Unscheduled road closures and events for provincial highways:

Unscheduled Events

HWY 10 Southbound [ 15 Sideroad / County Road 8 (Mono Centre Road) - 4th Ave ] - Recurring-Construction
Highway:HWY 10
Direction:Southbound
From/At:15 Sideroad / County Road 8 (Mono Centre Road)
To:4th Ave
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 10 northbound alternating southbound, between Mono Sideroad 15 and 4th Avenue, Camilla / Orangeville, at various locations, reduced to a single lane of traffic, Monday, November 20th, 2017 until Friday, November 24th, 2017, daily, from 0000 hours until 1700 hours, for construction work operations, weather permitting.
Event Start:November 20, 2017 00:00
Event End:November 24, 2017 17:00
Last Change: Entered 2017-11-17 18:09

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure from 00:00 to 23:59. Monday: 1 lane closure from 17:00 to 15:00 the next day. Tuesday to Wednesday: 1 lane closure from 19:00 to 15:00 the next day. Thursday: 1 lane from 19:00 to 12:00 the next day. Friday: 1 lane from 21:00 to 10:00 the next day. Saturday: 1 lane from 17:00 to 23:59 the next day.
Event Start:November 12, 2017 00:00
Event End:November 18, 2017 23:59
Last Change: Entered 2017-11-08 15:35

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-15 15:38

Top of page Top of page


HWY 11 Northbound [ LINE 11 - LINE 11 ] - Recurring-Maintenance
Highway:HWY 11
Direction:Northbound
From/At:LINE 11
To:LINE 11
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 09:00
Event End:November 23, 2017 15:00
Last Change: Entered 2017-11-15 10:34

Top of page Top of page


HWY 11 Northbound [ LINE 9 - LINE 9 ] - Recurring-Maintenance
Highway:HWY 11
Direction:Northbound
From/At:LINE 9
To:LINE 9
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 09:00
Event End:November 23, 2017 15:00
Last Change: Entered 2017-11-15 10:32

Top of page Top of page


HWY 11 Northbound [ SHOREVIEW DRIVE - SIMCOE ROAD 169 ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:SHOREVIEW DRIVE
To:SIMCOE ROAD 169
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from TRENT CANAL BRIDGE/SEVERN RIVER NB/SB, Off-ramp to SIMCOE ROAD 169 NB/SB, Off-ramp to TRENT CANAL BRIDGE/SEVERN RIVER NB/SB, On-ramp from TRENT CANAL BRIDGE/SEVERN RIVER NB/SB, Off-ramp to SIMCOE ROAD 169 NB/SB, Off-ramp to TRENT CANAL BRIDGE/SEVERN RIVER NB/SB
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 00:00
Event End:November 19, 2017 23:59
Last Change: Entered 2017-11-08 16:49

Top of page Top of page


HWY 11 Northbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - TOWNLINE ROAD 12-13 ] - Recurring-Maintenance
Highway:HWY 11
Direction:Northbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:TOWNLINE ROAD 12-13
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-15 10:49

Top of page Top of page


HWY 11 Southbound [ LINE 11 - LINE 11 ] - Recurring-Maintenance
Highway:HWY 11
Direction:Southbound
From/At:LINE 11
To:LINE 11
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 09:00
Event End:November 23, 2017 15:00
Last Change: Entered 2017-11-15 10:35

Top of page Top of page


HWY 11 Southbound [ LINE 9 - LINE 9 ] - Recurring-Maintenance
Highway:HWY 11
Direction:Southbound
From/At:LINE 9
To:LINE 9
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 09:00
Event End:November 23, 2017 15:00
Last Change: Entered 2017-11-15 10:33

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 169 - SHOREVIEW DRIVE ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 169
To:SHOREVIEW DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from SIMCOE ROAD 169 NB/SB, On-ramp from SIMCOE ROAD 169 NB/SB
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 00:00
Event End:November 19, 2017 23:59
Last Change: Entered 2017-11-08 16:42

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 169 - SHOREVIEW DRIVE ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 169
To:SHOREVIEW DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from SIMCOE ROAD 169 NB/SB, On-ramp from SIMCOE ROAD 169 NB/SB
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 00:00
Event End:November 26, 2017 23:59
Last Change: Entered 2017-11-17 16:43

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure from 22:00 to 23:59. Monday to Thursday: 1 lane closure from 00:00 to 23:59. Friday: 1 lane closure from 18:00 to 10:00 the next day . Saturday: 1 lane closure from 15:00 to 10:00 the next day
Event Start:November 12, 2017 00:00
Event End:November 18, 2017 23:59
Last Change: Entered 2017-11-08 15:41

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-15 15:43

Top of page Top of page


HWY 11 Southbound [ TOWNLINE ROAD 12-13 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Maintenance
Highway:HWY 11
Direction:Southbound
From/At:TOWNLINE ROAD 12-13
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-15 10:50

Top of page Top of page


HWY 140 Northbound [ EAST MAIN STREET/FARR ROAD - EAST MAIN STREET/FARR ROAD ] - Recurring-Construction
Highway:HWY 140
Direction:Northbound
From/At:EAST MAIN STREET/FARR ROAD
To:EAST MAIN STREET/FARR ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 07:30
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-13 16:42

Top of page Top of page


HWY 140 Southbound [ BUCHNER ROAD - BUCHNER ROAD ] - Recurring-Construction
Highway:HWY 140
Direction:Southbound
From/At:BUCHNER ROAD
To:BUCHNER ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :1 through lane maintained by flagging operation.
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 20:00
Last Change: Entered 2017-11-17 09:00

Top of page Top of page


HWY 140 Southbound [ EAST MAIN STREET/FARR ROAD - EAST MAIN STREET/FARR ROAD ] - Recurring-Construction
Highway:HWY 140
Direction:Southbound
From/At:EAST MAIN STREET/FARR ROAD
To:EAST MAIN STREET/FARR ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 07:30
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-13 16:43

Top of page Top of page


HWY 20 (N.FALLS-ELFR) Eastbound [ HWY 58 - NIAGARA 70 ] - Recurring-Construction
Highway:HWY 20 (N.FALLS-ELFR)
Direction:Eastbound
From/At:HWY 58
To:NIAGARA 70
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 07:30
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-16 10:51

Top of page Top of page


HWY 20 (N.FALLS-ELFR) Westbound [ NIAGARA 70 - HWY 58 ] - Recurring-Construction
Highway:HWY 20 (N.FALLS-ELFR)
Direction:Westbound
From/At:NIAGARA 70
To:HWY 58
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 07:30
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-16 10:51

Top of page Top of page


HWY 21 Northbound [ County Road 10 North / Grey Bruce Line - County Road 10 North / Grey Bruce Line ] - Construction
Highway:HWY 21
Direction:Northbound
From/At:County Road 10 North / Grey Bruce Line
To:County Road 10 North / Grey Bruce Line
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 21, at Bruce Road 10 (Grey/Bruce Line), alternating directions, roundabout, Alvanley, various lane closures, Monday, November 20th, 2017, from 0800 hours until 1700 hours, for construction work operations, traffic control provided by flag persons, weather permitting and advanced signing in place.
Event Start:November 20, 2017 08:00
Event End:November 20, 2017 17:00
Last Change: Entered 2017-11-17 16:54

Top of page Top of page


HWY 21 Northbound [ Sararas Road - Stanley Boulevard ] - Recurring-Construction
Highway:HWY 21
Direction:Northbound
From/At:Sararas Road
To:Stanley Boulevard
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 21 Northbound and Southbound from Stanley Boulevard to Sararas Road will have alternating lane closures from November 20th at 0630 hours until November 24th at 1900 hours.
Event Start:November 20, 2017 06:30
Event End:November 24, 2017 19:00
Last Change: Entered 2017-11-17 14:11

Top of page Top of page


HWY 23 Northbound [ Perth Line 72 / County Road 72 - Fisher Ave ] - Recurring-Construction
Highway:HWY 23
Direction:Northbound
From/At:Perth Line 72 / County Road 72
To:Fisher Ave
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 23 between County Road 72 and Fisher Avenue will have temporary traffic lights regulating traffic for a single lane closure in alternating directions. Lights will run 24 hours a day from November 13th to November 19th.
Event Start:November 13, 2017 07:00
Event End:November 19, 2017 07:00
Last Change: Entered 2017-11-10 19:33

Top of page Top of page


HWY 23 Southbound [ Line 66 - Line 66 ] - Recurring-Construction
Highway:HWY 23
Direction:Southbound
From/At: Line 66
To: Line 66
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 23 southbound just north of Line 66 will have a left lane closure daily from July 24th to November 24th at 0200 hours to 1700 hours daily due to construction.
Event Start:July 24, 2017 02:00
Event End:November 24, 2017 17:00
Last Change: Entered 2017-07-24 15:09

Top of page Top of page


HWY 26 Eastbound [ SIDE ROAD 3-4 (SUNNYDALE) - SUNNIDALE CORNERS ] - Engineering Investigation
Highway:HWY 26
Direction:Eastbound
From/At:SIDE ROAD 3-4 (SUNNYDALE)
To:SUNNIDALE CORNERS
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonEngineering Investigation
Comment :1 through lane maintained by flagging operations.
Event Start:November 20, 2017 08:00
Event End:November 21, 2017 16:00
Last Change: Entered 2017-11-09 11:51

Top of page Top of page


HWY 26 Eastbound [ SUNNIDALE CORNERS - SUNNIDALE CORNERS ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:SUNNIDALE CORNERS
To:SUNNIDALE CORNERS
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mono-Thu: 1 lane closed 0700-1900. Fri: 1 lane closed 0700-1500. Sat: 1 lane closed 0700-1200.
Event Start:November 20, 2017 07:00
Event End:November 25, 2017 12:00
Last Change: Entered 2017-11-15 08:31

Top of page Top of page


HWY 26 Eastbound [ SUNNIDALE CORNERS - SUNNIDALE CORNERS ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:SUNNIDALE CORNERS
To:SUNNIDALE CORNERS
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 13, 2017 07:00
Event End:November 18, 2017 12:00
Last Change: Entered 2017-11-08 08:27

Top of page Top of page


HWY 26 Eastbound [ SUNNIDALE CORNERS - SUNNIDALE CORNERS ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:SUNNIDALE CORNERS
To:SUNNIDALE CORNERS
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 13, 2017 07:00
Event End:November 18, 2017 12:00
Last Change: Entered 2017-11-08 08:23

Top of page Top of page


HWY 26 Eastbound [ SUNNIDALE CORNERS - SUNNIDALE CORNERS ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:SUNNIDALE CORNERS
To:SUNNIDALE CORNERS
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu: 1 lane closed 0700-1900. Fri: 1 lane closed 0700-1500. Sat: 1 lane closed 0700-1200.
Event Start:November 20, 2017 07:00
Event End:November 25, 2017 12:00
Last Change: Entered 2017-11-15 08:26

Top of page Top of page


HWY 3 Eastbound [ TOWNLINE ROAD - HWY 140/ELIZABETH STREET ] - Recurring-Construction
Highway:HWY 3
Direction:Eastbound
From/At:TOWNLINE ROAD
To:HWY 140/ELIZABETH STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 07:30
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-13 15:50

Top of page Top of page


HWY 3 Westbound [ HWY 140/ELIZABETH STREET - TOWNLINE ROAD ] - Recurring-Construction
Highway:HWY 3
Direction:Westbound
From/At:HWY 140/ELIZABETH STREET
To:TOWNLINE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 07:30
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-13 15:53

Top of page Top of page


HWY 35/115 Northbound [ 3RD ROAD - WILCOX ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:3RD ROAD
To:WILCOX ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 20, 2017 07:00
Event End:November 24, 2017 14:00
Last Change: Entered 2017-11-01 16:28

Top of page Top of page


HWY 35/115 Northbound [ HWY 401 - 3RD ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:HWY 401
To:3RD ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 20, 2017 07:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-01 16:27

Top of page Top of page


HWY 35/115 Southbound [ 3RD ROAD - HWY 401 ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:3RD ROAD
To:HWY 401
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 20, 2017 07:00
Event End:November 24, 2017 17:30
Last Change: Entered 2017-11-01 16:35

Top of page Top of page


HWY 35/115 Southbound [ 3RD ROAD - HWY 401 ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:3RD ROAD
To:HWY 401
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 20, 2017 07:00
Event End:November 24, 2017 17:30
Last Change: Entered 2017-11-14 16:55

Top of page Top of page


HWY 35/115 Southbound [ WILCOX ROAD - 3RD ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:WILCOX ROAD
To:3RD ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 20, 2017 07:00
Event End:November 24, 2017 17:30
Last Change: Entered 2017-11-01 16:33

Top of page Top of page


HWY 400 Northbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Wednesday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 7:00, full reopen at 10:00. Thursday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 7:00, full reopen at 9:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 7:00, full reopen at 8:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 23:00. 1 lane reopen at 9:00, full reopen at 10:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 21:00. 1 lane reopen at 7:00, full reopen at 10:00.
Event Start:November 13, 2017 20:00
Event End:November 20, 2017 10:00
Last Change: Entered 2017-11-08 07:46

Top of page Top of page


HWY 400 Northbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Wednesday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 7:00, full reopen at 10:00. Thursday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 7:00, full reopen at 9:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 7:00, full reopen at 8:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 23:00. 1 lane reopen at 9:00, full reopen at 10:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 21:00. 1 lane reopen at 7:00, full reopen at 10:00.
Event Start:November 20, 2017 20:00
Event End:November 27, 2017 10:00
Last Change: Entered 2017-11-14 08:10

Top of page Top of page


HWY 400 Northbound [ AURORA ROAD. - HWY 9 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:AURORA ROAD.
To:HWY 9
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Monday- Thursday: 1 lane closed at 19:00 expanding to a 2 lane closure at 20:00. 1 lane reopens at 06:00, all lanes reopen at 11:00. Friday: 1 lane closed at 19:00 expanding to a 2 lane closure at 21:00. 1 lane reopens at 08:00, all lanes reopen at 11:00. Saturday: 1 lane closed at 17:00 expanding to a 2 lane closure at 19:00. 1 lane reopens at 10:00, all lanes reopen at 11:00. Sunday: Two lanes closed at 21:00; 1 lane reopens at 06:00, all lanes reopen at 11:00.
Event Start:November 13, 2017 17:00
Event End:November 20, 2017 11:00
Last Change: Entered 2017-11-08 08:18

Top of page Top of page


HWY 400 Northbound [ AURORA ROAD. - HWY 9 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:AURORA ROAD.
To:HWY 9
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Monday- Thursday: 1 lane closed at 19:00 expanding to a 2 lane closure at 20:00. 1 lane reopens at 06:00, all lanes reopen at 11:00. Friday: 1 lane closed at 19:00 expanding to a 2 lane closure at 21:00. 1 lane reopens at 08:00, all lanes reopen at 11:00. Saturday: 1 lane closed at 17:00 expanding to a 2 lane closure at 19:00. 1 lane reopens at 10:00, all lanes reopen at 11:00. Sunday: Two lanes closed at 21:00; 1 lane reopens at 06:00, all lanes reopen at 11:00.
Event Start:November 20, 2017 17:00
Event End:November 27, 2017 11:00
Last Change: Entered 2017-11-14 08:47

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure from 00:00 to 23:59 and two lane closure from 20:00 to 06:00 the next day. Monday to thursday: 1 lane closure from 00:00 to 23:59, and two lane closure from 20:00 to 06:00 the next day. Friday: 1 lane closed from 00:00 to 12:00 and two lane closure from 22:00 to 10:00 the next day. Saturday: 1 lane closed from 00:00 to 23:59 and two lane closure from 22:00 to 10:00 the next day.
Event Start:November 12, 2017 00:00
Event End:November 18, 2017 23:59
Last Change: Entered 2017-11-08 15:19

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 06:00. Monday to Wednesday: 1 lane closure from 00:00 to 23:59, and 2 lane closure from 20:00 to 06:00. Thursday: 1 lane closure from 00:00 to 12:00, 2 lane closure at 20:00 to 06:00. Friday: 1 lane closure from 20:00 to 23:59 and 2 lane closure from 22:00 to 10:00. Saturday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 22:00 to 10:00.
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-15 15:26

