Traffic Report - Simcoe

COMPASS

This report is being updated every few minutes. It contains information on collisions, breakdowns, emergency roadworks, and scheduled maintenance and construction events on provincially maintained highways.

Real-time traffic reports are also available for the Niagara, Hamilton, Halton, Peel, Toronto, York, Durham, Bancroft, Ontario East Communities, and Ottawa regions.

Current Events

Last Updated: November 22, 2014 11:09:42

Scheduled Events

Today's Roadwork
Planned Roadwork
HWY 11 Northbound [ BURNSIDE LINE/WEST STREET - NEW BRAILEY LINE/BAYOU ROAD ] - Recurring-Maintenance
Event Id: 34899
Highway: HWY 11
Direction: Northbound
Stream:
From/At: BURNSIDE LINE/WEST STREET
To: NEW BRAILEY LINE/BAYOU ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: November 24, 2014 06:30
Event End: November 27, 2014 15:00
Last Change: Entered 2014-11-12 11:45
Last Updated: November 12, 2014 11:45

Top of page Top of page


HWY 11 Northbound [ HAMPSHIRE MILLS - SOULES ROAD/TELFORD LANE ] - Recurring-Maintenance
Event Id: 34905
Highway: HWY 11
Direction: Northbound
Stream:
From/At: HAMPSHIRE MILLS
To: SOULES ROAD/TELFORD LANE
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: November 24, 2014 06:30
Event End: November 28, 2014 15:00
Last Change: Entered 2014-11-12 11:41
Last Updated: November 12, 2014 11:41

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Event Id: 34595
Highway: HWY 11
Direction: Northbound
Stream:
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 17, 2014 18:00
Event End: November 22, 2014 23:59
Last Change: Entered 2014-11-10 09:40
Last Updated: November 10, 2014 09:40

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Event Id: 34888
Highway: HWY 11
Direction: Northbound
Stream:
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 24, 2014 18:00
Event End: November 29, 2014 23:59
Last Change: Entered 2014-11-17 11:02
Last Updated: November 17, 2014 11:02

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Event Id: 34887
Highway: HWY 11
Direction: Northbound
Stream:
From/At: HWY 400
To: SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 24, 2014 00:00
Event End: November 29, 2014 11:00
Last Change: Entered 2014-11-17 11:02
Last Updated: November 17, 2014 11:02

Top of page Top of page


HWY 11 Northbound [ LINE 1 - LINE 2 ] - Recurring-Construction
Event Id: 34940
Highway: HWY 11
Direction: Northbound
Stream:
From/At: LINE 1
To: LINE 2
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 23, 2014 22:00
Event End: November 30, 2014 06:00
Last Change: Entered 2014-11-18 22:40
Last Updated: November 18, 2014 22:40

Top of page Top of page


HWY 11 Northbound [ LINE 1 - LINE 2 ] - Recurring-Construction
Event Id: 34665
Highway: HWY 11
Direction: Northbound
Stream:
From/At: LINE 1
To: LINE 2
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 16, 2014 22:00
Event End: November 23, 2014 06:00
Last Change: Entered 2014-11-12 10:00
Last Updated: November 12, 2014 10:00

Top of page Top of page


HWY 11 Northbound [ LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 - HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST ] - Construction
Event Id: 34931
Highway: HWY 11
Direction: Northbound
Stream:
From/At: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
To: HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: November 28, 2014 22:00
Event End: November 29, 2014 09:00
Last Change: Entered 2014-11-18 22:29
Last Updated: November 18, 2014 22:29

Top of page Top of page


HWY 11 Northbound [ LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 - HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST ] - Construction
Event Id: 33354
Highway: HWY 11
Direction: Northbound
Stream:
From/At: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
To: HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: October 18, 2014 16:00
Event End: October 24, 2015 09:00
Last Change: Entered 2014-10-08 17:34
Last Updated: October 08, 2014 17:34

