD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:ERIN MILLS PKWY Collector
To:MAVIS ROAD Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 22:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-14 17:24

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ HWY 407 ETR Collector - ERIN MILLS PKWY Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:HWY 407 ETR Collector
To:ERIN MILLS PKWY Collector
Lanes Affected:3 Left(with HOV) Lane(s)
Traffic Impact :On-ramp from WINSTON CHURCHILL BLVD NB, On-ramp from WINSTON CHURCHILL BLVD SB, Off-ramp to WINSTON CHURCHILL BLVD NB/SB
ReasonRecurring-Construction
Comment :Sun-Thu: HOV lane closes at 2000, expanding to 2 lanes at 2200, expanding to 3 lanes at 0100. 1 lane reopens at 0400, full reopen at 0500.
Event Start:December 17, 2017 20:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-14 17:12

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ ERIN MILLS PKWY Collector - HWY 407 ETR Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:ERIN MILLS PKWY Collector
To:HWY 407 ETR Collector
Lanes Affected:3 Left(with HOV) Lane(s)
Traffic Impact :On-ramp from WINSTON CHURCHILL BLVD NB, On-ramp from WINSTON CHURCHILL BLVD SB, Off-ramp to WINSTON CHURCHILL BLVD NB/SB
ReasonRecurring-Construction
Comment :Sun-Thu: HOV closes at 2000, expanding to 2 lanes at 2300, expanding to 3 lanes at 0100. 1 lane reopens at 0400. Full reopen at 0600.
Event Start:December 17, 2017 20:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-14 17:08

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MATHESON BLVD Collector - HURONTARIO STREET Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MATHESON BLVD Collector
To:HURONTARIO STREET Collector
Lanes Affected:3 Right Lane(s)
Traffic Impact :On-ramp from EASTGATE DRIVE NB/SB
ReasonRecurring-Construction
Comment :1 lane closes at 2300, expanding to 2 lanes at 2359, expanding to 3 lanes at 0100. 1 lane reopens at 0400, 2 lanes reopen at 0530, full reopen at 0600.
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-14 17:21

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MATHESON BLVD Collector - HURONTARIO STREET Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MATHESON BLVD Collector
To:HURONTARIO STREET Collector
Lanes Affected:1 Left(with HOV) Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 20:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-14 17:14

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MAVIS ROAD Collector - ERIN MILLS PKWY Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MAVIS ROAD Collector
To:ERIN MILLS PKWY Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-14 17:25

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Off-ramp [ - ERIN MILLS PKWY Northbound ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:
To:ERIN MILLS PKWY Northbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 11, 2017 10:00
Event End:December 22, 2017 15:00
Last Change: Entered 2017-11-30 11:09

Top of page Top of page


HWY 404 Northbound [ MAJOR MACKENZIE DRIVE - STOUFFVILLE ROAD ] - Recurring-Engineering Investigation
Highway:HWY 404
Direction:Northbound
From/At:MAJOR MACKENZIE DRIVE
To:STOUFFVILLE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to ELGIN MILLS ROAD EB/WB, Off-ramp to STOUFFVILLE ROAD EB/WB, On-ramp from MAJOR MACKENZIE DRIVE EB/WB, On-ramp from ELGIN MILLS ROAD EB/WB, On-ramp from STOUFFVILLE ROAD EB/WB, Off-ramp to MAJOR MACKENZIE DRIVE EB/WB
ReasonRecurring-Engineering Investigation
Comment :Sunday: 1 lane closure at 23:00. Full reopen at 6:00. Monday-Thursday: 1 lane closure at 22:00. Full reopen at 6:00. Friday: 1 lane closure at 23:59. Full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 08:00
Last Change: Entered 2017-12-13 18:40

Top of page Top of page


HWY 404 Southbound [ STOUFFVILLE ROAD - MAJOR MACKENZIE DRIVE ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:STOUFFVILLE ROAD
To:MAJOR MACKENZIE DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from STOUFFVILLE ROAD EB/WB, On-ramp from ELGIN MILLS ROAD EB/WB, On-ramp from MAJOR MACKENZIE DRIVE EB/WB, Off-ramp to STOUFFVILLE ROAD EB/WB, Off-ramp to ELGIN MILLS ROAD EB/WB, Off-ramp to MAJOR MACKENZIE DRIVE EB/WB
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 18:44

