Road Closures

Please press the Refresh or Reload button at the top of your screen to see the most recent updates.

Unscheduled road closures and events for provincial highways:

Unscheduled Events

Scheduled Events

HWY 10 Northbound [ DUFFERIN RD 124 (N) DUFFERIN RD 11(S) - CHATSWORTH RD 24 (W)/HOLLAND 30 SIDEROAD (E) ] - Recurring-Construction
Highway: HWY 10
Direction: Northbound
From/At: DUFFERIN RD 124 (N) DUFFERIN RD 11(S)
To: CHATSWORTH RD 24 (W)/HOLLAND 30 SIDEROAD (E)
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 10 from 2 km South of Dufferin Rd. 17 to 0.6 km North of Hwy 10 Southgate Rd. 24 will have the right lane closed in alternating directions June 29 - July 3 daily from 0700-1900. Hwy 10 from Campbell St. (Flesherton) to Southgate Rd. 24 will have the right lane closed in alternating directions June 29 - July 3 daily from 0700-1900. Hwy 7 from 0.6 km East of Wellington Rd. 44 to 0.1 km West of Skyway Dr. will have the right lane closed alternating directions June 29-July 3 from 0700-1900 hours. Note: No closure will be done on July 1
Event Start: June 29, 2015 07:00
Event End: July 03, 2015 19:00
Last Change: Entered 2015-06-25 14:34

Top of page Top of page


HWY 10 Northbound [ FORKS OF THE CREDIT ROAD - HWY. 24/CHARLESTON SIDEROAD ] - Moving Maintenance Closure
Highway: HWY 10
Direction: Northbound
From/At: FORKS OF THE CREDIT ROAD
To: HWY. 24/CHARLESTON SIDEROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Moving Maintenance Closure
Comment :
Event Start: July 04, 2015 20:00
Event End: July 10, 2015 05:00
Last Change: Entered 2015-07-01 07:55

Top of page Top of page


HWY 10 Southbound [ HWY. 24/CHARLESTON SIDEROAD - FORKS OF THE CREDIT ROAD ] - Moving Maintenance Closure
Highway: HWY 10
Direction: Southbound
From/At: HWY. 24/CHARLESTON SIDEROAD
To: FORKS OF THE CREDIT ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Moving Maintenance Closure
Comment :
Event Start: July 04, 2015 10:00
Event End: July 10, 2015 05:00
Last Change: Entered 2015-07-01 07:58

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway: HWY 11
Direction: Northbound
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 18:00
Event End: July 05, 2015 23:59
Last Change: Entered 2015-06-22 09:02

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway: HWY 11
Direction: Northbound
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 00:00
Event End: July 05, 2015 10:00
Last Change: Entered 2015-06-22 09:02

Top of page Top of page


HWY 11 Northbound [ SOUTH SPARROW LAKE ROAD - SEVERN RIVER BRIDGE/WEST BRANCH ] - Maintenance
Highway: HWY 11
Direction: Northbound
From/At: SOUTH SPARROW LAKE ROAD
To: SEVERN RIVER BRIDGE/WEST BRANCH
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: July 02, 2015 19:00
Event End: July 03, 2015 07:00
Last Change: Entered 2015-06-29 17:58

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway: HWY 11
Direction: Southbound
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 06, 2015 19:00
Event End: July 12, 2015 23:59
Last Change: Entered 2015-06-22 09:28

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway: HWY 11
Direction: Southbound
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 00:00
Event End: July 05, 2015 10:00
Last Change: Entered 2015-06-22 09:02

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway: HWY 11
Direction: Southbound
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 19:00
Event End: July 05, 2015 23:59
Last Change: Entered 2015-06-22 09:02

Top of page Top of page


HWY 12 Northbound [ HWY 11/SIMCOE ROAD 11/COLDWATER ROAD - HWY 93/SIMCOE ROAD 93 ] - Maintenance
Highway: HWY 12
Direction: Northbound
From/At: HWY 11/SIMCOE ROAD 11/COLDWATER ROAD
To: HWY 93/SIMCOE ROAD 93
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: July 02, 2015 20:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-26 10:05

Top of page Top of page


HWY 12 Northbound [ HWY 11/SIMCOE ROAD 11/COLDWATER ROAD - HWY 93/SIMCOE ROAD 93 ] - Recurring-Maintenance
Highway: HWY 12
Direction: Northbound
From/At: HWY 11/SIMCOE ROAD 11/COLDWATER ROAD
To: HWY 93/SIMCOE ROAD 93
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 02, 2015 09:00
Event End: July 03, 2015 15:00
Last Change: Entered 2015-06-26 10:25

Top of page Top of page


HWY 12 Northbound [ TALBOT ROAD/GAMEBRIDGE - MIDLAND/WYE RIVER BRIDGE ] - Recurring-Maintenance
Highway: HWY 12
Direction: Northbound
From/At: TALBOT ROAD/GAMEBRIDGE
To: MIDLAND/WYE RIVER BRIDGE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 02, 2015 09:00
Event End: July 03, 2015 15:00
Last Change: Entered 2015-06-26 10:55

Top of page Top of page


HWY 12 Northbound [ TALBOT ROAD/GAMEBRIDGE - MIDLAND/WYE RIVER BRIDGE ] - Recurring-Maintenance
Highway: HWY 12
Direction: Northbound
From/At: TALBOT ROAD/GAMEBRIDGE
To: MIDLAND/WYE RIVER BRIDGE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 02, 2015 20:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-26 10:47

Top of page Top of page


HWY 12 Southbound [ HWY 93/SIMCOE ROAD 93 - HWY 11/SIMCOE ROAD 11/COLDWATER ROAD ] - Maintenance
Highway: HWY 12
Direction: Southbound
From/At: HWY 93/SIMCOE ROAD 93
To: HWY 11/SIMCOE ROAD 11/COLDWATER ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: July 02, 2015 20:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-26 10:06

Top of page Top of page


HWY 12 Southbound [ HWY 93/SIMCOE ROAD 93 - HWY 11/SIMCOE ROAD 11/COLDWATER ROAD ] - Recurring-Maintenance
Highway: HWY 12
Direction: Southbound
From/At: HWY 93/SIMCOE ROAD 93
To: HWY 11/SIMCOE ROAD 11/COLDWATER ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 02, 2015 09:00
Event End: July 03, 2015 15:00
Last Change: Entered 2015-06-26 10:14

Top of page Top of page


HWY 12 Southbound [ MIDLAND/WYE RIVER BRIDGE - TALBOT ROAD/GAMEBRIDGE ] - Recurring-Maintenance
Highway: HWY 12
Direction: Southbound
From/At: MIDLAND/WYE RIVER BRIDGE
To: TALBOT ROAD/GAMEBRIDGE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 02, 2015 09:00
Event End: July 03, 2015 15:00
Last Change: Entered 2015-06-26 10:56

Top of page Top of page


HWY 12 Southbound [ MIDLAND/WYE RIVER BRIDGE - TALBOT ROAD/GAMEBRIDGE ] - Recurring-Maintenance
Highway: HWY 12
Direction: Southbound
From/At: MIDLAND/WYE RIVER BRIDGE
To: TALBOT ROAD/GAMEBRIDGE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 02, 2015 20:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-26 10:49

Top of page Top of page


HWY 137 Northbound [ THOUSAND ISLAND PKWY - THOUSAND ISLAND PKWY ] - Recurring-Construction
Highway: HWY 137
Direction: Northbound
From/At: THOUSAND ISLAND PKWY
To: THOUSAND ISLAND PKWY
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Hwy 137N/B & S/B @ Thousand Island Parkway (Gananoque)
Event Start: June 29, 2015 07:00
Event End: July 03, 2015 17:00
Last Change: Entered 2015-06-18 09:07

Top of page Top of page


HWY 137 Northbound [ THOUSAND ISLAND PKWY - THOUSAND ISLAND PKWY ] - Recurring-Construction
Highway: HWY 137
Direction: Northbound
From/At: THOUSAND ISLAND PKWY
To: THOUSAND ISLAND PKWY
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Hwy 137N/B & S/B @ Thousand Island Parkway (Gananoque)
Event Start: July 06, 2015 07:00
Event End: July 10, 2015 17:00
Last Change: Entered 2015-07-02 10:29

Top of page Top of page


HWY 140 Northbound [ KLIEINSMITH ROAD - EAST MAIN STREET/FARR ROAD ] - Recurring-Construction
Highway: HWY 140
Direction: Northbound
From/At: KLIEINSMITH ROAD
To: EAST MAIN STREET/FARR ROAD
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : This is a flagging operation and 1 through lane will be maintained
Event Start: June 30, 2015 00:00
Event End: July 03, 2015 15:00
Last Change: Entered 2015-06-26 11:07

Top of page Top of page


HWY 140 Southbound [ EAST MAIN STREET/FARR ROAD - KLIEINSMITH ROAD ] - Recurring-Construction
Highway: HWY 140
Direction: Southbound
From/At: EAST MAIN STREET/FARR ROAD
To: KLIEINSMITH ROAD
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : This is a flagging operation and 1 through lane will be maintained.
Event Start: June 30, 2015 00:00
Event End: July 03, 2015 15:00
Last Change: Entered 2015-06-26 11:08

Top of page Top of page


HWY 16 Northbound [ HWY 401 - HWY 401 ] - Construction
Highway: HWY 16
Direction: Northbound
From/At: HWY 401
To: HWY 401
Lanes Affected: 2 Right Lane(s)
Traffic Impact :
Reason Construction
Comment : Hwy 16N/B lanes closed @ CNR Overpass. Traffic will be diverted to S/B lanes - one lane each direction (Johnstown)
Event Start: June 15, 2015 00:00
Event End: August 31, 2015 23:59
Last Change: Entered 2015-06-05 14:45

Top of page Top of page


HWY 17 Westbound [ CAMPBELL DR - SCHEEL DR ] - Recurring-Construction
Highway: HWY 17
Direction: Westbound
From/At: CAMPBELL DR
To: SCHEEL DR
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily single lane closures with flagging operation on Hwy 17 in Arnprior
Event Start: June 29, 2015 06:00
Event End: July 03, 2015 20:00
Last Change: Entered 2015-06-25 13:44

Top of page Top of page


HWY 26 Eastbound [ POPLAR SIDEROAD - BAYVIEW AVE ] - Recurring-Moving Maintenance Closure
Highway: HWY 26
Direction: Eastbound
From/At: POPLAR SIDEROAD
To: BAYVIEW AVE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment :
Event Start: July 02, 2015 09:00
Event End: July 03, 2015 15:00
Last Change: Entered 2015-06-26 11:25

Top of page Top of page


HWY 26 Eastbound [ POPLAR SIDEROAD - BAYVIEW AVE ] - Recurring-Moving Maintenance Closure
Highway: HWY 26
Direction: Eastbound
From/At: POPLAR SIDEROAD
To: BAYVIEW AVE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment :
Event Start: July 02, 2015 20:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-26 11:20

Top of page Top of page


HWY 26 Westbound [ BAYVIEW AVE - POPLAR SIDEROAD ] - Recurring-Maintenance
Highway: HWY 26
Direction: Westbound
From/At: BAYVIEW AVE
To: POPLAR SIDEROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 02, 2015 09:00
Event End: July 03, 2015 15:00
Last Change: Entered 2015-06-26 11:27

Top of page Top of page


HWY 26 Westbound [ BAYVIEW AVE - POPLAR SIDEROAD ] - Recurring-Moving Maintenance Closure
Highway: HWY 26
Direction: Westbound
From/At: BAYVIEW AVE
To: POPLAR SIDEROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment :
Event Start: July 02, 2015 20:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-26 11:21

Top of page Top of page


HWY 26 Westbound [ SIMCOE ROAD 22/HORSESHOE VALLEY ROAD WEST - NOTTAWASAGA RIVER ] - Maintenance
Highway: HWY 26
Direction: Westbound
From/At: SIMCOE ROAD 22/HORSESHOE VALLEY ROAD WEST
To: NOTTAWASAGA RIVER
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: July 02, 2015 05:00
Event End: July 03, 2015 12:00
Last Change: Entered 2015-06-29 14:33

Top of page Top of page


HWY 28 Southbound [ LOWER FARADAY RD - EELS LAKE PUBLIC LANDING RD ] - Recurring-Maintenance
Highway: HWY 28
Direction: Southbound
From/At: LOWER FARADAY RD
To: EELS LAKE PUBLIC LANDING RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment : HWY 28 S/B from Lower Faraday Rd to beyond Eels Lake Public Landing Rd intermittent lane closures in various locations (Paudash-Apsley)
Event Start: June 15, 2015 07:00
Event End: July 31, 2015 15:30
Last Change: Entered 2015-06-09 15:53

Top of page Top of page


HWY 3 (HURON CHURCH ROAD) Eastbound [ Pulford Street - Pulford Street ] - Recurring-Construction
Highway: HWY 3 (HURON CHURCH ROAD)
Direction: Eastbound
From/At: Pulford Street
To: Pulford Street
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 3 at the intersection of Pulford St., eastbound and westbound will have the left lane closed from Wednesday, July 1, 2015 at 0001 hours to Tuesday, July 14, 2015, for construction purposes.
Event Start: July 01, 2015 00:00
Event End: July 14, 2015 16:00
Last Change: Entered 2015-06-29 20:27

Top of page Top of page


HWY 3 (HURON CHURCH ROAD) Westbound [ Bethlehem Avenue / Labelle Street - Lambton Street / Grand Marais Road West ] - Recurring-Construction
Highway: HWY 3 (HURON CHURCH ROAD)
Direction: Westbound
From/At: Bethlehem Avenue / Labelle Street
To: Lambton Street / Grand Marais Road West
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 3 at the intersection of Grand Marias to the intersection of Highway 3 and Labelle St., westbound lanes will be closed from Friday, July 3, 2015 at 1900 hours to Friday, August 14, 2015, for construction purposes.
Event Start: July 03, 2015 19:00
Event End: August 14, 2015 23:59
Last Change: Entered 2015-06-30 19:00