Top of page Top of page


HWY 11 Northbound [ LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 - HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST ] - Construction
Event Id: 34936
Highway: HWY 11
Direction: Northbound
Stream:
From/At: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
To: HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: November 22, 2014 16:00
Event End: November 28, 2014 09:00
Last Change: Entered 2014-11-18 22:30
Last Updated: November 18, 2014 22:30

Top of page Top of page


HWY 11 Southbound [ HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST - LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 ] - Construction
Event Id: 34938
Highway: HWY 11
Direction: Southbound
Stream:
From/At: HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST
To: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: November 24, 2014 19:00
Event End: November 28, 2014 12:00
Last Change: Entered 2014-11-18 22:36
Last Updated: November 18, 2014 22:36

Top of page Top of page


HWY 11 Southbound [ HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST - LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 ] - Recurring-Construction
Event Id: 34664
Highway: HWY 11
Direction: Southbound
Stream:
From/At: HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST
To: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 21, 2014 18:00
Event End: November 24, 2014 09:00
Last Change: Entered 2014-11-12 09:59
Last Updated: November 12, 2014 09:59

Top of page Top of page


HWY 11 Southbound [ HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST - LINE 15/MEMORIAL AVE/SIMCOE ROAD 49 ] - Recurring-Construction
Event Id: 34939
Highway: HWY 11
Direction: Southbound
Stream:
From/At: HWY 12 SOUTH JCT/OLD BARRIE ROAD EAST
To: LINE 15/MEMORIAL AVE/SIMCOE ROAD 49
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 28, 2014 18:00
Event End: December 01, 2014 09:00
Last Change: Entered 2014-11-18 22:39
Last Updated: November 18, 2014 22:39

Top of page Top of page


HWY 11 Southbound [ LINE 2 - LINE 1 ] - Recurring-Construction
Event Id: 34668
Highway: HWY 11
Direction: Southbound
Stream:
From/At: LINE 2
To: LINE 1
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 16, 2014 23:00
Event End: November 23, 2014 07:00
Last Change: Entered 2014-11-12 10:00
Last Updated: November 12, 2014 10:00

Top of page Top of page


HWY 11 Southbound [ LINE 2 - LINE 1 ] - Recurring-Construction
Event Id: 34941
Highway: HWY 11
Direction: Southbound
Stream:
From/At: LINE 2
To: LINE 1
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 23, 2014 23:00
Event End: November 30, 2014 07:00
Last Change: Entered 2014-11-18 22:41
Last Updated: November 18, 2014 22:41

Top of page Top of page


HWY 11 Southbound [ NEW BRAILEY LINE/BAYOU ROAD - BURNSIDE LINE/WEST STREET ] - Recurring-Maintenance
Event Id: 34900
Highway: HWY 11
Direction: Southbound
Stream:
From/At: NEW BRAILEY LINE/BAYOU ROAD
To: BURNSIDE LINE/WEST STREET
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: November 24, 2014 06:30
Event End: November 28, 2014 15:00
Last Change: Entered 2014-11-12 11:46
Last Updated: November 12, 2014 11:46

Top of page Top of page


HWY 11 Southbound [ SHOREVIEW DRIVE - SHOREVIEW DRIVE ] - Recurring-Maintenance
Event Id: 34903
Highway: HWY 11
Direction: Southbound
Stream:
From/At: SHOREVIEW DRIVE
To: SHOREVIEW DRIVE
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: November 24, 2014 06:30
Event End: November 28, 2014 19:00
Last Change: Entered 2014-11-12 11:53
Last Updated: November 12, 2014 11:53

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Event Id: 34890
Highway: HWY 11
Direction: Southbound
Stream:
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 24, 2014 00:00
Event End: November 29, 2014 23:59
Last Change: Entered 2014-11-17 11:03
Last Updated: November 17, 2014 11:03