Top of page Top of page


HWY 406 Northbound [ GIBSON LAKE BRIDGE - GLENDALE AVE ] - Recurring-Construction
Highway:HWY 406
Direction:Northbound
From/At:GIBSON LAKE BRIDGE
To:GLENDALE AVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 00:00
Event End:December 23, 2017 00:00
Last Change: Entered 2017-12-13 16:52

Top of page Top of page


HWY 406 Northbound Off-ramp [ - HWY 58 Southbound ] - Recurring-Construction
Highway:HWY 406
Direction:Northbound
From/At:
To:HWY 58 Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 06:00
Last Change: Entered 2017-12-13 17:08

Top of page Top of page


HWY 406 Northbound Off-ramp [ - ST DAVID'S ROAD Westbound ] - Construction
Highway:HWY 406
Direction:Northbound
From/At:
To:ST DAVID'S ROAD Westbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Permanently closed until December 22, 2017.
Event Start:November 18, 2017 00:00
Event End:December 22, 2017 23:59
Last Change: Entered 2017-11-16 11:06

Top of page Top of page


HWY 406 Southbound [ GLENDALE AVE - BEAVERDAMS ROAD ] - Recurring-Construction
Highway:HWY 406
Direction:Southbound
From/At:GLENDALE AVE
To:BEAVERDAMS ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 00:00
Event End:December 23, 2017 00:00
Last Change: Entered 2017-12-13 16:23

Top of page Top of page


HWY 407 ETR Eastbound [ RITSON RD N - HARMONY RD N ] - Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:RITSON RD N
To:HARMONY RD N
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 21, 2017 15:00
Event End:January 02, 2018 12:00
Last Change: Entered 2017-11-16 13:25

Top of page Top of page


HWY 410 Northbound [ CLARK BLVD - QUEEN STREET/S JCT HWY 7 ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:CLARK BLVD
To:QUEEN STREET/S JCT HWY 7
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 6:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-13 15:46

Top of page Top of page


HWY 410 Northbound [ COURTNEY PARK DRIVE - DERRY ROAD ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:COURTNEY PARK DRIVE
To:DERRY ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to DERRY ROAD EB/WB, Off-ramp to COURTNEY PARK DRIVE EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:54

Top of page Top of page


HWY 410 Northbound [ DERRY ROAD - STEELES AVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:DERRY ROAD
To:STEELES AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from DERRY ROAD EB, On-ramp from DERRY ROAD EB/WB, On-ramp from DERRY ROAD WB, Off-ramp to STEELES AVE EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:48

Top of page Top of page


HWY 410 Northbound [ HWY 401 - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401
To:COURTNEY PARK DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to COURTNEY PARK DRIVE EB/WB
ReasonRecurring-Construction
Comment :Sunday to Thursday: 2 lane closure at 23:59. Full reopen at 05:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:55

Top of page Top of page


HWY 410 Northbound [ STEELES AVE - CLARK BLVD ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:STEELES AVE
To:CLARK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to CLARK BLVD EB/WB
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00, 2 lane closure at 23:59. Full reopen at 06:00. Monday-Wednesday: 2 lane closure at 23:00. Full reopen at 06:00. Thursday: 2 lane closure at 23:00. 1 lane reopen at 05:00, full reopen at 06:00.
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-13 15:47

Top of page Top of page


HWY 410 Southbound [ CLARK BLVD - STEELES AVE ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:CLARK BLVD
To:STEELES AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to STEELES AVE EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:39

Top of page Top of page


HWY 410 Southbound [ COURTNEY PARK DRIVE - HWY 401 ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:COURTNEY PARK DRIVE
To:HWY 401
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00, 2 lane closure at 23.59. Full reopen at 05:00. Monday-Thursday: 2 lane closure at 23:00. Full reopen at 05:00.
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:43

Top of page Top of page


HWY 410 Southbound [ DERRY ROAD - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:DERRY ROAD
To:COURTNEY PARK DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from DERRY ROAD EB, On-ramp from COURTNEY PARK DRIVE EB/WB, On-ramp from DERRY ROAD WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:42

Top of page Top of page


HWY 410 Southbound [ QUEEN STREET/S JCT HWY 7 - CLARK BLVD ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:QUEEN STREET/S JCT HWY 7
To:CLARK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from CLARK BLVD EB/WB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59 and full reopen at 05:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:38