Top of page Top of page


HWY 3 Eastbound [ Carson Line - Green Line ] - Construction
Highway: HWY 3
Direction: Eastbound
From/At: Carson Line
To: Green Line
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment : Highway 3 Eastbound and Westbound between Green Line and Carson Line/Elliot Road will have a full closure, July 11 at 0600 to July 13 at 0600.
Event Start: July 11, 2015 06:00
Event End: July 13, 2015 06:00
Last Change: Entered 2015-06-26 13:28

Top of page Top of page


HWY 3 Eastbound [ Carter Road - John Pound Road ] - Recurring-Construction
Highway: HWY 3
Direction: Eastbound
From/At: Carter Road
To: John Pound Road
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 3 Eastbound and Westbound will have an alternating lane closure from Carter Road to John Pound Road, June 29-July 3 between 0700-1900 with the exception of July 1st when no operations will be taking place.
Event Start: June 29, 2015 07:00
Event End: July 03, 2015 19:00
Last Change: Entered 2015-06-26 12:38

Top of page Top of page


HWY 3 Eastbound [ E JCT CENTENNIAL RD (N)/ELGIN RD 28 (S) - JOHN POUND RD (N) ] - Recurring-Construction
Highway: HWY 3
Direction: Eastbound
From/At: E JCT CENTENNIAL RD (N)/ELGIN RD 28 (S)
To: JOHN POUND RD (N)
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 3 Eastbound and Westbound will have alternating lane closures from Carter Road to John Pound Road alternating from the left and right lanes, May 13-November 1 between 0700-1900 hours.
Event Start: May 13, 2015 07:00
Event End: November 01, 2015 19:00
Last Change: Entered 2015-05-11 14:06

Top of page Top of page


HWY 3 Eastbound [ HOWARD AV-ESSEX RD 9 - HWY 401 ENDS ] - Recurring-Construction
Highway: HWY 3
Direction: Eastbound
From/At: HOWARD AV-ESSEX RD 9
To: HWY 401 ENDS
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 3 is fully closed eastbound and westbound from Essex Road 18 to Essex Road 34. Graham Side Road will not have access to Highway 3.
Event Start: June 25, 2015 00:00
Event End: July 31, 2015 23:59
Last Change: Entered 2015-06-24 19:11

Top of page Top of page


HWY 3 Eastbound [ Huron Church Line Road/County Road 7/St. Clair College entrance - Huron Church Line Road/County Road 7/St. Clair College entrance ] - Recurring-Construction
Highway: HWY 3
Direction: Eastbound
From/At: Huron Church Line Road/County Road 7/St. Clair College entrance
To: Huron Church Line Road/County Road 7/St. Clair College entrance
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 3 at the intersection of Huron Church Line, eastbound and westbound will have the left lane closed from Wednesday, July 1, 2015 at 0001 hours to Tuesday, July 14, 2015, for construction purposes.
Event Start: July 01, 2015 01:00
Event End: July 14, 2015 16:00
Last Change: Entered 2015-06-29 20:19

Top of page Top of page


HWY 3 Eastbound [ TOWNLINE ROAD (WAINFLEET) - TOWNLINE ROAD ] - Recurring-Construction
Highway: HWY 3
Direction: Eastbound
From/At: TOWNLINE ROAD (WAINFLEET)
To: TOWNLINE ROAD
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 03, 2015 08:00
Event End: July 03, 2015 20:00
Last Change: Entered 2015-06-30 16:05

Top of page Top of page


HWY 3 Westbound [ TOWNLINE ROAD - TOWNLINE ROAD (WAINFLEET) ] - Recurring-Maintenance
Highway: HWY 3
Direction: Westbound
From/At: TOWNLINE ROAD
To: TOWNLINE ROAD (WAINFLEET)
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 06, 2015 08:00
Event End: July 11, 2015 20:00
Last Change: Entered 2015-06-30 16:08

Top of page Top of page


HWY 4 Northbound [ HURON RD 84-KING ST - HURON RD 84-KING ST ] - Recurring-Construction
Highway: HWY 4
Direction: Northbound
From/At: HURON RD 84-KING ST
To: HURON RD 84-KING ST
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 4 south of Hensall at the Black Creek River Bridge, and south of Kippen, at the Kippen Creek Bridge, will have the northbound lane closed from noon on Thursday, May 21st, 2015 to noon on Saturday, October 31st, 2015, for bridge work
Event Start: May 21, 2015 12:00
Event End: October 31, 2015 12:00
Last Change: Entered 2015-05-20 13:45

Top of page Top of page


HWY 400 Northbound [ 11TH CONCESSION - 11TH CONCESSION ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: 11TH CONCESSION
To: 11TH CONCESSION
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure. On Monday and Thursday, lane 1 will close at 8:00PM and lane 2 will close at 11:00PM. On Friday, lane 1 will close at 11:59PM and on Saturday, lane 1 will close at 10:00PM. Lane 2 will not be closed on Friday and Saturday.
Event Start: June 29, 2015 20:00
Event End: July 05, 2015 08:00
Last Change: Entered 2015-06-25 14:19

Top of page Top of page


HWY 400 Northbound [ 13TH CONCESSION - HWY 89/SIMCOE ROAD 89 ] - Maintenance
Highway: HWY 400
Direction: Northbound
From/At: 13TH CONCESSION
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: July 03, 2015 07:00
Event End: July 03, 2015 10:00
Last Change: Entered 2015-06-30 15:32

Top of page Top of page


HWY 400 Northbound [ AURORA ROAD. - CANAL ROAD. ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: AURORA ROAD.
To: CANAL ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 20:00
Event End: July 05, 2015 06:00
Last Change: Entered 2015-06-29 19:40

Top of page Top of page


HWY 400 Northbound [ AURORA ROAD. - CANAL ROAD. ] - Recurring-Maintenance
Highway: HWY 400
Direction: Northbound
From/At: AURORA ROAD.
To: CANAL ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 05, 2015 20:00
Event End: July 12, 2015 06:00
Last Change: Entered 2015-06-29 19:53

Top of page Top of page


HWY 400 Northbound [ CANAL ROAD. - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: CANAL ROAD.
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 28, 2015 22:00
Event End: July 04, 2015 11:00
Last Change: Entered 2015-06-24 13:18

Top of page Top of page


HWY 400 Northbound [ CANAL ROAD. - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: CANAL ROAD.
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 04, 2015 19:00
Event End: July 05, 2015 09:00
Last Change: Entered 2015-06-30 09:21

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - PARTRIDGE SKI TRAIL ROAD ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: DUCKWORTH STREET
To: PARTRIDGE SKI TRAIL ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 00:00
Event End: July 05, 2015 23:59
Last Change: Entered 2015-06-22 09:01

Top of page Top of page


HWY 400 Northbound [ ESSA ROAD / SIMCOE ROAD 27 - DUNLOP STREET / SIMCOE ROAD 90 ] - Recurring-Engineering Investigation
Highway: HWY 400
Direction: Northbound
From/At: ESSA ROAD / SIMCOE ROAD 27
To: DUNLOP STREET / SIMCOE ROAD 90
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment :
Event Start: June 28, 2015 20:00
Event End: July 03, 2015 07:00
Last Change: Entered 2015-06-24 11:35

Top of page Top of page


HWY 400 Northbound [ HWY 89/SIMCOE ROAD 89 - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: HWY 89/SIMCOE ROAD 89
To: INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB, On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, On-ramp from SIMCOE ROAD 88 EB/WB, Off-ramp to INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to SIMCOE ROAD 88 EB/WB
Reason Recurring-Construction
Comment : No two consecutive ramps will be closed at the same time.
Event Start: June 28, 2015 20:00
Event End: July 04, 2015 11:00
Last Change: Entered 2015-06-24 13:30

Top of page Top of page


HWY 400 Northbound [ HWY 89/SIMCOE ROAD 89 - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: HWY 89/SIMCOE ROAD 89
To: INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : No two consecutive ramps will be closed at the same time.
Event Start: July 04, 2015 19:00
Event End: July 05, 2015 09:00
Last Change: Entered 2015-06-30 09:22

Top of page Top of page


HWY 400 Northbound [ JANE STREET - 401 ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: JANE STREET
To: 401
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from 401 EB
Reason Construction
Comment : Expands from 1 lane to 2 lane closure at 23:00, and full ramp closure at midnight.
Event Start: July 03, 2015 22:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-07-02 15:39

Top of page Top of page


HWY 400 Northbound [ JANE STREET - 401 ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: JANE STREET
To: 401
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from JANE STREET SB, Off-ramp to 401 WB
Reason Construction
Comment :
Event Start: July 02, 2015 22:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-29 12:53

Top of page Top of page


HWY 400 Northbound [ LOWER BIG CHUTE ROAD - VASEY ROAD/SIMCOE ROAD 23 ] - Recurring-Construction
Highway: HWY 400
Direction: Northbound
From/At: LOWER BIG CHUTE ROAD
To: VASEY ROAD/SIMCOE ROAD 23
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 00:00
Event End: July 03, 2015 12:00
Last Change: Entered 2015-06-22 11:15

Top of page Top of page


HWY 400 Northbound [ MAPLEVIEW DRIVE - TIFFIN ST. ] - Recurring-Maintenance
Highway: HWY 400
Direction: Northbound
From/At: MAPLEVIEW DRIVE
To: TIFFIN ST.
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: June 29, 2015 20:00
Event End: July 03, 2015 05:00
Last Change: Entered 2015-06-26 08:06

Top of page Top of page


HWY 400 Northbound [ VASEY ROAD/SIMCOE ROAD 23 - VASEY ROAD/SIMCOE ROAD 23 ] - Construction
Highway: HWY 400
Direction: Northbound
From/At: VASEY ROAD/SIMCOE ROAD 23
To: VASEY ROAD/SIMCOE ROAD 23
Lanes Affected: 1 Left Lane(s)
Traffic Impact : On-ramp from VASEY ROAD/SIMCOE ROAD 23 EB/WB
Reason Construction
Comment :
Event Start: May 19, 2015 09:00
Event End: November 30, 2015 23:59
Last Change: Entered 2015-04-28 08:40

Top of page Top of page


HWY 400 Northbound Off-ramp [ - MAJOR MACKENZIE DRIVE Eastbound ] - Maintenance
Highway: HWY 400
Direction: Northbound
From/At:
To: MAJOR MACKENZIE DRIVE Eastbound
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: July 04, 2015 09:00
Event End: July 04, 2015 15:00
Last Change: Entered 2015-06-16 09:25

Top of page Top of page


HWY 400 Southbound [ 11TH CONCESSION - 11TH CONCESSION ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: 11TH CONCESSION
To: 11TH CONCESSION
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Alternating 2 lane closure. On Monday, Thursday and Friday, lane 1 will be closed at 8:00PM whereas on Saturday, lane 1 will be closed at 11:00PM. On Monday and Friday, lane 2 will close at 10:00PM, on Thursday, lane 2 will close at 11:00PM and on Friday, lane 2 will close at 11:59PM (Midnight).
Event Start: June 29, 2015 20:00
Event End: July 05, 2015 09:00
Last Change: Entered 2015-06-25 14:31

Top of page Top of page


HWY 400 Southbound [ ANNE ST. - ANNE ST. ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: ANNE ST.
To: ANNE ST.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 20:00
Event End: July 09, 2015 05:00
Last Change: Entered 2015-06-25 00:28

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - AURORA ROAD. ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: CANAL ROAD.
To: AURORA ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 05, 2015 19:00
Event End: July 12, 2015 05:00
Last Change: Entered 2015-06-29 19:55

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - AURORA ROAD. ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: CANAL ROAD.
To: AURORA ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 20:00
Event End: July 05, 2015 06:00
Last Change: Entered 2015-06-29 19:43

Top of page Top of page


HWY 400 Southbound [ DUCKWORTH STREET - DUCKWORTH STREET ] - Construction
Highway: HWY 400
Direction: Southbound
From/At: DUCKWORTH STREET
To: DUCKWORTH STREET
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : Off-ramp to DUCKWORTH STREET SB
Reason Construction
Comment :
Event Start: July 02, 2015 19:00
Event End: July 03, 2015 05:00
Last Change: Entered 2015-06-29 13:20

Top of page Top of page


HWY 400 Southbound [ DUNLOP STREET / SIMCOE ROAD 90 - ESSA ROAD / SIMCOE ROAD 27 ] - Recurring-Engineering Investigation
Highway: HWY 400
Direction: Southbound
From/At: DUNLOP STREET / SIMCOE ROAD 90
To: ESSA ROAD / SIMCOE ROAD 27
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment :
Event Start: June 28, 2015 22:00
Event End: July 03, 2015 06:30
Last Change: Entered 2015-06-24 11:41

Top of page Top of page


HWY 400 Southbound [ HORSESHOE VALLEY ROAD/SIMCOE ROAD 22 - FORBES ROAD/SIMCOE ROAD 11 ] - Maintenance
Highway: HWY 400
Direction: Southbound
From/At: HORSESHOE VALLEY ROAD/SIMCOE ROAD 22
To: FORBES ROAD/SIMCOE ROAD 11
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: July 02, 2015 00:00
Event End: July 02, 2015 23:59
Last Change: Entered 2015-06-29 13:37

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - SIMCOE ROAD 88 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: HWY 89/SIMCOE ROAD 89
To: SIMCOE ROAD 88
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 28, 2015 21:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-24 13:51

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - SIMCOE ROAD 88 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: HWY 89/SIMCOE ROAD 89
To: SIMCOE ROAD 88
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 04, 2015 21:00
Event End: July 05, 2015 08:00
Last Change: Entered 2015-06-30 09:31

