Traffic Report - Niagara

COMPASS

This report is being updated every few minutes. It contains information on collisions, breakdowns, emergency roadworks, and scheduled maintenance and construction events on provincially maintained highways.

Real-time traffic reports are also available for the Hamilton, Halton, Peel, Toronto, York, Durham, Simcoe, Bancroft, Ontario East Communities, and Ottawa regions.

Current Events

Last Updated: August 25, 2016 03:49:24

Scheduled Events

Today's Roadwork
Planned Roadwork
EAST MAIN ST WELLAND Eastbound [ WELLAND TUNNEL - WELLAND TUNNEL ] - Recurring-Construction
Event Id: 61292
Highway: EAST MAIN ST WELLAND
Direction: Eastbound
Stream:
From/At: WELLAND TUNNEL
To: WELLAND TUNNEL
Lanes Affected: 1 Right Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: August 22, 2016 09:00
Event End: August 26, 2016 15:00
Last Change: Entered 2016-08-16 13:58
Last Updated: August 16, 2016 13:58

Top of page Top of page


EAST MAIN ST WELLAND Westbound [ WELLAND TUNNEL - WELLAND TUNNEL ] - Recurring-Construction
Event Id: 61293
Highway: EAST MAIN ST WELLAND
Direction: Westbound
Stream:
From/At: WELLAND TUNNEL
To: WELLAND TUNNEL
Lanes Affected: 1 Right Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: August 22, 2016 09:00
Event End: August 26, 2016 15:00
Last Change: Entered 2016-08-16 13:59
Last Updated: August 16, 2016 13:59

Top of page Top of page


HWY 3 Eastbound [ HWY 140/ELIZABETH STREET - KILLALY STREET EAST/NIAGARA ROAD 5 ] - Recurring-Construction
Event Id: 61245
Highway: HWY 3
Direction: Eastbound
Stream:
From/At: HWY 140/ELIZABETH STREET
To: KILLALY STREET EAST/NIAGARA ROAD 5
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: August 17, 2016 07:00
Event End: August 24, 2016 20:00
Last Change: Entered 2016-08-16 09:10
Last Updated: August 16, 2016 09:10

Top of page Top of page


HWY 3 Eastbound [ KILLALY STREET EAST/NIAGARA ROAD 5 - ROSE HILL ROAD ] - Recurring-Construction
Event Id: 61242
Highway: HWY 3
Direction: Eastbound
Stream:
From/At: KILLALY STREET EAST/NIAGARA ROAD 5
To: ROSE HILL ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: August 16, 2016 00:00
Event End: August 24, 2016 23:59
Last Change: Entered 2016-08-16 09:05
Last Updated: August 16, 2016 09:05

Top of page Top of page


HWY 3 Westbound [ ROSE HILL ROAD - KILLALY STREET EAST/NIAGARA ROAD 5 ] - Recurring-Construction
Event Id: 61243
Highway: HWY 3
Direction: Westbound
Stream:
From/At: ROSE HILL ROAD
To: KILLALY STREET EAST/NIAGARA ROAD 5
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: August 16, 2016 00:00
Event End: August 24, 2016 23:59
Last Change: Entered 2016-08-16 09:07
Last Updated: August 16, 2016 09:07

Top of page Top of page


HWY 406 Northbound [ GLENDALE AVE - 4TH AVE ] - Recurring-Maintenance
Event Id: 61281
Highway: HWY 406
Direction: Northbound
Stream:
From/At: GLENDALE AVE
To: 4TH AVE
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: August 22, 2016 20:30
Event End: September 02, 2016 07:00
Last Change: Entered 2016-08-16 13:33
Last Updated: August 16, 2016 13:33