Top of page Top of page


HWY 410 Southbound [ STEELES AVE - DERRY ROAD ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:STEELES AVE
To:DERRY ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to DERRY ROAD EB/WB
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00, 2 lane closure at 23:59. Full reopen at 05:00. Monday-Thursday: 2 lane closure at 23:00. Full reopen at 05:00.
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:41

Top of page Top of page


HWY 417 Eastbound [ ST. ALBERT RD (IC 66) - DUNVEGAN RD ] - Recurring-Engineering Investigation
Highway:HWY 417
Direction:Eastbound
From/At:ST. ALBERT RD (IC 66)
To:DUNVEGAN RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Left lane closures Hwy 417 E/B & W/B btwn St. Albert Rd and Dunvegan Rd (Cassleman)
Event Start:December 18, 2017 08:00
Event End:December 21, 2017 16:00
Last Change: Entered 2017-12-06 10:38

Top of page Top of page


HWY 420 Westbound Off-ramp [ - QEW Northbound ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:
To:QEW Northbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 18, 2017 00:00
Event End:April 30, 2018 23:59
Last Change: Entered 2017-11-17 09:10

Top of page Top of page


HWY 420 Westbound On-ramp [ DORCHESTER ROAD/LUNDY'S LANE Westbound - ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:DORCHESTER ROAD/LUNDY'S LANE Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 18, 2017 00:00
Event End:April 30, 2018 23:59
Last Change: Entered 2017-11-17 09:13

Top of page Top of page


HWY 427 Northbound [ FINCH AVENUE - HWY 7 ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:FINCH AVENUE
To:HWY 7
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 22:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-15 11:51

Top of page Top of page


HWY 427 Southbound [ HWY 7 - FINCH AVENUE ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:HWY 7
To:FINCH AVENUE
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 22:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-15 11:50

Top of page Top of page


HWY 6 Northbound [ Grey Road 17 - Grey Road 17 ] - Recurring-Construction
Highway:HWY 6
Direction:Northbound
From/At:Grey Road 17
To:Grey Road 17
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:October 02, 2017 07:00
Event End:November 06, 2018 19:00
Last Change: Entered 2017-09-29 16:29

Top of page Top of page


HWY 6 Northbound [ King Street / Haldimand Road 20 - Mississauga Road / Haldimand 1st Line ] - Recurring-Construction
Highway:HWY 6
Direction:Northbound
From/At:King Street / Haldimand Road 20
To:Mississauga Road / Haldimand 1st Line
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 6 (northbound and southbound) from the north limit of Hagersville to 0.3 kilometres north of First Line will be having alternating daily lane restrictions as required with use of flagmen and/or temporary traffic signals. Project duration is July 4, 2017 to December 2017, Lane restrictions are permitted Monday to Friday 00:00 hours to 16:00 hours and 18:00 hours to 24:00 hours (no night work is currently scheduled).
Event Start:July 10, 2017 00:00
Event End:December 31, 2017 23:59
Last Change: Entered 2017-07-10 10:49

Top of page Top of page


HWY 9 Westbound [ WEST CANAL BANK ROAD - KING TWP CONCESSION 8 ] - Recurring-Construction
Highway:HWY 9
Direction:Westbound
From/At:WEST CANAL BANK ROAD
To:KING TWP CONCESSION 8
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 07:00
Last Change: Entered 2017-12-15 08:38

Top of page Top of page


QEW Fort Erie Bound [ DORVAL DRIVE - DORVAL DRIVE ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:DORVAL DRIVE
To:DORVAL DRIVE
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-14 10:04

Top of page Top of page


QEW Fort Erie Bound [ MCLEOD ROAD - MCLEOD ROAD ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:MCLEOD ROAD
To:MCLEOD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from MCLEOD ROAD WB, Off-ramp to MCLEOD ROAD EB/WB
ReasonRecurring-Construction
Comment :
Event Start:December 13, 2017 20:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-12 20:03

Top of page Top of page


QEW Fort Erie Bound [ NORTHSHORE BLVD/HWY 2 - BURLINGTON SKYWAY ] - Recurring-Maintenance
Highway:QEW
Direction:Fort Erie Bound
From/At:NORTHSHORE BLVD/HWY 2
To:BURLINGTON SKYWAY
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from NORTHSHORE BLVD/HWY 2 EB/WB
ReasonRecurring-Maintenance
Comment :
Event Start:December 17, 2017 21:00
Event End:December 23, 2017 06:00
Last Change: Entered 2017-12-13 13:49