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 17, 2017 20:00
Event End:November 17, 2017 23:59
Last Change: Entered 2017-11-08 15:20

Top of page Top of page


HWY 400 Northbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - MAPLEVIEW DRIVE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:INNISFIL BEACH ROAD - SIMCOE ROAD 21
To:MAPLEVIEW DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB, On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 20:00, 2 lane closure at 21:00. Full reopen at 07:00. Friday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 08:00, full reopen at 09:00. Saturday: 1 lane closure at 19:00, 2 lane closure at 22:00. 1 lane reopen at 08:00, full reopen at 10:00. Sunday: 1 lane closure at 19:00, 2 lane closure at 22:00. Full reopen at 07:00.
Event Start:November 13, 2017 20:00
Event End:November 20, 2017 10:00
Last Change: Entered 2017-11-07 12:54

Top of page Top of page


HWY 400 Northbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - MAPLEVIEW DRIVE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:INNISFIL BEACH ROAD - SIMCOE ROAD 21
To:MAPLEVIEW DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 20:00, 2 lane closure at 21:00. Full reopen at 7:00. Friday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 8:00, full reopen at 9:00. Saturday: 1 lane closure at 19:00, 2 lane closure at 22:00. 1 lane reopen at 8:00, full reopen at 10:00. Sunday: 1 lane closure at 19:00, 2 lane closure at 22:00. Full reopen at 7:00.
Event Start:November 20, 2017 19:00
Event End:November 27, 2017 10:00
Last Change: Entered 2017-11-08 07:40

Top of page Top of page


HWY 400 Northbound [ KING ROAD - AURORA ROAD. ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:KING ROAD
To:AURORA ROAD.
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Friday: 1 lane closed at 21:00, 2 lanes closed at 23:59. 1 lane reopened at 07:00, all lanes reopened at 09:00. Saturday: 1 lane closed at 19:00, 2 lanes closed at 23:00. 1 lane reopened at 09:00, all lanes reopened at 11:00. Sunday: 1 lane closed at 20:00, 2 lanes closed at 22:00. 1 lane reopened at 06:00, all lanes reopened at 10:00. Monday: 1 lane closed at 20:00, 2 lanes closed at 23:00. 1 lane reopened at 06:00, all lanes reopened at 10:00. Tuesday- Thursday: 1 lane closed at 21:00, 2 lanes closed at 23:00. 1 lane reopened at 06:00, all lanes reopened at 10:00
Event Start:November 10, 2017 21:00
Event End:November 20, 2017 10:00
Last Change: Entered 2017-11-10 10:59

Top of page Top of page


HWY 400 Northbound [ MAPLEVIEW DRIVE - DUCKWORTH STREET ] - Recurring-Maintenance
Highway:HWY 400
Direction:Northbound
From/At:MAPLEVIEW DRIVE
To:DUCKWORTH STREET
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 00:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 11:09

Top of page Top of page


HWY 400 Northbound [ SHEPPARD AVENUE - FINCH AVENUE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:SHEPPARD AVENUE
To:FINCH AVENUE
Lanes Affected:4 Alternating Lane(s)
Traffic Impact :Off-ramp to FINCH AVENUE NB
ReasonRecurring-Construction
Comment :Wednesday-Thursday: 3 lane closure at 22:00, 4 lane closure at 23:00. 1 lane reopen at 4:00, full reopen at 5:00. Friday: 1 lane closure at 22:00, 3 lane closure at 23:00, 4 lane closure at 1:00. Full reopen at 5:00.
Event Start:November 15, 2017 22:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-03 11:31

Top of page Top of page


HWY 400 Northbound [ SIMCOE ROAD 88 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:SIMCOE ROAD 88
To:HWY 89/SIMCOE ROAD 89
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Wednesday: 2 lane closure at 20:00. 1 lane reopen at 7:00, full reopen at 11:00. Thursday: 2 lane closure at 20:00. 1 lane reopen at 6:00, full reopen at 8:00. Friday: 2 lane closure at 22:00. 1 lane reopen at 8:00, the other lane remains closed. Saturday: 2 lane closure at 21:00. 1 lane reopen at 10:00, the other lane remains closed. Sunday: 2 lane closure at 21:00. 1 lane reopen at 7:00, full reopen at 11:00.
Event Start:November 20, 2017 20:00
Event End:November 27, 2017 11:00
Last Change: Entered 2017-11-14 08:24

Top of page Top of page


HWY 400 Northbound [ SIMCOE ROAD 88 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:SIMCOE ROAD 88
To:HWY 89/SIMCOE ROAD 89
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Wednesday: 2 lane closure at 20:00. 1 lane reopen at 7:00, full reopen at 11:00. Thursday: 2 lane closure at 20:00. 1 lane reopen at 6:00, full reopen at 8:00. Friday: 2 lane closure at 22:00. 1 lane reopen at 8:00, the other lane remains closed. Saturday: 2 lane closure at 21:00. 1 lane reopen at 10:00, the other lane remains closed. Sunday: 2 lane closure at 21:00. 1 lane reopen at 7:00, full reopen at 11:00.
Event Start:November 13, 2017 20:00
Event End:November 20, 2017 11:00
Last Change: Entered 2017-11-08 07:59

Top of page Top of page


HWY 400 Southbound [ 401 - 401 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:401
To:401
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 22:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-16 07:03

Top of page Top of page


HWY 400 Southbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 18:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 2 lane closure at 19:00. 1 lane reopen at 8:00, full reopen at 10:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 21:00. 1 lane reopen at 9:00, full reopen at 10:00. Sunday: 1 lane closure at 21:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:November 20, 2017 18:00
Event End:November 27, 2017 10:00
Last Change: Entered 2017-11-14 08:13

Top of page Top of page


HWY 400 Southbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 18:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 2 lane closure at 19:00. 1 lane reopen at 8:00, full reopen at 10:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 21:00. 1 lane reopen at 9:00, full reopen at 10:00. Sunday: 1 lane closure at 21:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:November 13, 2017 18:00
Event End:November 20, 2017 10:00
Last Change: Entered 2017-11-08 07:49

Top of page Top of page


HWY 400 Southbound [ AURORA ROAD. - KING ROAD ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:AURORA ROAD.
To:KING ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Friday: 1 lane closed at 19:00, 2 lanes closed at 22:00. 1 lane reopened at 07:00, all lanes reopened at 10:00. Saturday: 1 lane closed at 19:00, 2 lanes closed at 21:00, 1 lane reopened at 09:00, all lanes reopened at 11:00. Sunday: 1 lane closed at 21:00, 2 lanes closed at 22:00. All lanes reopened at 05:00. Monday-Thursday: 1 lane closed at 19:00, 2 lanes closed at 21:00. All lanes reopened at 05:00.
Event Start:November 10, 2017 19:00
Event End:November 20, 2017 05:00
Last Change: Entered 2017-11-10 11:09

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - AURORA ROAD. ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:CANAL ROAD.
To:AURORA ROAD.
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 11:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 1 lane closure at 18:00, 2 lane closure at 20:00. 1 lane reopen at 8:00, full reopen at 11:00. Saturday: 1 lane closure at 18:00, 2 lane closure at 20:00. 1 lane reopen at 9:00, full reopen at 11:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:November 20, 2017 11:00
Event End:November 27, 2017 11:00
Last Change: Entered 2017-11-14 08:52

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - AURORA ROAD. ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:CANAL ROAD.
To:AURORA ROAD.
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 11:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 1 lane closure at 18:00, 2 lane closure at 20:00. 1 lane reopen at 8:00, full reopen at 11:00. Saturday: 1 lane closure at 18:00, 2 lane closure at 20:00. 1 lane reopen at 8:00, full reopen at 11:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:November 13, 2017 11:00
Event End:November 20, 2017 11:00
Last Change: Entered 2017-11-08 08:23

Top of page Top of page


HWY 400 Southbound [ DUCKWORTH STREET - MAPLEVIEW DRIVE ] - Recurring-Maintenance
Highway:HWY 400
Direction:Southbound
From/At:DUCKWORTH STREET
To:MAPLEVIEW DRIVE
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 00:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 11:10

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 Lane closure from 00:00 to 11:00 and 2 lane closure from 22:00 to 06:00 the next day. Monday to Thursday: 1 lane closed from 00:00 to 23:59 and 2 lane closure from 20:00 to 6:00 the next day. Friday: 1 Lane closed from 00:00 to 23:59 and 2 lanes closure from 22:00 to 09:00 the next day. Saturday: 1 lane closed from 00:00 to 23:59 and 2 lane closure from 20:00 to 09:00 the next day.
Event Start:November 12, 2017 00:00
Event End:November 18, 2017 23:59
Last Change: Entered 2017-11-08 15:27

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 Lane closure from 00:00 to 23:59 and 2 lane closure from 22:00 to 06:00. Monday to Thursday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 6:00. Friday: 1 Lane closure from 00:00 to 23:59 and 2 lane closure from 22:00 to 09:00. Saturday: 1 lane closure from 00:00 to 11:00 and 2 lane closure from 20:00 to 09:00.
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-15 15:34

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - SIMCOE ROAD 88 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 89/SIMCOE ROAD 89
To:SIMCOE ROAD 88
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 11:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 2 lane closure at 19:00. 1 lane reopen at 7:00, the other lane remains closed. Friday: 2 lane closure at 19:00. Full reopen at 10:00. Sunday: 2 lane closure at 21:00. Full reopen at 5:00.
Event Start:November 20, 2017 11:00
Event End:November 27, 2017 10:00
Last Change: Entered 2017-11-14 08:32

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - SIMCOE ROAD 88 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 89/SIMCOE ROAD 89
To:SIMCOE ROAD 88
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 11:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 2 lane closure at 19:00. 1 lane reopen at 7:00, the other lane remains closed. Friday: 2 lane closure at 19:00. Full reopen at 10:00. Sunday: 2 lane closure at 21:00. Full reopen at 5:00.
Event Start:November 13, 2017 11:00
Event End:November 20, 2017 10:00
Last Change: Entered 2017-11-08 08:07

Top of page Top of page


HWY 400 Southbound [ MAPLEVIEW DRIVE - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:MAPLEVIEW DRIVE
To:INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday; 1 lane closes at 1900, 2nd land closes at 2100. 1 lane opens at 0500, 2nd lane opens at 0600. Friday;1 lane closes at 1900, 2nd land closes at 2100. 1 lane opens at 0800, 2nd lane opens at 0900. Saturday;1 lane closes at 1900, 2nd land closes at 2100. 1 lane opens at 0800, 2nd lane opens at 1000. Sunday;1 lane closes at 2000, 2nd land closes at 2200. 1 lane opens at 0500, 2nd lane opens at 0600.
Event Start:November 20, 2017 19:00
Event End:November 27, 2017 10:00
Last Change: Entered 2017-11-08 07:43

Top of page Top of page


HWY 400 Southbound [ MAPLEVIEW DRIVE - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:MAPLEVIEW DRIVE
To:INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday; 1 lane closes at 1900, 2nd land closes at 2100. 1 lane opens at 0500, 2nd lane opens at 0600. Friday;1 lane closes at 1900, 2nd land closes at 2100. 1 lane opens at 0800, 2nd lane opens at 0900. Saturday;1 lane closes at 1900, 2nd land closes at 2100. 1 lane opens at 0800, 2nd lane opens at 1000. Sunday;1 lane closes at 2000, 2nd land closes at 2200. 1 lane opens at 0500, 2nd lane opens at 0600.
Event Start:November 13, 2017 19:00
Event End:November 20, 2017 10:00
Last Change: Entered 2017-11-07 12:58

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:PARTRIDGE SKI TRAIL ROAD
To:HWY 11 JCT
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday to Saturday: 1 lane closure from 00:00 to 23:59
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-15 15:31

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:PARTRIDGE SKI TRAIL ROAD
To:HWY 11 JCT
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 00:00
Event End:November 18, 2017 23:59
Last Change: Entered 2017-11-08 15:21

Top of page Top of page


HWY 400 Southbound [ SIMCOE ROAD 88 - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:SIMCOE ROAD 88
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closed at 20:00 expanding to a 2 lane closure at 22:00. Full reopen at 05:00. Monday-Thursday: 1 lane closed at 11:00 expanding to a 2 lane closure at 19:00. Full reopen at 05:00. Friday: 1 lane closed at 18:00 expanding to a 2 lane closure at 20:00. 1 lane reopens at 08:00 and full reopen at 10:00
Event Start:November 12, 2017 11:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-08 16:44

Top of page Top of page


HWY 400 Southbound [ SIMCOE ROAD 88 - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:SIMCOE ROAD 88
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closed at 20:00 expanding to a 2 lane closure at 22:00. Full reopen at 05:00. Monday-Thursday: 1 lane closed at 11:00 expanding to a 2 lane closure at 19:00. Full reopen at 05:00. Friday: 1 lane closed at 18:00 expanding to a 2 lane closure at 20:00. 1 lane reopens at 08:00 and full reopen at 10:00
Event Start:November 19, 2017 11:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-08 17:08

Top of page Top of page


HWY 400 Southbound [ STEELES AVENUE - FINCH AVENUE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:STEELES AVENUE
To:FINCH AVENUE
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :Off-ramp to FINCH AVENUE SB
ReasonRecurring-Construction
Comment :Wednesday-Thursday: 2 lane closure at 22:00, 3 lane closure at 23:00. 1 lane reopen at 4:00, full reopen at 5:00. Friday: 2 lane closure at 22:00, 3 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 15, 2017 22:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-03 11:28

Top of page Top of page


HWY 400 Southbound Express [ LANGSTAFF ROAD Express - HIGHWAY 7 Express ] - Construction
Highway:HWY 400
Direction:Southbound
From/At:LANGSTAFF ROAD Express
To:HIGHWAY 7 Express
Lanes Affected:2 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 17, 2017 20:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-15 13:52

Top of page Top of page


HWY 401 Eastbound [ 407ETR - WINSTON CHURCHILL BLVD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:407ETR
To:WINSTON CHURCHILL BLVD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-10 12:06

Top of page Top of page


HWY 401 Eastbound [ CAMDEN EAST RD (IC 593) - CAMDEN EAST RD (IC 593) ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:CAMDEN EAST RD (IC 593)
To:CAMDEN EAST RD (IC 593)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Lane reductions Hwy 401 E/B & W/B @ Camden East Rd (Odessa)
Event Start:November 20, 2017 07:00
Event End:November 21, 2017 16:00
Last Change: Entered 2017-11-10 16:32

Top of page Top of page


HWY 401 Eastbound [ COURTICE ROAD - HOLT ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:COURTICE ROAD
To:HOLT ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 00:00
Event End:November 24, 2017 12:00
Last Change: Entered 2017-11-17 16:16

Top of page Top of page


HWY 401 Eastbound [ COURTICE ROAD - HOLT ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:COURTICE ROAD
To:HOLT ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Expanding closure: Friday: 2 lanes closed at 22:00. 1 lane reopens at 07:00, full reopen at 09:00. Saturday: 1 lane closed at 18:00 expanding to a 2 lane closure at 22:00. 1 lane reopens at 07:00, full reopen at 10:00. Sunday: 1 lane closed at 22:00 expanding to a 2 lane closure at 23:00. 1 lane reopens at 05:00, full reopen at 06:00. Monday to Wednesday: 1 lane closed at 18:00 expanding to a 2 lane closure at 22:00. 1 lane reopens at 05:00, full reopen at 06:00
Event Start:November 17, 2017 18:00
Event End:November 23, 2017 06:00
Last Change: Entered 2017-11-17 15:24

Top of page Top of page


HWY 401 Eastbound [ COURTICE ROAD - HOLT ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:COURTICE ROAD
To:HOLT ROAD
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday, Monday and Tuesday: One lane closed at 1800, two lanes closed at 2200, full closure at 2359, One lane open at 0500, lane two and three open at 0600.
Event Start:November 19, 2017 23:59
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-17 14:41