Top of page Top of page


HWY 406 Northbound [ QEW - QEW ] - Construction
Event Id: 57476
Highway: HWY 406
Direction: Northbound
Stream:
From/At: QEW
To: QEW
Lanes Affected: 1 Left Lane(s)
Comment :
Traffic Impact : Off-ramp to QEW WB
Type - Reason Planned - Construction
Event Start: June 15, 2016 22:00
Event End: September 15, 2016 05:00
Last Change: Entered 2016-06-09 23:41
Last Updated: June 09, 2016 23:41

Top of page Top of page


HWY 406 Northbound [ WESTCHESTER AVE - 4TH AVE ] - Construction
Event Id: 60887
Highway: HWY 406
Direction: Northbound
Stream:
From/At: WESTCHESTER AVE
To: 4TH AVE
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact : On-ramp from THE PARKWAY / RACE STREET EB/WB, On-ramp from GENEVA STREET NB/SB, Off-ramp to GENEVA STREET NB/SB
Type - Reason Planned - Construction
Event Start: August 23, 2016 22:00
Event End: August 24, 2016 06:00
Last Change: Entered 2016-08-09 08:21
Last Updated: August 09, 2016 08:21

Top of page Top of page


HWY 406 Northbound [ WESTCHESTER AVE - 4TH AVE ] - Construction
Event Id: 60892
Highway: HWY 406
Direction: Northbound
Stream:
From/At: WESTCHESTER AVE
To: 4TH AVE
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact : On-ramp from THE PARKWAY / RACE STREET EB/WB, On-ramp from GENEVA STREET NB/SB, Off-ramp to GENEVA STREET NB/SB
Type - Reason Planned - Construction
Event Start: August 25, 2016 22:00
Event End: August 26, 2016 06:00
Last Change: Entered 2016-08-09 08:28
Last Updated: August 09, 2016 08:28

Top of page Top of page


HWY 406 Northbound [ WESTCHESTER AVE - 4TH AVE ] - Construction
Event Id: 60894
Highway: HWY 406
Direction: Northbound
Stream:
From/At: WESTCHESTER AVE
To: 4TH AVE
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact : On-ramp from THE PARKWAY / RACE STREET EB/WB, On-ramp from GENEVA STREET NB/SB, Off-ramp to GENEVA STREET NB/SB
Type - Reason Planned - Construction
Event Start: August 26, 2016 22:00
Event End: August 27, 2016 06:00
Last Change: Entered 2016-08-09 08:29
Last Updated: August 09, 2016 08:29

Top of page Top of page


HWY 406 Northbound [ WESTCHESTER AVE - 4TH AVE ] - Construction
Event Id: 60889
Highway: HWY 406
Direction: Northbound
Stream:
From/At: WESTCHESTER AVE
To: 4TH AVE
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact : On-ramp from THE PARKWAY / RACE STREET EB/WB, On-ramp from GENEVA STREET NB/SB, Off-ramp to GENEVA STREET NB/SB
Type - Reason Planned - Construction
Event Start: August 24, 2016 22:00
Event End: August 25, 2016 06:00
Last Change: Entered 2016-08-09 08:24
Last Updated: August 09, 2016 08:24

Top of page Top of page


HWY 406 Northbound [ WESTCHESTER AVE - 4TH AVE ] - Construction
Event Id: 60885
Highway: HWY 406
Direction: Northbound
Stream:
From/At: WESTCHESTER AVE
To: 4TH AVE
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact : On-ramp from THE PARKWAY / RACE STREET EB/WB, On-ramp from GENEVA STREET NB/SB, Off-ramp to GENEVA STREET NB/SB
Type - Reason Planned - Construction
Event Start: August 22, 2016 22:00
Event End: August 23, 2016 06:00
Last Change: Entered 2016-08-09 08:20
Last Updated: August 09, 2016 08:20