Top of page Top of page


HWY 400 Southbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: INNISFIL BEACH ROAD - SIMCOE ROAD 21
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : No two consecutive ramps will be closed at the same time.
Event Start: July 04, 2015 21:00
Event End: July 05, 2015 10:00
Last Change: Entered 2015-06-30 09:29

Top of page Top of page


HWY 400 Southbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: INNISFIL BEACH ROAD - SIMCOE ROAD 21
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB, On-ramp from SIMCOE ROAD 88 EB/WB, On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB/WB, Off-ramp to SIMCOE ROAD 88 EB/WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB
Reason Recurring-Construction
Comment : No two consecutive ramps will be closed at the same time.
Event Start: June 28, 2015 11:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-24 13:49

Top of page Top of page


HWY 400 Southbound [ SIMCOE ROAD 88 - CANAL ROAD. ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: SIMCOE ROAD 88
To: CANAL ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 04, 2015 21:00
Event End: July 05, 2015 08:00
Last Change: Entered 2015-06-30 09:33

Top of page Top of page


HWY 400 Southbound [ SIMCOE ROAD 88 - CANAL ROAD. ] - Recurring-Construction
Highway: HWY 400
Direction: Southbound
From/At: SIMCOE ROAD 88
To: CANAL ROAD.
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 28, 2015 11:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-24 13:53

Top of page Top of page


HWY 400 Southbound Express [ HORSESHOE VALLEY ROAD/SIMCOE ROAD 22 Express - PARTRIDGE SKI TRAIL ROAD Express ] - Construction
Highway: HWY 400
Direction: Southbound
From/At: HORSESHOE VALLEY ROAD/SIMCOE ROAD 22 Express
To: PARTRIDGE SKI TRAIL ROAD Express
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 03, 2015 00:00
Event End: July 03, 2015 12:00
Last Change: Entered 2015-06-30 13:13

Top of page Top of page


HWY 400 Southbound Off-ramp [ - HORSESHOE VALLEY ROAD/SIMCOE ROAD 22 Eastbound/Westbound ] - Construction
Highway: HWY 400
Direction: Southbound
From/At:
To: HORSESHOE VALLEY ROAD/SIMCOE ROAD 22 Eastbound/Westbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: July 02, 2015 23:59
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-29 14:01

Top of page Top of page


HWY 401 Eastbound [ BENNETT ROAD - BOUNDARY ROAD ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At: BENNETT ROAD
To: BOUNDARY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 05, 2015 22:00
Event End: July 06, 2015 08:00
Last Change: Entered 2015-07-01 18:40

Top of page Top of page


HWY 401 Eastbound [ BENNETT ROAD - BOUNDARY ROAD ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: BENNETT ROAD
To: BOUNDARY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 06, 2015 20:00
Event End: July 10, 2015 08:00
Last Change: Entered 2015-07-01 18:45

Top of page Top of page


HWY 401 Eastbound [ BROCK ST - THICKSON ROAD ] - Recurring-Engineering Investigation
Highway: HWY 401
Direction: Eastbound
From/At: BROCK ST
To: THICKSON ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment :
Event Start: June 29, 2015 22:00
Event End: July 03, 2015 07:00
Last Change: Entered 2015-06-25 15:02

Top of page Top of page


HWY 401 Eastbound [ Burnham St (IC 472) - Nagle Rd ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: Burnham St (IC 472)
To: Nagle Rd
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : HWY 401 E/B & W/B lane reductions (Cobourg)
Event Start: July 02, 2015 23:00
Event End: July 03, 2015 03:00
Last Change: Entered 2015-06-24 07:15

Top of page Top of page


HWY 401 Eastbound [ CHURCH RD - CHURCH RD ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At: CHURCH RD
To: CHURCH RD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Left lane closed Hwy 401E/B & W/B @ Church Rd (Morrisburg)
Event Start: June 09, 2015 07:00
Event End: July 24, 2015 05:00
Last Change: Entered 2015-06-04 11:37

Top of page Top of page


HWY 401 Eastbound [ Currie Rd (149KM) - Highway 4 / Colonel Talbot Rd (177KM) ] - Recurring-Engineering Investigation
Highway: HWY 401
Direction: Eastbound
From/At: Currie Rd (149KM)
To: Highway 4 / Colonel Talbot Rd (177KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment : Highway 401 eastbound alternating westbound, between Elgin Road 8 (Currie Road) Interchange 149 and Highway 4 (Colonel Talbot Road) Interchange 177, Dutton / London areas, reduced from 2 lanes to a single lane of traffic, Monday, July 6th, 2015 until Thursday, July 9th, 2015, daily, from 0700 hours until 2000 hours and Friday, July 10th, 2015, from 0700 hours until 1200 hours, for engineering (boreholes and coreholes work) investigation operations.
Event Start: July 06, 2015 07:00
Event End: July 10, 2015 20:00
Last Change: Entered 2015-07-02 19:21

Top of page Top of page


HWY 401 Eastbound [ HWY 25 - TRAFALGAR ROAD ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: HWY 25
To: TRAFALGAR ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from JAMES SNOW PKWY NB, On-ramp from JAMES SNOW PKWY NB, On-ramp from TRAFALGAR ROAD SB, On-ramp from JAMES SNOW PKWY SB, Off-ramp to TRAFALGAR ROAD NB/SB, Off-ramp to JAMES SNOW PKWY NB/SB
Reason Recurring-Construction
Comment : Alternating 2 lane closure.
Event Start: June 27, 2015 22:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-25 09:52

Top of page Top of page


HWY 401 Eastbound [ HWY 402 IC-183 (SCOTLAND RD/GLANWORTH) - HWY 402 IC-183 (SCOTLAND RD/GLANWORTH) ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: HWY 402 IC-183 (SCOTLAND RD/GLANWORTH)
To: HWY 402 IC-183 (SCOTLAND RD/GLANWORTH)
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 401 Eastbound and Westbound will have lane closures in effect from 1.5 kilometer West of Glanworth Drive underpass to approximately 1 kilometre East of Scotland Drive underpass. There will be a FULL Eastbound lane closure with traffic being detoured at the median crossover, and a left lane Westbound closure from April 14, 2015 1200 hours to September 4, 2014 1800 hours due to construction operations (new bridge).
Event Start: April 14, 2015 12:00
Event End: September 04, 2015 18:00
Last Change: Entered 2015-04-13 14:09

Top of page Top of page


HWY 401 Eastbound [ NUDELL BUSH RD - NUDELL BUSH RD ] - Maintenance
Highway: HWY 401
Direction: Eastbound
From/At: NUDELL BUSH RD
To: NUDELL BUSH RD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Maintenance
Comment : Lane reductions Hwy 401E/B & W/B @ Nudell Bush Rd (E/Morrisburg)
Event Start: July 03, 2015 07:00
Event End: July 03, 2015 17:00
Last Change: Entered 2015-07-02 14:35

Top of page Top of page


HWY 401 Eastbound [ SALEM ROAD - BROCK ST ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: SALEM ROAD
To: BROCK ST
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from SALEM ROAD NB/SB
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 22:00
Event End: July 06, 2015 05:00
Last Change: Entered 2015-06-23 20:53

Top of page Top of page


HWY 401 Eastbound [ THOUSAND ISLAND PKWY E/B (IC 647) - THOUSAND ISLAND PKWY E/B (IC 647) ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: THOUSAND ISLAND PKWY E/B (IC 647)
To: THOUSAND ISLAND PKWY E/B (IC 647)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Hwy 401E/B @ Thousand Island Parkway(Gananoque)
Event Start: July 06, 2015 07:00
Event End: July 10, 2015 17:00
Last Change: Entered 2015-07-02 10:45

Top of page Top of page


HWY 401 Eastbound [ THOUSAND ISLAND PKWY E/B (IC 647) - THOUSAND ISLAND PKWY E/B (IC 647) ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: THOUSAND ISLAND PKWY E/B (IC 647)
To: THOUSAND ISLAND PKWY E/B (IC 647)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Hwy 401E/B @ Thousand Island Parkway(Gananoque)
Event Start: June 29, 2015 07:00
Event End: July 03, 2015 17:00
Last Change: Entered 2015-06-18 09:14

Top of page Top of page


HWY 401 Eastbound [ UPPER CANADA RD (IC 758) - UPPER CANADA RD (IC 758) ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At: UPPER CANADA RD (IC 758)
To: UPPER CANADA RD (IC 758)
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Morrisburg
Event Start: July 03, 2015 07:00
Event End: July 03, 2015 17:00
Last Change: Entered 2015-06-30 20:32

Top of page Top of page


HWY 401 Eastbound [ UPPER CANADA RD (IC 758) - UPPER CANADA RD (IC 758) ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At: UPPER CANADA RD (IC 758)
To: UPPER CANADA RD (IC 758)
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment : Right lane closed 401E/B @ Upper Canada Rd (Morrisburg)
Event Start: June 25, 2015 07:00
Event End: July 25, 2015 17:00
Last Change: Entered 2015-06-23 14:05

Top of page Top of page


HWY 401 Eastbound [ Wellington Rd (186KM) - Putnam Rd / Middlesex Rd 30 (208KM) ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At: Wellington Rd (186KM)
To: Putnam Rd / Middlesex Rd 30 (208KM)
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 401 eastbound alternating westbound, between Wellington Road (Interchange 186) and Putnam Road (Interchange 208), London / Putnam areas, at various locations reduced from 3 lanes to 2 lanes of traffic very short term, Friday, July 3rd, 2015, from 0800 hours until 1700 hours, for construction work operations.
Event Start: July 03, 2015 08:00
Event End: July 03, 2015 17:00
Last Change: Entered 2015-07-02 20:29

Top of page Top of page


HWY 401 Eastbound Collector Off-ramp [ - BROCK ROAD Eastbound ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: BROCK ROAD Eastbound
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 02, 2015 23:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-29 11:21

Top of page Top of page


HWY 401 Eastbound Collector [ ALLEN ROAD Collector - AVENUE ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: ALLEN ROAD Collector
To: AVENUE ROAD Collector
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 05, 2015 22:30
Event End: July 11, 2015 05:00
Last Change: Entered 2015-06-28 18:57

Top of page Top of page


HWY 401 Eastbound Collector [ ALLEN ROAD Collector - AVENUE ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: ALLEN ROAD Collector
To: AVENUE ROAD Collector
Lanes Affected: 2 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 28, 2015 22:30
Event End: July 04, 2015 05:30
Last Change: Entered 2015-06-19 03:36

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 400/BLACK CREEK DRIVE Collector - MORNINGSIDE AVE Collector ] - Recurring-Maintenance
Highway: HWY 401
Direction: Eastbound
From/At: HWY 400/BLACK CREEK DRIVE Collector
To: MORNINGSIDE AVE Collector
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 03, 2015 23:00
Event End: July 10, 2015 05:00
Last Change: Entered 2015-07-02 09:32

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 404 Collector - KENNEDY ROAD (SCARBOROUGH) Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: HWY 404 Collector
To: KENNEDY ROAD (SCARBOROUGH) Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 404 NB, On-ramp from VICTORIA PARK AVE NB, On-ramp from VICTORIA PARK AVE SB, Off-ramp to VICTORIA PARK AVE NB/SB, Off-ramp to WARDEN AVE NB/SB
Reason Recurring-Construction
Comment :
Event Start: July 01, 2015 22:00
Event End: July 04, 2015 06:00
Last Change: Entered 2015-06-24 17:35

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 6 SOUTH Collector - HWY 400/BLACK CREEK DRIVE Collector ] - Recurring-Maintenance
Highway: HWY 401
Direction: Eastbound
From/At: HWY 6 SOUTH Collector
To: HWY 400/BLACK CREEK DRIVE Collector
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 05, 2015 23:59
Event End: July 10, 2015 04:30
Last Change: Entered 2015-06-30 14:10

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 6 SOUTH Collector - HWY 400/BLACK CREEK DRIVE Collector ] - Recurring-Maintenance
Highway: HWY 401
Direction: Eastbound
From/At: HWY 6 SOUTH Collector
To: HWY 400/BLACK CREEK DRIVE Collector
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: June 21, 2015 23:59
Event End: July 03, 2015 04:30
Last Change: Entered 2015-06-16 08:08

Top of page Top of page


HWY 401 Eastbound Collector [ MORNINGSIDE AVE Collector - BOUNDARY ROAD Collector ] - Recurring-Maintenance
Highway: HWY 401
Direction: Eastbound
From/At: MORNINGSIDE AVE Collector
To: BOUNDARY ROAD Collector
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: June 28, 2015 23:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-18 12:50

Top of page Top of page


HWY 401 Eastbound Collector [ TOMKEN ROAD Collector - DIXIE ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: TOMKEN ROAD Collector
To: DIXIE ROAD Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DIXIE ROAD NB
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 21:00
Event End: July 07, 2015 05:00
Last Change: Entered 2015-06-25 16:40

Top of page Top of page


HWY 401 Eastbound Express [ ALLEN ROAD Express - AVENUE ROAD Express ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: ALLEN ROAD Express
To: AVENUE ROAD Express
Lanes Affected: 1 Right Lane(s)
Traffic Impact : On-ramp from ALLEN ROAD NB
Reason Recurring-Construction
Comment :
Event Start: July 05, 2015 22:30
Event End: July 11, 2015 05:00
Last Change: Entered 2015-06-28 18:58

Top of page Top of page


HWY 401 Eastbound Express [ ALLEN ROAD Express - AVENUE ROAD Express ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: ALLEN ROAD Express
To: AVENUE ROAD Express
Lanes Affected: 1 Right Lane(s)
Traffic Impact : On-ramp from ALLEN ROAD NB
Reason Recurring-Construction
Comment :
Event Start: June 28, 2015 22:30
Event End: July 04, 2015 05:30
Last Change: Entered 2015-06-19 03:35