Top of page Top of page


HWY 401 Eastbound [ CTY RD 32 (IC 645) - CTY RD 32 (IC 645) ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:CTY RD 32 (IC 645)
To:CTY RD 32 (IC 645)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 20, 2017 07:00
Event End:November 20, 2017 16:00
Last Change: Entered 2017-11-17 17:46

Top of page Top of page


HWY 401 Eastbound [ DERRY ROAD - CREDIT RIVER ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:DERRY ROAD
To:CREDIT RIVER
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-10 11:53

Top of page Top of page


HWY 401 Eastbound [ DERRY ROAD - MISSISSAUGA ROAD ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:DERRY ROAD
To:MISSISSAUGA ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to MISSISSAUGA ROAD NB/SB
ReasonRecurring-Engineering Investigation
Comment :Sun-Thu: 1 lane closed 2200-0500. Fri: 1 lane closed 2300-0600.
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 17:53

Top of page Top of page


HWY 401 Eastbound [ FRASER RD - FRASER RD ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:FRASER RD
To:FRASER RD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Summerstown
Event Start:November 13, 2017 07:00
Event End:November 20, 2017 00:00
Last Change: Entered 2017-11-10 13:39

Top of page Top of page


HWY 401 Eastbound [ FRASER RD - FRASER RD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:FRASER RD
To:FRASER RD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Right lane closed Hwy 401 E/B east of Fraser Rd (Summerstown)
Event Start:November 23, 2017 07:00
Event End:November 24, 2017 19:00
Last Change: Entered 2017-11-16 14:25

Top of page Top of page


HWY 401 Eastbound [ GUELPH LINE - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GUELPH LINE
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, all lanes reopen at 8:00.
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-08 07:18

Top of page Top of page


HWY 401 Eastbound [ GUELPH LINE - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GUELPH LINE
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 6:00, all lanes reopen at 8:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 06:08

Top of page Top of page


HWY 401 Eastbound [ HWY 25 - HWY 25 ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 25
To:HWY 25
Lanes Affected:ALL LANES CLOSED
Traffic Impact :On-ramp from HWY 25 NB/SB
ReasonConstruction
Comment :Highway 401 Eastbound at Highway 25 will be fully closed at 19:00. A single lane will be closed starting at 18:30, expanding to two lanes at 18:45. All lanes will be closed at 19:00 on Saturday November 18th and all lanes will reopen at 13:00 on Sunday November 19th, 2017. The on-ramp from Highway 25 to Highway 401 Eastbound will also be closed.
Event Start:November 18, 2017 18:30
Event End:November 19, 2017 13:00
Last Change: Entered 2017-11-06 06:48

Top of page Top of page


HWY 401 Eastbound [ HWY 25 - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 25
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 25 SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 6:00, full reopen at 8:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 06:14

Top of page Top of page


HWY 401 Eastbound [ HWY 25 - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 25
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 25 SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-08 07:24

Top of page Top of page


HWY 401 Eastbound [ HWY 412 - HENRY ST ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 412
To:HENRY ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 06:00, fully open at 07:00. Fri; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 07:00, fully open at 08:00. Sat; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 08:00, fully open at 10:00. Sun; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 06:00, fully open at 07:00
Event Start:November 20, 2017 20:30
Event End:November 27, 2017 07:00
Last Change: Entered 2017-11-14 15:41

Top of page Top of page


HWY 401 Eastbound [ HWY 412 - HENRY ST ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 412
To:HENRY ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 06:00, fully open at 07:00. Fri; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 07:00, fully open at 08:00. Sat; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 08:00, fully open at 10:00. Sun; one lane closed at 20:30, two lanes closed at 22:00. One lane open at 06:00, fully open at 07:00
Event Start:November 27, 2017 20:30
Event End:December 04, 2017 07:00
Last Change: Entered 2017-11-14 16:01

Top of page Top of page


HWY 401 Eastbound [ HWY 412 - HENRY ST ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 412
To:HENRY ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 20:30, 2 lane closure at 22:30. 1 lane reopen at 6:00, full reopen at 7:00. Friday: 1 lane closure at 20:30, 2 lane closure at 22:30. 1 lane reopen at 7:00, full reopen at 8:00. Saturday: 1 lane closure at 20:30, 2 lane closure at 22:30. 1 lane reopen at 8:00, full reopen at 10:00. Sunday: 1 lane closure at 20:30, 2 lane closure at 22:00. 1 lane reopen at 6:00, full reopen at 7:00.
Event Start:November 13, 2017 20:30
Event End:November 20, 2017 07:00
Last Change: Entered 2017-11-09 07:41

Top of page Top of page


HWY 401 Eastbound [ JAMES SNOW PKWY - SIXTH LINE ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JAMES SNOW PKWY
To:SIXTH LINE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-10 12:24

Top of page Top of page


HWY 401 Eastbound [ JAMES SNOW PKWY - TRAFALGAR ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JAMES SNOW PKWY
To:TRAFALGAR ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. All lanes reopen at 05:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 06:00, full reopen at 08:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 06:12

Top of page Top of page


HWY 401 Eastbound [ JAMES SNOW PKWY - TRAFALGAR ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JAMES SNOW PKWY
To:TRAFALGAR ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lanes closure at 23:00. All lanes reopen at 05:00. Friday: 1 lane closure at 22:00, 2 lanes closure at 23:00. 1 lane reopens at 06:00, all lanes reopen at 08:00.
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-08 07:22

Top of page Top of page


HWY 401 Eastbound [ MISSISSAUGA ROAD - CREDIT RIVER ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:MISSISSAUGA ROAD
To:CREDIT RIVER
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Mon-Thu: 1 lane closed 2200-0500. Fri: 1 lane closed 2300-0600. Sat: 1 lane closed 2200-0600.
Event Start:November 05, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-02 16:34

Top of page Top of page


HWY 401 Eastbound [ Mill Street (56KM) - Bloomfield Road (81KM) ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:Mill Street (56KM)
To:Bloomfield Road (81KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 401 Eastbound and Westbound from Essex Road 42 to Bloomfield Road will have left lane closures from November 1st at 2200 hours until further notice
Event Start:November 01, 2017 22:00
Event End:December 01, 2017 07:00
Last Change: Entered 2017-11-01 12:13

Top of page Top of page


HWY 401 Eastbound [ NASSAGWAEGA ROAD - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:NASSAGWAEGA ROAD
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 6:00, all lanes reopen at 8:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 06:09

Top of page Top of page


HWY 401 Eastbound [ NASSAGWAEGA ROAD - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:NASSAGWAEGA ROAD
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, all lanes reopen at 8:00.
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-08 07:19

Top of page Top of page


HWY 401 Eastbound [ RENFORTH DRIVE - HWY 427 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:RENFORTH DRIVE
To:HWY 427
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :Off-ramp to EGLINTON AVE EB
ReasonRecurring-Construction
Comment :Alternating 3 of 4 lane closure on HWY401 EB collectors between Renforth and HWY427 on Sunday. First lane (22:00-06:00, second (22:00-05:00), and third (23:59-05:00). Eglinton EB off-ramp also closed.
Event Start:November 19, 2017 22:00
Event End:November 20, 2017 06:00
Last Change: Entered 2017-11-16 06:52

Top of page Top of page


HWY 401 Eastbound [ SD&G RD 2 & 34 (IC 814) - SD&G RD 2 & 34 (IC 814) ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:SD&G RD 2 & 34 (IC 814)
To:SD&G RD 2 & 34 (IC 814)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Lane reductions Hwy 401 E/B & W/B @ Cty Rd 2&34 (Lancaster)
Event Start:November 13, 2017 08:00
Event End:November 21, 2017 17:00
Last Change: Entered 2017-10-31 07:39

Top of page Top of page


HWY 401 Eastbound [ Tilbury South OnRoute/Eastbound service centre (61 km) - Tilbury South OnRoute/Eastbound service centre (61 km) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Tilbury South OnRoute/Eastbound service centre (61 km)
To:Tilbury South OnRoute/Eastbound service centre (61 km)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 401 from Essex Rd. 42 to Victoria Rd. will have the left lane closed in alternating directions 11/20 to 11/23 from 0730-1800 hours, 11/24 0730 hours to 1230 hours, 11/27 to 11/30 from 0730-1800 hours and 12/1 from 0730 to 1230 hours.
Event Start:November 20, 2017 00:00
Event End:December 01, 2017 12:30
Last Change: Entered 2017-11-16 11:25

Top of page Top of page


HWY 401 Eastbound [ Veterans Memorial Parkway (194KM) - Veterans Memorial Parkway (194KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Veterans Memorial Parkway (194KM)
To:Veterans Memorial Parkway (194KM)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 401 at Veterans Memorial Parkway will have lane 3 closures (right lane) in both directions May 17 for approx 6 months
Event Start:May 17, 2017 00:00
Event End:December 17, 2017 00:00
Last Change: Entered 2017-05-17 08:42

Top of page Top of page


HWY 401 Eastbound [ Victoria Road / Kent Road 17 (109KM) - Currie Rd (149KM) ] - Special Event
Highway:HWY 401
Direction:Eastbound
From/At:Victoria Road / Kent Road 17 (109KM)
To:Currie Rd (149KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonSpecial Event
Comment :Highway 401 Eastbound and Westbound from Victoria Road to Currie Road will have left lane closures from November 13th at 0700 hours until November 24th at 1700 hours.
Event Start:November 13, 2017 07:00
Event End:November 24, 2017 17:00
Last Change: Entered 2017-11-07 13:58

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - ALLEN ROAD Northbound/Southbound ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:
To:ALLEN ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 17, 2017 23:59
Event End:November 20, 2017 05:00
Last Change: Entered 2017-08-25 10:36

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - DIXIE ROAD Northbound/Southbound ] - Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:
To:DIXIE ROAD Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonEngineering Investigation
Comment :
Event Start:November 18, 2017 23:00
Event End:November 20, 2017 05:00
Last Change: Entered 2017-11-16 12:17

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - WESTON ROAD Northbound/Southbound ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:
To:WESTON ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 18, 2017 23:59
Event End:November 19, 2017 07:00
Last Change: Entered 2017-10-25 13:18

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 400/BLACK CREEK DRIVE Collector - JANE ST Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 400/BLACK CREEK DRIVE Collector
To:JANE ST Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 400/BLACK CREEK DRIVE SB
ReasonRecurring-Construction
Comment :Friday-Saturday: 1 lane closure at 23:00, 2 lane closure at 23:59. 1 lane reopen at 7:00, full reopen at 8:00.
Event Start:November 17, 2017 23:00
Event End:November 19, 2017 08:00
Last Change: Entered 2017-11-09 05:17

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 400/BLACK CREEK DRIVE Collector - JANE ST Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 400/BLACK CREEK DRIVE Collector
To:JANE ST Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 400/BLACK CREEK DRIVE SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 5:00, full reopen at 5:30.
Event Start:November 19, 2017 22:00
Event End:November 24, 2017 05:30
Last Change: Entered 2017-11-16 06:31

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 403 Collector - TOMKEN ROAD Collector ] - Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:HWY 403 Collector
To:TOMKEN ROAD Collector
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonEngineering Investigation
Comment :
Event Start:November 18, 2017 23:00
Event End:November 20, 2017 05:00
Last Change: Entered 2017-11-16 12:14

Top of page Top of page


HWY 401 Eastbound Collector [ ISLINGTON AVE Collector - WESTON ROAD Collector ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:ISLINGTON AVE Collector
To:WESTON ROAD Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :On-ramp from ISLINGTON AVE SB, Off-ramp to WESTON ROAD NB/SB
ReasonConstruction
Comment :
Event Start:November 17, 2017 22:00
Event End:November 18, 2017 07:00
Last Change: Entered 2017-10-24 14:56

Top of page Top of page


HWY 401 Eastbound Collector [ ISLINGTON AVE Collector - WESTON ROAD Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:ISLINGTON AVE Collector
To:WESTON ROAD Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :Off-ramp to WESTON ROAD NB/SB
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 16:00
Event End:November 19, 2017 18:00
Last Change: Entered 2017-11-13 19:15

Top of page Top of page


HWY 401 Eastbound Collector [ ISLINGTON AVE Collector - WESTON ROAD Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:ISLINGTON AVE Collector
To:WESTON ROAD Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :Off-ramp to WESTON ROAD NB/SB
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 08:00
Event End:November 18, 2017 19:00
Last Change: Entered 2017-10-25 10:45

Top of page Top of page


HWY 401 Eastbound Collector [ JANE ST Collector - KEELE ST Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JANE ST Collector
To:KEELE ST Collector
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Friday: 1 lane closure at 23:00, 2 lane closure at 23:59. 1 lane reopen at 7:00, full reopen at 8:00. Saturday: 1 lane closure at 23:00, 2 lane closure at 23:59. 1 lane reopen at 7:00, full reopen at 9:00.
Event Start:November 17, 2017 23:00
Event End:November 19, 2017 08:00
Last Change: Entered 2017-11-09 05:20

Top of page Top of page


HWY 401 Eastbound Collector [ JANE ST Collector - KEELE ST Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JANE ST Collector
To:KEELE ST Collector
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 22:00, 2 lane closure at 23:59. Full reopen at 05:00. Monday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00.
Event Start:November 19, 2017 22:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-16 06:33

Top of page Top of page


HWY 401 Eastbound Collector [ TOMKEN ROAD Collector - RENFORTH DRIVE Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Collector
To:RENFORTH DRIVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu: 1 lane closes at 2200, expanding to 2 lanes at 2300. Full reopen at 0500. Fri: 1 lane closes at 2200, expanding to 2 lanes at 2300. 1 lane reopens at 0700, full reopen at 0800.
Event Start:November 20, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 17:40

Top of page Top of page


HWY 401 Eastbound Collector [ TOMKEN ROAD Collector - RENFORTH DRIVE Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Collector
To:RENFORTH DRIVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu: 1 lane closes at 2200, expanding to 2 lanes at 2300. All lanes reopen at 0500. Fri: 1 lane closes at 2200, expanding to 2 lanes at 2300. 1 lane reopens at 0700. Full reopen at 0800.
Event Start:November 13, 2017 22:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-13 07:25

Top of page Top of page


HWY 401 Eastbound Express [ KIPLING AVE Express - WESTON ROAD Express ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:KIPLING AVE Express
To:WESTON ROAD Express
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 17, 2017 23:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-17 10:55

Top of page Top of page


HWY 401 Eastbound Express [ TOMKEN ROAD Express - RENFORTH DRIVE Express ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Express
To:RENFORTH DRIVE Express
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu: 1 lane closes at 2100, expanding to 2 lanes at 2200, expanding to 3 lanes at 2359. All lanes reopen at 0500. Fri: 1 lane closes at 2100, expanding to 2 lanes at 2200, expanding to 3 lanes at 2359. 1 lane reopens at 0600. 2 lanes at 0700. Full reopen at 0800.
Event Start:November 13, 2017 21:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-13 09:26

Top of page Top of page


HWY 401 Eastbound Express [ TOMKEN ROAD Express - RENFORTH DRIVE Express ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Express
To:RENFORTH DRIVE Express
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu: 1 lane closes at 2100, expanding to 2 lanes at 2200, expanding to 3 lanes at 2359. Full reopen at 0500. Fri: 1 lane closes at 2100, expanding to 2 lanes at 2200, expanding to 3 lanes at 2359. 1 lane reopens at 0600, 2 lanes reopen at 0700, full reopen at 0800.
Event Start:November 20, 2017 21:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 17:44

Top of page Top of page


HWY 401 Eastbound Express [ TOMKEN ROAD Express - TOMKEN ROAD ] - Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Express
To:TOMKEN ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonEngineering Investigation
Comment :
Event Start:November 18, 2017 23:00
Event End:November 20, 2017 05:00
Last Change: Entered 2017-11-16 12:04

Top of page Top of page


HWY 401 Eastbound Express and Collector Off-ramp [ - ALLEN ROAD Northbound/Southbound ] - Special Event
Highway:HWY 401
Direction:Eastbound
From/At:
To:ALLEN ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonSpecial Event
Comment :
Event Start:November 17, 2017 23:59
Event End:November 19, 2017 10:00
Last Change: Entered 2017-11-15 08:08