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER AVE ] - Construction
Event Id: 60895
Highway: HWY 406
Direction: Southbound
Stream:
From/At: 4TH AVE
To: WESTCHESTER AVE
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact : On-ramp from 4TH AVE EB/WB, Off-ramp to WESTCHESTER AVE EB/WB
Type - Reason Planned - Construction
Event Start: August 26, 2016 22:00
Event End: August 27, 2016 06:00
Last Change: Entered 2016-08-09 08:30
Last Updated: August 09, 2016 08:30

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER AVE ] - Construction
Event Id: 60893
Highway: HWY 406
Direction: Southbound
Stream:
From/At: 4TH AVE
To: WESTCHESTER AVE
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact : On-ramp from 4TH AVE EB/WB, Off-ramp to WESTCHESTER AVE EB/WB
Type - Reason Planned - Construction
Event Start: August 25, 2016 22:00
Event End: August 26, 2016 06:00
Last Change: Entered 2016-08-09 08:28
Last Updated: August 09, 2016 08:28

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER AVE ] - Construction
Event Id: 60888
Highway: HWY 406
Direction: Southbound
Stream:
From/At: 4TH AVE
To: WESTCHESTER AVE
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact : On-ramp from 4TH AVE EB/WB, Off-ramp to WESTCHESTER AVE EB/WB
Type - Reason Planned - Construction
Event Start: August 23, 2016 22:00
Event End: August 24, 2016 06:00
Last Change: Entered 2016-08-09 08:23
Last Updated: August 09, 2016 08:23

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER AVE ] - Construction
Event Id: 60886
Highway: HWY 406
Direction: Southbound
Stream:
From/At: 4TH AVE
To: WESTCHESTER AVE
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact : On-ramp from 4TH AVE EB/WB, Off-ramp to WESTCHESTER AVE EB/WB
Type - Reason Planned - Construction
Event Start: August 22, 2016 22:00
Event End: August 23, 2016 06:00
Last Change: Entered 2016-08-09 08:21
Last Updated: August 09, 2016 08:21

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER AVE ] - Construction
Event Id: 60891
Highway: HWY 406
Direction: Southbound
Stream:
From/At: 4TH AVE
To: WESTCHESTER AVE
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact : On-ramp from 4TH AVE EB/WB, Off-ramp to WESTCHESTER AVE EB/WB
Type - Reason Planned - Construction
Event Start: August 24, 2016 22:00
Event End: August 25, 2016 06:00
Last Change: Entered 2016-08-09 08:27
Last Updated: August 09, 2016 08:27

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - WESTCHESTER OVERPASS ] - Recurring-Maintenance
Event Id: 61282
Highway: HWY 406
Direction: Southbound
Stream:
From/At: 4TH AVE
To: WESTCHESTER OVERPASS
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: August 22, 2016 20:00
Event End: August 26, 2016 07:00
Last Change: Entered 2016-08-16 13:35
Last Updated: August 16, 2016 13:35

Top of page Top of page


HWY 420 Eastbound [ QEW - QEW ] - Recurring-Construction
Event Id: 61240
Highway: HWY 420
Direction: Eastbound
Stream:
From/At: QEW
To: QEW
Lanes Affected: 1 Alternating Lane(s)
Comment : For mainline: On Sunday 1 lane closed at 23:59. All lanes open at 06:00. From Monday to Thursday, One lane closed at 23:00 and all lanes open at 06:00. For ramp: On Sunday all lane closed at 23:59. All lanes open at 06:00. From Monday to Thursday, all lane closed at 23:00 and all lanes open at 06:00.
Traffic Impact : Off-ramp to QEW NB
Type - Reason Planned - Recurring-Construction
Event Start: August 21, 2016 23:00
Event End: August 26, 2016 06:00
Last Change: Entered 2016-08-16 09:04
Last Updated: August 16, 2016 09:04

