Traffic Report - Simcoe

COMPASS

This report is being updated every few minutes. It contains information on collisions, breakdowns, emergency roadworks, and scheduled maintenance and construction events on provincially maintained highways.

Real-time traffic reports are also available for the Niagara, Hamilton, Halton, Peel, Toronto, York, Durham, Bancroft, Ontario East Communities, and Ottawa regions.

Current Events

Last Updated: August 29, 2014 16:09:42

Scheduled Events

Today's Roadwork
Planned Roadwork
HWY 11 Northbound [ HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST - HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST ] - Recurring-Construction
Event Id: 29953
Highway: HWY 11
Direction: Northbound
Stream:
From/At: HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST
To: HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST
Lanes Affected: 2 Alternating Lane(s)
Comment :
Traffic Impact : Off-ramp to HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST WB
Type - Reason Planned - Recurring-Construction
Event Start: August 24, 2014 18:00
Event End: August 31, 2014 10:00
Last Change: Entered 2014-08-19 12:53
Last Updated: August 19, 2014 12:53

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Event Id: 29670
Highway: HWY 11
Direction: Northbound
Stream:
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 18:00
Event End: September 04, 2014 23:59
Last Change: Entered 2014-08-14 16:27
Last Updated: August 14, 2014 16:27

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Event Id: 29669
Highway: HWY 11
Direction: Northbound
Stream:
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 00:00
Event End: September 05, 2014 12:00
Last Change: Entered 2014-08-14 16:26
Last Updated: August 14, 2014 16:26

Top of page Top of page


HWY 11 Northbound [ LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 - HWY 12 NORTH JCT/COLDWATER ROAD ] - Recurring-Construction
Event Id: 30380
Highway: HWY 11
Direction: Northbound
Stream:
From/At: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
To: HWY 12 NORTH JCT/COLDWATER ROAD
Lanes Affected: 2 Alternating Lane(s)
Comment :
Traffic Impact : Off-ramp to HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST WB
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 18:00
Event End: September 07, 2014 10:00
Last Change: Entered 2014-08-26 10:37
Last Updated: August 26, 2014 10:37

Top of page Top of page


HWY 11 Northbound [ LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 - HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST ] - Construction
Event Id: 30423
Highway: HWY 11
Direction: Northbound
Stream:
From/At: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
To: HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: September 02, 2014 00:00
Event End: September 05, 2014 09:00
Last Change: Entered 2014-08-27 19:09
Last Updated: August 27, 2014 19:09

Top of page Top of page


HWY 11 Northbound [ LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 - HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST ] - Recurring-Construction
Event Id: 30424
Highway: HWY 11
Direction: Northbound
Stream:
From/At: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
To: HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 05, 2014 22:00
Event End: September 07, 2014 00:00
Last Change: Entered 2014-08-27 19:10
Last Updated: August 27, 2014 19:10

Top of page Top of page


HWY 11 Northbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - WILLOW CREEK BRIDGE ] - Recurring-Construction
Event Id: 30428
Highway: HWY 11
Direction: Northbound
Stream:
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: WILLOW CREEK BRIDGE
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 22:00
Event End: September 08, 2014 06:00
Last Change: Entered 2014-08-27 19:19
Last Updated: August 27, 2014 19:19

Top of page Top of page


HWY 11 Southbound [ HWY 12 NORTH JCT/COLDWATER ROAD - LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 ] - Recurring-Construction
Event Id: 30384
Highway: HWY 11
Direction: Southbound
Stream:
From/At: HWY 12 NORTH JCT/COLDWATER ROAD
To: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact : On-ramp from HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST WB
Type - Reason Planned - Recurring-Construction
Event Start: August 31, 2014 00:00
Event End: September 07, 2014 06:00
Last Change: Entered 2014-08-26 11:06
Last Updated: August 26, 2014 11:06

Top of page Top of page


HWY 11 Southbound [ HWY 12 NORTH JCT/COLDWATER ROAD - LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 ] - Recurring-Construction
Event Id: 29950
Highway: HWY 11
Direction: Southbound
Stream:
From/At: HWY 12 NORTH JCT/COLDWATER ROAD
To: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact : On-ramp from HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST WB
Type - Reason Planned - Recurring-Construction
Event Start: August 24, 2014 00:00
Event End: August 31, 2014 06:00
Last Change: Entered 2014-08-19 12:42
Last Updated: August 19, 2014 12:42

Top of page Top of page


HWY 11 Southbound [ HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST - LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 ] - Construction
Event Id: 30425
Highway: HWY 11
Direction: Southbound
Stream:
From/At: HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST
To: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: September 02, 2014 19:00
Event End: September 05, 2014 12:00
Last Change: Entered 2014-08-27 19:13
Last Updated: August 27, 2014 19:13