Top of page Top of page


HWY 401 Eastbound Express [ HWY 404 Express - KENNEDY ROAD (SCARBOROUGH) Express ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At: HWY 404 Express
To: KENNEDY ROAD (SCARBOROUGH) Express
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 01, 2015 22:00
Event End: July 04, 2015 06:00
Last Change: Entered 2015-06-24 17:22

Top of page Top of page


HWY 401 Eastbound Express [ HWY 6 SOUTH Express - HWY 400/BLACK CREEK DRIVE Express ] - Recurring-Maintenance
Highway: HWY 401
Direction: Eastbound
From/At: HWY 6 SOUTH Express
To: HWY 400/BLACK CREEK DRIVE Express
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 05, 2015 23:59
Event End: July 10, 2015 04:30
Last Change: Entered 2015-06-30 14:04

Top of page Top of page


HWY 401 Eastbound Express [ HWY 6 SOUTH Express - HWY 400/BLACK CREEK DRIVE Express ] - Recurring-Maintenance
Highway: HWY 401
Direction: Eastbound
From/At: HWY 6 SOUTH Express
To: HWY 400/BLACK CREEK DRIVE Express
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: June 21, 2015 23:59
Event End: July 03, 2015 04:30
Last Change: Entered 2015-06-16 08:06

Top of page Top of page


HWY 401 Eastbound Express and Collector Off-ramp [ - HWY 404 Northbound/Southbound Express and Collector ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: HWY 404 Northbound/Southbound Express and Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: October 23, 2015 22:00
Event End: October 26, 2015 05:00
Last Change: Entered 2015-03-20 08:44

Top of page Top of page


HWY 401 Eastbound Off-ramp [ - ALLEN ROAD Northbound ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: ALLEN ROAD Northbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: June 28, 2015 22:30
Event End: July 04, 2015 05:30
Last Change: Entered 2015-06-19 03:33

Top of page Top of page


HWY 401 Eastbound Off-ramp [ - ALLEN ROAD Northbound ] - Recurring-Construction
Highway: HWY 401
Direction: Eastbound
From/At:
To: ALLEN ROAD Northbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 05, 2015 22:30
Event End: July 11, 2015 05:00
Last Change: Entered 2015-06-28 18:58

Top of page Top of page


HWY 401 Eastbound On-ramp [ BROCK ROAD Northbound/Southbound - ] - Construction
Highway: HWY 401
Direction: Eastbound
From/At: BROCK ROAD Northbound/Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: July 02, 2015 22:00
Event End: July 03, 2015 05:00
Last Change: Entered 2015-06-29 11:25

Top of page Top of page


HWY 401 Westbound [ BOUNDARY ROAD - BENNETT ROAD ] - Construction
Highway: HWY 401
Direction: Westbound
From/At: BOUNDARY ROAD
To: BENNETT ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 05, 2015 22:00
Event End: July 06, 2015 07:00
Last Change: Entered 2015-06-24 19:27

Top of page Top of page


HWY 401 Westbound [ BOUNDARY ROAD - BENNETT ROAD ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: BOUNDARY ROAD
To: BENNETT ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 06, 2015 19:00
Event End: July 09, 2015 07:00
Last Change: Entered 2015-06-24 19:29

Top of page Top of page


HWY 401 Westbound [ BOUNDARY ROAD - COBBLEDICK ROAD ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: BOUNDARY ROAD
To: COBBLEDICK ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 03, 2015 07:00
Event End: July 03, 2015 14:00
Last Change: Entered 2015-07-02 09:35

Top of page Top of page


HWY 401 Westbound [ BROCK ST - SALEM ROAD ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: BROCK ST
To: SALEM ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 28, 2015 22:00
Event End: July 05, 2015 05:00
Last Change: Entered 2015-06-24 18:57

Top of page Top of page


HWY 401 Westbound [ CHURCH ST - BROCK ROAD ] - Construction
Highway: HWY 401
Direction: Westbound
From/At: CHURCH ST
To: BROCK ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 03, 2015 22:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-30 15:18

Top of page Top of page


HWY 401 Westbound [ CTY RD 2 (IC 687) - MALLORYTOWN RD (IC 675) ] - Maintenance
Highway: HWY 401
Direction: Westbound
From/At: CTY RD 2 (IC 687)
To: MALLORYTOWN RD (IC 675)
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Maintenance
Comment : Hwy 401 WB closed, km 687 (CR 2) to km 675 (Mallorytown), Saturday 4 July fm 7am to 3pm (W/Brockville)
Event Start: July 04, 2015 07:00
Event End: July 04, 2015 15:00
Last Change: Entered 2015-07-02 12:31

Top of page Top of page


HWY 401 Westbound [ FURNIVAL RD IC-129-ELGIN RD 103 RODNEY - FURNIVAL RD IC-129-ELGIN RD 103 RODNEY ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: FURNIVAL RD IC-129-ELGIN RD 103 RODNEY
To: FURNIVAL RD IC-129-ELGIN RD 103 RODNEY
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 401 Eastbound and Westbound at Fleming Creek Bridge will have the left lane closed from May 7 - July 13 between 0700-2000 hours.
Event Start: May 07, 2015 07:00
Event End: July 13, 2015 20:00
Last Change: Entered 2015-05-01 18:00

Top of page Top of page


HWY 401 Westbound [ Franklin Blvd (284KM) - Highway 8 / King Street E/Shantz Hill Rd (278KM) ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: Franklin Blvd (284KM)
To: Highway 8 / King Street E/Shantz Hill Rd (278KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from Highway 24 / Hespeler Rd (282KM) WB, On-ramp from Highway 24 / Hespeler Rd (282KM) EB, On-ramp from Highway 24 / Hespeler Rd (282KM) EB
Reason Recurring-Construction
Comment : Highway 401 Westbound from Franklin Boulevard to King Street will have an alternating lane closure July 2-4. The left lane will be closed July 2 from 2000-0700 hours and July 3 from 2100 to 0700 hours. The centre lane will be closed July 3-4 from 0000-0600 hours. The Eastbound side will have the same closure with the right lane closed July 2 from 2000-0200 hours and July 3 from 2100-0200 hours. The centre lane will be closed July 3-4 from 0000-0500 hours. The left lane will be closed July 3 from 0200-0500 hours and July 4 from 0200-0700 hours. The Hespeler Eastbound On-Ramp will be closed July 2 from 2100-0000 hours and July 3 from 2300-0000 hours. The Westbound ramp will be closed July 2-4 from 1900-0700 hours.
Event Start: July 02, 2015 20:00
Event End: July 04, 2015 06:00
Last Change: Entered 2015-06-27 09:06

Top of page Top of page


HWY 401 Westbound [ Gages Creek Culvert - Hamilton Rd ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: Gages Creek Culvert
To: Hamilton Rd
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 08, 2015 00:00
Event End: July 10, 2015 23:59
Last Change: Entered 2015-07-02 16:42

Top of page Top of page


HWY 401 Westbound [ Nagle Rd - Burnham St (IC 472) ] - Construction
Highway: HWY 401
Direction: Westbound
From/At: Nagle Rd
To: Burnham St (IC 472)
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : left lane closure EB and WB
Event Start: July 06, 2015 19:00
Event End: July 07, 2015 07:00
Last Change: Entered 2015-07-02 14:08

Top of page Top of page


HWY 401 Westbound [ TRAFALGAR ROAD - HALTON 22 ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: TRAFALGAR ROAD
To: HALTON 22
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from JAMES SNOW PKWY NB, On-ramp from HWY 25 NB, On-ramp from JAMES SNOW PKWY SB, On-ramp from HWY 25 SB, Off-ramp to JAMES SNOW PKWY NB/SB, Off-ramp to HWY 25 NB/SB
Reason Recurring-Construction
Comment : Alternating 2 lane closure.
Event Start: June 27, 2015 22:00
Event End: July 04, 2015 06:00
Last Change: Entered 2015-06-25 09:59

Top of page Top of page


HWY 401 Westbound [ UPPER CANADA RD (IC 758) - UPPER CANADA RD (IC 758) ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: UPPER CANADA RD (IC 758)
To: UPPER CANADA RD (IC 758)
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : HWY 401 W/B 2km East of Upper Canada Rd to 200m West of Upper Canada Rd right lane closure for construction. (Morrisburg)
Event Start: May 28, 2015 07:00
Event End: July 21, 2015 17:00
Last Change: Entered 2015-05-25 07:56

Top of page Top of page


HWY 401 Westbound Collector [ BOUNDARY ROAD Collector - MORNINGSIDE AVE Collector ] - Recurring-Maintenance
Highway: HWY 401
Direction: Westbound
From/At: BOUNDARY ROAD Collector
To: MORNINGSIDE AVE Collector
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: June 28, 2015 23:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-18 12:52

Top of page Top of page


HWY 401 Westbound Collector [ BROCK ROAD Collector - BROCK ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: BROCK ROAD Collector
To: BROCK ROAD Collector
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 22:00
Event End: July 03, 2015 05:00
Last Change: Entered 2015-06-25 16:16

Top of page Top of page


HWY 401 Westbound Collector [ DIXIE ROAD Collector - HWY 410 Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: DIXIE ROAD Collector
To: HWY 410 Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DIXIE ROAD SB
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 21:00
Event End: July 07, 2015 06:00
Last Change: Entered 2015-06-25 16:32

Top of page Top of page


HWY 401 Westbound Collector [ HWY 400/BLACK CREEK DRIVE Collector - HWY 6 SOUTH Collector ] - Recurring-Maintenance
Highway: HWY 401
Direction: Westbound
From/At: HWY 400/BLACK CREEK DRIVE Collector
To: HWY 6 SOUTH Collector
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: June 21, 2015 23:59
Event End: July 03, 2015 04:30
Last Change: Entered 2015-06-16 08:13

Top of page Top of page


HWY 401 Westbound Collector [ HWY 400/BLACK CREEK DRIVE Collector - HWY 6 SOUTH Express ] - Recurring-Maintenance
Highway: HWY 401
Direction: Westbound
From/At: HWY 400/BLACK CREEK DRIVE Collector
To: HWY 6 SOUTH Express
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 05, 2015 23:59
Event End: July 10, 2015 04:30
Last Change: Entered 2015-06-30 14:16

Top of page Top of page


HWY 401 Westbound Collector [ HWY 404 Collector - LESLIE STREET Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: HWY 404 Collector
To: LESLIE STREET Collector
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact : Off-ramp to LESLIE STREET NB/SB, On-ramp from LESLIE STREET NB/SB, On-ramp from HWY 404 SB
Reason Recurring-Construction
Comment :
Event Start: June 28, 2015 21:00
Event End: July 05, 2015 05:00
Last Change: Entered 2015-06-24 06:10

Top of page Top of page


HWY 401 Westbound Collector [ MORNINGSIDE AVE Collector - HWY 400/BLACK CREEK DRIVE Collector ] - Recurring-Maintenance
Highway: HWY 401
Direction: Westbound
From/At: MORNINGSIDE AVE Collector
To: HWY 400/BLACK CREEK DRIVE Collector
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 03, 2015 23:00
Event End: July 10, 2015 05:00
Last Change: Entered 2015-07-02 09:30

Top of page Top of page


HWY 401 Westbound Collector [ SHEPPARD AVE/PORT UNION ROAD Collector - CONLINS ROAD Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: SHEPPARD AVE/PORT UNION ROAD Collector
To: CONLINS ROAD Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from HWY 2/KINGSTON ROAD EB/WB, On-ramp from MEADOWVALE ROAD NB, On-ramp from MEADOWVALE ROAD SB, Off-ramp to MEADOWVALE ROAD NB/SB, Off-ramp to MORNINGSIDE AVE NB/SB
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 23:59
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-17 12:40

Top of page Top of page


HWY 401 Westbound Collector [ WARDEN AVE Collector - HWY 404 Collector ] - Construction
Highway: HWY 401
Direction: Westbound
From/At: WARDEN AVE Collector
To: HWY 404 Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from KENNEDY ROAD (SCARBOROUGH) NB/SB, On-ramp from WARDEN AVE NB/SB, On-ramp from VICTORIA PARK AVE NB/SB, Off-ramp to HWY 404 NB/SB, On-ramp from HWY 404 NB
Reason Construction
Comment :
Event Start: July 02, 2015 23:00
Event End: July 03, 2015 05:00
Last Change: Entered 2015-07-02 14:49

Top of page Top of page


HWY 401 Westbound Collector [ WARDEN AVE Collector - HWY 404 Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: WARDEN AVE Collector
To: HWY 404 Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from KENNEDY ROAD (SCARBOROUGH) NB/SB, On-ramp from WARDEN AVE NB/SB, On-ramp from VICTORIA PARK AVE NB/SB, Off-ramp to HWY 404 NB/SB, On-ramp from HWY 404 NB
Reason Recurring-Construction
Comment :
Event Start: July 03, 2015 23:59
Event End: July 04, 2015 09:00
Last Change: Entered 2015-07-02 14:53

Top of page Top of page


HWY 401 Westbound Collector [ WARDEN AVE Collector - HWY 404 Collector ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: WARDEN AVE Collector
To: HWY 404 Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from KENNEDY ROAD (SCARBOROUGH) NB/SB, On-ramp from WARDEN AVE NB/SB, On-ramp from VICTORIA PARK AVE NB/SB, Off-ramp to HWY 404 NB/SB, On-ramp from HWY 404 NB
Reason Recurring-Construction
Comment :
Event Start: July 04, 2015 23:59
Event End: July 05, 2015 10:00
Last Change: Entered 2015-07-02 14:55

Top of page Top of page


HWY 401 Westbound Collector [ WARDEN AVE Collector - HWY 404 Collector ] - Recurring-Construction (Cancelled for Today)
Highway: HWY 401
Direction: Westbound
From/At: WARDEN AVE Collector
To: HWY 404 Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from HWY 404 NB, On-ramp from KENNEDY ROAD (SCARBOROUGH) NB/SB, On-ramp from WARDEN AVE NB/SB, On-ramp from VICTORIA PARK AVE NB/SB, Off-ramp to HWY 404 NB/SB
Reason Recurring-Construction (Cancelled for Today)
Comment :
Event Start: June 28, 2015 22:00
Event End: July 05, 2015 08:00
Last Change: Entered 2015-06-24 06:05