Top of page Top of page


HWY 420 Westbound [ DORCHESTER ROAD/LUNDY'S LANE - QEW ] - Recurring-Construction
Event Id: 61241
Highway: HWY 420
Direction: Westbound
Stream:
From/At: DORCHESTER ROAD/LUNDY'S LANE
To: QEW
Lanes Affected: 1 Alternating Lane(s)
Comment : For mainline: On Sunday 1 lane closed at 23:59. All lanes open at 06:00. From Monday to Thursday, One lane closed at 23:00 and all lanes open at 06:00. For ramp: On Sunday all lanes closed at 23:59. All lanes open at 06:00. From Monday to Thursday, all lanes closed at 23:00 and all lanes open at 06:00.
Traffic Impact : Off-ramp to QEW SB
Type - Reason Planned - Recurring-Construction
Event Start: August 21, 2016 23:00
Event End: August 26, 2016 06:00
Last Change: Entered 2016-08-16 09:12
Last Updated: August 16, 2016 09:12

Top of page Top of page


HWY 420 Westbound Off-ramp [ - QEW Northbound ] - Construction
Event Id: 60707
Highway: HWY 420
Direction: Westbound
Stream: Off-ramp
From/At:
To: QEW Northbound
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: August 08, 2016 23:00
Event End: November 18, 2016 06:00
Last Change: Entered 2016-08-04 09:03
Last Updated: August 04, 2016 09:03

Top of page Top of page


HWY 420 Westbound Off-ramp [ - QEW Southbound ] - Construction
Event Id: 56922
Highway: HWY 420
Direction: Westbound
Stream: Off-ramp
From/At:
To: QEW Southbound
Lanes Affected: ALL LANES CLOSED
Comment : Highway 420 westbound off-ramp to QEW southbound will be permanently closed from Monday June 13th to Friday November 18th, 2016.
Traffic Impact :
Type - Reason Planned - Construction
Event Start: June 13, 2016 23:00
Event End: November 18, 2016 06:00
Last Change: Entered 2016-06-02 16:50
Last Updated: June 02, 2016 16:50

Top of page Top of page


HWY 58 Northbound [ CORONATION DRIVE NORTH - NORTHLAND AVENUE /MALL ENTRANCE NORTH ] - Recurring-Construction
Event Id: 60258
Highway: HWY 58
Direction: Northbound
Stream:
From/At: CORONATION DRIVE NORTH
To: NORTHLAND AVENUE /MALL ENTRANCE NORTH
Lanes Affected: 1 Right Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: July 28, 2016 07:30
Event End: August 26, 2016 17:00
Last Change: Entered 2016-07-27 09:38
Last Updated: July 27, 2016 09:38

Top of page Top of page


HWY 58 Northbound [ THOROLD TUNNEL - THOROLD TUNNEL ] - Recurring-Maintenance
Event Id: 61287
Highway: HWY 58
Direction: Northbound
Stream:
From/At: THOROLD TUNNEL
To: THOROLD TUNNEL
Lanes Affected: 1 Left Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: August 22, 2016 09:00
Event End: August 25, 2016 14:30
Last Change: Entered 2016-08-16 13:53
Last Updated: August 16, 2016 13:53

Top of page Top of page


HWY 58 Southbound [ BARRICK ROAD - BARRICK ROAD ] - Recurring-Construction
Event Id: 60259
Highway: HWY 58
Direction: Southbound
Stream:
From/At: BARRICK ROAD
To: BARRICK ROAD
Lanes Affected: 1 Right Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: July 28, 2016 07:00
Event End: August 26, 2016 17:00
Last Change: Entered 2016-06-22 13:25
Last Updated: June 22, 2016 13:25

Top of page Top of page


HWY 58 Southbound [ THOROLD TUNNEL - THOROLD TUNNEL ] - Recurring-Maintenance
Event Id: 61288
Highway: HWY 58
Direction: Southbound
Stream:
From/At: THOROLD TUNNEL
To: THOROLD TUNNEL
Lanes Affected: 1 Left Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: August 22, 2016 09:00
Event End: August 25, 2016 14:30
Last Change: Entered 2016-08-16 13:54
Last Updated: August 16, 2016 13:54