Top of page Top of page


HWY 11 Southbound [ HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST - LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 ] - Recurring-Construction
Event Id: 30427
Highway: HWY 11
Direction: Southbound
Stream:
From/At: HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST
To: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 05, 2014 18:00
Event End: September 08, 2014 09:00
Last Change: Entered 2014-08-27 19:16
Last Updated: August 27, 2014 19:16

Top of page Top of page


HWY 11 Southbound [ LINE 2 - LINE 1 ] - Recurring-Construction
Event Id: 30430
Highway: HWY 11
Direction: Southbound
Stream:
From/At: LINE 2
To: LINE 1
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 22:00
Event End: September 08, 2014 06:00
Last Change: Entered 2014-08-27 19:21
Last Updated: August 27, 2014 19:21

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Event Id: 29672
Highway: HWY 11
Direction: Southbound
Stream:
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 00:00
Event End: September 05, 2014 11:00
Last Change: Entered 2014-08-14 16:27
Last Updated: August 14, 2014 16:27

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Event Id: 29671
Highway: HWY 11
Direction: Southbound
Stream:
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 18:00
Event End: September 04, 2014 23:59
Last Change: Entered 2014-08-14 16:27
Last Updated: August 14, 2014 16:27

Top of page Top of page


HWY 400 Northbound [ ANNE ST. - ANNE ST. ] - Recurring-Construction
Event Id: 30443
Highway: HWY 400
Direction: Northbound
Stream:
From/At: ANNE ST.
To: ANNE ST.
Lanes Affected: 2 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 21:00
Event End: September 05, 2014 07:00
Last Change: Entered 2014-08-27 12:17
Last Updated: August 27, 2014 12:17

Top of page Top of page


HWY 400 Northbound [ CANAL ROAD. - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Event Id: 30390
Highway: HWY 400
Direction: Northbound
Stream:
From/At: CANAL ROAD.
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 2 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 01, 2014 23:59
Event End: September 06, 2014 07:00
Last Change: Entered 2014-08-26 12:01
Last Updated: August 26, 2014 12:01

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Event Id: 29664
Highway: HWY 400
Direction: Northbound
Stream:
From/At: DUCKWORTH STREET
To: HWY 11 JCT
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 00:00
Event End: September 05, 2014 11:00
Last Change: Entered 2014-08-14 16:26
Last Updated: August 14, 2014 16:26

Top of page Top of page


HWY 400 Northbound [ HWY 11 JCT - PARTRIDGE SKI TRAIL ROAD ] - Recurring-Construction
Event Id: 29665
Highway: HWY 400
Direction: Northbound
Stream:
From/At: HWY 11 JCT
To: PARTRIDGE SKI TRAIL ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 00:00
Event End: September 05, 2014 11:00
Last Change: Entered 2014-08-14 16:26
Last Updated: August 14, 2014 16:26

Top of page Top of page


HWY 400 Northbound [ HWY 89/SIMCOE ROAD 89 - PORT SEVERN ROAD ] - Maintenance
Event Id: 30560
Highway: HWY 400
Direction: Northbound
Stream:
From/At: HWY 89/SIMCOE ROAD 89
To: PORT SEVERN ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Maintenance
Event Start: September 02, 2014 21:00
Event End: September 05, 2014 06:00
Last Change: Entered 2014-08-28 14:50
Last Updated: August 28, 2014 14:50

Top of page Top of page


HWY 400 Northbound [ HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9 - MT. ST. LOUIS ROAD ] - Construction
Event Id: 30601
Highway: HWY 400
Direction: Northbound
Stream:
From/At: HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9
To: MT. ST. LOUIS ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: September 01, 2014 23:59
Event End: September 05, 2014 12:00
Last Change: Entered 2014-08-29 07:41
Last Updated: August 29, 2014 07:41

Top of page Top of page


HWY 400 Southbound [ HWY 12 N JCT - LOWER BIG CHUTE ROAD ] - Construction
Event Id: 30484
Highway: HWY 400
Direction: Southbound
Stream:
From/At: HWY 12 N JCT
To: LOWER BIG CHUTE ROAD
Lanes Affected: 1 Right Lane(s)
Comment :
Traffic Impact : Off-ramp to VASEY ROAD/SIMCOE ROAD 23 SB
Type - Reason Planned - Construction
Event Start: September 02, 2014 09:00
Event End: September 05, 2014 23:59
Last Change: Entered 2014-08-26 12:23
Last Updated: August 26, 2014 12:23