Top of page Top of page


HWY 401 Westbound Express [ BIRCHMOUNT ROAD Express - VICTORIA PARK AVE Express ] - Special Event
Highway: HWY 401
Direction: Westbound
From/At: BIRCHMOUNT ROAD Express
To: VICTORIA PARK AVE Express
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Special Event
Comment :
Event Start: July 06, 2015 00:00
Event End: July 06, 2015 05:00
Last Change: Entered 2015-06-30 15:58

Top of page Top of page


HWY 401 Westbound Express [ BROCK ROAD Express - BROCK ROAD Express ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: BROCK ROAD Express
To: BROCK ROAD Express
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 22:00
Event End: July 03, 2015 05:00
Last Change: Entered 2015-06-25 16:21

Top of page Top of page


HWY 401 Westbound Express [ HWY 400/BLACK CREEK DRIVE Express - HWY 6 SOUTH Express ] - Recurring-Maintenance
Highway: HWY 401
Direction: Westbound
From/At: HWY 400/BLACK CREEK DRIVE Express
To: HWY 6 SOUTH Express
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 05, 2015 23:59
Event End: July 10, 2015 04:30
Last Change: Entered 2015-06-30 14:13

Top of page Top of page


HWY 401 Westbound Express [ HWY 400/BLACK CREEK DRIVE Express - HWY 6 SOUTH Express ] - Recurring-Maintenance
Highway: HWY 401
Direction: Westbound
From/At: HWY 400/BLACK CREEK DRIVE Express
To: HWY 6 SOUTH Express
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: June 21, 2015 23:59
Event End: July 03, 2015 04:30
Last Change: Entered 2015-06-16 08:10

Top of page Top of page


HWY 401 Westbound Express [ ISLINGTON AVE Express - KIPLING AVE Express ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: ISLINGTON AVE Express
To: KIPLING AVE Express
Lanes Affected: 3 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 22:00
Event End: July 04, 2015 06:00
Last Change: Entered 2015-06-25 16:32

Top of page Top of page


HWY 401 Westbound Express [ VICTORIA PARK AVE Express - HWY 404 Express ] - Construction
Highway: HWY 401
Direction: Westbound
From/At: VICTORIA PARK AVE Express
To: HWY 404 Express
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 02, 2015 21:00
Event End: July 02, 2015 23:00
Last Change: Entered 2015-07-02 10:07

Top of page Top of page


HWY 401 Westbound Express and Collector Off-ramp [ - HWY 404 Northbound/Southbound Express and Collector ] - Construction
Highway: HWY 401
Direction: Westbound
From/At:
To: HWY 404 Northbound/Southbound Express and Collector
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: October 23, 2015 22:00
Event End: October 26, 2015 05:00
Last Change: Entered 2015-03-20 08:46

Top of page Top of page


HWY 401 Westbound Off-ramp [ - ESSO SERVICE CENTRE WB Westbound ] - Construction
Highway: HWY 401
Direction: Westbound
From/At:
To: ESSO SERVICE CENTRE WB Westbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: July 06, 2015 23:00
Event End: July 07, 2015 06:00
Last Change: Entered 2015-07-01 18:15

Top of page Top of page


HWY 401 Westbound Off-ramp [ - NEWTONVILLE ROAD Westbound ] - Construction
Highway: HWY 401
Direction: Westbound
From/At:
To: NEWTONVILLE ROAD Westbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: July 05, 2015 23:00
Event End: July 06, 2015 06:00
Last Change: Entered 2015-07-01 17:39

Top of page Top of page


HWY 401 Westbound On-ramp [ BROCK ROAD Northbound/Southbound - ] - Recurring-Construction
Highway: HWY 401
Direction: Westbound
From/At: BROCK ROAD Northbound/Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 22:00
Event End: July 03, 2015 05:00
Last Change: Entered 2015-06-25 16:09

Top of page Top of page


HWY 401 Westbound On-ramp [ ESSO SERVICE CENTRE WB Westbound - ] - Construction
Highway: HWY 401
Direction: Westbound
From/At: ESSO SERVICE CENTRE WB Westbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: July 06, 2015 23:00
Event End: July 07, 2015 06:00
Last Change: Entered 2015-07-01 18:22

Top of page Top of page


HWY 401 Westbound On-ramp [ NEWTONVILLE ROAD Westbound - ] - Construction
Highway: HWY 401
Direction: Westbound
From/At: NEWTONVILLE ROAD Westbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: July 05, 2015 23:00
Event End: July 06, 2015 06:00
Last Change: Entered 2015-07-01 17:49

Top of page Top of page


HWY 402 Eastbound [ MIDDLESEX RD 2-LONGWOODS RD IC 86 - MIDDLESEX RD 2-LONGWOODS RD IC 86 ] - Recurring-Construction
Highway: HWY 402
Direction: Eastbound
From/At: MIDDLESEX RD 2-LONGWOODS RD IC 86
To: MIDDLESEX RD 2-LONGWOODS RD IC 86
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Adelaide Rd at Highway 402 eastbound wiill be reduced to 1 lane. From Monday, May 4th, 2015, to Saturday, August 15th, 2015 for construction purposes. Traffic signals will be in place.
Event Start: May 04, 2015 00:00
Event End: August 15, 2015 23:59
Last Change: Entered 2015-05-01 08:10

Top of page Top of page


HWY 402 Eastbound [ MIDDLESEX RD 39-HICKORY DRIVE IC-69 - MIDDLESEX RD 39-HICKORY DRIVE IC-69 ] - Construction
Highway: HWY 402
Direction: Eastbound
From/At: MIDDLESEX RD 39-HICKORY DRIVE IC-69
To: MIDDLESEX RD 39-HICKORY DRIVE IC-69
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 402 eastbound, at the Sydenham River, Strathroy area, reduced from 2 lanes to a single lane of traffic, Tuesday, May 13th, 2015 at 0700 hours until Friday, May 31st, 2015 at 1700 hours, for construction (bridge structure rehabilitation work) operations.
Event Start: May 13, 2015 07:00
Event End: July 31, 2015 17:00
Last Change: Entered 2015-05-12 19:58

Top of page Top of page


HWY 402 Eastbound [ WONDERLAND RD IC-100 - WONDERLAND RD IC-100 ] - Recurring-Construction
Highway: HWY 402
Direction: Eastbound
From/At: WONDERLAND RD IC-100
To: WONDERLAND RD IC-100
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 402 at Westdel Bourne Underpass, Miller Rd. Underpass and Sharon Drive Underpass will have a lane closure alternating directions daily June 29-July 10 from 0700-1900 hours.
Event Start: June 29, 2015 07:00
Event End: July 10, 2015 19:00
Last Change: Entered 2015-06-25 14:40

Top of page Top of page


HWY 402 Westbound [ MIDDLESEX RD 39-HICKORY DRIVE IC-69 - MIDDLESEX RD 39-HICKORY DRIVE IC-69 ] - Recurring-Construction
Highway: HWY 402
Direction: Westbound
From/At: MIDDLESEX RD 39-HICKORY DRIVE IC-69
To: MIDDLESEX RD 39-HICKORY DRIVE IC-69
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 402 westbound will have the left lane closed from Hickory Drive to the Sydenham River Bridge. From Thursday, May 21st, 2015 at 0700 hours until Friday, July 31st, 2015 at 2400 hours, for bridge structure rehabilitation work.
Event Start: May 21, 2015 07:00
Event End: July 31, 2015 23:59
Last Change: Entered 2015-05-20 22:37

Top of page Top of page


HWY 403 HAMILTON Eastbound [ 403/401 (0KM) - Jerseyville Road / Brant Road 17 (47KM) ] - Maintenance
Highway: HWY 403 HAMILTON
Direction: Eastbound
From/At: 403/401 (0KM)
To: Jerseyville Road / Brant Road 17 (47KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Maintenance
Comment : Highway 403 eastbound and westbound from Highway 401 to Brantford, will have alternating lane closures from 2100 hours on Thursday, July 2nd, 2015, to 0600 hours on Friday, July 3rd, 2015 for line painting
Event Start: July 02, 2015 21:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-26 19:29

Top of page Top of page


HWY 403 HAMILTON Eastbound [ 403/401 (0KM) - Jerseyville Road / Brant Road 17 (47KM) ] - Recurring-Construction
Highway: HWY 403 HAMILTON
Direction: Eastbound
From/At: 403/401 (0KM)
To: Jerseyville Road / Brant Road 17 (47KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 403, Eastbound and Westbound, will have an alternating lane closure starting July 6 - July 9 from 6:45 am to 8:00 pm daily and July 10 from 8:00 am to 12:00 pm, at the following Underpass locations: - Brant Road 17 Underpass - Brant Road 16 Underpass - Maple Avenue North Underpass - Brant Road 25 Underpass - West Quarter Townline Road Underpass - Muir Road North Underpass - Oxford Road 55 Underpass - Highway 403 Bridge over Highway 401 *** WESTBOUND ONLY
Event Start: July 06, 2015 06:30
Event End: July 10, 2015 12:00
Last Change: Entered 2015-07-02 15:59

Top of page Top of page


HWY 403 HAMILTON Eastbound [ MAIN STREET - HWY 6 NORTH ] - Recurring-Construction
Highway: HWY 403 HAMILTON
Direction: Eastbound
From/At: MAIN STREET
To: HWY 6 NORTH
Lanes Affected: 2 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 05, 2015 00:00
Event End: July 11, 2015 06:00
Last Change: Entered 2015-07-02 09:43

Top of page Top of page


HWY 403 HAMILTON Eastbound [ Wayne Gretzky Parkway (38KM) - Wayne Gretzky Parkway (38KM) ] - Construction
Highway: HWY 403 HAMILTON
Direction: Eastbound
From/At: Wayne Gretzky Parkway (38KM)
To: Wayne Gretzky Parkway (38KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from Wayne Gretzky Parkway (38KM) EB/WB
Reason Construction
Comment : Highway 403 Eastbound at Wayne Gretzky Parkway will have an alternating right and left lane closure, July 2 between 0000-0700 and 1800-2359 hours. The Westbound side will have the same closure between 0000-1500 and 1800-2359 hours. The Eastbound and Westbound On-Ramps will also be closed between 2100-2400 hours.
Event Start: July 02, 2015 00:00
Event End: July 02, 2015 23:59
Last Change: Entered 2015-06-26 12:53

Top of page Top of page


HWY 403 HAMILTON Eastbound [ Wayne Gretzky Parkway (38KM) - Wayne Gretzky Parkway (38KM) ] - Construction
Highway: HWY 403 HAMILTON
Direction: Eastbound
From/At: Wayne Gretzky Parkway (38KM)
To: Wayne Gretzky Parkway (38KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from Wayne Gretzky Parkway (38KM) EB/WB
Reason Construction
Comment : Highway 403 Eastbound at Wayne Gretzky Parkway will have an alternating right and left lane closure, July 3 between 0000-0700 and 1900-2359 hours. The Westbound side will have the same closure between 0000-1200 and 1900-2359 hours. The Eastbound and Westbound On-Ramp will also be closed between 0000-0600 hours.
Event Start: July 03, 2015 00:00
Event End: July 03, 2015 23:59
Last Change: Entered 2015-06-26 13:05

Top of page Top of page


HWY 403 HAMILTON Eastbound [ Wayne Gretzky Parkway (38KM) - Wayne Gretzky Parkway (38KM) ] - Construction
Highway: HWY 403 HAMILTON
Direction: Eastbound
From/At: Wayne Gretzky Parkway (38KM)
To: Wayne Gretzky Parkway (38KM)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 403 Eastbound at Wayne Gretzky Parkway will have an alternating right and left lane closure, July 4 between 0000-1100 hours and 1800-2359 hours. The Westbound side will have the same closure between 0000-1200 and 1500-2359 hours.
Event Start: July 04, 2015 00:00
Event End: July 04, 2015 23:59
Last Change: Entered 2015-06-26 13:08

Top of page Top of page


HWY 403 HAMILTON Eastbound [ YORK BLVD - PLAINS ROAD ] - Recurring-Construction
Highway: HWY 403 HAMILTON
Direction: Eastbound
From/At: YORK BLVD
To: PLAINS ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from HWY 6 NORTH SB, Off-ramp to HWY 6 NORTH NB
Reason Recurring-Construction
Comment :
Event Start: June 28, 2015 21:00
Event End: July 03, 2015 05:00
Last Change: Entered 2015-06-25 03:46

Top of page Top of page


HWY 403 HAMILTON Westbound [ LEMONVILLE ROAD - HWY 6 SOUTH ] - Recurring-Construction
Highway: HWY 403 HAMILTON
Direction: Westbound
From/At: LEMONVILLE ROAD
To: HWY 6 SOUTH
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to HWY 6 NORTH NB
Reason Recurring-Construction
Comment :
Event Start: June 28, 2015 22:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-25 03:39

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound [ UPPER MIDDLE ROAD - DUNDAS STREET ] - Recurring-Engineering Investigation
Highway: HWY 403 MISSISSAUGA
Direction: Eastbound
From/At: UPPER MIDDLE ROAD
To: DUNDAS STREET
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment :
Event Start: July 05, 2015 22:00
Event End: July 10, 2015 05:00
Last Change: Entered 2015-06-29 14:03

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound [ UPPER MIDDLE ROAD - DUNDAS STREET ] - Recurring-Engineering Investigation
Highway: HWY 403 MISSISSAUGA
Direction: Eastbound
From/At: UPPER MIDDLE ROAD
To: DUNDAS STREET
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Engineering Investigation
Comment :
Event Start: July 02, 2015 23:00
Event End: July 03, 2015 05:00
Last Change: Entered 2015-06-29 12:01