Top of page Top of page


HWY 58 Southbound On-ramp [ COLLIER ROAD Southbound - ] - Construction
Event Id: 55611
Highway: HWY 58
Direction: Southbound
Stream: On-ramp
From/At: COLLIER ROAD Southbound
To:
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: May 18, 2016 00:00
Event End: August 25, 2016 23:59
Last Change: Entered 2016-05-12 07:29
Last Updated: May 12, 2016 07:29

Top of page Top of page


QEW Fort Erie Bound [ BAKER ROAD - TOWNLINE ROAD ] - Construction
Event Id: 56090
Highway: QEW
Direction: Fort Erie Bound
Stream:
From/At: BAKER ROAD
To: TOWNLINE ROAD
Lanes Affected: 1 Right Lane(s)
Comment : Two consecutive on and off ramps will not be closed at the same time. Ramps closed from 00:00 to 23:59. Closure is from May 21st to November 30th.
Traffic Impact : On-ramp from NETHERBY ROAD EB, On-ramp from NETHERBY ROAD WB
Type - Reason Planned - Construction
Event Start: May 21, 2016 00:00
Event End: November 30, 2016 23:59
Last Change: Entered 2016-05-18 13:41
Last Updated: May 18, 2016 13:41

Top of page Top of page


QEW Fort Erie Bound [ HWY 406 - GLENDALE AVENUE ] - Recurring-Maintenance
Event Id: 61284
Highway: QEW
Direction: Fort Erie Bound
Stream:
From/At: HWY 406
To: GLENDALE AVENUE
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: August 22, 2016 20:00
Event End: August 26, 2016 07:00
Last Change: Entered 2016-08-16 13:42
Last Updated: August 16, 2016 13:42

Top of page Top of page


QEW Fort Erie Bound [ HWY 406 - PEACE BRIDGE ] - Recurring-Moving Maintenance Closure
Event Id: 61306
Highway: QEW
Direction: Fort Erie Bound
Stream:
From/At: HWY 406
To: PEACE BRIDGE
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Moving Maintenance Closure
Event Start: August 21, 2016 22:00
Event End: August 26, 2016 05:00
Last Change: Entered 2016-08-16 16:23
Last Updated: August 16, 2016 16:23

Top of page Top of page


QEW Fort Erie Bound [ HWY 420 - HWY 420 ] - Recurring-Construction
Event Id: 61246
Highway: QEW
Direction: Fort Erie Bound
Stream:
From/At: HWY 420
To: HWY 420
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact : On-ramp from HWY 420 WB
Type - Reason Planned - Recurring-Construction
Event Start: August 21, 2016 23:00
Event End: August 26, 2016 06:00
Last Change: Entered 2016-08-16 09:17
Last Updated: August 16, 2016 09:17

Top of page Top of page


QEW Fort Erie Bound [ JORDAN ROAD - LAKE STREET ] - Recurring-Engineering Investigation
Event Id: 61272
Highway: QEW
Direction: Fort Erie Bound
Stream:
From/At: JORDAN ROAD
To: LAKE STREET
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Engineering Investigation
Event Start: August 14, 2016 20:00
Event End: August 26, 2016 06:00
Last Change: Entered 2016-08-10 12:40
Last Updated: August 10, 2016 12:40

Top of page Top of page


QEW Fort Erie Bound [ MOUNTAINVIEW ROAD - VICTORIA AVENUE ] - Recurring-Construction
Event Id: 60877
Highway: QEW
Direction: Fort Erie Bound
Stream:
From/At: MOUNTAINVIEW ROAD
To: VICTORIA AVENUE
Lanes Affected: 2 Alternating Lane(s)
Comment : On Sunday and Friday, one lane closed at 22:00 and two lanes closed at 23:00. One lane opens at 06:00 and all lanes open at 07:00. Monday through Thursday, one lane closed at 20:00 and two lanes closed at 22:00. One lane opens at 06:00 and all lanes open at 07:00.
Traffic Impact : Off-ramp to VICTORIA AVENUE NB/SB
Type - Reason Planned - Recurring-Construction
Event Start: August 21, 2016 20:00
Event End: August 27, 2016 07:00
Last Change: Entered 2016-08-08 17:22
Last Updated: August 08, 2016 17:22