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - CANAL ROAD. ] - Recurring-Construction
Event Id: 30389
Highway: HWY 400
Direction: Southbound
Stream:
From/At: HWY 89/SIMCOE ROAD 89
To: CANAL ROAD.
Lanes Affected: 2 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 01, 2014 11:00
Event End: September 06, 2014 05:00
Last Change: Entered 2014-08-26 11:56
Last Updated: August 26, 2014 11:56

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - CANAL ROAD. ] - Recurring-Construction
Event Id: 29994
Highway: HWY 400
Direction: Southbound
Stream:
From/At: HWY 89/SIMCOE ROAD 89
To: CANAL ROAD.
Lanes Affected: 2 Alternating Lane(s)
Comment :
Traffic Impact : On-ramp from HWY 89/SIMCOE ROAD 89 EB/WB, Off-ramp to HWY 89/SIMCOE ROAD 89 EB/WB
Type - Reason Planned - Recurring-Construction
Event Start: August 24, 2014 11:00
Event End: August 31, 2014 05:00
Last Change: Entered 2014-08-20 08:07
Last Updated: August 20, 2014 08:07

Top of page Top of page


HWY 400 Southbound [ MT. ST. LOUIS ROAD - HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9 ] - Construction
Event Id: 30602
Highway: HWY 400
Direction: Southbound
Stream:
From/At: MT. ST. LOUIS ROAD
To: HWY 93/PENETANGUISHENE ROAD/SIMCOE ROAD 9
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: September 02, 2014 09:00
Event End: September 05, 2014 17:00
Last Change: Entered 2014-08-29 07:42
Last Updated: August 29, 2014 07:42

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Recurring-Construction
Event Id: 29668
Highway: HWY 400
Direction: Southbound
Stream:
From/At: PARTRIDGE SKI TRAIL ROAD
To: HWY 11 JCT
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 00:00
Event End: September 05, 2014 12:00
Last Change: Entered 2014-08-14 16:26
Last Updated: August 14, 2014 16:26

Top of page Top of page


HWY 400 Southbound [ SEVERN RIVER BRIDGE - HWY 89/SIMCOE ROAD 89 ] - Maintenance
Event Id: 30561
Highway: HWY 400
Direction: Southbound
Stream:
From/At: SEVERN RIVER BRIDGE
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Maintenance
Event Start: September 02, 2014 21:00
Event End: September 05, 2014 06:00
Last Change: Entered 2014-08-28 14:55
Last Updated: August 28, 2014 14:55

Top of page Top of page


HWY 400 Southbound Express [ LINE 6 NORTH Express - HWY 89/SIMCOE ROAD 89 Express ] - Recurring-Construction
Event Id: 30038
Highway: HWY 400
Direction: Southbound
Stream: Express
From/At: LINE 6 NORTH Express
To: HWY 89/SIMCOE ROAD 89 Express
Lanes Affected: 1 Right Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 18:00
Event End: September 05, 2014 05:00
Last Change: Entered 2014-08-20 14:17
Last Updated: August 20, 2014 14:17

Top of page Top of page


HWY 400 Southbound On-ramp [ DUCKWORTH STREET Eastbound - ] - Construction
Event Id: 30529
Highway: HWY 400
Direction: Southbound
Stream: On-ramp
From/At: DUCKWORTH STREET Eastbound
To:
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: August 29, 2014 19:00
Event End: September 05, 2014 12:00
Last Change: Entered 2014-08-28 10:43
Last Updated: August 28, 2014 10:43

Top of page Top of page


HWY 400 Southbound On-ramp [ DUCKWORTH STREET Southbound - ] - Construction
Event Id: 29647
Highway: HWY 400
Direction: Southbound
Stream: On-ramp
From/At: DUCKWORTH STREET Southbound
To:
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: August 15, 2014 23:59
Event End: August 29, 2014 21:00
Last Change: Entered 2014-08-11 11:58
Last Updated: August 11, 2014 11:58

Top of page Top of page


HWY 89 Eastbound [ NEW TECUMSETH 20 SDRD - NEW TECUMSETH 20 SDRD ] - Recurring-Construction
Event Id: 30417
Highway: HWY 89
Direction: Eastbound
Stream:
From/At: NEW TECUMSETH 20 SDRD
To: NEW TECUMSETH 20 SDRD
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 07:30
Event End: September 05, 2014 19:00
Last Change: Entered 2014-08-27 07:13
Last Updated: August 27, 2014 07:13

Top of page Top of page


HWY 89 Eastbound [ NEW TECUMSETH 20 SDRD - SIMCOE ROAD 27/KING STREET (COOKSTOWN) ] - Recurring-Construction
Event Id: 30086
Highway: HWY 89
Direction: Eastbound
Stream:
From/At: NEW TECUMSETH 20 SDRD
To: SIMCOE ROAD 27/KING STREET (COOKSTOWN)
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: August 25, 2014 07:30
Event End: August 29, 2014 19:00
Last Change: Entered 2014-08-21 08:53
Last Updated: August 21, 2014 08:53