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound On-ramp [ DUNDAS STREET Eastbound - ] - Construction
Highway: HWY 403 MISSISSAUGA
Direction: Eastbound
From/At: DUNDAS STREET Eastbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: July 03, 2015 23:00
Event End: July 04, 2015 07:00
Last Change: Entered 2015-06-30 15:33

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector Off-ramp [ - CAWTHRA ROAD Southbound ] - Construction
Highway: HWY 403 MISSISSAUGA
Direction: Westbound
From/At:
To: CAWTHRA ROAD Southbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: July 02, 2015 23:00
Event End: July 03, 2015 05:00
Last Change: Entered 2015-06-30 15:53

Top of page Top of page


HWY 404 Northbound [ AURORA ROAD - AURORA ROAD ] - Recurring-Construction
Highway: HWY 404
Direction: Northbound
From/At: AURORA ROAD
To: AURORA ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from AURORA ROAD EB
Reason Recurring-Construction
Comment :
Event Start: June 28, 2015 23:00
Event End: July 04, 2015 06:00
Last Change: Entered 2015-06-24 10:58

Top of page Top of page


HWY 404 Northbound [ STEELES AVE / WOODBINE AVE - STEELES AVE / WOODBINE AVE ] - Recurring-Construction
Highway: HWY 404
Direction: Northbound
From/At: STEELES AVE / WOODBINE AVE
To: STEELES AVE / WOODBINE AVE
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact : On-ramp from STEELES AVE / WOODBINE AVE EB
Reason Recurring-Construction
Comment :
Event Start: July 01, 2015 23:59
Event End: July 04, 2015 09:00
Last Change: Entered 2015-06-25 22:20

Top of page Top of page


HWY 404 Southbound [ AURORA ROAD - AURORA ROAD ] - Recurring-Construction
Highway: HWY 404
Direction: Southbound
From/At: AURORA ROAD
To: AURORA ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from AURORA ROAD WB
Reason Recurring-Construction
Comment :
Event Start: June 28, 2015 23:00
Event End: July 04, 2015 08:00
Last Change: Entered 2015-06-24 10:55

Top of page Top of page


HWY 404 Southbound [ SHEPPARD AVE - SHEPPARD AVE ] - Construction
Highway: HWY 404
Direction: Southbound
From/At: SHEPPARD AVE
To: SHEPPARD AVE
Lanes Affected: ALL LANES CLOSED
Traffic Impact : On-ramp from FAIRVIEW MALL DRIVE / SHEPPARD AVE SB
Reason Construction
Comment :
Event Start: October 23, 2015 22:00
Event End: October 26, 2015 05:00
Last Change: Entered 2015-03-20 08:42

Top of page Top of page


HWY 404 Southbound [ STEELES AVE / WOODBINE AVE - STEELES AVE / WOODBINE AVE ] - Recurring-Construction
Highway: HWY 404
Direction: Southbound
From/At: STEELES AVE / WOODBINE AVE
To: STEELES AVE / WOODBINE AVE
Lanes Affected: 3 Alternating Lane(s)
Traffic Impact : On-ramp from STEELES AVE / WOODBINE AVE EB, On-ramp from STEELES AVE / WOODBINE AVE WB
Reason Recurring-Construction
Comment :
Event Start: July 01, 2015 23:59
Event End: July 04, 2015 09:00
Last Change: Entered 2015-06-25 22:31

Top of page Top of page


HWY 406 Northbound [ 3RD AVENUE - QEW ] - Recurring-Construction
Highway: HWY 406
Direction: Northbound
From/At: 3RD AVENUE
To: QEW
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 17:30
Event End: July 03, 2015 23:59
Last Change: Entered 2015-06-30 07:06

Top of page Top of page


HWY 406 Northbound [ GLENDALE AVE - GLENDALE AVE ] - Recurring-Construction
Highway: HWY 406
Direction: Northbound
From/At: GLENDALE AVE
To: GLENDALE AVE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 18:30
Event End: July 04, 2015 11:00
Last Change: Entered 2015-06-24 22:15

Top of page Top of page


HWY 406 Northbound [ MERRITT ROAD - MERRITT ROAD ] - Recurring-Maintenance
Highway: HWY 406
Direction: Northbound
From/At: MERRITT ROAD
To: MERRITT ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 02, 2015 06:00
Event End: July 04, 2015 19:00
Last Change: Entered 2015-06-26 07:55

Top of page Top of page


HWY 406 Northbound [ ST DAVID'S ROAD - ST DAVID'S ROAD ] - Engineering Investigation
Highway: HWY 406
Direction: Northbound
From/At: ST DAVID'S ROAD
To: ST DAVID'S ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : Off-ramp to ST DAVID'S ROAD EB, Off-ramp to HWY 58 SB, Off-ramp to ST DAVID'S ROAD WB
Reason Engineering Investigation
Comment :
Event Start: July 03, 2015 21:30
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-23 09:35

Top of page Top of page


HWY 406 Southbound [ GLENDALE AVE - GLENDALE AVE ] - Recurring-Construction
Highway: HWY 406
Direction: Southbound
From/At: GLENDALE AVE
To: GLENDALE AVE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 19:00
Event End: July 04, 2015 11:00
Last Change: Entered 2015-06-24 21:39

Top of page Top of page


HWY 406 Southbound [ ST DAVID'S ROAD - ST DAVID'S ROAD ] - Engineering Investigation
Highway: HWY 406
Direction: Southbound
From/At: ST DAVID'S ROAD
To: ST DAVID'S ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : Off-ramp to ST DAVID'S ROAD WB, Off-ramp to ST DAVID'S ROAD EB
Reason Engineering Investigation
Comment :
Event Start: July 02, 2015 21:30
Event End: July 03, 2015 05:00
Last Change: Entered 2015-06-23 09:10

Top of page Top of page


HWY 410 Northbound [ CLARK BLVD - QUEEN STREET/S JCT HWY 7 ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: CLARK BLVD
To: QUEEN STREET/S JCT HWY 7
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
Reason Recurring-Construction
Comment : No two consecutive on and off ramps will be closed at the same time.
Event Start: July 02, 2015 23:59
Event End: July 04, 2015 06:00
Last Change: Entered 2015-06-24 20:29

Top of page Top of page


HWY 410 Northbound [ COURTNEY PARK DRIVE - DERRY ROAD ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: COURTNEY PARK DRIVE
To: DERRY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to DERRY ROAD EB/WB
Reason Recurring-Construction
Comment :
Event Start: July 05, 2015 23:59
Event End: July 07, 2015 05:00
Last Change: Entered 2015-07-01 15:21

Top of page Top of page


HWY 410 Northbound [ COURTNEY PARK DRIVE - DERRY ROAD ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: COURTNEY PARK DRIVE
To: DERRY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to DERRY ROAD EB/WB
Reason Recurring-Construction
Comment : No two consecutive on and off ramps will be closed at the same time.
Event Start: July 02, 2015 23:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-24 20:20

Top of page Top of page


HWY 410 Northbound [ DERRY ROAD - STEELES AVE ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: DERRY ROAD
To: STEELES AVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DERRY ROAD EB, On-ramp from DERRY ROAD EB/WB, On-ramp from DERRY ROAD WB, Off-ramp to STEELES AVE EB/WB
Reason Recurring-Construction
Comment : No two consecutive on and off ramps will be closed at the same time.
Event Start: July 02, 2015 23:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-24 20:22

Top of page Top of page


HWY 410 Northbound [ HWY 401 - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: HWY 401
To: COURTNEY PARK DRIVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to COURTNEY PARK DRIVE EB/WB
Reason Recurring-Construction
Comment : No two consecutive on/off ramps will be closed at the same time.
Event Start: July 02, 2015 22:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-24 20:18

Top of page Top of page


HWY 410 Northbound [ HWY 401 - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: HWY 401
To: COURTNEY PARK DRIVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to COURTNEY PARK DRIVE EB/WB
Reason Recurring-Construction
Comment :
Event Start: July 05, 2015 22:00
Event End: July 07, 2015 05:00
Last Change: Entered 2015-07-01 15:19

Top of page Top of page


HWY 410 Northbound [ STEELES AVE - CLARK BLVD ] - Recurring-Construction
Highway: HWY 410
Direction: Northbound
From/At: STEELES AVE
To: CLARK BLVD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to CLARK BLVD EB/WB
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 23:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-24 20:26

Top of page Top of page


HWY 410 Southbound [ CLARK BLVD - STEELES AVE ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: CLARK BLVD
To: STEELES AVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to STEELES AVE EB/WB
Reason Recurring-Construction
Comment : On Thursday, lane 1 and lane 2 will close at 22:00. On Friday, lane 1 will close at 22:00, expanding to 2 lanes at 23:00. Off-ramp to Steeles Avenue, lane 1 and lane 2 will close at 23:00.
Event Start: July 02, 2015 22:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-24 20:53

Top of page Top of page


HWY 410 Southbound [ CLARK BLVD - STEELES AVE ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: CLARK BLVD
To: STEELES AVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : Off-ramp to STEELES AVE EB/WB
Reason Recurring-Construction
Comment :
Event Start: July 05, 2015 22:00
Event End: July 07, 2015 05:00
Last Change: Entered 2015-07-01 15:43

Top of page Top of page


HWY 410 Southbound [ COURTNEY PARK DRIVE - HWY 401 ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: COURTNEY PARK DRIVE
To: HWY 401
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 23:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-24 21:04

Top of page Top of page


HWY 410 Southbound [ DERRY ROAD - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: DERRY ROAD
To: COURTNEY PARK DRIVE
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from DERRY ROAD EB, On-ramp from COURTNEY PARK DRIVE EB/WB, On-ramp from DERRY ROAD WB
Reason Recurring-Construction
Comment : No two consecutive on and off ramps will be closed at the same time.
Event Start: July 02, 2015 23:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-24 21:01

Top of page Top of page


HWY 410 Southbound [ QUEEN STREET/S JCT HWY 7 - CLARK BLVD ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: QUEEN STREET/S JCT HWY 7
To: CLARK BLVD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from CLARK BLVD EB/WB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
Reason Recurring-Construction
Comment : No two consecutive on/off ramps may be closed at the same time.
Event Start: July 02, 2015 23:59
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-24 20:50

Top of page Top of page


HWY 410 Southbound [ STEELES AVE - DERRY ROAD ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: STEELES AVE
To: DERRY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to DERRY ROAD EB/WB
Reason Recurring-Construction
Comment :
Event Start: July 05, 2015 23:59
Event End: July 11, 2015 05:00
Last Change: Entered 2015-07-01 15:45

Top of page Top of page


HWY 410 Southbound [ STEELES AVE - DERRY ROAD ] - Recurring-Construction
Highway: HWY 410
Direction: Southbound
From/At: STEELES AVE
To: DERRY ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact : On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to DERRY ROAD EB/WB
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 23:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-24 20:58

Top of page Top of page


HWY 416 Southbound [ VENTNOR RD - VENTNOR RD ] - Recurring-Construction
Highway: HWY 416
Direction: Southbound
From/At: VENTNOR RD
To: VENTNOR RD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Hwy 416 SB, left lane closed daily fm 8am to 3pm
Event Start: July 08, 2015 08:00
Event End: July 09, 2015 15:00
Last Change: Entered 2015-07-02 08:53

Top of page Top of page


HWY 417 Eastbound [ BEARBROOK BRIDGE - Piperville Rd ] - Recurring-Construction
Highway: HWY 417
Direction: Eastbound
From/At: BEARBROOK BRIDGE
To: Piperville Rd
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Ottawa
Event Start: June 29, 2015 07:00
Event End: July 03, 2015 14:30
Last Change: Entered 2015-06-26 18:17

Top of page Top of page


HWY 417 Eastbound [ BRONSON AVE (IC 121A) - METCALFE ST (IC 119A) ] - Recurring-Construction
Highway: HWY 417
Direction: Eastbound
From/At: BRONSON AVE (IC 121A)
To: METCALFE ST (IC 119A)
Lanes Affected: 2 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : alternating Lane reductions 417E/B & W/B @ Kent St (Ottawa) W/B O'Connor on ramp and E/B Kent off ramp closed as required.
Event Start: July 05, 2015 21:00
Event End: July 11, 2015 06:00
Last Change: Entered 2015-06-25 08:45

Top of page Top of page


HWY 417 Eastbound [ DEVINE RD - DEVINE RD ] - Recurring-Construction
Highway: HWY 417
Direction: Eastbound
From/At: DEVINE RD
To: DEVINE RD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Ottawa
Event Start: June 29, 2015 00:00
Event End: July 03, 2015 14:30
Last Change: Entered 2015-06-26 18:21

Top of page Top of page


HWY 417 Eastbound [ P&R RD 4 & 14 (IC 5) - P&R RD 4 & 14 (IC 5) ] - Recurring-Maintenance
Highway: HWY 417
Direction: Eastbound
From/At: P&R RD 4 & 14 (IC 5)
To: P&R RD 4 & 14 (IC 5)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment : Lane reductions 417 E/B @ P&R Rd 4&14 (W/Quebec Border)
Event Start: July 07, 2015 08:00
Event End: July 07, 2015 20:00
Last Change: Entered 2015-06-29 11:31

Top of page Top of page


HWY 417 Eastbound [ ST. ALBERT RD (IC 66) - HWY 138 (IC 58) ] - Construction
Highway: HWY 417
Direction: Eastbound
From/At: ST. ALBERT RD (IC 66)
To: HWY 138 (IC 58)
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Left lane closed Hwy 417 E/B from St-Albert to HWY 138 (East of Casselman)
Event Start: July 02, 2015 06:00
Event End: July 06, 2015 17:00
Last Change: Entered 2015-06-30 18:43

Top of page Top of page


HWY 417 Westbound [ DEVINE RD - BOUNDARY RD (IC 96) ] - Construction
Highway: HWY 417
Direction: Westbound
From/At: DEVINE RD
To: BOUNDARY RD (IC 96)
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Ottawa
Event Start: June 29, 2015 10:00
Event End: July 03, 2015 17:00
Last Change: Entered 2015-06-26 18:12