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Event Id: 34598
Highway: HWY 11
Direction: Southbound
Stream:
From/At: SIMCOE ROAD 93/PENETANGUISHENE ROAD
To: HWY 400
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 17, 2014 00:00
Event End: November 22, 2014 23:59
Last Change: Entered 2014-11-10 09:40
Last Updated: November 10, 2014 09:40

Top of page Top of page


HWY 11 Southbound [ SOUTH SPARROW LAKE ROAD - KNIGHT AVE ] - Recurring-Maintenance
Event Id: 34901
Highway: HWY 11
Direction: Southbound
Stream:
From/At: SOUTH SPARROW LAKE ROAD
To: KNIGHT AVE
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: November 24, 2014 06:30
Event End: November 28, 2014 19:00
Last Change: Entered 2014-11-12 11:49
Last Updated: November 12, 2014 11:49

Top of page Top of page


HWY 400 Northbound [ CANAL ROAD. - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Event Id: 35003
Highway: HWY 400
Direction: Northbound
Stream:
From/At: CANAL ROAD.
To: HWY 89/SIMCOE ROAD 89
Lanes Affected: 2 Alternating Lane(s)
Comment :
Traffic Impact : On-ramp from SIMCOE ROAD 88 EB/WB, Off-ramp to SIMCOE ROAD 88 EB/WB
Type - Reason Planned - Recurring-Construction
Event Start: November 23, 2014 20:00
Event End: November 29, 2014 14:00
Last Change: Entered 2014-11-20 12:12
Last Updated: November 20, 2014 12:12

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - PARTRIDGE SKI TRAIL ROAD ] - Recurring-Construction
Event Id: 34884
Highway: HWY 400
Direction: Northbound
Stream:
From/At: DUCKWORTH STREET
To: PARTRIDGE SKI TRAIL ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 24, 2014 00:00
Event End: November 29, 2014 23:59
Last Change: Entered 2014-11-17 11:00
Last Updated: November 17, 2014 11:00

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - PARTRIDGE SKI TRAIL ROAD ] - Recurring-Construction
Event Id: 34586
Highway: HWY 400
Direction: Northbound
Stream:
From/At: DUCKWORTH STREET
To: PARTRIDGE SKI TRAIL ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 17, 2014 00:00
Event End: November 22, 2014 23:59
Last Change: Entered 2014-11-10 09:39
Last Updated: November 10, 2014 09:39

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - PARTRIDGE SKI TRAIL ROAD ] - Recurring-Construction
Event Id: 34885
Highway: HWY 400
Direction: Northbound
Stream:
From/At: DUCKWORTH STREET
To: PARTRIDGE SKI TRAIL ROAD
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 28, 2014 18:00
Event End: November 28, 2014 23:59
Last Change: Entered 2014-11-17 11:01
Last Updated: November 17, 2014 11:01

Top of page Top of page


HWY 400 Northbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - ESSA ROAD / SIMCOE ROAD 27 ] - Recurring-Engineering Investigation
Event Id: 35002
Highway: HWY 400
Direction: Northbound
Stream:
From/At: INNISFIL BEACH ROAD - SIMCOE ROAD 21
To: ESSA ROAD / SIMCOE ROAD 27
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Engineering Investigation
Event Start: November 23, 2014 19:00
Event End: November 28, 2014 05:00
Last Change: Entered 2014-11-20 11:56
Last Updated: November 20, 2014 11:56

Top of page Top of page


HWY 400 Southbound [ ESSA ROAD / SIMCOE ROAD 27 - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Engineering Investigation
Event Id: 35005
Highway: HWY 400
Direction: Southbound
Stream:
From/At: ESSA ROAD / SIMCOE ROAD 27
To: INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Engineering Investigation
Event Start: November 23, 2014 17:00
Event End: November 28, 2014 05:00
Last Change: Entered 2014-11-20 12:16
Last Updated: November 20, 2014 12:16