Top of page Top of page


QEW Fort Erie Bound [ RIDGEMOUNT ROAD - GILMORE ROAD ] - Recurring-Maintenance
Event Id: 61594
Highway: QEW
Direction: Fort Erie Bound
Stream:
From/At: RIDGEMOUNT ROAD
To: GILMORE ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: August 22, 2016 20:00
Event End: August 24, 2016 05:00
Last Change: Entered 2016-08-20 10:30
Last Updated: August 20, 2016 10:30

Top of page Top of page


QEW Fort Erie Bound [ WELLAND RIVER BRIDGE - BECK ROAD ] - Recurring-Construction
Event Id: 56884
Highway: QEW
Direction: Fort Erie Bound
Stream:
From/At: WELLAND RIVER BRIDGE
To: BECK ROAD
Lanes Affected: 1 Right Lane(s)
Comment : From 24th to 28th, one lane will be closed QEW Fort Erie Bound. On-ramps from Lyons Creek Rd will also be closed.
Traffic Impact : On-ramp from LYONS CREEK ROAD EB, On-ramp from LYONS CREEK ROAD WB
Type - Reason Planned - Recurring-Construction
Event Start: May 29, 2016 00:00
Event End: November 30, 2016 23:59
Last Change: Entered 2016-05-25 22:19
Last Updated: May 25, 2016 22:19

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - ONTARIO STREET (ST. CATHARINES) Northbound/Southbound ] - Recurring-Construction
Event Id: 61271
Highway: QEW
Direction: Fort Erie Bound
Stream: Off-ramp
From/At:
To: ONTARIO STREET (ST. CATHARINES) Northbound/Southbound
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: August 17, 2016 23:59
Event End: August 26, 2016 05:00
Last Change: Entered 2016-08-16 11:30
Last Updated: August 16, 2016 11:30

Top of page Top of page


QEW Toronto bound [ BECK ROAD - LYONS CREEK ROAD ] - Construction
Event Id: 56117
Highway: QEW
Direction: Toronto bound
Stream:
From/At: BECK ROAD
To: LYONS CREEK ROAD
Lanes Affected: 1 Left Lane(s)
Comment :
Traffic Impact : On-ramp from LYONS CREEK ROAD EB, On-ramp from LYONS CREEK ROAD WB, Off-ramp to LYONS CREEK ROAD EB/WB
Type - Reason Planned - Construction
Event Start: May 20, 2016 00:00
Event End: November 30, 2016 23:59
Last Change: Entered 2016-05-18 13:44
Last Updated: May 18, 2016 13:44

Top of page Top of page


QEW Toronto bound [ CASABLANCA BLVD. - FRUITLAND ROAD ] - Recurring-Construction
Event Id: 61428
Highway: QEW
Direction: Toronto bound
Stream:
From/At: CASABLANCA BLVD.
To: FRUITLAND ROAD
Lanes Affected: 2 Alternating Lane(s)
Comment : Mainline: On Sunday, one lane closes at 22:00, two lanes close at 23:00, all lanes open at 05:00. Monday through Friday, one lane closes at 21:00, two lanes close at 22:00, all lanes open at 05:00. On Saturday, one lane closes at 23:00, two lanes close at 23:59, all lanes open at 07:00. All Ramps: On Sunday ramps closed from 22:00 to 05:00. Monday through Thursday, ramps closed from 21:00 to 05:00. On Friday, ramps closed from 23:00 to 05:00. On Saturday, ramps closed from 23:00 to 07:00.
Traffic Impact : On-ramp from FIFTY ROAD NB, On-ramp from FIFTY ROAD SB, Off-ramp to FIFTY ROAD WB
Type - Reason Planned - Recurring-Construction
Event Start: August 21, 2016 21:00
Event End: August 28, 2016 08:00
Last Change: Entered 2016-08-17 22:12
Last Updated: August 17, 2016 22:12