Top of page Top of page


HWY 401 Eastbound Off-ramp [ - EGLINTON AVE Eastbound/Westbound ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:
To:EGLINTON AVE Eastbound/Westbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 14, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-10 12:29

Top of page Top of page


HWY 401 Eastbound Off-ramp [ - SIMCOE ST Eastbound ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:
To:SIMCOE ST Eastbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:August 14, 2017 07:00
Event End:December 15, 2017 12:00
Last Change: Entered 2017-08-02 11:57

Top of page Top of page


HWY 401 Eastbound On-ramp [ COURTICE ROAD Northbound/Southbound - ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:COURTICE ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:June 05, 2017 23:00
Event End:December 05, 2018 05:00
Last Change: Entered 2017-05-30 15:24

Top of page Top of page


HWY 401 Eastbound On-ramp [ HWY 410 Southbound - ] - Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:HWY 410 Southbound
To:
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonEngineering Investigation
Comment :
Event Start:November 18, 2017 23:00
Event End:November 20, 2017 05:00
Last Change: Entered 2017-11-16 12:15

Top of page Top of page


HWY 401 Eastbound On-ramp [ VICTORIA PARK AVE Northbound - ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:VICTORIA PARK AVE Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 12, 2017 23:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-08 07:52

Top of page Top of page


HWY 401 Eastbound On-ramp [ VICTORIA PARK AVE Southbound - ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:VICTORIA PARK AVE Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 12, 2017 23:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-08 08:12

Top of page Top of page


HWY 401 Eastbound On-ramp [ VICTORIA PARK AVE Southbound - ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:VICTORIA PARK AVE Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 19, 2017 23:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-14 15:27

Top of page Top of page


HWY 401 Eastbound Transfer [ MCCOWAN ROAD Express to Collector - ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:MCCOWAN ROAD Express to Collector
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 19, 2017 23:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-14 15:26

Top of page Top of page


HWY 401 Eastbound Transfer [ MCCOWAN ROAD Express to Collector - ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:MCCOWAN ROAD Express to Collector
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 12, 2017 23:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-08 08:02

Top of page Top of page


HWY 401 Westbound [ BROCK ST - HENRY ST ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:BROCK ST
To:HENRY ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from BROCK ST SB
ReasonRecurring-Construction
Comment :Mon-Thu; one lane closed at 20:00, two lanes closed at 23:00. One lane open at 05:00, fully open at 05:30. Fri; one lane closed at 21:00, two lanes closed at 23:00. One lane open at 07:00, fully open at 06:00. Sat; one lane closed at 20:00, two lanes closed at 23:00. One lane open at 09:00, fully open at 08:00. Sun; one lane closed at 21:00, two lanes closed at 23:00. One lane open at 05:00, fully open at 05:30
Event Start:November 13, 2017 20:00
Event End:November 20, 2017 05:30
Last Change: Entered 2017-11-03 09:27

Top of page Top of page


HWY 401 Westbound [ CREDIT RIVER - DERRY ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:CREDIT RIVER
To:DERRY ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-10 11:51

Top of page Top of page


HWY 401 Westbound [ DIXON ROAD/MARTIN GROVE ROAD - HWY 427 ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:DIXON ROAD/MARTIN GROVE ROAD
To:HWY 427
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 2 lanes close at 2200, expanding to 3 lanes at 2359. 2 lanes reopen at 0500, full reopen at 0600. Fri: 2 lanes close at 2200, expanding to 3 lanes at 0100. 1 lane reopens at 0600, 2 lanes reopen at 0700, full reopen at 0800.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 06:49

Top of page Top of page


HWY 401 Westbound [ FRASER RD - SUMMERSTOWN RD (IC 804) ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:FRASER RD
To:SUMMERSTOWN RD (IC 804)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Right lane closed Hwy 401 W/B btwn Fraser Rd and Summerstown Rd (Summerstown)
Event Start:November 20, 2017 06:00
Event End:November 22, 2017 18:00
Last Change: Entered 2017-11-16 14:29

Top of page Top of page


HWY 401 Westbound [ Franklin Blvd (284KM) - Highway 8 / King Street E/Shantz Hill Rd (278KM) ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:Franklin Blvd (284KM)
To:Highway 8 / King Street E/Shantz Hill Rd (278KM)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 401 Westbound from King Street to Franklin Boulevard will have right lane closures from November 17th at 2100 hours to November 18th at 0800 hours.
Event Start:November 17, 2017 21:00
Event End:November 18, 2017 08:00
Last Change: Entered 2017-11-17 14:17

Top of page Top of page


HWY 401 Westbound [ GUELPH LINE - HWY 6 SOUTH ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:GUELPH LINE
To:HWY 6 SOUTH
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, 2 lanes reopen at 8:00.
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 07:19

Top of page Top of page


HWY 401 Westbound [ GUELPH LINE - HWY 6 SOUTH ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:GUELPH LINE
To:HWY 6 SOUTH
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 6:00, full reopen at 8:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 06:10

Top of page Top of page


HWY 401 Westbound [ HOLT ROAD - COURTICE ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HOLT ROAD
To:COURTICE ROAD
Lanes Affected:2 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday to Thursday:1 lane closed at 18:00 expanding to a 2 lane closure at 22:00. 1 lane reopens at 05:00. full reopen at 06:00. Friday: 2 lanes closed at 22:00. 1 lane reopens at 07:00, full reopen at 10:00. Saturday: 1 lane closed at 18:00 expanding to a 2 lane closure at 22:00. 1 lane reopens at 07:00, full reopen at 10:00.
Event Start:November 13, 2017 18:00
Event End:November 19, 2017 06:00
Last Change: Entered 2017-11-10 13:49

Top of page Top of page


HWY 401 Westbound [ HOLT ROAD - COURTICE ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HOLT ROAD
To:COURTICE ROAD
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Wednesday and Thursday; One lane closed at 1800, two lanes closed at 2200, full closure at 2300, One lane open at 0400, two lanes open at 500, three open at 0600. Friday; One lane closed at 2200, full closure at 2300. One lane open at 0400, two lanes open at 500, three open at 0600.
Event Start:November 22, 2017 23:00
Event End:November 25, 2017 04:00
Last Change: Entered 2017-11-02 12:43

Top of page Top of page


HWY 401 Westbound [ HOLT ROAD - COURTICE ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HOLT ROAD
To:COURTICE ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 10:00
Event End:November 24, 2017 14:00
Last Change: Entered 2017-11-17 16:18

Top of page Top of page


HWY 401 Westbound [ HWY 25 - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 07:17

Top of page Top of page


HWY 401 Westbound [ HWY 25 - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 06:07

Top of page Top of page


HWY 401 Westbound [ HWY 25 - HWY 25 ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:HWY 25
Lanes Affected:ALL LANES CLOSED
Traffic Impact :On-ramp from HWY 25 NB/SB
ReasonConstruction
Comment :Highway 401 Westbound at Highway 25 will be fully closed at 19:00. A single lane will be closed starting at 18:30, expanding to two lanes at 18:45. All lanes will be closed at 19:00 on Saturday November 18th and all lanes will reopen at 13:00 on Sunday November 19th, 2017. The on-ramp from Highway 25 to Highway 401 Westbound will also be closed.
Event Start:November 18, 2017 18:30
Event End:November 19, 2017 13:00
Last Change: Entered 2017-11-07 12:26

Top of page Top of page


HWY 401 Westbound [ HWY 25 - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 25 NB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00. All lanes reopened at 06:00. Friday: 1 lane closed at 22:00, 2 lanes closed at 23:00. 1 lane reopened at 06:00. All lanes reopened at 08:00.
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 07:25

Top of page Top of page


HWY 401 Westbound [ HWY 25 - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 25 NB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00. All lanes reopened at 06:00. Friday: 1 lane closed at 22:00, 2 lanes closed at 23:00. 1 lane reopened at 06:00. All lanes reopened at 08:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 06:15

Top of page Top of page


HWY 401 Westbound [ Kent Bridge Rd / Kent Road 15 (101KM) - Bloomfield Road (81KM) ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:Kent Bridge Rd / Kent Road 15 (101KM)
To:Bloomfield Road (81KM)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Highway 401 eastbound and westbound from Kent Bridge Road to Bloomfield Road on April 30th starting at 1000 hours to November 24th at 1000 hours will have a right lane closure due to road maintenance.
Event Start:April 30, 2017 10:00
Event End:November 24, 2017 10:00
Last Change: Entered 2017-04-24 13:10

Top of page Top of page


HWY 401 Westbound [ SD&G RD 2 & 34 (IC 814) - SD&G RD 2 & 34 (IC 814) ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:SD&G RD 2 & 34 (IC 814)
To:SD&G RD 2 & 34 (IC 814)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Lancaster
Event Start:November 17, 2017 10:00
Event End:November 20, 2017 00:00
Last Change: Entered 2017-11-10 13:52

Top of page Top of page


HWY 401 Westbound [ SIXTH LINE ROAD - JAMES SNOW PKWY ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:SIXTH LINE ROAD
To:JAMES SNOW PKWY
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lanes closure at 23:00. All lanes reopen at 06:00. Friday: 1 lane closure at 22:00, 2 lanes closure at 23:00. 1 lane reopens at 06:00. All lanes reopen at 08:00.
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 07:22

Top of page Top of page


HWY 401 Westbound [ SIXTH LINE ROAD - JAMES SNOW PKWY ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:SIXTH LINE ROAD
To:JAMES SNOW PKWY
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lanes closure at 23:00. All lanes reopen at 06:00. Friday: 1 lane closure at 22:00, 2 lanes closure at 23:00. 1 lane reopens at 06:00. All lanes reopen at 08:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 06:13

Top of page Top of page


HWY 401 Westbound [ THICKSON ROAD - HENRY ST ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:THICKSON ROAD
To:HENRY ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from BROCK ST SB
ReasonRecurring-Construction
Comment :Mon-Thu; one lane closed at 20:00, two lanes closed at 23:00. One lane open at 05:00, fully open at 05:30. Fri; one lane closed at 21:00, two lanes closed at 23:00. One lane open at 06:00, fully open at 07:00. Sat; one lane closed at 20:00, two lanes closed at 23:00. One lane open at 08:00, fully open at 09:00. Sun; one lane closed at 21:00, two lanes closed at 23:00. One lane open at 05:00, fully open at 05:30
Event Start:November 27, 2017 20:00
Event End:December 04, 2017 05:30
Last Change: Entered 2017-11-14 16:11

Top of page Top of page


HWY 401 Westbound [ THICKSON ROAD - HENRY ST ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:THICKSON ROAD
To:HENRY ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from BROCK ST SB
ReasonRecurring-Construction
Comment :Mon-Thu; one lane closed at 20:00, two lanes closed at 23:00. One lane open at 05:00, fully open at 05:30. Fri; one lane closed at 21:00, two lanes closed at 23:00. One lane open at 06:00, fully open at 07:00. Sat; one lane closed at 20:00, two lanes closed at 23:00. One lane open at 08:00, fully open at 09:00. Sun; one lane closed at 21:00, two lanes closed at 23:00. One lane open at 05:00, fully open at 05:30
Event Start:November 20, 2017 20:00
Event End:November 27, 2017 23:00
Last Change: Entered 2017-11-14 15:46

Top of page Top of page


HWY 401 Westbound [ WINSTON CHURCHILL BLVD - 407ETR ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:WINSTON CHURCHILL BLVD
To:407ETR
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-10 12:01

Top of page Top of page


HWY 401 Westbound Collector Off-ramp [ - ALLEN ROAD Northbound/Southbound ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:ALLEN ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 17, 2017 23:59
Event End:November 20, 2017 05:00
Last Change: Entered 2017-08-25 10:41

Top of page Top of page


HWY 401 Westbound Collector Off-ramp [ - HWY 400/BLACK CREEK DRIVE Southbound ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:HWY 400/BLACK CREEK DRIVE Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Long term ramp closures: Hwy 401 EB collectors off-ramp to Hwy 400 SB/Black Creek Drive will be closed at midnight on Sunday Oct 22 to 5:00 AM on Saturday Nov 20.
Event Start:October 23, 2017 00:00
Event End:November 20, 2017 05:00
Last Change: Entered 2017-10-20 14:37

Top of page Top of page


HWY 401 Westbound Collector Off-ramp [ - HWY 404 Southbound ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:HWY 404 Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Approved by Sandy
Event Start:November 18, 2017 07:00
Event End:November 19, 2017 12:00
Last Change: Entered 2017-11-17 06:05

Top of page Top of page


HWY 401 Westbound Collector [ LESLIE STREET Collector - YONGE ST Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:LESLIE STREET Collector
To:YONGE ST Collector
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :Off-ramp to BAYVIEW AVE NB/SB, On-ramp from LESLIE STREET NB/SB, On-ramp from BAYVIEW AVE NB/SB, On-ramp from YONGE ST NB/SB, Off-ramp to YONGE ST NB/SB
ReasonRecurring-Construction
Comment :Wed: 2 lane closure at 21:00, 3 lane closure at 22:00. Full reopen at 5:30. Fri: 2 lane closure at 2100, expanding to 3 lane closure at 2300. 1 lane reopens at 0800, full reopen at 0900.
Event Start:November 15, 2017 21:00
Event End:November 18, 2017 05:30
Last Change: Entered 2017-11-14 10:43

Top of page Top of page


HWY 401 Westbound Collector [ MARKHAM ROAD Collector - KENNEDY ROAD (SCARBOROUGH) Collector ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:MARKHAM ROAD Collector
To:KENNEDY ROAD (SCARBOROUGH) Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Mon-Thu: 2 lanes closed 2300-0500. Fri: 1 lane closes 2300, expanding to 2 lanes at 2359. Full reopen at 0500.
Event Start:November 14, 2017 23:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-14 14:15

Top of page Top of page


HWY 401 Westbound Collector [ YONGE ST Collector - ALLEN ROAD Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:YONGE ST Collector
To:ALLEN ROAD Collector
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Wed: 2 lane closure at 21:00, 3 lane closure at 22:00. Full reopen at 5:30. Fri: 2 lane closure at 21:00, 3 lane closure at 23:00. 1 lane reopens at 08:00. Full reopen at 09:00.
Event Start:November 15, 2017 21:00
Event End:November 18, 2017 05:30
Last Change: Entered 2017-11-14 11:26

Top of page Top of page


HWY 401 Westbound Express Off-ramp [ - ALLEN ROAD Northbound/Southbound ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:ALLEN ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 17, 2017 23:59
Event End:November 20, 2017 05:00
Last Change: Entered 2017-08-25 10:41

Top of page Top of page


HWY 401 Westbound Express Off-ramp [ - HWY 404 Southbound ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:HWY 404 Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Approved by Sandy
Event Start:November 18, 2017 10:00
Event End:November 19, 2017 14:00
Last Change: Entered 2017-11-17 06:04

Top of page Top of page


HWY 401 Westbound Express [ RENFORTH DRIVE Express - DIXIE ROAD Express ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:RENFORTH DRIVE Express
To:DIXIE ROAD Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu: 1 lane closes at 2100, expanding to 2 lanes at 2300, full reopen at 0500. Fri: 1 lane closes at 2100, expanding to 2 lanes at 2300. 1 lane reopens at 0600. Full reopen at 0700.
Event Start:November 13, 2017 21:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-13 09:56

Top of page Top of page


HWY 401 Westbound Express [ RENFORTH DRIVE Express - DIXIE ROAD Express ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:RENFORTH DRIVE Express
To:DIXIE ROAD Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu: 1 lane closes at 2100, expanding to 2 lanes at 2300. Full reopen at 0500. Fri: 1 lane closes at 2100, expanding to 2 lanes at 2300. 1 lane reopens at 0600, full reopen at 0700.
Event Start:November 20, 2017 21:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 17:18