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - CANAL ROAD. ] - Recurring-Construction
Event Id: 35004
Highway: HWY 400
Direction: Southbound
Stream:
From/At: HWY 89/SIMCOE ROAD 89
To: CANAL ROAD.
Lanes Affected: 2 Alternating Lane(s)
Comment :
Traffic Impact : On-ramp from SIMCOE ROAD 88 EB/WB, Off-ramp to SIMCOE ROAD 88 EB/WB
Type - Reason Planned - Recurring-Construction
Event Start: November 23, 2014 11:00
Event End: November 29, 2014 05:00
Last Change: Entered 2014-11-20 12:21
Last Updated: November 20, 2014 12:21

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Construction
Event Id: 34588
Highway: HWY 400
Direction: Southbound
Stream:
From/At: PARTRIDGE SKI TRAIL ROAD
To: HWY 11 JCT
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: November 17, 2014 00:00
Event End: November 22, 2014 23:59
Last Change: Entered 2014-11-10 09:39
Last Updated: November 10, 2014 09:39

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Construction
Event Id: 34886
Highway: HWY 400
Direction: Southbound
Stream:
From/At: PARTRIDGE SKI TRAIL ROAD
To: HWY 11 JCT
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: November 24, 2014 00:00
Event End: November 29, 2014 23:59
Last Change: Entered 2014-11-17 11:01
Last Updated: November 17, 2014 11:01

Top of page Top of page


HWY 400 Southbound [ SIMCOE ROAD 88 - CANAL ROAD. ] - Recurring-Engineering Investigation
Event Id: 35026
Highway: HWY 400
Direction: Southbound
Stream:
From/At: SIMCOE ROAD 88
To: CANAL ROAD.
Lanes Affected: 1 Right Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Engineering Investigation
Event Start: November 23, 2014 22:00
Event End: November 28, 2014 05:00
Last Change: Entered 2014-11-19 08:23
Last Updated: November 19, 2014 08:23

Top of page Top of page


HWY 400 Southbound [ VASEY ROAD/SIMCOE ROAD 23 - VASEY ROAD/SIMCOE ROAD 23 ] - Construction
Event Id: 33505
Highway: HWY 400
Direction: Southbound
Stream:
From/At: VASEY ROAD/SIMCOE ROAD 23
To: VASEY ROAD/SIMCOE ROAD 23
Lanes Affected: 1 Left Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Construction
Event Start: October 18, 2014 00:00
Event End: November 30, 2014 23:59
Last Change: Entered 2014-10-17 11:21
Last Updated: October 17, 2014 11:21

Top of page Top of page


HWY 89 Westbound [ CONCESSION ROAD 7/ELIZABETH ST - CONCESSION ROAD 7/ELIZABETH ST ] - Recurring-Maintenance
Event Id: 35097
Highway: HWY 89
Direction: Westbound
Stream:
From/At: CONCESSION ROAD 7/ELIZABETH ST
To: CONCESSION ROAD 7/ELIZABETH ST
Lanes Affected: 1 Right Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Maintenance
Event Start: November 25, 2014 09:00
Event End: November 27, 2014 15:00
Last Change: Entered 2014-11-21 15:51
Last Updated: November 21, 2014 15:51

Top of page Top of page


HWY 89 Westbound [ SIMCOE ROAD 50 - CONCESSION ROAD 5 ] - Recurring-Construction
Event Id: 35007
Highway: HWY 89
Direction: Westbound
Stream:
From/At: SIMCOE ROAD 50
To: CONCESSION ROAD 5
Lanes Affected: 1 Alternating Lane(s)
Comment :
Traffic Impact :
Type - Reason Planned - Recurring-Construction
Event Start: November 24, 2014 07:00
Event End: November 28, 2014 19:00
Last Change: Entered 2014-11-20 13:36
Last Updated: November 20, 2014 13:36

Top of page Top of page


This information is provided as a public service. Although we endeavour to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.