Top of page Top of page


QEW Toronto bound [ CENTRAL AVENUE - GILMORE ROAD ] - Recurring-Construction
Event Id: 61387
Highway: QEW
Direction: Toronto bound
Stream:
From/At: CENTRAL AVENUE
To: GILMORE ROAD
Lanes Affected: 1 Left Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: August 22, 2016 06:00
Event End: August 28, 2016 06:00
Last Change: Entered 2016-08-17 14:41
Last Updated: August 17, 2016 14:41

Top of page Top of page


QEW Toronto bound [ GILMORE ROAD - SODOM ROAD ] - Recurring-Maintenance
Event Id: 61596
Highway: QEW
Direction: Toronto bound
Stream:
From/At: GILMORE ROAD
To: SODOM ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact : On-ramp from GILMORE ROAD EB/WB, On-ramp from BOWEN ROAD EB/WB, On-ramp from SODOM ROAD EB/WB, Off-ramp to GILMORE ROAD EB/WB, Off-ramp to BOWEN ROAD EB/WB, Off-ramp to SODOM ROAD EB/WB
Type - Reason Planned - Recurring-Maintenance
Event Start: August 22, 2016 20:00
Event End: August 25, 2016 05:00
Last Change: Entered 2016-08-20 10:40
Last Updated: August 20, 2016 10:40

Top of page Top of page


QEW Toronto bound [ GLENDALE AVENUE - HWY 406 ] - Recurring-Maintenance
Event Id: 61283
Highway: QEW
Direction: Toronto bound
Stream:
From/At: GLENDALE AVENUE
To: HWY 406
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: August 22, 2016 18:00
Event End: August 26, 2016 07:00
Last Change: Entered 2016-08-16 13:39
Last Updated: August 16, 2016 13:39

Top of page Top of page


QEW Toronto bound [ HWY 420 - HWY 420 ] - Recurring-Construction
Event Id: 61247
Highway: QEW
Direction: Toronto bound
Stream:
From/At: HWY 420
To: HWY 420
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact : On-ramp from HWY 420 EB
Type - Reason Planned - Recurring-Construction
Event Start: August 21, 2016 23:00
Event End: August 26, 2016 06:00
Last Change: Entered 2016-08-16 09:26
Last Updated: August 16, 2016 09:26

Top of page Top of page


QEW Toronto bound [ LAKE STREET - JORDAN ROAD ] - Recurring-Engineering Investigation
Event Id: 61408
Highway: QEW
Direction: Toronto bound
Stream:
From/At: LAKE STREET
To: JORDAN ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Engineering Investigation
Event Start: August 14, 2016 20:00
Event End: August 26, 2016 06:00
Last Change: Entered 2016-08-17 15:32
Last Updated: August 17, 2016 15:32

Top of page Top of page


QEW Toronto bound [ MOUNTAIN ROAD - GLENDALE AVENUE ] - Recurring-Maintenance
Event Id: 61285
Highway: QEW
Direction: Toronto bound
Stream:
From/At: MOUNTAIN ROAD
To: GLENDALE AVENUE
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: August 22, 2016 20:00
Event End: August 26, 2016 07:00
Last Change: Entered 2016-08-16 13:45
Last Updated: August 16, 2016 13:45