Top of page Top of page


HWY 401 Westbound Express and Collector Off-ramp [ - ALLEN ROAD Northbound/Southbound ] - Maintenance
Highway:HWY 401
Direction:Westbound
From/At:
To:ALLEN ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:November 17, 2017 23:59
Event End:November 19, 2017 10:00
Last Change: Entered 2017-11-15 08:08

Top of page Top of page


HWY 401 Westbound Express and Collector Off-ramp [ - HWY 404 Southbound ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:HWY 404 Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Thursday,Friday, and Sunday: Hwy 401 Westbound, Off-ramp - from Express and Collector, 2 out of 2 lanes closed at 23:59, and all lanes reopen at 05:00.
Event Start:November 16, 2017 23:59
Event End:November 20, 2017 05:00
Last Change: Entered 2017-11-15 06:50

Top of page Top of page


HWY 401 Westbound Off-ramp [ - HWY 25 Northbound/Southbound ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:HWY 25 Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 17, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-16 14:09

Top of page Top of page


HWY 403 HAMILTON Eastbound [ CITY OF HAMILTON-COUNTY OF BRANT TOWNLINE - BRANT STREET ] - Recurring-Maintenance
Highway:HWY 403 HAMILTON
Direction:Eastbound
From/At:CITY OF HAMILTON-COUNTY OF BRANT TOWNLINE
To:BRANT STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 19, 2017 23:00
Event End:November 26, 2017 04:00
Last Change: Entered 2017-11-10 15:45

Top of page Top of page


HWY 403 HAMILTON Eastbound On-ramp [ Oxford County Rd 55 (5KM) Southbound - ] - Construction
Highway:HWY 403 HAMILTON
Direction:Eastbound
From/At:Oxford County Rd 55 (5KM) Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Highway 403 Eastbound on-ramp from Southbound Oxford Road 55 will be closed from July 31, 2017 until November, 2017
Event Start:July 31, 2017 00:00
Event End:November 30, 2017 23:59
Last Change: Entered 2017-07-21 10:56

Top of page Top of page


HWY 403 HAMILTON Westbound [ BRANT STREET - CITY OF HAMILTON-COUNTY OF BRANT TOWNLINE ] - Recurring-Maintenance
Highway:HWY 403 HAMILTON
Direction:Westbound
From/At:BRANT STREET
To:CITY OF HAMILTON-COUNTY OF BRANT TOWNLINE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 19, 2017 23:00
Event End:November 26, 2017 04:30
Last Change: Entered 2017-11-10 15:51

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector Off-ramp [ - HWY 410 Northbound ] - Engineering Investigation
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:
To:HWY 410 Northbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonEngineering Investigation
Comment :
Event Start:November 18, 2017 23:00
Event End:November 19, 2017 05:00
Last Change: Entered 2017-11-16 11:55

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ EGLINTON AVE Collector - MATHESON BLVD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:EGLINTON AVE Collector
To:MATHESON BLVD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from EGLINTON AVE EB, On-ramp from EGLINTON AVE WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 19, 2017 22:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:31

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ ERIN MILLS PKWY Collector - MAVIS ROAD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:ERIN MILLS PKWY Collector
To:MAVIS ROAD Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-08 19:14

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ ERIN MILLS PKWY Collector - MAVIS ROAD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:ERIN MILLS PKWY Collector
To:MAVIS ROAD Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closed 2200-0500. Sun: 1 lane closed 2300-0700.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-15 08:52

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ HWY 407 ETR Collector - ERIN MILLS PKWY Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:HWY 407 ETR Collector
To:ERIN MILLS PKWY Collector
Lanes Affected:3 Left(with HOV) Lane(s)
Traffic Impact :On-ramp from WINSTON CHURCHILL BLVD NB, On-ramp from WINSTON CHURCHILL BLVD SB, Off-ramp to WINSTON CHURCHILL BLVD NB/SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 20:00, 2 lane closure at 22:00, 3 lane closure at 1:00. 1 lane reopen at 4:00, full reopen at 5:00. Friday: 1 lane closure at 20:00, 2 lane closure at 23:00, 3 lane closure at 1:00. Full reopen at 5:00.
Event Start:November 12, 2017 20:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-08 18:32

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ HWY 407 ETR Collector - ERIN MILLS PKWY Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:HWY 407 ETR Collector
To:ERIN MILLS PKWY Collector
Lanes Affected:3 Left(with HOV) Lane(s)
Traffic Impact :On-ramp from WINSTON CHURCHILL BLVD NB, On-ramp from WINSTON CHURCHILL BLVD SB, Off-ramp to WINSTON CHURCHILL BLVD NB/SB
ReasonRecurring-Construction
Comment :Sun-Thu: HOV closes at 2000, expanding to 2 lanes at 2200, expanding to 3 lanes at 0100. 1 lane reopens at 0400, full reopen at 0500. Fri: HOV lane closes at 2000, expanding to 2 lanes at 2300, expanding to 3 lanes at 0100. Full reopen at 0500.
Event Start:November 19, 2017 20:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-15 08:37

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ ERIN MILLS PKWY Collector - HWY 407 ETR Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:ERIN MILLS PKWY Collector
To:HWY 407 ETR Collector
Lanes Affected:3 Left(with HOV) Lane(s)
Traffic Impact :On-ramp from WINSTON CHURCHILL BLVD NB, On-ramp from WINSTON CHURCHILL BLVD SB, Off-ramp to WINSTON CHURCHILL BLVD NB/SB
ReasonRecurring-Construction
Comment :Sun-Thu: HOV closes at 2000, expanding to 2 lanes at 2300, expanding to 3 lanes at 0100. 1 lane reopens at 0400. Full reopen at 0600. Fri: HOV closes at 2200, expanding to 2 lanes at 2359, expanding to 3 lanes at 0100. 1 lane reopens at 0500. Full reopen at 0600.
Event Start:November 19, 2017 20:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-15 08:32

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ ERIN MILLS PKWY Collector - HWY 407 ETR Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:ERIN MILLS PKWY Collector
To:HWY 407 ETR Collector
Lanes Affected:3 Left(with HOV) Lane(s)
Traffic Impact :On-ramp from WINSTON CHURCHILL BLVD NB, On-ramp from WINSTON CHURCHILL BLVD SB, Off-ramp to WINSTON CHURCHILL BLVD NB/SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 20:00, 2 lane closure at 23:00, 3 lane closure at 1:00. 1 lane reopen at 4:00, full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:59, 3 lane closure at 1:00. 1 lane reopen at 5:00, full reopen at 6:00.
Event Start:November 12, 2017 20:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 18:26

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MATHESON BLVD Collector - HURONTARIO STREET Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MATHESON BLVD Collector
To:HURONTARIO STREET Collector
Lanes Affected:3 Right Lane(s)
Traffic Impact :On-ramp from EASTGATE DRIVE NB/SB
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00, 3 lane closure at 1:00. 1 lane reopen at 4:00, 2 lane reopen at 5:30, full reopen at 6:00. Monday-Thursday: 1 lane closure at 23:00, 2 lane closure at 23:59, 3 lane closure at 1:00. 1 lane reopen at 4:00, 2 lane reopen at 5:30, full reopen at 6:00. Friday: 1 lane closure at 23:59, 3 lane closure at 1:00. 1 lane reopen at 4:00, 2 lane reopen at 5:30, 3 lane reopen at 6:00.
Event Start:November 12, 2017 23:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 19:12

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MATHESON BLVD Collector - HURONTARIO STREET Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MATHESON BLVD Collector
To:HURONTARIO STREET Collector
Lanes Affected:1 Left(with HOV) Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 20:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 19:00

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MATHESON BLVD Collector - HURONTARIO STREET Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MATHESON BLVD Collector
To:HURONTARIO STREET Collector
Lanes Affected:1 Left(with HOV) Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: HOV lane closed 2000-0600. Fri: HOV lane closed 2200-0600.
Event Start:November 19, 2017 20:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-15 08:40

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MATHESON BLVD Collector - HURONTARIO STREET Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MATHESON BLVD Collector
To:HURONTARIO STREET Collector
Lanes Affected:3 Right Lane(s)
Traffic Impact :On-ramp from EASTGATE DRIVE NB/SB
ReasonRecurring-Construction
Comment :Sunday: 1 lane closed at 23:00 expanding to a 2 lane closure at 23:59 and a 3 lane closure at 02:00. 1 lane reopens at 05:00, 2 lanes reopen at 05:30 and full reopen at 06:00. Monday to Thursday: 1 lane closed at 23:00 expanding to a 2 lane closure at 23:59 and a 3 lane closure at 01:00. 1 lane reopens at 04:00, 2 lanes reopen at 05:30 and full reopen at 06:00. Friday: 1 lane closed at 23:59 expanding to 3 lane closure at 01:00. 1 lane reopens at 04:00, 2 lanes reopen at 05:30 and full reopen at 06:00
Event Start:November 19, 2017 23:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-15 08:49

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MAVIS ROAD Collector - ERIN MILLS PKWY Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MAVIS ROAD Collector
To:ERIN MILLS PKWY Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 23:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 19:17

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MAVIS ROAD Collector - ERIN MILLS PKWY Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MAVIS ROAD Collector
To:ERIN MILLS PKWY Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closed 2300-0600. Fri: 1 lane closed 2359-0600.
Event Start:November 19, 2017 23:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-15 09:06

Top of page Top of page


HWY 404 Northbound [ 19TH AVE - 19TH AVE Collector ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:19TH AVE
To:19TH AVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closes at 2200, expanding to 2 lanes at 2300. 1 lane reopens at 0500, full reopen at 0600. Fri: 2 lanes close at 2300, 1 lane reopens at 0700. Full reopen at 0800.
Event Start:November 19, 2017 23:00
Event End:November 25, 2017 08:00
Last Change: Entered 2017-11-17 09:26

Top of page Top of page


HWY 404 Northbound [ BLOOMINGTON ROAD - VANDORF SIDEROAD ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:BLOOMINGTON ROAD
To:VANDORF SIDEROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Expanding closure: 1 lane closes at 2100, expanding to 2 lanes at 2300. 1 lane reopens at 0600. Full reopen at 0700.
Event Start:November 20, 2017 21:00
Event End:November 22, 2017 07:00
Last Change: Entered 2017-11-16 11:02

Top of page Top of page


HWY 404 Northbound [ JOHN ST - JOHN ST ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:JOHN ST
To:JOHN ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE / WOODBINE AVE WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00. All lanes reopen at 06:00.
Event Start:November 20, 2017 22:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 10:41

Top of page Top of page


HWY 404 Northbound [ JOHN ST - JOHN ST ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:JOHN ST
To:JOHN ST
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE / WOODBINE AVE WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00, 3 lanes closed at 00:00. 1 lane reopens at 05:00, all lanes reopen at 06:00. Friday: 2 lanes closed at 23:00, 3 lanes closed at 00:00. 1 lane reopens at 07:00, 2 lanes reopen at 08:00, all lanes reopen at 09:00.
Event Start:November 13, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 14:42

Top of page Top of page


HWY 404 Northbound [ MAJOR MACKENZIE DRIVE - STOUFFVILLE ROAD ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:MAJOR MACKENZIE DRIVE
To:STOUFFVILLE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from MAJOR MACKENZIE DRIVE EB/WB, On-ramp from ELGIN MILLS ROAD EB/WB, On-ramp from STOUFFVILLE ROAD EB/WB, Off-ramp to MAJOR MACKENZIE DRIVE EB/WB, Off-ramp to ELGIN MILLS ROAD EB/WB, Off-ramp to STOUFFVILLE ROAD EB/WB
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 23:00
Event End:November 18, 2017 08:00
Last Change: Entered 2017-11-08 08:42

Top of page Top of page


HWY 404 Northbound [ MAJOR MACKENZIE DRIVE - STOUFFVILLE ROAD ] - Recurring-Engineering Investigation
Highway:HWY 404
Direction:Northbound
From/At:MAJOR MACKENZIE DRIVE
To:STOUFFVILLE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to ELGIN MILLS ROAD EB/WB, Off-ramp to STOUFFVILLE ROAD EB/WB, On-ramp from MAJOR MACKENZIE DRIVE EB/WB, On-ramp from ELGIN MILLS ROAD EB/WB, On-ramp from STOUFFVILLE ROAD EB/WB, Off-ramp to MAJOR MACKENZIE DRIVE EB/WB
ReasonRecurring-Engineering Investigation
Comment :Sun-Thu: 1 lane closed 2200-0600. Fri: 1 lane closed 2359-0800.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 08:00
Last Change: Entered 2017-11-15 17:22

Top of page Top of page


HWY 404 Northbound [ MCNICOLL AVE - MCNICOLL AVE ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:MCNICOLL AVE
To:MCNICOLL AVE
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :On-ramp from FINCH AVE EB
ReasonRecurring-Construction
Comment :Monday-Wednesday: 1 lane closed at 22:00, 2 lanes closed at 23:00, 3 lanes closed 00:00. 1 lane reopens at 05:00, all lanes reopen at 06:00. Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00, 3 lanes closed at 01:00. 1 lane reopened at 05:00. All lanes reopened at 06:00. Friday: 1 lane closed at 23:00, 2 lanes closed at 23:59, 3 lanes closed at 01:00. 1 lane reopens at 07:00, 2 lanes reopen at 08:00, all lanes reopen at 09:00.
Event Start:November 13, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 14:56

Top of page Top of page


HWY 404 Northbound [ MCNICOLL AVE - MCNICOLL AVE ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:MCNICOLL AVE
To:MCNICOLL AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from FINCH AVE EB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00. All lanes reopen at 06:00.
Event Start:November 20, 2017 22:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 10:46

Top of page Top of page


HWY 404 Northbound [ YORK MILLS ROAD - HWY 401 ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:YORK MILLS ROAD
To:HWY 401
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Wed-Thu: 2 lane closure at 23:59. 1 lane reopen at 5:00, full reopen at 6:00. Fri: 2 lanes closed 2359-0800.
Event Start:November 15, 2017 23:59
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-14 09:18

Top of page Top of page


HWY 404 Northbound Collector [ 19TH AVE Collector - 19TH AVE Collector ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:19TH AVE Collector
To:19TH AVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 2 lane closure at 23:00. 1 lane reopen at 5:00, full reopen at 6:00. Monday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 5:00, full reopen at 6:00. Friday: 2 lane closure at 23:00. 1 lane reopen at 7:00, full reopen at 8:00.
Event Start:November 12, 2017 23:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 17:25

Top of page Top of page


HWY 404 Southbound [ JOHN ST - JOHN ST ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:JOHN ST
To:JOHN ST
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00, 3 lanes closed at 00:00. 1 lane reopens at 05:00, all lanes reopen at 06:00. Friday: 2 lanes closed at 23:00, 3 lanes closed at 01:00. 1 lane reopens at 07:00, 2 lanes reopen at 08:00, all lanes reopen at 09:00.
Event Start:November 13, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 14:35

Top of page Top of page


HWY 404 Southbound [ JOHN ST - JOHN ST ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:JOHN ST
To:JOHN ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00 1 lane all lanes reopen at 06:00.
Event Start:November 20, 2017 22:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 10:37

Top of page Top of page


HWY 404 Southbound [ MCNICOLL AVE - MCNICOLL AVE ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:MCNICOLL AVE
To:MCNICOLL AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE / WOODBINE AVE SB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00. All lanes reopen at 06:00.
Event Start:November 20, 2017 22:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 11:18

Top of page Top of page


HWY 404 Southbound [ MCNICOLL AVE - MCNICOLL AVE ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:MCNICOLL AVE
To:MCNICOLL AVE
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE / WOODBINE AVE SB
ReasonRecurring-Construction
Comment :Monday-Wednesday: 1 lane closed at 22:00, 2 lanes closed at 23:00, 3 lanes closed at 23:59. 1 lane reopens at 05:00, all lanes reopen at 06:00. Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00, 3 lanes closed at 01:00. 1 lane reopened at 05:00, all lanes reopened at 06:00. Friday: 1 lane closed at 23:00, 2 lanes closed at 23:59, 3 lanes closed at 01:00. 1 lane reopened at 07:00, 2 lanes reopened at 08:00, all lanes reopened at 09:00.
Event Start:November 13, 2017 22:00
Event End:November 18, 2017 09:00
Last Change: Entered 2017-11-08 15:03