Top of page Top of page


HWY 417 Westbound [ P&R RD 4 & 14 (IC 5) - P&R RD 4 & 14 (IC 5) ] - Recurring-Maintenance
Highway: HWY 417
Direction: Westbound
From/At: P&R RD 4 & 14 (IC 5)
To: P&R RD 4 & 14 (IC 5)
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment : Lane reductions 417 W/B @ P&R Rd 4&14 (W/Quebec Border)
Event Start: July 06, 2015 08:00
Event End: July 06, 2015 20:00
Last Change: Entered 2015-06-29 11:26

Top of page Top of page


HWY 417 Westbound [ Piperville Rd - BEARBROOK BRIDGE ] - Construction
Highway: HWY 417
Direction: Westbound
From/At: Piperville Rd
To: BEARBROOK BRIDGE
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Ottawa
Event Start: June 29, 2015 10:00
Event End: July 03, 2015 17:00
Last Change: Entered 2015-06-26 18:04

Top of page Top of page


HWY 420 Westbound [ DORCHESTER ROAD/LUNDY'S LANE - DORCHESTER ROAD/LUNDY'S LANE ] - Engineering Investigation
Highway: HWY 420
Direction: Westbound
From/At: DORCHESTER ROAD/LUNDY'S LANE
To: DORCHESTER ROAD/LUNDY'S LANE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Engineering Investigation
Comment :
Event Start: June 26, 2015 23:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-16 12:48

Top of page Top of page


HWY 427 Northbound Collector [ EGLINTON AVENUE Collector - DIXON ROAD/AIRPORT ROAD Collector ] - Recurring-Maintenance
Highway: HWY 427
Direction: Northbound
From/At: EGLINTON AVENUE Collector
To: DIXON ROAD/AIRPORT ROAD Collector
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 02, 2015 21:00
Event End: July 04, 2015 06:00
Last Change: Entered 2015-06-30 16:00

Top of page Top of page


HWY 427 Northbound Express [ DUNDAS STREET Express - BLOOR STREET Express ] - Construction
Highway: HWY 427
Direction: Northbound
From/At: DUNDAS STREET Express
To: BLOOR STREET Express
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 02, 2015 22:00
Event End: July 03, 2015 05:00
Last Change: Entered 2015-06-30 14:45

Top of page Top of page


HWY 427 Northbound On-ramp [ GARDINER EXPRESSWAY Westbound - ] - Construction
Highway: HWY 427
Direction: Northbound
From/At: GARDINER EXPRESSWAY Westbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 25, 2015 22:00
Event End: September 28, 2015 05:00
Last Change: Entered 2015-03-20 09:02

Top of page Top of page


HWY 427 Southbound Collector Off-ramp [ - EGLINTON AVENUE Eastbound ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At:
To: EGLINTON AVENUE Eastbound
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 05, 2015 21:00
Event End: July 07, 2015 05:00
Last Change: Entered 2015-07-02 14:08

Top of page Top of page


HWY 427 Southbound Collector On-ramp [ HWY 401 Westbound Collector - ] - Recurring-Construction
Highway: HWY 427
Direction: Southbound
From/At: HWY 401 Westbound Collector
To:
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 21:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-23 12:01

Top of page Top of page


HWY 427 Southbound Collector [ EGLINTON AVENUE Collector - ERINGATE DRIVE Collector ] - Construction
Highway: HWY 427
Direction: Southbound
From/At: EGLINTON AVENUE Collector
To: ERINGATE DRIVE Collector
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 03, 2015 22:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-30 15:09

Top of page Top of page


HWY 427 Southbound Collector [ HWY 401 Collector - RATHBURN ROAD Collector ] - Construction
Highway: HWY 427
Direction: Southbound
From/At: HWY 401 Collector
To: RATHBURN ROAD Collector
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 02, 2015 22:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-30 16:42

Top of page Top of page


HWY 427 Southbound Express and Collector Off-ramp [ - GARDINER EXPRESSWAY Eastbound ] - Construction
Highway: HWY 427
Direction: Southbound
From/At:
To: GARDINER EXPRESSWAY Eastbound
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 25, 2015 22:00
Event End: September 28, 2015 05:00
Last Change: Entered 2015-03-20 08:56

Top of page Top of page


HWY 48 Northbound [ LITTLE ROUGE RIVER - AURORA ROAD ] - Recurring-Construction
Highway: HWY 48
Direction: Northbound
From/At: LITTLE ROUGE RIVER
To: AURORA ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 19:00
Event End: July 06, 2015 07:00
Last Change: Entered 2015-06-25 06:46

Top of page Top of page


HWY 58 Northbound [ FORKS ROAD / NIAGARA ROAD 23 - KLEINER STREET ] - Construction
Highway: HWY 58
Direction: Northbound
From/At: FORKS ROAD / NIAGARA ROAD 23
To: KLEINER STREET
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 02, 2015 07:00
Event End: July 03, 2015 17:00
Last Change: Entered 2015-06-29 16:01

Top of page Top of page


HWY 6 Northbound [ GREY RD 12-MARKDALE RD (E) - GREY RD 12-MARKDALE RD (E) ] - Recurring-Construction
Highway: HWY 6
Direction: Northbound
From/At: GREY RD 12-MARKDALE RD (E)
To: GREY RD 12-MARKDALE RD (E)
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 6 northbound lanes at the Rocky Saugeen River Bridge, will have a full closure from 1400 hours on Thursday, June 11th, 2015 until October 31st, 2015. Traffic will be controlled by temporary traffic signals.
Event Start: June 11, 2015 14:00
Event End: October 31, 2015 23:59
Last Change: Entered 2015-06-09 11:16

Top of page Top of page


HWY 6 Northbound [ HWY 5/CLAPPISONS CORNERS - WEST FLAMBOROUGH TWP CON. 6 ROAD ] - Recurring-Construction
Highway: HWY 6
Direction: Northbound
From/At: HWY 5/CLAPPISONS CORNERS
To: WEST FLAMBOROUGH TWP CON. 6 ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 20:00
Event End: July 04, 2015 08:00
Last Change: Entered 2015-06-24 16:37

Top of page Top of page


HWY 6 Northbound [ Highway 401 / Highway 6 North - Woodlawn Road / Highway 7 Intersection ] - Construction
Highway: HWY 6
Direction: Northbound
From/At: Highway 401 / Highway 6 North
To: Woodlawn Road / Highway 7 Intersection
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 6 northbound and southbound from Highway 401 to Woodlawn, will have alternating lane closures from 2100 hours on Thursday, July 2nd, 2015, to 0600 hours on Friday, July 3rd, 2015, for line painting
Event Start: July 02, 2015 21:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-26 19:23

Top of page Top of page


HWY 6 Southbound [ WEST FLAMBOROUGH TWP CON. 6 ROAD - HWY 5/CLAPPISONS CORNERS ] - Recurring-Construction
Highway: HWY 6
Direction: Southbound
From/At: WEST FLAMBOROUGH TWP CON. 6 ROAD
To: HWY 5/CLAPPISONS CORNERS
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: June 29, 2015 19:00
Event End: July 04, 2015 09:00
Last Change: Entered 2015-06-24 16:42

Top of page Top of page


HWY 7 Eastbound [ BROCK ROAD - PICKERING SIDELINE 14 ] - Construction
Highway: HWY 7
Direction: Eastbound
From/At: BROCK ROAD
To: PICKERING SIDELINE 14
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: March 26, 2015 13:00
Event End: October 01, 2015 13:00
Last Change: Entered 2015-03-30 10:57

Top of page Top of page


HWY 7 Westbound [ PICKERING SIDELINE 14 - BROCK ROAD ] - Recurring-Construction
Highway: HWY 7
Direction: Westbound
From/At: PICKERING SIDELINE 14
To: BROCK ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Short duration lane closures will occur periodically.
Event Start: June 29, 2015 09:00
Event End: July 03, 2015 15:00
Last Change: Entered 2015-06-25 15:31

Top of page Top of page


HWY 8 Westbound [ HURON RD 15 - KINBURN LINE(N) KINBURN LINE(S) - HURON RD 31- SHARPES CK LINE(E) -PARR LINE(W) ] - Recurring-Construction
Highway: HWY 8
Direction: Westbound
From/At: HURON RD 15 - KINBURN LINE(N) KINBURN LINE(S)
To: HURON RD 31- SHARPES CK LINE(E) -PARR LINE(W)
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 8 westbound, at the culvert 500 metres east of Sanctuary Line, east of Clinton, reduced to a single lane of traffic, Monday, June 8th, 2015, from 0800 hours until 1600 hours, for construction work operations, traffic control provided by flag persons. Note: At the completion of work traffic will be single lane at the culvert (24 hours per day / 7 days a week), controlled by temporary traffic signal lights and temporary concrete barrier wall.
Event Start: June 08, 2015 08:00
Event End: July 31, 2015 16:00
Last Change: Entered 2015-06-07 20:25

Top of page Top of page


HWY 85 Northbound [ LANCASTER ST UP IC-KITCHENER - LANCASTER ST UP IC-KITCHENER ] - Construction
Highway: HWY 85
Direction: Northbound
From/At: LANCASTER ST UP IC-KITCHENER
To: LANCASTER ST UP IC-KITCHENER
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 85 Northbound will have the left lane closed from Krug Street Bridge to Lancaster Street From July 3- July 6 from 10:00 pm to 6:00 am as well as the right lane closed from Frederick Street Bridge to Lancaster Street from July 3 - July 4 from 10:00 pm to 8:00 am.
Event Start: July 03, 2015 22:00
Event End: July 06, 2015 06:00
Last Change: Entered 2015-07-02 16:15

Top of page Top of page


HWY 85 Northbound [ LANCASTER ST UP IC-KITCHENER - LANCASTER ST UP IC-KITCHENER ] - Recurring-Construction
Highway: HWY 85
Direction: Northbound
From/At: LANCASTER ST UP IC-KITCHENER
To: LANCASTER ST UP IC-KITCHENER
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Highway 85 (Conestoga Parkway) northbound, from Krug Street to Lancaster Street, Waterloo, alternating 1 of 2 collector lanes closed, Friday, July 3rd, 2015 until Monday, July 6th, 2015, nightly, from 2200 hours until 0600 hours, for construction work operations.
Event Start: July 03, 2015 22:00
Event End: July 06, 2015 06:00
Last Change: Entered 2015-07-02 20:15

Top of page Top of page


HWY 89 Eastbound [ CONCESSION ROAD 2 - HWY 400 ] - Recurring-Maintenance
Highway: HWY 89
Direction: Eastbound
From/At: CONCESSION ROAD 2
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 02, 2015 20:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-26 11:03

Top of page Top of page


HWY 89 Eastbound [ CONCESSION ROAD 2 - HWY 400 ] - Recurring-Maintenance
Highway: HWY 89
Direction: Eastbound
From/At: CONCESSION ROAD 2
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 02, 2015 09:00
Event End: July 03, 2015 15:00
Last Change: Entered 2015-06-26 11:11

Top of page Top of page


HWY 89 Westbound [ DUFFERIN ROAD 25 - GRAND VALLEY - WELLINGTON RD 14 (S) & GREY RD 14-CONN (N) ] - Construction
Highway: HWY 89
Direction: Westbound
From/At: DUFFERIN ROAD 25 - GRAND VALLEY
To: WELLINGTON RD 14 (S) & GREY RD 14-CONN (N)
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Construction
Comment : Highway 89 westbound, at Mud Creek, between Conn / Keldon, continuously reduced to a single lane of traffic, Wednesday, April 8th, 2015 at 1300 hours until July 27 2015, for construction (bridge structure work) operations. Reduced speed to 60 kilometres per hour in construction zone, temporary concrete barrier walls and traffic signal lights in place.
Event Start: April 08, 2015 13:00
Event End: July 31, 2015 16:00
Last Change: Entered 2015-04-03 08:35

Top of page Top of page


HWY 89 Westbound [ HWY 400 - CONCESSION ROAD 2 ] - Recurring-Moving Maintenance Closure
Highway: HWY 89
Direction: Westbound
From/At: HWY 400
To: CONCESSION ROAD 2
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Moving Maintenance Closure
Comment :
Event Start: July 02, 2015 20:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-26 11:04

Top of page Top of page


HWY 89 Westbound [ HWY 400 - CONCESSION ROAD 3 ] - Recurring-Maintenance
Highway: HWY 89
Direction: Westbound
From/At: HWY 400
To: CONCESSION ROAD 3
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 02, 2015 09:00
Event End: July 03, 2015 15:00
Last Change: Entered 2015-06-26 11:12

Top of page Top of page


HWY 9 Eastbound [ Highway 21 - County Road 7 / Sideroad 20 ] - Recurring-Maintenance
Highway: HWY 9
Direction: Eastbound
From/At: Highway 21
To: County Road 7 / Sideroad 20
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment : Highway 9 eastbound and westbound, from Highway 21 to Bruce County Road 7, will have daily, alternating lane closures from 0700 hours to 1900 hours, from Monday June 29th,2015, to Friday July 3rd, 2015 for maintenance operations
Event Start: June 29, 2015 07:00
Event End: July 03, 2015 19:00
Last Change: Entered 2015-06-26 19:58

Top of page Top of page


HWY 9 Eastbound [ PEEL REGIONAL ROAD 50 - JANE STREET ] - Recurring-Maintenance
Highway: HWY 9
Direction: Eastbound
From/At: PEEL REGIONAL ROAD 50
To: JANE STREET
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: June 28, 2015 21:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-25 13:44

Top of page Top of page


HWY 9 Westbound [ JANE STREET - PEEL REGIONAL ROAD 50 ] - Recurring-Maintenance
Highway: HWY 9
Direction: Westbound
From/At: JANE STREET
To: PEEL REGIONAL ROAD 50
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: June 28, 2015 21:00
Event End: July 03, 2015 06:00
Last Change: Entered 2015-06-25 13:37