Top of page Top of page


QEW Toronto bound [ PEACE BRIDGE - HWY 406 ] - Recurring-Moving Maintenance Closure
Event Id: 61307
Highway: QEW
Direction: Toronto bound
Stream:
From/At: PEACE BRIDGE
To: HWY 406
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Moving Maintenance Closure
Event Start: August 21, 2016 22:00
Event End: August 26, 2016 05:00
Last Change: Entered 2016-08-16 16:26
Last Updated: August 16, 2016 16:26

Top of page Top of page


QEW Toronto bound [ RIDGEMOUNT ROAD - NETHERBY ROAD ] - Construction
Event Id: 56091
Highway: QEW
Direction: Toronto bound
Stream:
From/At: RIDGEMOUNT ROAD
To: NETHERBY ROAD
Lanes Affected: 1 Left Lane(s)
Comment : Two consecutive on and off ramps will not be closed at the same time. Ramps closed from 00:00 to 23:59. Closure is from May 21st to November 30th.
Traffic Impact : Off-ramp to NETHERBY ROAD EB/WB
Type - Reason Planned - Construction
Event Start: May 21, 2016 00:00
Event End: November 30, 2016 23:59
Last Change: Entered 2016-05-18 13:34
Last Updated: May 18, 2016 13:34

Top of page Top of page


QEW Toronto bound [ THOROLD STONE ROAD - MOUNTAIN ROAD ] - Recurring-Construction
Event Id: 61289
Highway: QEW
Direction: Toronto bound
Stream:
From/At: THOROLD STONE ROAD
To: MOUNTAIN ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: August 22, 2016 00:00
Event End: August 26, 2016 07:00
Last Change: Entered 2016-08-16 13:54
Last Updated: August 16, 2016 13:54

Top of page Top of page


QEW Toronto bound [ VICTORIA AVENUE - MOUNTAINVIEW ROAD ] - Recurring-Construction
Event Id: 60876
Highway: QEW
Direction: Toronto bound
Stream:
From/At: VICTORIA AVENUE
To: MOUNTAINVIEW ROAD
Lanes Affected: 2 Alternating Lane(s)
Comment : On Sunday one lane closed at 22:00, two lanes closed at 23:00. One lane opens at 05:00 and all lanes open at 06:00. Monday to Thursday one lane closed at 21:00, two lanes closed at 23:00. One lane opens at 05:00 and all lanes open at 06:00. On Friday one lane closed at 22:00, two lanes closed at 23:59. One lane opens at 05:00 and all lanes open at 06:00.
Traffic Impact : On-ramp from VICTORIA AVENUE NB/SB
Type - Reason Planned - Recurring-Construction
Event Start: August 21, 2016 21:00
Event End: August 27, 2016 06:00
Last Change: Entered 2016-08-08 17:20
Last Updated: August 08, 2016 17:20

Top of page Top of page


QEW Toronto bound Off-ramp [ - HWY 406 Southbound ] - Construction
Event Id: 55909
Highway: QEW
Direction: Toronto bound
Stream: Off-ramp
From/At:
To: HWY 406 Southbound
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: May 24, 2016 22:00
Event End: October 14, 2016 22:00
Last Change: Entered 2016-05-17 10:44
Last Updated: May 17, 2016 10:44

Top of page Top of page


QEW Toronto bound On-ramp [ ONTARIO STREET (ST. CATHARINES) Northbound/Southbound - ] - Recurring-Engineering Investigation
Event Id: 61274
Highway: QEW
Direction: Toronto bound
Stream: On-ramp
From/At: ONTARIO STREET (ST. CATHARINES) Northbound/Southbound
To:
Lanes Affected: ALL LANES CLOSED
Comment : No closure will occur on Friday and Saturday.
Traffic Impact :
Type - Reason Planned - Recurring-Engineering Investigation
Event Start: August 14, 2016 23:59
Event End: August 26, 2016 05:00
Last Change: Entered 2016-08-10 13:48
Last Updated: August 10, 2016 13:48

Top of page Top of page


This information is provided as a public service. Although we endeavour to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.