Top of page Top of page


HWY 404 Southbound [ STOUFFVILLE ROAD - MAJOR MACKENZIE DRIVE ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:STOUFFVILLE ROAD
To:MAJOR MACKENZIE DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from STOUFFVILLE ROAD EB/WB, On-ramp from ELGIN MILLS ROAD EB/WB, On-ramp from MAJOR MACKENZIE DRIVE EB/WB, Off-ramp to STOUFFVILLE ROAD EB/WB, Off-ramp to ELGIN MILLS ROAD EB/WB, Off-ramp to MAJOR MACKENZIE DRIVE EB/WB
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 23:00
Event End:November 18, 2017 08:00
Last Change: Entered 2017-11-08 08:46

Top of page Top of page


HWY 404 Southbound [ STOUFFVILLE ROAD - MAJOR MACKENZIE DRIVE ] - Recurring-Engineering Investigation
Highway:HWY 404
Direction:Southbound
From/At:STOUFFVILLE ROAD
To:MAJOR MACKENZIE DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to ELGIN MILLS ROAD EB/WB, Off-ramp to MAJOR MACKENZIE DRIVE EB/WB, On-ramp from STOUFFVILLE ROAD EB/WB, On-ramp from ELGIN MILLS ROAD EB/WB, On-ramp from MAJOR MACKENZIE DRIVE EB/WB, Off-ramp to STOUFFVILLE ROAD EB/WB
ReasonRecurring-Engineering Investigation
Comment :Sun: 1 lane closed 2300-0500. Mon: 1 lane closed 2000-0500. Tue-Thu: 1 lane closed 2100-0500. Fri: 1 lane closed 2100-0800.
Event Start:November 19, 2017 20:00
Event End:November 25, 2017 08:00
Last Change: Entered 2017-11-15 17:23

Top of page Top of page


HWY 404 Southbound Collector [ 19TH AVE Collector - 19TH AVE Collector ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:19TH AVE Collector
To:19TH AVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 2 lane closure at 23:00. 1 lane reopen at 5:00, full reopen at 6:00. Monday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 5:00, full reopen at 6:00. Friday: 2 lane closure at 23:00. 1 lane reopen at 7:00, full reopen at 8:00.
Event Start:November 12, 2017 23:00
Event End:November 18, 2017 08:00
Last Change: Entered 2017-11-08 17:29

Top of page Top of page


HWY 404 Southbound Collector [ 19TH AVE Collector - 19TH AVE Collector ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:19TH AVE Collector
To:19TH AVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closes at 2200, expanding to 2 lanes at 2300. 1 lane reopens at 0500, full reopen at 0600. Fri: 2 lanes close at 2300, 1 lane reopens at 0700. Full reopen at 0800.
Event Start:November 19, 2017 23:00
Event End:November 25, 2017 08:00
Last Change: Entered 2017-11-17 09:33

Top of page Top of page


HWY 404 Southbound Express [ SHEPPARD AVE Express - HWY 401 Express ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:SHEPPARD AVE Express
To:HWY 401 Express
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to HOV TUNNEL TO 401 WB, On-ramp from HWY 401 WB
ReasonRecurring-Construction
Comment :No access to the HOV lane from the south of Finch Ave.
Event Start:November 20, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-15 16:26

Top of page Top of page


HWY 406 Northbound [ MERRITT ROAD - BEAVERDAMS ROAD ] - Construction
Highway:HWY 406
Direction:Northbound
From/At:MERRITT ROAD
To:BEAVERDAMS ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 12, 2017 00:00
Event End:November 18, 2017 00:00
Last Change: Entered 2017-11-09 08:47

Top of page Top of page


HWY 406 Northbound [ MERRITT ROAD - GLENDALE AVE ] - Construction
Highway:HWY 406
Direction:Northbound
From/At:MERRITT ROAD
To:GLENDALE AVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-16 11:01

Top of page Top of page


HWY 406 Northbound Off-ramp [ - HWY 58 Southbound ] - Recurring-Construction
Highway:HWY 406
Direction:Northbound
From/At:
To:HWY 58 Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 12, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-09 08:50

Top of page Top of page


HWY 406 Northbound Off-ramp [ - HWY 58 Southbound ] - Recurring-Construction
Highway:HWY 406
Direction:Northbound
From/At:
To:HWY 58 Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 11:03

Top of page Top of page


HWY 406 Northbound Off-ramp [ - ST DAVID'S ROAD Westbound ] - Construction
Highway:HWY 406
Direction:Northbound
From/At:
To:ST DAVID'S ROAD Westbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Permanently closed until December 22, 2017.
Event Start:November 18, 2017 00:00
Event End:December 22, 2017 23:59
Last Change: Entered 2017-11-16 11:06

Top of page Top of page


HWY 406 Southbound [ GLENDALE AVE - BEAVERDAMS ROAD ] - Construction
Highway:HWY 406
Direction:Southbound
From/At:GLENDALE AVE
To:BEAVERDAMS ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 12, 2017 00:00
Event End:November 18, 2017 00:00
Last Change: Entered 2017-11-09 08:41

Top of page Top of page


HWY 406 Southbound [ GLENDALE AVE - BEAVERDAMS ROAD ] - Construction
Highway:HWY 406
Direction:Southbound
From/At:GLENDALE AVE
To:BEAVERDAMS ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-16 10:58

Top of page Top of page


HWY 406 Southbound Off-ramp [ - HWY 58 Southbound ] - Recurring-Construction
Highway:HWY 406
Direction:Southbound
From/At:
To:HWY 58 Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 14, 2017 00:00
Event End:November 17, 2017 23:59
Last Change: Entered 2017-11-09 08:55

Top of page Top of page


HWY 407 ETR Eastbound [ BALDWIN ST S - ANDERSON ST ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:BALDWIN ST S
To:ANDERSON ST
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:32

Top of page Top of page


HWY 407 ETR Eastbound [ SIMCOE ST - HARMONY RD N ] - Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:SIMCOE ST
To:HARMONY RD N
Lanes Affected:ALL LANES CLOSED
Traffic Impact :On-ramp from SIMCOE ST NB/SB
ReasonConstruction
Comment :Highway 407 Eastbound closed from Simcoe St. to Harmony Rd from 9:00 am on Sunday November 19th to 3:00 pm on Tuesday November 21st. On-ramps from Simcoe St. northbound and southbound also closed.
Event Start:November 19, 2017 09:00
Event End:November 21, 2017 15:00
Last Change: Entered 2017-11-16 13:15

Top of page Top of page


HWY 407 ETR Eastbound [ WESTNEY RD N - SALEM RD ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:WESTNEY RD N
To:SALEM RD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:24

Top of page Top of page


HWY 407 ETR Eastbound Off-ramp [ - HWY 412 Southbound ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:
To:HWY 412 Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:09

Top of page Top of page


HWY 407 ETR Westbound [ HALLS RD N - LAKE RIDGE RD ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Westbound
From/At:HALLS RD N
To:LAKE RIDGE RD
Lanes Affected:2 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 16, 2017 09:00
Event End:November 20, 2017 16:00
Last Change: Entered 2017-11-15 14:59

Top of page Top of page


HWY 407 ETR Westbound [ ST THOMAS ST - BALDWIN ST S ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Westbound
From/At:ST THOMAS ST
To:BALDWIN ST S
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:34

Top of page Top of page


HWY 407 ETR Westbound [ THORNTON RD N - THICKSON RD ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Westbound
From/At:THORNTON RD N
To:THICKSON RD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:19

Top of page Top of page


HWY 407 ETR Westbound [ WESTNEY RD N - SIDELINE 14 ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Westbound
From/At:WESTNEY RD N
To:SIDELINE 14
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:21

Top of page Top of page


HWY 407 ETR Westbound Off-ramp [ - THICKSON RD Northbound/Southbound ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Westbound
From/At:
To:THICKSON RD Northbound/Southbound
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:31

Top of page Top of page


HWY 407 ETR Westbound On-ramp [ HARMONY RD N Northbound - ] - Construction
Highway:HWY 407 ETR
Direction:Westbound
From/At:HARMONY RD N Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :On-ramp from Harmony Road northbound closed from 9:00 a.m. on Sunday November 19th to 5:00 p.m. on Wednesday November 22nd, 2017.
Event Start:November 19, 2017 09:00
Event End:November 22, 2017 17:00
Last Change: Entered 2017-11-16 13:19

Top of page Top of page


HWY 409 Eastbound [ CARLINGVIEW DRIVE - HWY 401 ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:CARLINGVIEW DRIVE
To:HWY 401
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sat: 1 lane closure at 2200, expanding to 2 lanes at 2359. 1 lane reopens at 0800. Full reopen at 1000. Sun: 1 lane closure at 2100, expanding to 2 lanes at 2359. Full reopen at 0500. Mon-Wed: 1 lane closure at 2200, expanding to 2 lanes at 2300. Full reopen at 0500.
Event Start:November 18, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 13:56

Top of page Top of page


HWY 409 Eastbound [ HWY 427 - HWY 401 ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:HWY 427
To:HWY 401
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :1 lane closure at 2200, expanding to 2 lanes at 2300. Full reopen at 0500.
Event Start:November 15, 2017 22:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-13 16:07

Top of page Top of page


HWY 409 Eastbound Off-ramp [ - HWY 427 Southbound ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:
To:HWY 427 Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 23:59
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:37

Top of page Top of page


HWY 409 Eastbound Off-ramp [ - MARTIN GROVE ROAD Eastbound/Westbound ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:
To:MARTIN GROVE ROAD Eastbound/Westbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:44

Top of page Top of page


HWY 409 Eastbound On-ramp [ HWY 427 Northbound - ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:HWY 427 Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 23:59
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:43

Top of page Top of page


HWY 409 Eastbound On-ramp [ HWY 427 Southbound - ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:HWY 427 Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 23:59
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:41

Top of page Top of page


HWY 409 Eastbound On-ramp [ KIPLING AVE/BELFIELD ROAD Eastbound - ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:KIPLING AVE/BELFIELD ROAD Eastbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:48

Top of page Top of page


HWY 409 Eastbound On-ramp [ KIPLING AVE/BELFIELD ROAD Westbound - ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:KIPLING AVE/BELFIELD ROAD Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:49

Top of page Top of page


HWY 409 Eastbound On-ramp [ MARTIN GROVE ROAD Eastbound - ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:MARTIN GROVE ROAD Eastbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:46

Top of page Top of page


HWY 409 Eastbound On-ramp [ MARTIN GROVE ROAD Westbound - ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:MARTIN GROVE ROAD Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:47

Top of page Top of page


HWY 410 Northbound [ CLARK BLVD - QUEEN STREET/S JCT HWY 7 ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:CLARK BLVD
To:QUEEN STREET/S JCT HWY 7
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 6:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 07:35

Top of page Top of page


HWY 410 Northbound [ COURTNEY PARK DRIVE - DERRY ROAD ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:COURTNEY PARK DRIVE
To:DERRY ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to DERRY ROAD EB/WB, Off-ramp to COURTNEY PARK DRIVE EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:32

Top of page Top of page


HWY 410 Northbound [ DERRY ROAD - STEELES AVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:DERRY ROAD
To:STEELES AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from DERRY ROAD EB, On-ramp from DERRY ROAD EB/WB, On-ramp from DERRY ROAD WB, Off-ramp to STEELES AVE EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:33

Top of page Top of page


HWY 410 Northbound [ HWY 401 - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401
To:COURTNEY PARK DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to COURTNEY PARK DRIVE EB/WB
ReasonRecurring-Construction
Comment :Sunday to Thursday: 2 lane closure at 23:59. Full reopen at 05:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:30

Top of page Top of page


HWY 410 Northbound [ STEELES AVE - CLARK BLVD ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:STEELES AVE
To:CLARK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to CLARK BLVD EB/WB
ReasonRecurring-Construction
Comment :Sunday: 2 lane closure at 23:59. Full reopen at 6:00. Monday-Thursday: 2 lane closure at 23:00. Full reopen at 6:00.
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 07:34

Top of page Top of page


HWY 410 Southbound [ CLARK BLVD - STEELES AVE ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:CLARK BLVD
To:STEELES AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to STEELES AVE EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:27

Top of page Top of page


HWY 410 Southbound [ COURTNEY PARK DRIVE - HWY 401 ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:COURTNEY PARK DRIVE
To:HWY 401
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00, 2 lane closure at 23:59. Full reopen at 5:00. Monday-Thursday: 2 lane closure at 23:00. Full reopen at 5:00.
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:29

Top of page Top of page


HWY 410 Southbound [ DERRY ROAD - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:DERRY ROAD
To:COURTNEY PARK DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from DERRY ROAD EB, On-ramp from COURTNEY PARK DRIVE EB/WB, On-ramp from DERRY ROAD WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:29

Top of page Top of page


HWY 410 Southbound [ QUEEN STREET/S JCT HWY 7 - CLARK BLVD ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:QUEEN STREET/S JCT HWY 7
To:CLARK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from CLARK BLVD EB/WB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lanes closed at 23:59 and all lanes reopen at 05:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:26

Top of page Top of page


HWY 410 Southbound [ STEELES AVE - DERRY ROAD ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:STEELES AVE
To:DERRY ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to DERRY ROAD EB/WB
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00, 2 lane closure at 23:59. Full reopen at 5:00. Monday-Thursday: 2 lane closure at 23:00. Full reopen at 5:00.
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:28

Top of page Top of page


HWY 412 Northbound Off-ramp [ - HWY 407 ETR Westbound ] - Recurring-Construction
Highway:HWY 412
Direction:Northbound
From/At:
To:HWY 407 ETR Westbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:06

Top of page Top of page


HWY 412 Southbound [ HWY 7 - TAUNTON RD ] - Recurring-Construction
Highway:HWY 412
Direction:Southbound
From/At:HWY 7
To:TAUNTON RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:12

Top of page Top of page


HWY 412 Southbound Off-ramp [ - HWY 401 Eastbound ] - Recurring-Construction
Highway:HWY 412
Direction:Southbound
From/At:
To:HWY 401 Eastbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:17

Top of page Top of page


HWY 412 Southbound Off-ramp [ - HWY 401 Westbound ] - Recurring-Construction
Highway:HWY 412
Direction:Southbound
From/At:
To:HWY 401 Westbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:13

Top of page Top of page


HWY 417 Eastbound [ MAITLAND AVE (IC 126) - CARLING AVE / KIRKWOOD AVE (IC 124) ] - Construction
Highway:HWY 417
Direction:Eastbound
From/At:MAITLAND AVE (IC 126)
To:CARLING AVE / KIRKWOOD AVE (IC 124)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Left lane closed Hwy 417 E/B Maitland to Carling (Ottawa)
Event Start:November 22, 2017 10:00
Event End:November 22, 2017 14:30
Last Change: Entered 2017-11-17 11:25

Top of page Top of page


HWY 417 Eastbound [ P&R CTY RD 17 (IC 9) - ONTARIO/QUEBEC BDY ] - Recurring-Construction
Highway:HWY 417
Direction:Eastbound
From/At:P&R CTY RD 17 (IC 9)
To:ONTARIO/QUEBEC BDY
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Lane reductions Hwy 417 E/B & W/B btwn Cty Rd 17 and Quebec Border (W/ON-QC Border); W/B Travel Information Centre ramps closed as required.
Event Start:November 20, 2017 00:00
Event End:November 24, 2017 23:59
Last Change: Entered 2017-11-16 13:54

Top of page Top of page


HWY 417 Eastbound [ P&R CTY RD 17 (IC 9) - ONTARIO/QUEBEC BDY ] - Recurring-Construction
Highway:HWY 417
Direction:Eastbound
From/At:P&R CTY RD 17 (IC 9)
To:ONTARIO/QUEBEC BDY
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Lane reductions Hwy 417 E/B & W/B btwn Cty Rd 17 and Quebec Border (W/ON-QC Border); W/B Travel Information Centre ramps closed as required.
Event Start:November 13, 2017 00:00
Event End:November 17, 2017 23:59
Last Change: Entered 2017-11-10 16:08