Top of page Top of page


QEW Fort Erie Bound [ EAST MALL - EAST MALL ] - Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: EAST MALL
To: EAST MALL
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 02, 2015 22:00
Event End: July 03, 2015 05:00
Last Change: Entered 2015-06-30 16:19

Top of page Top of page


QEW Fort Erie Bound [ HWY 427 - BRONTE ROAD ] - Recurring-Maintenance
Highway: QEW
Direction: Fort Erie Bound
From/At: HWY 427
To: BRONTE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 05, 2015 23:59
Event End: July 12, 2015 04:30
Last Change: Entered 2015-06-30 14:38

Top of page Top of page


QEW Fort Erie Bound [ HWY 427 - TRAFALGAR ROAD ] - Recurring-Special Event
Highway: QEW
Direction: Fort Erie Bound
From/At: HWY 427
To: TRAFALGAR ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Special Event
Comment :
Event Start: July 02, 2015 20:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-30 11:27

Top of page Top of page


QEW Fort Erie Bound [ ROYAL WINDSOR DRIVE - TRAFALGAR ROAD ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: ROYAL WINDSOR DRIVE
To: TRAFALGAR ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 03, 2015 22:00
Event End: July 05, 2015 05:00
Last Change: Entered 2015-07-02 08:11

Top of page Top of page


QEW Fort Erie Bound [ SODOM ROAD - SODOM ROAD ] - Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: SODOM ROAD
To: SODOM ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 03, 2015 07:00
Event End: July 03, 2015 17:00
Last Change: Entered 2015-06-29 09:15

Top of page Top of page


QEW Fort Erie Bound [ SODOM ROAD - SODOM ROAD ] - Maintenance
Highway: QEW
Direction: Fort Erie Bound
From/At: SODOM ROAD
To: SODOM ROAD
Lanes Affected: 1 Left Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: May 08, 2015 08:00
Event End: July 28, 2015 17:00
Last Change: Entered 2015-05-07 11:05

Top of page Top of page


QEW Fort Erie Bound [ TRAFALGAR ROAD - TRAFALGAR ROAD ] - Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: TRAFALGAR ROAD
To: TRAFALGAR ROAD
Lanes Affected: 2 Right Lane(s)
Traffic Impact : On-ramp from TRAFALGAR ROAD NB, Off-ramp to TRAFALGAR ROAD WB
Reason Construction
Comment :
Event Start: July 05, 2015 00:00
Event End: July 05, 2015 07:00
Last Change: Entered 2015-06-30 10:05

Top of page Top of page


QEW Fort Erie Bound [ WALKERS LINE - GUELPH LINE ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: WALKERS LINE
To: GUELPH LINE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 22:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-07-02 15:04

Top of page Top of page


QEW Fort Erie Bound [ WINSTON CHURCHILL BLVD - TRAFALGAR ROAD ] - Recurring-Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: WINSTON CHURCHILL BLVD
To: TRAFALGAR ROAD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 22:00
Event End: July 04, 2015 06:00
Last Change: Entered 2015-06-30 08:11

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - FORD DRIVE Northbound/Southbound ] - Maintenance
Highway: QEW
Direction: Fort Erie Bound
From/At:
To: FORD DRIVE Northbound/Southbound
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: July 04, 2015 09:00
Event End: July 04, 2015 15:00
Last Change: Entered 2015-06-30 12:40

Top of page Top of page


QEW Fort Erie Bound On-ramp [ FORD DRIVE Southbound - ] - Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: FORD DRIVE Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: July 03, 2015 23:00
Event End: July 06, 2015 05:00
Last Change: Entered 2015-06-29 12:14

Top of page Top of page


QEW Fort Erie Bound On-ramp [ NETHERBY ROAD Southbound - ] - Construction
Highway: QEW
Direction: Fort Erie Bound
From/At: NETHERBY ROAD Southbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: April 07, 2015 07:00
Event End: August 26, 2015 17:00
Last Change: Entered 2015-04-02 12:16

Top of page Top of page


QEW Toronto bound [ BRONTE ROAD - HWY 427 ] - Recurring-Maintenance
Highway: QEW
Direction: Toronto bound
From/At: BRONTE ROAD
To: HWY 427
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Maintenance
Comment :
Event Start: July 05, 2015 23:59
Event End: July 12, 2015 04:30
Last Change: Entered 2015-06-30 14:31

Top of page Top of page


QEW Toronto bound [ DORCHESTER ROAD / WATSON STREET - THOROLD STONE ROAD ] - Maintenance
Highway: QEW
Direction: Toronto bound
From/At: DORCHESTER ROAD / WATSON STREET
To: THOROLD STONE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: July 02, 2015 23:00
Event End: July 05, 2015 06:00
Last Change: Entered 2015-06-29 17:46

Top of page Top of page


QEW Toronto bound [ GUELPH LINE - WALKERS LINE ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: GUELPH LINE
To: WALKERS LINE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 22:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-07-02 15:04

Top of page Top of page


QEW Toronto bound [ LUNDY'S LANE - THOROLD STONE ROAD ] - Engineering Investigation
Highway: QEW
Direction: Toronto bound
From/At: LUNDY'S LANE
To: THOROLD STONE ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact : On-ramp from DORCHESTER ROAD / WATSON STREET NB
Reason Engineering Investigation
Comment :
Event Start: July 03, 2015 23:59
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-16 12:48

Top of page Top of page


QEW Toronto bound [ SODOM ROAD - SODOM ROAD ] - Construction
Highway: QEW
Direction: Toronto bound
From/At: SODOM ROAD
To: SODOM ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Construction
Comment :
Event Start: July 03, 2015 07:00
Event End: July 03, 2015 17:00
Last Change: Entered 2015-06-29 09:36

Top of page Top of page


QEW Toronto bound [ SODOM ROAD - SODOM ROAD ] - Maintenance
Highway: QEW
Direction: Toronto bound
From/At: SODOM ROAD
To: SODOM ROAD
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Maintenance
Comment :
Event Start: May 08, 2015 08:00
Event End: July 28, 2015 17:00
Last Change: Entered 2015-05-07 11:07

Top of page Top of page


QEW Toronto bound [ TRAFALGAR ROAD - ROYAL WINDSOR DRIVE ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: TRAFALGAR ROAD
To: ROYAL WINDSOR DRIVE
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 03, 2015 22:00
Event End: July 05, 2015 05:00
Last Change: Entered 2015-07-02 08:12

Top of page Top of page


QEW Toronto bound [ TRAFALGAR ROAD - TRAFALGAR ROAD ] - Construction
Highway: QEW
Direction: Toronto bound
From/At: TRAFALGAR ROAD
To: TRAFALGAR ROAD
Lanes Affected: 2 Right Lane(s)
Traffic Impact : On-ramp from TRAFALGAR ROAD SB
Reason Construction
Comment :
Event Start: July 05, 2015 00:00
Event End: July 05, 2015 07:00
Last Change: Entered 2015-06-30 10:03

Top of page Top of page


QEW Toronto bound [ TRAFALGAR ROAD - WINSTON CHURCHILL BLVD ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At: TRAFALGAR ROAD
To: WINSTON CHURCHILL BLVD
Lanes Affected: 1 Right Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 22:00
Event End: July 04, 2015 05:00
Last Change: Entered 2015-06-30 08:12

Top of page Top of page


QEW Toronto bound Off-ramp [ - GLENDALE AVENUE Eastbound/Westbound ] - Recurring-Construction
Highway: QEW
Direction: Toronto bound
From/At:
To: GLENDALE AVENUE Eastbound/Westbound
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 23:00
Event End: July 03, 2015 23:59
Last Change: Entered 2015-06-30 07:08

Top of page Top of page


QEW Toronto bound On-ramp [ BROWN'S LINE Eastbound - ] - Construction
Highway: QEW
Direction: Toronto bound
From/At: BROWN'S LINE Eastbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 25, 2015 22:00
Event End: September 28, 2015 05:00
Last Change: Entered 2015-03-23 14:11

Top of page Top of page


QEW Toronto bound On-ramp [ NETHERBY ROAD Northbound - ] - Construction
Highway: QEW
Direction: Toronto bound
From/At: NETHERBY ROAD Northbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: April 07, 2015 07:00
Event End: August 26, 2015 17:00
Last Change: Entered 2015-04-02 12:26

Top of page Top of page


QEW Toronto bound On-ramp [ WEST MALL/EVANS AVE Eastbound - ] - Construction
Highway: QEW
Direction: Toronto bound
From/At: WEST MALL/EVANS AVE Eastbound
To:
Lanes Affected: ALL LANES CLOSED
Traffic Impact :
Reason Construction
Comment :
Event Start: September 25, 2015 22:00
Event End: September 28, 2015 05:00
Last Change: Entered 2015-03-23 14:09

Top of page Top of page


THOROLD STONE ROAD (NIAGARA) Westbound [ TAYLOR ROAD/THOROLD TOWNLINE ROAD - TAYLOR ROAD/THOROLD TOWNLINE ROAD ] - Recurring-Construction
Highway: THOROLD STONE ROAD (NIAGARA)
Direction: Westbound
From/At: TAYLOR ROAD/THOROLD TOWNLINE ROAD
To: TAYLOR ROAD/THOROLD TOWNLINE ROAD
Lanes Affected: 2 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment :
Event Start: July 02, 2015 00:00
Event End: July 10, 2015 23:59
Last Change: Entered 2015-06-29 08:44

Top of page Top of page


Thousand Island Parkway Eastbound [ HWY 401- IC647 - HWY 137 ] - Recurring-Construction
Highway: Thousand Island Parkway
Direction: Eastbound
From/At: HWY 401- IC647
To: HWY 137
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Thousand Island Parkway E/B & W/B @ Hwy 137 and Hwy 401E/B structures (Gananoque)
Event Start: June 29, 2015 07:00
Event End: July 03, 2015 17:00
Last Change: Entered 2015-06-18 08:50

Top of page Top of page


Thousand Island Parkway Eastbound [ HWY 401- IC647 - HWY 137 ] - Recurring-Construction
Highway: Thousand Island Parkway
Direction: Eastbound
From/At: HWY 401- IC647
To: HWY 137
Lanes Affected: 1 Alternating Lane(s)
Traffic Impact :
Reason Recurring-Construction
Comment : Daily lane reductions Thousand Island Parkway E/B & W/B @ Hwy 137 and Hwy 401E/B structures (Gananoque)
Event Start: July 06, 2015 07:00
Event End: July 10, 2015 17:00
Last Change: Entered 2015-07-02 10:38

Top of page Top of page


401 Westbound Off-ramp [ - NEWTONVILLE ROAD Northbound/Southbound ] - Other
Highway: 401
Direction: Westbound
From/At:
To: NEWTONVILLE ROAD Northbound/Southbound
Lanes Affected: 1 RIGHT LANE(S)
Traffic Impact :
Reason Other
Comment : Town of Newcastle - MINOR SINK HOLE - RIGHT LANE PARTLY BLOCKED UNTIL TOMORROW (JULY 3, 2015)
Event Start: July 02, 2015 18:41
Event End:
Last Change: ENTERED 2015-07-02 18:41

Top of page Top of page


EASTPORT Southbound [ LIFT BRIDGE - ] - Other
Highway: EASTPORT
Direction: Southbound
From/At: LIFT BRIDGE
To:
Lanes Affected: 1 LEFT LANE(S)
Traffic Impact :
Reason Other
Comment : BURLINGTON - NO CHANGE IN STATUS AS OF JUL 2, 2015 AT 22:00
Event Start: July 01, 2015 00:52
Event End:
Last Change: UPDATED 2015-07-02 22:01

Top of page Top of page


HWY 17 Westbound [ HWY 61 - HARBOUR EXPRESSWAY - ] - Other
Highway: HWY 17
Direction: Westbound
From/At: HWY 61 - HARBOUR EXPRESSWAY
To:
Lanes Affected: 1 lane blocked
Traffic Impact :
Reason Other
Comment : The City of Thunder Bay Public Works has issued the following Media Release: Harbour Expressway Repaving Begins June 08, 2015 - Resurfacing of the Harbour Expressway between Highway 11/17 and Golf Links Road will begin on Monday, June 08 and last approximately four weeks. Work on the Harbour Expressway will proceed in three stages. During STAGE ONE, which begins MONDAY (today), traffic movements will be permitted in an EASTERLY DIRECTION ONLY (i.e., travelling from Highway 11/17 to Golf Links Road), with ALL WEST BOUND LANES CLOSED. This stage is expected to take two weeks to complete. ** Stage 3 is now being worked on and weather permitting, work might be completed by July 10th. Updated July 02, 2015 at 11:07 A.M. During stage two, all westbound lanes and one eastbound lane will be open to traffic. This stage is expected to take one week to complete. In the final stage, all westbound lanes will be open, and all eastbound lanes will be closed. Work in this stage is expected to last one week. Reduced speed limits will also be in place to increase safety for work crews. Drivers are asked to avoid the area if possible; a detour route will be posted. If travelling in the area is necessary, drivers are asked to use caution and obey all posted signage. Updated July 1, 2015 at 10:30am
Event Start: June 08, 2015 08:29
Event End:
Last Change: Updated 2015-07-02 11:07

Top of page Top of page


QEW Toronto bound On-ramp [ CASABLANCA BLVD. Northbound - ] - Emergency Roadwork
Highway: QEW
Direction: Toronto bound
From/At: CASABLANCA BLVD. Northbound
To:
Lanes Affected: All lanes closed
Traffic Impact :
Reason Emergency Roadwork
Comment : GRIMSBY
Event Start: July 02, 2015 18:04
Event End:
Last Change: ENTERED 2015-07-02 18:04

Top of page Top of page


This information is provided as a public service. Although we endeavor to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.