Top of page Top of page


QEW Fort Erie Bound On-ramp [ FAIRVIEW STREET/PLAINS ROAD Westbound - ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:FAIRVIEW STREET/PLAINS ROAD Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:December 15, 2017 23:59
Event End:December 20, 2017 05:00
Last Change: Entered 2017-12-09 06:56

Top of page Top of page


QEW Toronto bound [ HWY 420 - HWY 420 ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:HWY 420
To:HWY 420
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:December 12, 2017 00:00
Event End:December 22, 2017 23:59
Last Change: Entered 2017-12-08 16:10

Top of page Top of page


QEW Toronto bound [ MCLEOD ROAD - MCLEOD ROAD ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:MCLEOD ROAD
To:MCLEOD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from MCLEOD ROAD WB, Off-ramp to MCLEOD ROAD EB/WB
ReasonRecurring-Construction
Comment :
Event Start:December 13, 2017 20:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-12 20:00

Top of page Top of page


QEW Toronto bound [ THOMPSON ROAD - THOMPSON ROAD ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:THOMPSON ROAD
To:THOMPSON ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to THOMPSON ROAD SB
ReasonRecurring-Construction
Comment :
Event Start:December 13, 2017 14:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-12 20:06

Top of page Top of page


HWY 401 Eastbound Express [ McCOWAN ROAD - ] - Vehicle Fire
Highway:HWY 401
Direction:Eastbound
From/At:McCOWAN ROAD
To:
Lanes Affected:2 right lanes blocked
Traffic Impact :
ReasonVehicle Fire
Comment :
Event Start:December 17, 2017 05:42
Event End:
Last Change: Updated 2017-12-17 05:52

Top of page Top of page


HWY 401 Eastbound Transfer [ McCowan Express to Collector - ] - Vehicle Fire
Highway:HWY 401
Direction:Eastbound
From/At:McCowan Express to Collector
To:
Lanes Affected:All lanes blocked
Traffic Impact :
ReasonVehicle Fire
Comment :
Event Start:December 17, 2017 05:50
Event End:
Last Change: Entered 2017-12-17 05:50

Top of page Top of page


HWY 403 HAMILTON Eastbound [ WILSON STREET - ] - Collision
Highway:HWY 403 HAMILTON
Direction:Eastbound
From/At:WILSON STREET
To:
Lanes Affected:left lane blocked
Traffic Impact :
ReasonCollision
Comment :
Event Start:December 17, 2017 06:38
Event End:
Last Change: Entered 2017-12-17 06:38

Top of page Top of page


HWY 417 Eastbound On-ramp [ LEES AVE - ] - Disabled Vehicle
Highway:HWY 417
Direction:Eastbound
From/At:LEES AVE
To:
Lanes Affected:right lane and right shoulder blocked
Traffic Impact :
ReasonDisabled Vehicle
Comment :
Event Start:December 17, 2017 06:25
Event End:
Last Change: Entered 2017-12-17 06:25

Top of page Top of page


HWY 537 Southbound [ CROSS RD-CLELAND TWP - S JCT ST CLOUD RD-CLELAND TWP ] - Flooding
Highway:HWY 537
Direction:Southbound
From/At:CROSS RD-CLELAND TWP
To:S JCT ST CLOUD RD-CLELAND TWP
Lanes Affected: lane and Southbound shoulder blocked
Traffic Impact :
ReasonFlooding
Comment :HWY 537 REDUCED TO SINGLE LANE IN WAHNAPITAE FROM CROSS RD TO ST.CLOUD RD - JUMBO CREEK - UPDATED DECEMBER 16TH AT 2345 HRS
Event Start:November 16, 2017 13:16
Event End:
Last Change: Updated 2017-12-16 23:44

Top of page Top of page


This information is provided as a public service. Although we endeavor to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.

Road information by phone

  • Provincial Call Centre: 1-800-268-4686
  • In GTA: 416-235-4686
  • Provincial TTY: 1-866-471-8929
  • Niagara Region TTY: 905-704-2426

See also:

Ontario 511 Logo