Top of page Top of page


HWY 417 Eastbound [ PARKDALE AVE (IC 122) - METCALFE ST (IC 119A) ] - Construction
Highway:HWY 417
Direction:Eastbound
From/At:PARKDALE AVE (IC 122)
To:METCALFE ST (IC 119A)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Intermittent short duration right lane closures Hwy 417 E/B & W/B btwn Parkdale and Metcalfe (Ottawa)
Event Start:November 21, 2017 10:00
Event End:November 21, 2017 14:00
Last Change: Entered 2017-11-17 13:40

Top of page Top of page


HWY 417 Eastbound [ RAMSAYVILLE RD - BOUNDARY RD (IC 96) ] - Recurring-Construction
Highway:HWY 417
Direction:Eastbound
From/At:RAMSAYVILLE RD
To:BOUNDARY RD (IC 96)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Lane reductions Hwy 417 E/B btwn Ramsayville Rd and Boundary Rd (E/Ottawa)
Event Start:November 20, 2017 03:00
Event End:November 24, 2017 14:30
Last Change: Entered 2017-11-16 14:04

Top of page Top of page


HWY 417 Eastbound Off-ramp [ - NICHOLAS ST (IC 118) Northbound ] - Maintenance
Highway:HWY 417
Direction:Eastbound
From/At:
To:NICHOLAS ST (IC 118) Northbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Lane reduction Hwy 417 E/B Nicholas off ramp (Ottawa)
Event Start:November 20, 2017 21:00
Event End:November 20, 2017 23:59
Last Change: Entered 2017-11-17 08:59

Top of page Top of page


HWY 417 Westbound [ BOUNDARY RD (IC 96) - RAMSAYVILLE RD ] - Recurring-Construction
Highway:HWY 417
Direction:Westbound
From/At:BOUNDARY RD (IC 96)
To:RAMSAYVILLE RD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Lane reductions Hwy 417 W/B btwn Boundary Rd and Ramsayville Rd (E/Ottawa)
Event Start:November 20, 2017 10:00
Event End:November 24, 2017 20:00
Last Change: Entered 2017-11-16 13:59

Top of page Top of page


HWY 417 Westbound [ METCALFE ST (IC 119A) - BRONSON AVE (IC 121A) ] - Construction
Highway:HWY 417
Direction:Westbound
From/At:METCALFE ST (IC 119A)
To:BRONSON AVE (IC 121A)
Lanes Affected:2 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Right lanes closed Hwy 417 W/B btwn Metcalfe and Bronson (Ottawa); W/B O'Connor on ramp closed
Event Start:November 20, 2017 21:00
Event End:November 21, 2017 06:00
Last Change: Entered 2017-11-17 13:33

Top of page Top of page


HWY 417 Westbound [ NICHOLAS ST (IC 118) - METCALFE ST (IC 119A) ] - Maintenance
Highway:HWY 417
Direction:Westbound
From/At:NICHOLAS ST (IC 118)
To:METCALFE ST (IC 119A)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Right lane closed Hwy 417 W/B btwn Nicholas and Metcalfe off ramp (Ottawa)
Event Start:November 19, 2017 21:00
Event End:November 20, 2017 06:00
Last Change: Entered 2017-11-16 11:28

Top of page Top of page


HWY 417 Westbound [ O'CONNOR ST (IC 119B) - BRONSON AVE (IC 121A) ] - Recurring-Maintenance
Highway:HWY 417
Direction:Westbound
From/At:O'CONNOR ST (IC 119B)
To:BRONSON AVE (IC 121A)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Left lane closed Hwy 417 W/B btwn O'Connor and Bronson (Ottawa)
Event Start:November 21, 2017 21:00
Event End:November 23, 2017 06:00
Last Change: Entered 2017-11-17 10:57

Top of page Top of page


HWY 417 Westbound [ OTTAWA RD 174 (IC 113) - ST. LAURENT BLVD (IC 115) ] - Engineering Investigation
Highway:HWY 417
Direction:Westbound
From/At:OTTAWA RD 174 (IC 113)
To:ST. LAURENT BLVD (IC 115)
Lanes Affected:3 Right Lane(s)
Traffic Impact :
ReasonEngineering Investigation
Comment :Right lanes closed Hwy 417 W/B from Hwy 417/174 Split to St. Laurent (Ottawa); Hwy 174 W/B closed west of Blair. Traffic detoured via St. Laurent interchange
Event Start:November 19, 2017 22:00
Event End:November 20, 2017 06:00
Last Change: Entered 2017-11-03 11:27

Top of page Top of page


HWY 417 Westbound [ TERRY FOX DR (IC 140) - PALLADIUM DR (IC 142) ] - Recurring-Construction
Highway:HWY 417
Direction:Westbound
From/At:TERRY FOX DR (IC 140)
To:PALLADIUM DR (IC 142)
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Lane reductions Hwy 417 E/B & W/B btwn Terry Fox and Palladium (Ottawa); W/B Palladium off ramp closed as required
Event Start:November 14, 2017 21:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-10 15:18

Top of page Top of page


HWY 417 Westbound [ TERRY FOX DR (IC 140) - PALLADIUM DR (IC 142) ] - Recurring-Construction
Highway:HWY 417
Direction:Westbound
From/At:TERRY FOX DR (IC 140)
To:PALLADIUM DR (IC 142)
Lanes Affected:2 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Lane reductions Hwy 417 E/B & W/B btwn Terry Fox and Palladium (Ottawa); E/B Palladium on ramp and W/B Palladium off ramp closed as required
Event Start:November 19, 2017 21:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-17 14:34

Top of page Top of page


HWY 417 Westbound Off-ramp [ - ISLAND PARK DR E/B (IC 123) Northbound ] - Construction
Highway:HWY 417
Direction:Westbound
From/At:
To:ISLAND PARK DR E/B (IC 123) Northbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Lane reduction Hwy 417 W/B Island Park off ramp (Ottawa)
Event Start:November 21, 2017 01:00
Event End:November 21, 2017 06:00
Last Change: Entered 2017-11-17 15:21

Top of page Top of page


HWY 417 Westbound Off-ramp [ - ISLAND PARK DR E/B (IC 123) Northbound ] - Recurring-Maintenance
Highway:HWY 417
Direction:Westbound
From/At:
To:ISLAND PARK DR E/B (IC 123) Northbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Lane reduction Hwy 417 W/B Island Park off ramp (Ottawa)
Event Start:November 22, 2017 21:00
Event End:November 23, 2017 06:00
Last Change: Entered 2017-11-17 11:14

Top of page Top of page


HWY 417 Westbound Off-ramp [ - MOODIE DR (IC 134) Northbound/Southbound ] - Construction
Highway:HWY 417
Direction:Westbound
From/At:
To:MOODIE DR (IC 134) Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Hwy 417 W/B Moodie off ramp closed (Ottawa); Right lane closed from Holly Acres to Moodie
Event Start:November 20, 2017 23:00
Event End:November 21, 2017 05:00
Last Change: Entered 2017-11-15 12:46

Top of page Top of page


HWY 427 Northbound [ BURNHAMTHORPE ROAD - HWY 401 ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:BURNHAMTHORPE ROAD
To:HWY 401
Lanes Affected:3 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mainline: 1 lane closure at 21:00, 3 lane closure at 22:00. 2 lanes reopen at 05:00, full reopen at 06:00. 427NB ramp to 401EB, 1 lane closure at 21:00, full closure at 23:00. full reopen at 07:30
Event Start:November 21, 2017 21:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 07:00

Top of page Top of page


HWY 427 Northbound [ FINCH AVENUE - HWY 7 ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:FINCH AVENUE
To:HWY 7
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday to Friday: Left lane closed on Highway 427 NB between Finch Ave to Highway 7 from 2200 to 0500.
Event Start:November 11, 2017 22:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-10 11:55

Top of page Top of page


HWY 427 Northbound [ FINCH AVENUE - HWY 7 ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:FINCH AVENUE
To:HWY 7
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday to Friday: Left lane closed on Highway 427 NB between Finch Ave to Highway 7 from 2200 to 0500.
Event Start:November 18, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 13:25

Top of page Top of page


HWY 427 Northbound [ HWY 401 - DIXON ROAD/AIRPORT ROAD ] - Construction
Highway:HWY 427
Direction:Northbound
From/At:HWY 401
To:DIXON ROAD/AIRPORT ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 401 EB
ReasonConstruction
Comment :
Event Start:November 20, 2017 20:00
Event End:November 21, 2017 06:00
Last Change: Entered 2017-11-16 06:56

Top of page Top of page


HWY 427 Northbound Collector [ CAMPUS ROAD/FASKEN DRIVE Collector - REXDALE BLVD / DERRY ROAD Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:CAMPUS ROAD/FASKEN DRIVE Collector
To:REXDALE BLVD / DERRY ROAD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closes at 1900, expanding to 2 lanes at 2000. Full reopen at 0600. Fri: 1 lane closes at 2000, expanding to 2 lanes at 2100. Full reopen at 0600.
Event Start:November 19, 2017 19:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-17 00:38

Top of page Top of page


HWY 427 Northbound Collector [ CAMPUS ROAD/FASKEN DRIVE Collector - REXDALE BLVD / DERRY ROAD Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:CAMPUS ROAD/FASKEN DRIVE Collector
To:REXDALE BLVD / DERRY ROAD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 409 WB, Off-ramp to REXDALE BLVD / DERRY ROAD EB/WB
ReasonRecurring-Construction
Comment :Tues; one lane closed 1900, two lanes closed 2000; full reopen 0600 Wed; one lane closed 1900, two lanes closed 2000; full reopen 0600 Thu; one lane closed 1900, two lanes closed 2000; full reopen 0600 Fri; one lane closed 2000, two lanes closed 2100; full reopen 0600
Event Start:November 14, 2017 19:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-09 09:27

Top of page Top of page


HWY 427 Southbound [ HWY 7 - FINCH AVENUE ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:HWY 7
To:FINCH AVENUE
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday to Friday: Left lane closed on Highway 427 SB between Highway 7 and Finch Ave from 2200 to 0500.
Event Start:November 11, 2017 22:00
Event End:November 18, 2017 05:00
Last Change: Entered 2017-11-10 11:53

Top of page Top of page


HWY 427 Southbound [ HWY 7 - FINCH AVENUE ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:HWY 7
To:FINCH AVENUE
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday to Friday: Left lane closed on Highway 427 SB between Highway 7 and Finch Ave from 2200 to 0500.
Event Start:November 18, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 13:23

Top of page Top of page


HWY 427 Southbound Collector [ FINCH AVENUE Collector - REXDALE BLVD / DERRY ROAD Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:FINCH AVENUE Collector
To:REXDALE BLVD / DERRY ROAD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from FINCH AVENUE EB
ReasonRecurring-Construction
Comment :Tuesday-Friday: 1 lane closed at 19:00 expanding to a 2 lane closure at 22:00. 1 lane reopens at 05:00 and all lanes reopen at 06:00.
Event Start:November 14, 2017 19:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-14 09:16

Top of page Top of page


HWY 427 Southbound Collector [ FINCH AVENUE Collector - REXDALE BLVD / DERRY ROAD Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:FINCH AVENUE Collector
To:REXDALE BLVD / DERRY ROAD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from FINCH AVENUE EB
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closed at 19:00 expanding to a 2 lane closure at 22:00. 1 lane reopens at 05:00 and all lanes reopen at 06:00. Fri: 1 lane closed at 20:00 expanding to a 2 lane closure at 21:00. Full reopen at 06:00
Event Start:November 19, 2017 19:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-17 00:42

Top of page Top of page


HWY 427 Southbound Collector [ REXDALE BLVD / DERRY ROAD Collector - CAMPUS ROAD/FASKEN DRIVE Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:REXDALE BLVD / DERRY ROAD Collector
To:CAMPUS ROAD/FASKEN DRIVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 409 EB, On-ramp from HWY 409 WB
ReasonRecurring-Construction
Comment :Tuesday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00. 1 lane reopens at 05:00 and full reopen at 06:00. Friday: 1 lane closed at 23:00, 2 lanes closed at 23:59. 1 lane reopens 07:00 and full reopen at 08:00
Event Start:November 14, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-09 09:23

Top of page Top of page


HWY 427 Southbound Collector [ REXDALE BLVD / DERRY ROAD Collector - CAMPUS ROAD/FASKEN DRIVE Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:REXDALE BLVD / DERRY ROAD Collector
To:CAMPUS ROAD/FASKEN DRIVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00. 1 lane reopens at 05:00 and full reopen at 06:00. Friday: 1 lane closed at 23:00, 2 lanes closed at 23:59. Full reopen at 0600.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-17 00:33

Top of page Top of page


HWY 427 Southbound Off-ramp [ - EGLINTON AVE Eastbound ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:
To:EGLINTON AVE Eastbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 15, 2017 22:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-15 11:37

Top of page Top of page


HWY 6 Northbound [ Grey Road 17 - Grey Road 17 ] - Recurring-Construction
Highway:HWY 6
Direction:Northbound
From/At:Grey Road 17
To:Grey Road 17
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:October 02, 2017 07:00
Event End:November 06, 2018 19:00
Last Change: Entered 2017-09-29 16:29

Top of page Top of page


HWY 6 Northbound [ Highway 401 / Highway 6 North - Wellington Road 34 / County Road 34 ] - Construction
Highway:HWY 6
Direction:Northbound
From/At:Highway 401 / Highway 6 North
To:Wellington Road 34 / County Road 34
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 6 Northbound and Southbound from Highway 401 to Wellington road 34 will have right lane closures from October 26th at 0830 hours until December 10th at 1730 hours
Event Start:October 26, 2017 08:30
Event End:December 10, 2017 17:30
Last Change: Entered 2017-10-23 15:28

Top of page Top of page


HWY 6 Northbound [ King Street / Haldimand Road 20 - Mississauga Road / Haldimand 1st Line ] - Recurring-Construction
Highway:HWY 6
Direction:Northbound
From/At:King Street / Haldimand Road 20
To:Mississauga Road / Haldimand 1st Line
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 6 (northbound and southbound) from the north limit of Hagersville to 0.3 kilometres north of First Line will be having alternating daily lane restrictions as required with use of flagmen and/or temporary traffic signals. Project duration is July 4, 2017 to December 2017, Lane restrictions are permitted Monday to Friday 00:00 hours to 16:00 hours and 18:00 hours to 24:00 hours (no night work is currently scheduled).
Event Start:July 10, 2017 00:00
Event End:December 31, 2017 23:59
Last Change: Entered 2017-07-10 10:49

Top of page Top of page


HWY 6/21 Northbound [ Highway 6 / County Road 18 - Nichol's Gully Road / 9th Ave West ] - Recurring-Construction
Highway:HWY 6/21
Direction:Northbound
From/At:Highway 6 / County Road 18
To:Nichol's Gully Road / 9th Ave West
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 21 alternating directions, between Grey Road 18 and 9th Avenue, Springmount / Owen Sound, various lane closures, Monday, November 20th, 2017 until Friday, November 24th, 2017, daily, from 0700 hours until 1900 hours, for construction work operations, weather permitting, with reduced speed and advanced signing in place.
Event Start:November 20, 2017 07:00
Event End:November 24, 2017 19:00
Last Change: Entered 2017-11-17 17:40

Top of page Top of page


HWY 7 Eastbound [ Asphodel 6Th Line - Asphodel 7Th Line ] - Recurring-Construction
Highway:HWY 7
Direction:Eastbound
From/At:Asphodel 6Th Line
To:Asphodel 7Th Line
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Traffic may encounter single lane closures with flagging operations on Hwy 7 west of Norwood
Event Start:November 20, 2017 07:00
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-17 11:39

Top of page Top of page


HWY 7 Eastbound [ N JCT HALTON ROAD 3-TRAFALGAR ROAD - S JCT HALTON ROAD 3-TRAFALGAR ROAD ] - Recurring-Construction
Highway:HWY 7
Direction:Eastbound
From/At:N JCT HALTON ROAD 3-TRAFALGAR ROAD
To:S JCT HALTON ROAD 3-TRAFALGAR ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 13, 2017 09:00
Event End:November 18, 2017 07:00
Last Change: Entered 2017-11-09 16:46