Top of page Top of page


HWY 89 Eastbound [ SANDY BEACH ROAD/8TH LINE - HWY 400 ] - Recurring-Construction
Event Id: 30419
Highway: HWY 89
Direction: Eastbound
Stream:
From/At: SANDY BEACH ROAD/8TH LINE
To: HWY 400
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 20:00
Event End: September 05, 2014 06:00
Last Change: Entered 2014-08-27 07:41
Last Updated: August 27, 2014 07:41

Top of page Top of page


HWY 89 Eastbound [ SIMCOE ROAD 10/ADDISON ROAD - SANDY BEACH ROAD/8TH LINE ] - Recurring-Engineering Investigation
Event Id: 30394
Highway: HWY 89
Direction: Eastbound
Stream:
From/At: SIMCOE ROAD 10/ADDISON ROAD
To: SANDY BEACH ROAD/8TH LINE
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Engineering Investigation
Event Start: September 02, 2014 09:00
Event End: September 04, 2014 15:00
Last Change: Entered 2014-08-26 12:20
Last Updated: August 26, 2014 12:20

Top of page Top of page


HWY 89 Westbound [ HWY 400 - SANDY BEACH ROAD/8TH LINE ] - Recurring-Construction
Event Id: 30420
Highway: HWY 89
Direction: Westbound
Stream:
From/At: HWY 400
To: SANDY BEACH ROAD/8TH LINE
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 20:00
Event End: September 05, 2014 06:00
Last Change: Entered 2014-08-27 07:42
Last Updated: August 27, 2014 07:42

Top of page Top of page


HWY 89 Westbound [ NEW TECUMSETH 10 SIDEROAD - INDUSTRY PKWY ] - Recurring-Engineering Investigation
Event Id: 30627
Highway: HWY 89
Direction: Westbound
Stream:
From/At: NEW TECUMSETH 10 SIDEROAD
To: INDUSTRY PKWY
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Engineering Investigation
Event Start: September 02, 2014 09:00
Event End: September 04, 2014 15:00
Last Change: Entered 2014-08-29 10:19
Last Updated: August 29, 2014 10:19

Top of page Top of page


HWY 89 Westbound [ NEW TECUMSETH 10 SIDEROAD - INDUSTRY PKWY ] - Recurring-Engineering Investigation
Event Id: 30628
Highway: HWY 89
Direction: Westbound
Stream:
From/At: NEW TECUMSETH 10 SIDEROAD
To: INDUSTRY PKWY
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Engineering Investigation
Event Start: September 02, 2014 09:00
Event End: September 04, 2014 15:00
Last Change: Entered 2014-08-29 10:21
Last Updated: August 29, 2014 10:21

Top of page Top of page


HWY 89 Westbound [ SANDY BEACH ROAD/8TH LINE - SIMCOE ROAD 10/ADDISON ROAD ] - Recurring-Engineering Investigation
Event Id: 30393
Highway: HWY 89
Direction: Westbound
Stream:
From/At: SANDY BEACH ROAD/8TH LINE
To: SIMCOE ROAD 10/ADDISON ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Engineering Investigation
Event Start: September 02, 2014 09:00
Event End: September 04, 2014 15:00
Last Change: Entered 2014-08-26 12:16
Last Updated: August 26, 2014 12:16

Top of page Top of page


HWY 89 Westbound [ SIMCOE ROAD 27/KING STREET (COOKSTOWN) - NEW TECUMSETH 20 SDRD ] - Recurring-Construction
Event Id: 30088
Highway: HWY 89
Direction: Westbound
Stream:
From/At: SIMCOE ROAD 27/KING STREET (COOKSTOWN)
To: NEW TECUMSETH 20 SDRD
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: August 25, 2014 07:30
Event End: August 29, 2014 19:00
Last Change: Entered 2014-08-21 08:57
Last Updated: August 21, 2014 08:57

Top of page Top of page


HWY 89 Westbound [ SIMCOE ROAD 27/KING STREET (COOKSTOWN) - NEW TECUMSETH 20 SDRD ] - Recurring-Construction
Event Id: 30418
Highway: HWY 89
Direction: Westbound
Stream:
From/At: SIMCOE ROAD 27/KING STREET (COOKSTOWN)
To: NEW TECUMSETH 20 SDRD
Lanes Affected: ALL LANES CLOSED
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: September 02, 2014 07:30
Event End: September 05, 2014 19:00
Last Change: Entered 2014-08-27 07:28
Last Updated: August 27, 2014 07:28

Top of page Top of page


This information is provided as a public service. Although we endeavour to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.