Top of page Top of page


HWY 7 Eastbound [ PICKERING SIDELINE 34 - PICKERING SIDELINE 32 ] - Recurring-Construction
Highway:HWY 7
Direction:Eastbound
From/At:PICKERING SIDELINE 34
To:PICKERING SIDELINE 32
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-10 15:47

Top of page Top of page


HWY 7 Westbound [ PICKERING SIDELINE 32 - PICKERING SIDELINE 34 ] - Recurring-Construction
Highway:HWY 7
Direction:Westbound
From/At:PICKERING SIDELINE 32
To:PICKERING SIDELINE 34
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation and 1 through lane will be maintained
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-10 15:42

Top of page Top of page


HWY 7 Westbound [ YORK/DURHAM ROAD 30 - LITTLE ROUGE CREEK ] - Recurring-Construction
Highway:HWY 7
Direction:Westbound
From/At:YORK/DURHAM ROAD 30
To:LITTLE ROUGE CREEK
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-10 15:50

Top of page Top of page


HWY 7/12 Northbound [ CRAGG ROAD - COUVES LANE ] - Recurring-Maintenance
Highway:HWY 7/12
Direction:Northbound
From/At:CRAGG ROAD
To:COUVES LANE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :1 through lane maintained by flagging operation.
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-10 13:07

Top of page Top of page


HWY 7/12 Northbound [ DOBLE STREET - DURHAM ROAD 10 / RIVER STREET / 6TH LINE ] - Recurring-Maintenance
Highway:HWY 7/12
Direction:Northbound
From/At:DOBLE STREET
To:DURHAM ROAD 10 / RIVER STREET / 6TH LINE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :1 through lane maintained by flagging operations.
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-10 12:01

Top of page Top of page


HWY 7/8 Eastbound [ Trussler Road / Ira Needles Boulevard - Fischer-Hallman Road ] - Construction
Highway:HWY 7/8
Direction:Eastbound
From/At:Trussler Road / Ira Needles Boulevard
To:Fischer-Hallman Road
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 7/8 from Trussler Rd. to Fischer-Hallman Rd. will have the Eastbound right lane closed Nov 17-18 from 2000-0800 hours and Westbound left and right lane closed Nov 17-18 from 2000-0800 hours
Event Start:November 17, 2017 20:00
Event End:November 18, 2017 08:00
Last Change: Entered 2017-11-16 13:39

Top of page Top of page


HWY 7A Westbound [ NESBITT LINE ROAD - REGIONAL ROAD 57 (BLACKSTOCK) ] - Recurring-Maintenance
Highway:HWY 7A
Direction:Westbound
From/At:NESBITT LINE ROAD
To:REGIONAL ROAD 57 (BLACKSTOCK)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :1 through lane maintained by flagging operations.
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-10 11:55

Top of page Top of page


HWY 9 Eastbound [ Ayton Road / Anna's Lane - 11th Line ] - Recurring-Construction
Highway:HWY 9
Direction:Eastbound
From/At:Ayton Road / Anna's Lane
To:11th Line
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 9 between Ayton Road and 11th Line will have temporary traffic lights regulating traffic for single lane closure in alternating direction. Lights will be operation 24 hours a day from November 13th until November 19th.
Event Start:November 13, 2017 07:00
Event End:November 19, 2017 07:00
Last Change: Entered 2017-11-10 19:28

Top of page Top of page


QEW Fort Erie Bound [ BAKER ROAD - RIDGEMOUNT ROAD ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:BAKER ROAD
To:RIDGEMOUNT ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :On-ramp from NETHERBY ROAD NB
ReasonConstruction
Comment :
Event Start:June 02, 2017 00:00
Event End:November 30, 2017 23:59
Last Change: Entered 2017-05-29 16:02

Top of page Top of page


QEW Fort Erie Bound [ BURLINGTON SKYWAY - BURLINGTON SKYWAY ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:BURLINGTON SKYWAY
To:BURLINGTON SKYWAY
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from NORTHSHORE BLVD/HWY 2 SB
ReasonRecurring-Engineering Investigation
Comment :Fri: 2 lanes closed 2200-0700. Sat: 2 lanes closed 2100-0700.
Event Start:November 17, 2017 21:00
Event End:November 19, 2017 07:00
Last Change: Entered 2017-11-15 16:01

Top of page Top of page


QEW Fort Erie Bound [ GARDEN CITY SKYWAY - HWY 405 ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:GARDEN CITY SKYWAY
To:HWY 405
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 19, 2017 19:00
Event End:November 24, 2017 07:00
Last Change: Entered 2017-11-14 15:10

Top of page Top of page


QEW Fort Erie Bound [ HWY 10/HURONTARIO - ERIN MILLS PKWY/SOUTHDOWN ROAD ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:HWY 10/HURONTARIO
To:ERIN MILLS PKWY/SOUTHDOWN ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Sun-Thu: 23:00-6:00. Fri: 23:00-7:00. Sat 23:59-9:00.
Event Start:November 12, 2017 23:00
Event End:November 19, 2017 09:00
Last Change: Entered 2017-11-06 14:34

Top of page Top of page


QEW Fort Erie Bound [ HWY 427 - HWY 10/HURONTARIO ] - Recurring-Maintenance
Highway:QEW
Direction:Fort Erie Bound
From/At:HWY 427
To:HWY 10/HURONTARIO
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 19, 2017 23:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-15 08:36

Top of page Top of page


QEW Fort Erie Bound [ MCLEOD ROAD - MCLEOD ROAD ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:MCLEOD ROAD
To:MCLEOD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from MCLEOD ROAD EB, On-ramp from MCLEOD ROAD WB, Off-ramp to MCLEOD ROAD EB/WB
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 20:42

Top of page Top of page


QEW Fort Erie Bound [ THOMPSON ROAD - THOMPSON ROAD ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:THOMPSON ROAD
To:THOMPSON ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 12:00
Last Change: Entered 2017-11-15 13:09

Top of page Top of page


QEW Fort Erie Bound [ WELLAND RIVER BRIDGE - BECK ROAD ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:WELLAND RIVER BRIDGE
To:BECK ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :On-ramp from LYONS CREEK ROAD EB, On-ramp from LYONS CREEK ROAD WB
ReasonConstruction
Comment :
Event Start:May 17, 2017 00:00
Event End:November 30, 2017 23:59
Last Change: Entered 2017-05-15 10:57

Top of page Top of page


QEW Fort Erie Bound [ WINSTON CHURCHILL BLVD - ROYAL WINDSOR DRIVE ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:WINSTON CHURCHILL BLVD
To:ROYAL WINDSOR DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to FORD DRIVE NB/SB, On-ramp from HWY 403 OAKVILLE WB, On-ramp from FORD DRIVE NB, On-ramp from FORD DRIVE SB
ReasonRecurring-Construction
Comment :Mon-Thur: Single lane closed at 21:00, and expanding to a two lane closed at 2300. All lanes opened at 0600. Fri: Single lane closed at 21:00, and expanding to a two lane closed at 2300. One lane opened at 0700, and all lanes opened at 0800.
Event Start:November 13, 2017 20:00
Event End:November 18, 2017 06:00
Last Change: Entered 2017-11-08 08:30

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - CENTRAL AVENUE Eastbound ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:CENTRAL AVENUE Eastbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 13:04

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - DORVAL DRIVE Northbound/Southbound ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:DORVAL DRIVE Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-14 06:34

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - HWY 406 Southbound ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:HWY 406 Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 19, 2017 22:00
Event End:November 20, 2017 05:00
Last Change: Entered 2017-11-15 14:35

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - MISSISSAUGA ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:MISSISSAUGA ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 12, 2017 23:00
Event End:November 19, 2017 05:00
Last Change: Entered 2017-11-06 14:42

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - WALKERS LINE Northbound/Southbound ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:WALKERS LINE Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 21, 2017 22:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-14 06:31

Top of page Top of page


QEW Fort Erie Bound On-ramp [ CAWTHRA ROAD Northbound/Southbound - ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:CAWTHRA ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 13, 2017 23:00
Event End:November 20, 2017 05:00
Last Change: Entered 2017-11-09 19:28

Top of page Top of page


QEW Fort Erie Bound On-ramp [ DORVAL DRIVE Northbound - ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:DORVAL DRIVE Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 23:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-14 06:36

Top of page Top of page


QEW Fort Erie Bound On-ramp [ MISSISSAUGA ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:MISSISSAUGA ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 12, 2017 23:00
Event End:November 19, 2017 05:00
Last Change: Entered 2017-11-06 14:41

Top of page Top of page


QEW Fort Erie Bound On-ramp [ WALKERS LINE Northbound - ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:WALKERS LINE Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 21, 2017 23:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-14 06:31

Top of page Top of page


QEW Fort Erie Bound On-ramp [ WINSTON CHURCHILL BLVD Northbound/Southbound - ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:WINSTON CHURCHILL BLVD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 13, 2017 23:00
Event End:November 20, 2017 05:00
Last Change: Entered 2017-11-09 19:34

Top of page Top of page


QEW Toronto bound [ BECK ROAD - WELLAND RIVER BRIDGE ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:BECK ROAD
To:WELLAND RIVER BRIDGE
Lanes Affected:1 Right Lane(s)
Traffic Impact :Off-ramp to LYONS CREEK ROAD EB/WB
ReasonConstruction
Comment :
Event Start:May 17, 2017 00:00
Event End:November 30, 2017 23:59
Last Change: Entered 2017-05-15 11:00

Top of page Top of page


QEW Toronto bound [ BURLINGTON ST - NORTHSHORE BLVD/HWY 2 ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:BURLINGTON ST
To:NORTHSHORE BLVD/HWY 2
Lanes Affected:3 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Fri: Two lanes closed at 2000, and expanding to a three lane closure at 2359; two lanes opened at 0800, and all lanes opened at 0700. Sat-Sun: No closures. Mon-Thu: Two lanes closed at 1900, and expanding to a three lanes closure at 2359; all lanes opened at 0500.
Event Start:November 17, 2017 20:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-10 11:50

Top of page Top of page


QEW Toronto bound [ ERIN MILLS PKWY/SOUTHDOWN ROAD - HWY 10/HURONTARIO ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:ERIN MILLS PKWY/SOUTHDOWN ROAD
To:HWY 10/HURONTARIO
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Sun-Thu: 23:00-5:00. Fri: 23:00-7:00. Sat: 23:00-9:00.
Event Start:November 12, 2017 23:00
Event End:November 19, 2017 09:00
Last Change: Entered 2017-11-06 14:39

Top of page Top of page


QEW Toronto bound [ HWY 10/HURONTARIO - HWY 427 ] - Recurring-Maintenance
Highway:QEW
Direction:Toronto bound
From/At:HWY 10/HURONTARIO
To:HWY 427
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 19, 2017 23:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-15 08:39

Top of page Top of page


QEW Toronto bound [ HWY 405 - GARDEN CITY SKYWAY ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:HWY 405
To:GARDEN CITY SKYWAY
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 19, 2017 19:00
Event End:November 24, 2017 07:00
Last Change: Entered 2017-11-14 15:14

Top of page Top of page


QEW Toronto bound [ MCLEOD ROAD - MCLEOD ROAD ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:MCLEOD ROAD
To:MCLEOD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from MCLEOD ROAD NB, On-ramp from MCLEOD ROAD SB, Off-ramp to MCLEOD ROAD NB/SB
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 20:47

Top of page Top of page


QEW Toronto bound [ RIDGEMOUNT ROAD - BAKER ROAD ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:RIDGEMOUNT ROAD
To:BAKER ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:June 02, 2017 00:00
Event End:November 30, 2017 23:59
Last Change: Entered 2017-05-29 15:56

Top of page Top of page


QEW Toronto bound [ THOMPSON ROAD - THOMPSON ROAD ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:THOMPSON ROAD
To:THOMPSON ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 12:00
Last Change: Entered 2017-11-15 13:08

Top of page Top of page


QEW Toronto bound Off-ramp [ - CENTRAL AVENUE Eastbound ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:
To:CENTRAL AVENUE Eastbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 13:07

Top of page Top of page


QEW Toronto bound Off-ramp [ - DORVAL DRIVE Northbound/Southbound ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:
To:DORVAL DRIVE Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-14 06:34

Top of page Top of page


QEW Toronto bound Off-ramp [ - MISSISSAUGA ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:
To:MISSISSAUGA ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 12, 2017 23:00
Event End:November 19, 2017 05:00
Last Change: Entered 2017-11-06 14:46

Top of page Top of page


QEW Toronto bound Off-ramp [ - THOMPSON ROAD Southbound ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:
To:THOMPSON ROAD Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:May 18, 2017 00:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-05-17 11:29

Top of page Top of page


QEW Toronto bound Off-ramp [ - WALKERS LINE Northbound/Southbound ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:
To:WALKERS LINE Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 21, 2017 22:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-14 06:30

Top of page Top of page


QEW Toronto bound On-ramp [ CAWTHRA ROAD Northbound/Southbound - ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:CAWTHRA ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 13, 2017 23:00
Event End:November 20, 2017 05:00
Last Change: Entered 2017-11-09 19:26

Top of page Top of page


QEW Toronto bound On-ramp [ MISSISSAUGA ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:MISSISSAUGA ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 12, 2017 23:00
Event End:November 19, 2017 05:00
Last Change: Entered 2017-11-06 14:44

Top of page Top of page


QEW Toronto bound On-ramp [ WINSTON CHURCHILL BLVD Northbound/Southbound - ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:WINSTON CHURCHILL BLVD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 13, 2017 23:00
Event End:November 20, 2017 05:00
Last Change: Entered 2017-11-09 19:31

Top of page Top of page


HWY 401 Westbound Off-ramp [ - MISSISSAUGA RD ] - Collision
Highway:HWY 401
Direction:Westbound
From/At:
To:MISSISSAUGA RD
Lanes Affected:left shoulder and 2 left lanes blocked
Traffic Impact :
ReasonCollision
Comment :
Event Start:November 17, 2017 22:31
Event End:
Last Change: Updated 2017-11-17 22:49

Top of page Top of page


HWY 427 Southbound Express [ BURNHAMTHORPE ROAD - ] - Collision
Highway:HWY 427
Direction:Southbound
From/At:BURNHAMTHORPE ROAD
To:
Lanes Affected:All lanes blocked
Traffic Impact :
ReasonCollision
Comment :
Event Start:November 17, 2017 18:57
Event End:
Last Change: Updated 2017-11-17 19:03

Top of page Top of page


HWY 537 Both Directions [ CROSS RD-CLELAND TWP - S JCT ST CLOUD RD-CLELAND TWP ] - Flooding
Highway:HWY 537
Direction:Both Directions
From/At:CROSS RD-CLELAND TWP
To:S JCT ST CLOUD RD-CLELAND TWP
Lanes Affected:All lanes closed
Traffic Impact :
ReasonFlooding
Comment :HWY 537 CLOSED IN WAHNAPITAE FROM CROSS RD TO ST.CLOUDS RD - JUMBO CREEK - UPDATED NOVEMBER 17 AT 2300 HOURS
Event Start:November 16, 2017 13:16
Event End:
Last Change: Updated 2017-11-17 23:00

Top of page Top of page


QEW Toronto bound Off-ramp [ - THIRD LINE ] - Collision
Highway:QEW
Direction:Toronto bound
From/At:
To:THIRD LINE
Lanes Affected:right lane blocked
Traffic Impact :
ReasonCollision
Comment :
Event Start:November 17, 2017 20:49
Event End:
Last Change: Entered 2017-11-17 20:49

Top of page Top of page


This information is provided as a public service. Although we endeavor to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.

Road information by phone

  • Provincial Call Centre: 1-800-268-4686
  • In GTA: 416-235-4686
  • Provincial TTY: 1-866-471-8929
  • Niagara Region TTY: 905-704-2426

See also:

Ontario 511 Logo